ML19295A101
| ML19295A101 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 09/12/1980 |
| From: | Speis T Office of Nuclear Reactor Regulation |
| To: | Cutchin J NRC OFFICE OF THE EXECUTIVE LEGAL DIRECTOR (OELD) |
| Shared Package | |
| ML111090060 | List:
|
| References | |
| FOIA-80-515, FOIA-80-555 NUDOCS 8009290455 | |
| Download: ML19295A101 (1) | |
Text
-
hh h
l ry SEP 121980 MEMORANDUM FOR:
James M. Cutchin, Office of the Executive Legal Director Paul S. Check, Assistant Director for Plant Systems, OSI, NRR FRCH:
Themis Speis, Chief RSB, DSI, NRR
SUBJECT:
TESTIMONY FOR TMI-l RESTART HEARING This is to formally transmit the prepared testimony of W. Jensen on UCS Contentions 1 and 2 for the THI-l restart hearing.
The testimony incorporates the OELD comments for clarity and format, and we consider them to be in final form.
Testimony in final form reflecting OELD comments on ECNP id and UCS 5 is in preparation. We have not yet received OELD comments on UCS 3, Sholly 3, and in the combined response to UCS 8, Sholly 7, and ECNP le.
Themis Speis, Chief Reactor Systems Branch Division of Systems Integration, NRR
Enclosure:
As stated cc:
D. Ross DSI ads DSI BCs R. Capra H. Silver J. Rosenthal R. Fitzpatrick G. Mazetis g '/
W. Jensen i
0 q
Concurrence:
CRESS:PH N
OSI h
- DSI N R:DSI WJensen dMazetis eis 9/9/80 9/9/80 9/9/80 9/9/80 800D290
.