Letter Sequence Request |
---|
|
|
MONTHYEARRBG-47983, Application to Revise Technical Specification 3.3.5.2, RPV Water Inventory Control Instrumentation to Adopt TSTF-425, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5b.2019-11-18018 November 2019 Application to Revise Technical Specification 3.3.5.2, RPV Water Inventory Control Instrumentation to Adopt TSTF-425, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5b. Project stage: Request ML19352F5222019-12-17017 December 2019 NRR E-mail Capture - Acceptance Review Results for License Amend Request to Revise TS 3.3.5.2 to Adopt TSTF-425, Rev 3, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5b, for River Bend, Project stage: Acceptance Review ML20244A0112020-09-28028 September 2020 Issuance of Amendment No. 202 Adopt TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control- RITSTF Initiative 5b Project stage: Approval 2019-12-17
[Table View] |
|
---|
Category:Letter type:RBG
MONTHYEARRBG-48315, Reply to a Notice of Violation, NRC Inspection Report 05000458/2023003 Supplement2024-09-24024 September 2024 Reply to a Notice of Violation, NRC Inspection Report 05000458/2023003 Supplement RBG-48306, Report of Changes and Errors to 10CFR50.462024-09-24024 September 2024 Report of Changes and Errors to 10CFR50.46 RBG-48311, Reply to a Notice of Violation, NRC Inspection Report 05000458/20240022024-08-28028 August 2024 Reply to a Notice of Violation, NRC Inspection Report 05000458/2024002 RBG-48308, Notification of Readiness for Supplemental Inspection2024-07-31031 July 2024 Notification of Readiness for Supplemental Inspection RBG-48276, 2023 Annual Radioactive Effluent Release Report2024-04-23023 April 2024 2023 Annual Radioactive Effluent Release Report RBG-48288, Louisiana Pollutant Discharge Elimination System Permit Renewal2024-04-15015 April 2024 Louisiana Pollutant Discharge Elimination System Permit Renewal RBG-48277, 2023 Annual Radiological Environmental Operating Report2024-04-10010 April 2024 2023 Annual Radiological Environmental Operating Report RBG-48278, 2023 Spent Fuel Storage Radioactive Effluent Release Report2024-02-27027 February 2024 2023 Spent Fuel Storage Radioactive Effluent Release Report RBG-48286, Revision to Owners Activity Report Form (OAR) for Cycle 222024-02-27027 February 2024 Revision to Owners Activity Report Form (OAR) for Cycle 22 RBG-48274, Notification of Readiness for Supplemental Inspection2024-02-0505 February 2024 Notification of Readiness for Supplemental Inspection RBG-48271, Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b and Application to Adopt 10 CFR 50.69, Risk2024-01-12012 January 2024 Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b and Application to Adopt 10 CFR 50.69, Risk RBG-48267, Reply to a Notice of Violation, NRC Inspection Report 05000458/20230032023-12-0707 December 2023 Reply to a Notice of Violation, NRC Inspection Report 05000458/2023003 RBG-48264, Core Operating Limits Report (COLR) - Cycle 23, Revision 12023-11-0606 November 2023 Core Operating Limits Report (COLR) - Cycle 23, Revision 1 RBG-48260, Notification of Readiness for Supplemental Inspection2023-10-12012 October 2023 Notification of Readiness for Supplemental Inspection RBG-48258, Notification of Readiness for Supplemental Inspection2023-10-0505 October 2023 Notification of Readiness for Supplemental Inspection RBG-48259, Revision to Reply to Notice of Violation; EA-23-0552023-10-0303 October 2023 Revision to Reply to Notice of Violation; EA-23-055 RBG-48254, Report of Changes and Errors to 10CFR50.462023-09-21021 September 2023 Report of Changes and Errors to 10CFR50.46 RBG-48249, Reply to a Notice of Violation, EA-23-0712023-09-14014 September 2023 Reply to a Notice of Violation, EA-23-071 RBG-48253, Submittal of Owners Activity Report Form for Cycle 222023-09-12012 September 2023 Submittal of Owners Activity Report Form for Cycle 22 RBG-48247, Reply to Notice of Violation; EA-23-0552023-08-21021 August 2023 Reply to Notice of Violation; EA-23-055 RBG-48238, USAR Revision 28, TRM Revision 168, Technical Specifications and Bases Amendment 212 & 23-04, 10 CFR 50.59 Report, 10 CFR 72.48 Report, Commitment Change Summary Report, and 54.37(b) Report2023-07-20020 July 2023 USAR Revision 28, TRM Revision 168, Technical Specifications and Bases Amendment 212 & 23-04, 10 CFR 50.59 Report, 10 CFR 72.48 Report, Commitment Change Summary Report, and 54.37(b) Report RBG-48226, Core Operating Limits Report (COLR) - Cycle 23, Revision 02023-05-31031 May 2023 Core Operating Limits Report (COLR) - Cycle 23, Revision 0 RBG-48237, Response to NRC Integrated Inspection Report 05000458/20230012023-05-25025 May 2023 Response to NRC Integrated Inspection Report 05000458/2023001 RBG-48221, 2022 Annual Radiological Environmental Operating Report2023-04-25025 April 2023 2022 Annual Radiological Environmental Operating Report RBG-48220, Submittal of 2022 Annual Radioactive Effluent Release Report2023-04-25025 April 2023 Submittal of 2022 Annual Radioactive Effluent Release Report RBG-48143, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-02-27027 February 2023 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors RBG-48142, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSFT-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2023-02-27027 February 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSFT-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b RBG-48198, Report of Changes and Errors to 10CFR50.462022-09-22022 September 2022 Report of Changes and Errors to 10CFR50.46 RBG-48187, Notification of Spent Fuel Cask Use2022-08-15015 August 2022 Notification of Spent Fuel Cask Use RBG-48184, Notification of Spent Fuel Cask Use2022-07-18018 July 2022 Notification of Spent Fuel Cask Use RBG-48178, Notification of Spent Fuel Cask Use2022-06-29029 June 2022 Notification of Spent Fuel Cask Use RBG-48166, Supplement to Special Report for Tritium Discovered Onsite2022-05-12012 May 2022 Supplement to Special Report for Tritium Discovered Onsite RBG-48149, 2021 Annual Radioactive Effluent Release Report2022-04-27027 April 2022 2021 Annual Radioactive Effluent Release Report RBG-48148, 2021 Annual Radiological Environmental Operating Report2022-04-27027 April 2022 2021 Annual Radiological Environmental Operating Report RBG-48134, Inservice Testing Program Relief Request VRR-RBS-2021-1 Pressure Isolation Valve Testing Frequency2021-11-29029 November 2021 Inservice Testing Program Relief Request VRR-RBS-2021-1 Pressure Isolation Valve Testing Frequency RBG-48136, Additional Information for the 2020 Annual Radioactive Effluent Release Report2021-11-12012 November 2021 Additional Information for the 2020 Annual Radioactive Effluent Release Report RBG-48137, Additional Information for the 2019 Annual Radioactive Effluent Release Report2021-11-12012 November 2021 Additional Information for the 2019 Annual Radioactive Effluent Release Report RBG-48128, Reply to a Notice of Violation; EA-21-017, 030 and 0502021-10-29029 October 2021 Reply to a Notice of Violation; EA-21-017, 030 and 050 RBG-48129, Payment of a Civil Penalty2021-10-21021 October 2021 Payment of a Civil Penalty RBG-48112, Report of Changes and Errors to 10CFR50.462021-09-16016 September 2021 Report of Changes and Errors to 10CFR50.46 RBG-48110, Core Operating Limits Report (COLR) - Cycle 22, Revision 12021-08-19019 August 2021 Core Operating Limits Report (COLR) - Cycle 22, Revision 1 RBG-48104, Fitness for Duty Blind Quality Assurance Specimen Testing Error2021-06-30030 June 2021 Fitness for Duty Blind Quality Assurance Specimen Testing Error RBG-48099, Submittal of Owner'S Activity Report Form for Cycle 212021-06-16016 June 2021 Submittal of Owner'S Activity Report Form for Cycle 21 RBG-48083, Application to Add License Condition Concerning Receipt, Possession, and Use of Byproduct Materials2021-06-15015 June 2021 Application to Add License Condition Concerning Receipt, Possession, and Use of Byproduct Materials RBG-48093, Corrected 2020 Annual Radiological Environmental Operating Report2021-05-20020 May 2021 Corrected 2020 Annual Radiological Environmental Operating Report RBG-48081, 2020 Annual Radioactive Effluent Release Report2021-04-20020 April 2021 2020 Annual Radioactive Effluent Release Report RBG-48082, 2020 Annual Radiological Environmental Operating Report2021-04-20020 April 2021 2020 Annual Radiological Environmental Operating Report RBG-48078, Core Operating Limits Report (COLR) - Cycle 22, Revision 02021-03-14014 March 2021 Core Operating Limits Report (COLR) - Cycle 22, Revision 0 RBG-48075, Notification of Deviation from BWRVIP Guidelines2021-02-24024 February 2021 Notification of Deviation from BWRVIP Guidelines RBG-48074, Spent Fuel Storage Radioactive Effluent Release Report for 20202021-02-22022 February 2021 Spent Fuel Storage Radioactive Effluent Release Report for 2020 2024-09-24
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARML24081A0072024-05-16016 May 2024 Issuance of Amendment No. 213 Revision to Technical Specifications to Adopt TSTF 505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b ML24128A0422024-05-0707 May 2024 License Amendment Request to Remove Obsolete License Conditions ML23208A2112023-07-27027 July 2023 Entergy Operations Inc., Application to Revise Technical Specifications to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions RBG-48143, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-02-27027 February 2023 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML21279A2312021-10-0606 October 2021 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements Using the Consolidated Line-Item Improvement ML21266A1612021-09-23023 September 2021 Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated RBG-48083, Application to Add License Condition Concerning Receipt, Possession, and Use of Byproduct Materials2021-06-15015 June 2021 Application to Add License Condition Concerning Receipt, Possession, and Use of Byproduct Materials ML21062A1982021-03-0303 March 2021 Supplement to License Amendment Request to Adopt TSTF-501 Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control, Revision 1 RBG-48033, Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements2020-09-0404 September 2020 Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements CNRO-2020-00009, Application to Revise Technical Specifications to Adopt TSTF-501 Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control, Revision 12020-02-26026 February 2020 Application to Revise Technical Specifications to Adopt TSTF-501 Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control, Revision 1 CNRO-2020-00008, Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR-Shutdown Cooling Subsystems Using the Consolidated Line Item Improvement Process2020-01-24024 January 2020 Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR-Shutdown Cooling Subsystems Using the Consolidated Line Item Improvement Process CNRO-2020-00006, Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO, Revision 22020-01-24024 January 2020 Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO, Revision 2 RBG-47983, Application to Revise Technical Specification 3.3.5.2, RPV Water Inventory Control Instrumentation to Adopt TSTF-425, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5b.2019-11-18018 November 2019 Application to Revise Technical Specification 3.3.5.2, RPV Water Inventory Control Instrumentation to Adopt TSTF-425, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5b. CNRO-2019-00009, Stations - Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR, Revision 22019-03-0707 March 2019 Stations - Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR, Revision 2 CNRO-2019-00003, Application to Revise Technical Specifications to Adopt TSTF-529 11 Clarify Use and Application Rules, 11 Revision 42019-01-31031 January 2019 Application to Revise Technical Specifications to Adopt TSTF-529 11 Clarify Use and Application Rules, 11 Revision 4 RBG-47925, Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)2018-12-20020 December 2018 Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) RBG-47918, Removal of the Table of Contents from the Technical Specifications2018-11-29029 November 2018 Removal of the Table of Contents from the Technical Specifications RBG-47906, Response to Request for Additional Information for License Amendment Request, Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 62018-10-18018 October 2018 Response to Request for Additional Information for License Amendment Request, Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6 RBG-47883, Amendment 1 to License Renewal Application2018-08-0202 August 2018 Amendment 1 to License Renewal Application RBG-47886, Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)2018-07-24024 July 2018 Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) RBG-47882, Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)2018-07-10010 July 2018 Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) RBG-47850, Response to License Renewal Application NRC Request for Additional Information Set 5 Supplement2018-04-0404 April 2018 Response to License Renewal Application NRC Request for Additional Information Set 5 Supplement RBG-47824, License Amendment Request to Correct a Non-Conservative Technical Specification Figure 3.4.11-1 Minimum Temperature Required Vs. RCS Pressure by Replacing with 54 Effective Full Power Years (EFPY) Curves2018-04-0202 April 2018 License Amendment Request to Correct a Non-Conservative Technical Specification Figure 3.4.11-1 Minimum Temperature Required Vs. RCS Pressure by Replacing with 54 Effective Full Power Years (EFPY) Curves RBG-47848, License Renewal Application Update - Neutron Absorbing Material Monitoring Program - Supplement2018-03-22022 March 2018 License Renewal Application Update - Neutron Absorbing Material Monitoring Program - Supplement RBG-47799, Application for Technical Specification Change Regarding Risk - Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)2018-02-28028 February 2018 Application for Technical Specification Change Regarding Risk - Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) RBG-47830, License Renewal Application Update - Neutron Absorbing Material Monitoring Program2018-02-15015 February 2018 License Renewal Application Update - Neutron Absorbing Material Monitoring Program RBG-47823, Request for Review and Approval of Relocation of the Reactor Core Isolation Cooling (RCIC) Injection Point from the Reactor Vessel Head Spray Nozzle to the 'A' Feedwater Line Via the 'A' Residual Heat Removal (RHR) Shutdown Cooling2018-01-29029 January 2018 Request for Review and Approval of Relocation of the Reactor Core Isolation Cooling (RCIC) Injection Point from the Reactor Vessel Head Spray Nozzle to the 'A' Feedwater Line Via the 'A' Residual Heat Removal (RHR) Shutdown Cooling ML17268A2132017-09-21021 September 2017 ISFSI, River Bend Station Unit 1 & ISFSI, Waterford 3 Steam Electric Station & ISFSI, Grand Gulf Nuclear Station & ISFSI, Application for Order Approving Transfers of Licenses and Conforming License Amendments ML17153A2862017-05-31031 May 2017 River Bend Station, Unit 1, License Renewal Application RBG-47735, License Renewal Application - Appendices a Through D2017-05-31031 May 2017 License Renewal Application - Appendices a Through D ML17153A2852017-05-25025 May 2017 License Renewal Application RBG-47630, Resubmittal of License Amendment Request - Cyber Security Plan Implementation Schedule, River Bend Station - Unit 12015-12-0303 December 2015 Resubmittal of License Amendment Request - Cyber Security Plan Implementation Schedule, River Bend Station - Unit 1 RBG-47620, License Amendment Request for Change to Technical Specification; 5.5.13, to Be Extended to 15 Years, Drywell Bypass Test Frequency to 15 Years and Type C Test Frequency to 75 Months2015-10-29029 October 2015 License Amendment Request for Change to Technical Specification; 5.5.13, to Be Extended to 15 Years, Drywell Bypass Test Frequency to 15 Years and Type C Test Frequency to 75 Months RBG-47461, Application for Change to Technical Specification 3.8.1, AC Sources - Operating2014-07-0909 July 2014 Application for Change to Technical Specification 3.8.1, AC Sources - Operating CNRO-2014-00007, ISFSI, Waterford 3 and ISFSI - Application for Order Approving Transfers of Licenses and Conforming License Amendments2014-06-10010 June 2014 ISFSI, Waterford 3 and ISFSI - Application for Order Approving Transfers of Licenses and Conforming License Amendments RBG-47432, License Amendment Request 2013-18 Re Revision of Ultimate Heat Sink Design Capacity2014-02-10010 February 2014 License Amendment Request 2013-18 Re Revision of Ultimate Heat Sink Design Capacity RBG-47382, Heavy Load Movement Over Fuel Assemblies, License Amendment Request 2013-132013-07-29029 July 2013 Heavy Load Movement Over Fuel Assemblies, License Amendment Request 2013-13 RBG-47361, Application for Technical Specification Changes Technical Specification Task Force Improved Standard Technical Specification Change Traveler, TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel Designs.2013-07-16016 July 2013 Application for Technical Specification Changes Technical Specification Task Force Improved Standard Technical Specification Change Traveler, TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel Designs. RBG-47322, Submittal of Request for Amendment to the Technical Specifications2013-06-13013 June 2013 Submittal of Request for Amendment to the Technical Specifications CNRO-2013-00008, Arkansas, Units 1, 2 & ISFSI, Grand Gulf, ESP and ISFSI, River Bend, Unit 1 and ISFSI and Waterford 3 and ISFSI, Application for Order Approving Transfers of Licenses and Conforming License and ESP Amendments2013-04-16016 April 2013 Arkansas, Units 1, 2 & ISFSI, Grand Gulf, ESP and ISFSI, River Bend, Unit 1 and ISFSI and Waterford 3 and ISFSI, Application for Order Approving Transfers of Licenses and Conforming License and ESP Amendments RBG-47332, Unit 1 - License Amendment Request 2013-01, Battery Surveillance Requirement Acceptance Criteria2013-02-0707 February 2013 Unit 1 - License Amendment Request 2013-01, Battery Surveillance Requirement Acceptance Criteria ML12191A1222012-06-20020 June 2012 License Amendment Request - Cyber Security Plan Implementation Schedule Milestones RBG-47191, Changes to Technical Specification 3.8.1; AC Sources - Operating.2011-12-0808 December 2011 Changes to Technical Specification 3.8.1; AC Sources - Operating. RBG-47072, License Amendment Request 2010-04, Heavy Load Movement Over Fuel Assemblies2010-09-0909 September 2010 License Amendment Request 2010-04, Heavy Load Movement Over Fuel Assemblies RBG-47048, License Amendment Request, Application for Technical Specification Changes Technical Specification Task Force Improvement Standard Technical Specification Change Traveler, TSTF-484, Use of TS 3.10.1 for Scram Time Testing Activities2010-07-22022 July 2010 License Amendment Request, Application for Technical Specification Changes Technical Specification Task Force Improvement Standard Technical Specification Change Traveler, TSTF-484, Use of TS 3.10.1 for Scram Time Testing Activities ML0934801612009-12-0909 December 2009 Submittal of License Amendment Request - Cyber Security Plan RBG-46932, License Amendment Request 2009-05 to Support Operation with 24-Month Fuel Cycles2009-08-10010 August 2009 License Amendment Request 2009-05 to Support Operation with 24-Month Fuel Cycles RBG-46925, License Amendment Request, Technical Specification Change to Revise ASME Code Reference for Inservice Test Requirements2009-06-29029 June 2009 License Amendment Request, Technical Specification Change to Revise ASME Code Reference for Inservice Test Requirements RBG-46926, Unit 1 - Supplement to License Amendment Request (Lar), to Implement Changes Consistent with TSTF-163 on Diesel Generator Surveillance Requirements2009-06-22022 June 2009 Unit 1 - Supplement to License Amendment Request (Lar), to Implement Changes Consistent with TSTF-163 on Diesel Generator Surveillance Requirements ENOC-09-00009, Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions2009-04-27027 April 2009 Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions 2024-05-07
[Table view] |
Text
- ~Entergx Entergy Operations, Inc.
1340 Echelon Parkway Jackson, MS 39213 Tel 601-368-5138 Ron Gaston Director, Licensing 10 CFR 50.90 RBG-47983 November 18, 2019 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Subject:
Application to Revise Technical Specification 3.3.5.2, "RPV Water Inventory Control Instrumentation" to Adopt TSTF-425, "Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5b."
River Bend Station, Unit 1 NRC Docket No. 50-458 Renewed Facility Operating License No. NPF-47 In accordance with Title 10 of the Code of Federal Regulations (CFR) Part 50, Section 50.90, "Application for amendment of license, construction permit, or early site permit," Entergy Operations, Inc. (Entergy) is submitting a request for an amendment to Renewed Facility Operating License, Appendix A, "Technical Specifications" (TS) for River Bend Station, Unit 1 (RBS).
The proposed amendment would modify RBS TS 3.3.5.2, "RPV Water Inventory Control Instrumentation" by removing the surveillance frequencies and placing them in a licensee-controlled program through the adoption of Technical Specification Task Force (TSTF)-425, Revision 3, "Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5b."
The Enclosure to this letter provides a description and assessment of the proposed change.
Attachment 1 to the Enclosure provides the existing TS page marked-up to show the proposed change. Attachment 2 provides the revised TS page. Attachment 3 provides, for information only, a marked-up version of existing TS Bases pages to show the proposed changes.
Approval of the proposed amendment is requested by December 19, 2020. Once approved, the amendment shall be implemented within 90 days.
This letter contains no new regulatory commitments.
/
RBG-47983 Page 2 of 2 In accordance with 10 CFR 50.91, "Notice for public comment; State consultation," paragraph (b), a copy of this license amendment request, with enclosure, is being provided to the designated State Officials.
Should you have any questions or require additional information, please contact Tim Schenk, Regulatory Assurance Manager, River Bend Station at 225-381-4177.
I declare under penalty of perjury, that the foregoing is true and correct.
Executed on November 18, 2019.
Respectfully, Ron Gaston RWG/twf
Enclosure:
Description and Assessment of the Proposed Change Attachments to
Enclosure:
- 1. Technical Specification Page Markup
- 2. Revised Technical Specification Page
- 3. Technical Specification Bases Pages Markup cc: NRC Region IV Regional Administrator NRC Senior Resident Inspector- River Bend Station, Unit 1 Louisiana of Department of Environmental Quality NRC Project Manager - River Bend Station, Unit 1
Enclosure RBG-47983 Description and Assessment of the Proposed Change
RBG-47983 Enclosure Page 1 of 4 DESCRIPTION AND ASSESSMENT OF THE PROPOSED CHANGE 1.0 Description Entergy Operations, Inc. (Entergy) requests a revision to the River Bend Station, Unit 1 (RBS)
Technical Specifications (TS) by removing TS 3.3.5.2, "RPV Water Inventory Control Instrumentation" surveillance frequencies and placing them in a licensee-controlled program through the adoption of Technical Specification Task Force (TSTF)-425, Revision 3, "Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative Sb."
On November 7, 2018, the U.S. Nuclear Regulatory Commission (NRC) approved the adoption of TSTF-542, "Reactor Pressure Vessel Water Inventory Control," at RBS in TS Amendment 193 (Reference 1). This amendment added, in part, a new TS 3.3.5.2, "RPV Water Inventory Control Instrumentation" to Appendix A, "Technical Specifications." The surveillance requirements for this new TS were located on new TS Page 3.3-43c.
On April 29, 2019, the NRC approved the adoption of TSTF-425 into the RBS TS in Amendment 196 (Reference 2). Prior to final approval of Amendment 196, Entergy submitted a supplement to the RBS TSTF-425 license amendment request (Reference 3) that provided revised marked-up TS pages. These revised marked-up TS pages incorporated the changes approved in RBS TS Amendment 193. However, the Reference 3 supplement inadvertently omitted a revised markup of TS page 3.3-43c for the new TS 3.3.5.2 (i.e., "RPV Water Inventory Control Instrumentation") surveillance requirements.
The proposed changes are consistent with NRC approved lndustry/TSTF Standard Technical Specifications (STS) change TSTF-425, Revision 3, (NRC Agencywide Documents Access and Management System (ADAMS) Accession No. ML090850642). The Federal Register notice published on July 6, 2009 (74 FR 31996) announced the availability of this TS improvement.
2.0 Assessment 2.1 Applicability of Published Safety Evaluation Entergy has reviewed the NRC model SE for TSTF-425 provided in Federal Register Notice 74 FR 31996, dated July 6, 2009 and concluded that the justifications presented in the SE are applicable to RBS and justify this change request for incorporation into the RBS TS.
Entergy has determined that relocating the SR frequencies of RBS TS section 3.3.5.2 is consistent with TSTF-425, Revision 3; and with the NRC staff's scope exclusions identified in the model SE.
Specifically, these SR frequencies are not:
- 1. Frequencies that reference other approved programs for the specific interval (such as the lnservice Testing Program or the Primary Containment Leakage Rate Testing Program).
- 2. Frequencies that are purely event driven (e.g., "Each time the control rod is withdrawn to the 'full out' position").
RBG-47983 Enclosure Page 2 of 4
- 3. Frequencies that are event-driven but have a time component for performing the surveillance on a one-time basis once the event occurs (e.g., "within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after thermal power reaching 95% RTP").
- 4. Frequencies that are related to specific conditions (e.g., battery degradation, age, and capacity) or conditions for the performance of a surveillance requirement (e.g., "drywall to suppression chamber differential pressure decrease").
Changes to the frequency for these SRs will be controlled under the SFCP in accordance with TSTF-425. The SFCP provides the necessary administrative controls to ensure that SRs related to testing, calibration, and inspection are conducted at a frequency necessary to assure the quality of systems and components is maintained, that facility operation will be within safety limits, and that the limiting conditions for operation will be met.
Furthermore, TSTF-542 recognizes that the SFCP is acceptable for the SRs of RBS TS section 3.3.5.2.
2.2 Variations The proposed amendment is consistent with the changes described in TSTF-425, Revision 3.
3.0 Regulatory Analysis 3.1 No Significant Hazards Consideration Analysis Entergy Operations, Inc (Entergy) has reviewed the proposed no significant hazards consideration (NSHC) determination published in Federal Register 74 FR 32000, dated July 6, 2009. Entergy has concluded that the proposed NSHC presented in the Federal Register notice is applicable to River Bend Station, Unit 1 (RBS), and is provided below. This satisfies the requirements of 10 CFR 50.91 (a).
- 1. Does the proposed change involve a significant increase in the probability or consequences of any accident previously evaluated?
Response: No The proposed change relocates the specified frequencies for periodic surveillance requirements to licensee control under a new Surveillance Frequency Control Program. Surveillance frequencies are not an initiator to any accident previously evaluated. As a result, the probability of any accident previously evaluated is not significantly increased. The systems and components required by the technical specifications for which the surveillance frequencies are relocated are still required to be operable, meet the acceptance criteria for the surveillance requirements, and be capable of performing any mitigation function assumed in the accident analysis. As a result, the consequences of any accident previously evaluated are not significantly increased.
Therefore, the proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated.
RBG-47983 Enclosure Page 3 of 4
- 2. Does the proposed change create the possibility of a new or different kind of accident from any previously evaluated?
Response: No No new or different accidents result from utilizing the proposed change. The changes do not involve a physical alteration of the plant (i.e., no new or different type of equipment will be installed) or a change in the methods governing normal plant operation. In addition, the changes do not impose any new or different requirements.
The changes do not alter assumptions made in the safety analysis. The proposed changes are consistent with the safety analysis assumptions and current plant operating practice.
Therefore, the proposed changes do not create the possibility of a new or different kind of accident from any accident previously evaluated.
- 3. Does the proposed change involve a significant reduction in a margin of safety?
Response: No The design, operation, testing methods, and acceptance criteria for systems, structures, and components (SSCs), specified in applicable codes and standards (or alternatives approved for use by the NRC) will continue to be met as described in the plant licensing basis (including the final safety analysis report and bases to TS),
since these are not affected by changes to the surveillance frequencies. Similarly, there is no impact to safety analysis acceptance criteria as described in the plant licensing basis. To evaluate a change in the relocated surveillance frequency, Entergy will perform a probabilistic risk evaluation using the guidance contained in NRC approved NEI 04-10, Rev. 1 in accordance with the TS SFCP. NEI 04-10, Rev. 1, methodology provides reasonable acceptance guidelines and methods for evaluating the risk increase of proposed changes to surveillance frequencies consistent with Regulatory Guide 1.177.
Therefore, the proposed changes do not involve a significant reduction in a margin of safety.
Based upon the reasoning presented above, Entergy concludes that the requested change does not involve a significant hazards consideration as set forth in 10 CFR 50.92(c), Issuance of amendment.
3.2 Precedent Including the SRs of the TS section "RPV Water Inventory Control Instrumentation" in the SFCP was approved for multiple licensed facilities including; Peach Bottom Units 2 and 3 per License Amendment Nos. 317 and 320, respectively, issued on December 27, 2017 (NRC ADAMS Accession No. ML173258708), Susquehanna Units 1 and 2 per License Amendment Nos. 271 and 253, respectively, issued on September 26, 2018 (NRC ADAMS Accession No. ML18222A203), and Columbia per License Amendment No. 251 issued on October 30, 2018 (NRC ADAMS Accession No. ML18255A350).
RBG-47983 Enclosure Page4 of 4 3.3 Conclusion In conclusion, based on the considerations discussed above, (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendments will not be inimical to the common defense and security or to the health and safety of the public.
4.0 Environmental Consideration Entergy has reviewed the environmental consideration included in the NRC's model safety evaluation for TSTF-425 published in the Federal Register on July 6, 2009 (74 FR 32006).
Entergy has concluded that the NRC's findings presented therein are applicable to RBS, Unit 1, and the determination is hereby incorporated by reference for this application.
5.0 References 1 U.S. Nuclear Regulatory Commission (NRC) letter to Entergy Operations, Inc.
(Entergy), "River Bend Station, Unit 1 - Issuance of Amendment No. 193 RE:
Revision to Technical Specifications to Adopt TSTF-542, Revision 2, 'Reactor Pressure Vessel Water Inventory Control' (EPID L-2017-LLA-0383)" (ML18267A341),
dated November 7, 2018 2 NRC letter to Entergy "River Bend Station, Unit 1 - Issuance of Amendment RE:
Adoption of Technical Specifications Task Force Traveler TSTF-425, Revision 3 (EPID L-2018-LLA-0056)" (ML19066A008), dated April 29, 2019 3 Entergy letter to NRC, "Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)"
(ML19002A115), dated December 20, 2018 ATTACHMENTS
- 1. Technical Specification Page Markup
- 2. Revised Technical Specification Page
- 3. Technical Specification Bases Pages Markup
Enclosure, Attachment 1 RBG-47983 Technical Specification Page Markup
RPV Water Inventory Control Instrumentation 3.3.5.2 SURVEILLANCE REQUIREMENTS
NOTE-------------------------------------------------------
Refer to Table 3.3.5.2-1 to determine which SRs apply for each ECCS function.
SURVEILLANCE FREQUENCY
/
SR 3.3.5.2.1 Perform CHANNEL CHECK. 12 R9l:IFS ......
SR 3.3.5.2.2 Perform CHANNEL FUNCTIONAL TE ST. 92 elays /
SR 3.3.5.2.3 Perform LOGIC SYSTEM FUNCTION AL TEST. 24 meAtRS /
In accordance with the Surveillance Frequency Control Program RIVER BEND 3.3-43c Amendment No. 493
Enclosure, Attachment 2 RBG-47983 Revised Technical Specification Page
RPV Water Inventory Control Instrumentation 3.3.5.2 SURVEILLANCE REQUIREMENTS
--~~--~-----~--~--~-~--~--~--~-------------~---N()TE--~~-----~~~-------------~--~--~-~----------~--~-
Refer to Table 3.3.5.2-1 to determine which SRs apply for each ECCS function.
SURVEILLANCE FREQUENCY SR 3.3.5.2.1 Perform CHANNEL CHECK. In accordance with the Surveillance Frequency Control Program SR 3.3.5.2.2 Perform CHANNEL FUNCTl()NAL TEST. In accordance with the Surveillance Frequency Control Program SR 3.3.5.2.3 Perform L()GIC SYSTEM FUNCTl()NAL TEST. In accordance with the Surveillance Frequency Control Program RIVER BEND 3.3-43c Amendment No. 49J
Enclosure, Attachment 3 RBG-47983 Technical Specification Bases Pages Markup
PV Water Inventory Control Instrumentation B 3.3.5.2 BASES (continued)
SURVEILLANCE An noted in the beginning of the SRs, the SRs for each RPV Water REQUIREMENTS Inventory Control Instrument Function are found in the SRs column of Table 3.3.5.2-1.
SR 3.3.5.2.1 Performance of the CHANNEL CHECK ensures that a gross failure of instrumentation has not occurred. A CHANNEL CHECK is normally a comparison of the parameter indicated on one channel to a similar parameter on other channels. It is based on the assumption that instrument channels monitoring the same parameter should read approximately the same value. Significant deviations between the instrument channels could be an indication of excessive instrument drift The Surveillance Fre- in one of the channels or something even more serious. A CHANNEL quency is controlled under CHECK guarantees that undetected outright channel failure is limited; the Surveillance Frequency thus, it is key to verifying the instrumentation continues to operate properly between each CHANNEL FUNCTIONAL TEST.
Control Program Agreement criteria are determined by the plant staff, based on a combination of the channel instrument uncertainties, including indication and readability. If a channel is outside the criteria, it may be an indication that the instrument has drifted outside its limit.
The Frequency of 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> is based upon operating experience that demonstrates channel failure is rare.
The CHANNEL CHECK supplements less formal, but more frequent, checks of channels during normal operational use of the displays associated with the channels required by the LCO.
SR 3.3.5.2.2 A CHANNEL FUNCTIONAL TEST is performed on each required channel to ensure that the entire channel will perform the intended function. A successful test of the required contact(s) of a channel relay may be performed by the verification of the change of state of a single contact of the relay. This clarifies what is an acceptable CHANNEL FUNCTIONAL TEST of a relay. This is acceptable because all of the other required contacts of the relay are verified by other Technical Specifications and non-Technical Specifications tests.
Any setpoint adjustment shall be consistent with the assumptions of the current plant specific setpoint methodology.
(continued)
RIVER BEND B 3.3-121j Revision No. 4-7~
PV Water Inventory Control Instrumentation B 3.3.5.2 BASES SURVEILLANCE SR 3.3.5.2.2 (continued)
REQUIREMENTS The Frequency of 92 days is based upon operating e:><perience that
~ - - - - - - - - - - ~ demonstrates channel failure is rare.
The Surveillance Frequency is controlled under the Surveillance Frequency Control Program SR 3.3.5.2.3 The LOGIC SYSTEM FUNCTIONAL TEST demonstrates the OPERABILITY of the required initiation logic for a specific channel. The system functional testing performed in LCO 3.5.2 overlaps this Surveillance to complete testing of the assumed safety function.
The 24 month Frequency is based on operating e:><perience that has shown that these components usually pass the Surveillance when performed at the 24 month Frequency.
REFERENCES 1. Information Notice 84-81 "Inadvertent Reduction in Primary Coolant Inventory in Boiling Water Reactors During Shutdown and Startup,"
November 1984.
- 2. Information Notice 86-74, "Reduction of Reactor Coolant Inventory Because of Misalignment of RHR Valves," August 1986.
- 3. Generic Letter 92-04, "Resolution of the Issues Related to Reactor Vessel Water Level Instrumentation in BWRs Pursuant to 10 CFR 50.54(F), " August 1992.
- 4. NRC Bulletin 93-03, "Resolution of Issues Related to Reactor Vessel Water Level Instrumentation in BWRs," May 1993.
- 5. Information Notice 94-52, "Inadvertent Containment Spray and Reactor Vessel Draindown at Millstone 1," July 1994.
RIVER BEND B 3.3-121k Revision No. 472: