m ._ .- .-

} , - ~

O ~

TMI-1 OPERATING SLMfARY The Unit operated at 100", full pcver for the entire =cnth except for a 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> planned reduction en 8-5-76 fer Turbine Stop Valve Testing. Of significance concerning this valve testir- is the change in power level at which the testing is conducted. Recent approval frem B&~4 and Genera-tien Engineering nov per=its this testing to be conducted at 65", vs. 505.

In an effort to improve ecndenser performance, abrasive a=ertap balls were substituted for the normal soft spenge a=ertap balls for a cetal of apprcx-i=ately 15 days. (Five 3-iay test periods) -

Although our testing and data reduction is not complete, cursory review of the data does not conclusively demonstrate an improvement in cendenser performance.

SAFE"Y REI.A"ED IMINTENANCE There was no safety related maintenance perfor=ed during the ment.1 of August ,

1978.

q9042500 M

- AVERAGE DAILY UNIT POWER LEVIL Decket No. 50-289 Unit M -1 Date 9-13-78 Completed 3y D. G. Mitchell Telephone 215-929-3601 Ext. 169 M0!mI Au,Tast DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY PCWER IIIEL  !

(MWe-Net) (~MWe-Net )

1 775 17 76o 2 772 18 773 I 1

3 765 19 76h h 768 20 767 I 5 Th0 21 777 6 _

76h 22 776 7 772 23 773 8 767 2h 767 p 767 25 766 .

10 767 26 77h n 768 27 770 12 769 28 762 13 . 767 29 761 1h 765 30 766 15 76h 31 767 16 767

~ _ _ _ . .. _ . _ . . . ___ _ , _ _ _ .. __ _.

~

OPERATING DATA REPCRT Dockst No. 50-280

'- Date 9-13-78 Completed By n c. vita.!i OPEPATING STATUS Telephone o' e 7?o xm m-e 16;

1. Unit Name:  % .. m$. v , . ,e tre 4
2. Reporting Period: Auruct io?8 3 Licensed Thermal Power (Wt):
  • 2535
h. Nameplate Rating (Gross We): 871 5 Design Electrical Rating (Net We): 810
6. Max. Dependable Capacity (Gross We): 8ho 7 Max. Dependable Capacity (Net We): 702
8. If Changes Occur in Capacity Ratings (Items No. 3 through 7) Since Last Report,
  • Give Reasons:

9 Power Level to which Restricted. If Any (Net We):

10. Reasons for Restrictions, If Any:

This Month Yr . -to-Dat e Cumulative

11. Hours in Reporting Period 744 5811 15040
12. No. of Hours Reactor was Critical 74h 4616.5 27674.8
13. Reactor Reserve Shutdown Hours 0 0 9?8.5 lk. Hours Generator On-Line Thh h529.9 27127.h Unit Reserve Shutdown Hours 0 0 0 15
16. Gross Thermal Energy Generated (WH) 1860613 10coh872 66191h77 17 Gross Elect. Energy Generated (WR) 605659 3617796 22.m .5c8
18. Net Electrical Energy Generated (WH) 570938 3.386,31h 20,704,7 n 19 Unit Service Factor 100". 77.7 vv.h
20. Unit Availability Factor 100",  ??.? 77.h -
21. Unit Capacity Factor (Using MDC Net) 96.95 71.15 vh 65
22. Unit Capacity Factor (Using DER Net) 91.75 10.o"  ??.,5 23 Unit Forced Outage Rate 0 h.55 5. h ",

2k. Shutdowns Scheduled Over Next 6 Months (Typ=, Date, and Duration of Each):

I 4

25 If Shut Down at End of Report Period, Estimated Date of Startup: l

26. Units In Test Status (Prior to Commercial Operation): FORECAST ACHIEVED INITIAL CRITIC /.LITY
INITIAL ELECTRICITY COMMERCIAL OPEPATION i

l i l

\ \

l' .

l 3

i d

i UNIT S!!UTDOWNS AND POWER REDUCTIONS Docket No. 50-289 AUGUST

"" " 4 REPORT MONTl!

Date 9-13-78 Completed By n O_ ttI tA r11

. Telephone 215-929-3601 Ext. 169 No. Date Type l m System Component Cause and Corrective gg g og gg Code h Code 5 Action to bm g g 7, ,o, gp g Prevent Pecurrence f! N 2 EEj

$ iN S UMm -

None ,

i i

I:F Forted 2Reason; 3 " xhibit G - Instructions M m odi 3: Scheduled A-Equipment Failure (Explain) 1-Manu d f r Preparation of Data B-Maintenance or Test n ee s for Licensee 2-Manual Scram, C-Re Neling Event Report. (LER) File 3-Automatic Scram. ~

D-Regulatory Hestric*,lon h-Other (Explain)

E-Operator Training & Licensee Examination F-Administrative G-Operational Error (Explain) Exhibit 1 - Same Source II-Other (Explain) ,

I w . _ _ _ _ _

- _ _ _ _ _ _ _ _