MONTHYEARML18256A0522018-09-24024 September 2018 Plants, Units 1 and 2 - Supplemental Information Needed for Acceptance of Requested Licensing Action Risk-Informed Approach to Closure for Generic Safety Issue-191 (EPID L-2018-LLA-0222)and Project stage: Acceptance Review ML18283A0342018-10-10010 October 2018 Supplement to Final Response to Generic Letter 2004-02, Dated August 13, 2018 Project stage: Request ML18304A1392018-10-30030 October 2018 Acceptance of Requested Licensing Action Risk-Informed Approach to Closure for Generic Safety Issue-191 (EPID L-2018-LLA-0222 and EPID L-2018-LLE-0013) Project stage: Acceptance Review ML18345A1942018-12-21021 December 2018 Plants, Units 1 and 2 - Regulatory Audit Risk-Informed Approach to License Amendment Request for Closure of Generic Safety Issue-191 Project stage: Other ML19070A0192019-03-11011 March 2019 Request for Additional Information Regarding Exemption Request from 10CFR50.46(A)(1) to Support Resolution of GSI-191 Project stage: RAI ML19158A0752019-06-0707 June 2019 Revised: Final Response to Generic Letter 2004-02 Project stage: Request ML19205A2872019-07-19019 July 2019 Notification of Change in Review Schedule (Epids L-2018-LLA-0222 and L-2018-LLE-0013) Project stage: Other ML19261B2202019-09-18018 September 2019 Request for Additional Information Regarding Final Response to Generic Letter 2004-02 Project stage: RAI ML19277D1032019-10-0303 October 2019 Response to Request for Additional Information Revised - Final Response to Generic Letter 2004-02 Project stage: Response to RAI ML19294A0562019-10-21021 October 2019 Withdrawal of License Amendment Request for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 - Final Response to Generic Letter 2004-02 Project stage: Withdrawal ML19295E7142019-10-28028 October 2019 L-2018-LLA-0222 and L-2018-LLE-0013 -Withdrawal FRN 2019-10-22 Project stage: Other ML19295E7122019-10-28028 October 2019 Withdrawal of Amendment and Exemption Requests (Epids L-2018-LLA-0222 and L-2018 LLE-0013) Project stage: Withdrawal 2019-10-28
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000317/20230042024-02-0101 February 2024 Integrated Inspection Report 05000317/2023004 and 05000318/2023004 ML24029A0102024-01-29029 January 2024 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000317/2024010 and 05000318/2024010 ML24003A8872024-01-19019 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0033 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) 05000318/LER-2023-004, Submittal of LER 2023-004-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Submittal of Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer2024-01-16016 January 2024 Submittal of LER 2023-004-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Submittal of Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer ML24011A0732024-01-11011 January 2024 Proposed Alternative to the Requirements for Repair/Replacement of Saltwater (SW) System Buried Piping 05000318/LER-2023-002, Forward LER 2023-002-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer2024-01-0808 January 2024 Forward LER 2023-002-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer 05000318/LER-2023-003, Forward LER 2023-003-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Manual Actuation of Auxiliary Feedwater System Due to 22 Steam Generator Feedwater Pump Trip2024-01-0808 January 2024 Forward LER 2023-003-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Manual Actuation of Auxiliary Feedwater System Due to 22 Steam Generator Feedwater Pump Trip ML24005A0222024-01-0505 January 2024 Revised Steam Generator Tube Inspection Reports ML23304A0642024-01-0202 January 2024 Issuance of Amendment No. 349 to Modify the Long-Term Coupon Surveillance Program RS-23-125, Request for Exemption from 10 CFR 2.109(b)2023-12-0707 December 2023 Request for Exemption from 10 CFR 2.109(b) ML23331A2992023-11-27027 November 2023 Submittal of Condition Prohibited by Technical Specifications Due to Failure to Sample Diesel Generator Fuel Oil Storage Tank IR 05000317/20230102023-11-20020 November 2023 Biennial Problem Identification and Resolution Inspection Report 05000317/2023010 and 05000318/2023010 ML23318A4722023-11-14014 November 2023 Supplement to License Amendment Request to Adopt TSTF-59-A ML23317A1032023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums ML23310A0442023-11-0707 November 2023 Project Manager Assignment IR 05000317/20230402023-11-0202 November 2023 95001 Supplemental Inspection Report 05000317/2023040 and Follow-Up Assessment Letter IR 05000317/20230032023-11-0101 November 2023 Integrated Inspection Report 05000317/2023003 and 05000318/2023003 IR 05000317/20230902023-10-26026 October 2023 Final Significance Determination of a White Finding with Assessment Follow-Up and Notice of Violation; Inspection Report 05000317/2023090 ML23289A1202023-10-16016 October 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML23279A1202023-10-0606 October 2023 Response to NRC Inspection Report and Preliminary White Finding IR 05000317/20230502023-09-29029 September 2023 Special Inspection Report 05000317/2023050 and Preliminary White Finding and Apparent Violation ML23272A1032023-09-29029 September 2023 Condition Prohibited by Technical Specifications Due to Inoperable Nuclear Instrumentation at Very Low Power IR 05000317/20234012023-09-18018 September 2023 Cyber Security Inspection Report 05000317/2023401 and 05000318/2023401 ML23254A0012023-09-0505 September 2023 Registration of Use of Casks to Store Spent Fuel IR 05000317/20230052023-08-31031 August 2023 Updated Inspection Plan for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Report 05000317/2023005 and 05000318/2023005) ML23158A1952023-08-30030 August 2023 R. E. Ginna - Issuance of Amendments to Adopt TSTF-273-A, Revision 2, Safety Function Determination Program Clarifications ML23241A8412023-08-29029 August 2023 Response to Request for Additional Information - Proposed Alternative to the Requirements for Repair/Replacement of Saltwater (SW) System Buried Piping ML23240A3872023-08-28028 August 2023 Senior Reactor and Reactor Operator Initial License Examinations ML23151A3472023-08-21021 August 2023 Issuance of Amendments to Adopt TSTF-295-A, Modify Note 2 to Actions of PAM Table to Allow Separate Condition Entry for Each Penetration ML23219A1662023-08-16016 August 2023 Request for Additional Information Regarding Proposed Alternative to the Requirements for Repair/Replacement of Saltwater (SW) System Buried Piping (EPID: L-2023-LLR-0006) - Non-proprietary ML23228A1002023-08-15015 August 2023 Notification of Readiness for NRC 95001 Inspection ML23188A0402023-08-0808 August 2023 Issuance of Amendment Nos. 346 and 324 Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 ML23214A1572023-08-0707 August 2023 Correction to the Renewed Facility Operating License Page 3 in Amendment No 345 IR 05000317/20230022023-08-0303 August 2023 Integrated Inspection Report 05000317/2023002 ML23188A0512023-07-13013 July 2023 Correction to the Renewed Facility Operating License Pages in Amendment Nos. 336 and 314 ML23186A0372023-07-13013 July 2023 Correction to the Renewed Facility Operating License Pages in Amendment Nos. 340 and 318 IR 05000317/20233012023-07-12012 July 2023 Initial Operator Licensing Examination Report 05000317/2023301 and 05000318/2023301 IR 05000317/20230122023-07-10010 July 2023 Commercial Grade Dedication Report 05000317/2023012 and 05000318/2023012 ML23180A2362023-06-29029 June 2023 Correction of Errors on Technical Specification Pages RS-23-083, Withdrawal - Proposed Alternatives Related to the Steam Generators2023-06-27027 June 2023 Withdrawal - Proposed Alternatives Related to the Steam Generators ML23156A6752023-06-20020 June 2023 Request for Withholding Information from Public Disclosure for Proposed Alternative to the Requirements for Repair/Replacement of Saltwater System Buried Piping 2024-02-01
[Table view] |
Text
Exelon Generation ~ 200 Exelon Way Kennett Square. PA 19348 www.exeloncorp.com 10 CFR 50.90 October 21, 2019 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Calvert Cliffs Nuclear Power Plant, Units 1 and 2 Renewed Facility Operating License Nos. DPR-53 and DPR-69 Docket Nos. 50-317 and 50-318
Subject:
Withdrawal of License Amendment Request for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 - Final Response to Generic Letter 2004-02
References:
- 1. Letter from James Barstow (Exelon Generation Company, LLC) to U.S.
Nuclear Regulatory Commission - "Final Response to Generic Letter 2004-02," dated August 13, 2018 (ML18226A189)
- 2. Letter from David T. Gudger (Exelon Generation Company, LLC) to U.S.
Nuclear Regulatory Commission - "Supplement to Final Response to Generic Letter 2004-02, dated August 13, 2019," dated October 10, 2018 (ML18283A034)
- 3. Letter from James Barstow (Exelon Generation Company, LLC) to U.S.
Nuclear Regulatory Commission - "Revised - Final response to Generic letter 2004-02," dated June 7, 2019 (ML19158A075)
- 4. Letter from David T. Gudger (Exelon Generation Company, LLC) to U.S.
Nuclear Regulatory Commission - "Response to Request for Additional Information Revised - Final Response to Generic Letter 2004-02," dated October 3, 2019 (ML19277D103)
By letter dated August 13, 2018 (Reference 1), as supplemented by References 2, 3, and 4 above, Exelon Generation Company, LLC (Exelon) submitted a license amendment request (LAR) for Calvert Cliffs Nuclear Power Plant, Units 1 and 2. The proposed amendment would have changed the Calvert Cliffs' licensing bases, including the affected portions of the Technical Specifications and Updated Final Safety Analysis Report.
U.S. Nuclear Regulatory Commission Withdrawal of License Amendment Request Docket Nos. 50-317 and 50-318 October 21, 2019 Page2 Upon further review, Exelon has determined to follow a different approach in addressing Generic Safety Issue -191, "Assessment of Debris Accumulation on Pressurized-Water Reactor Sump Performance," and close out Generic Letter 2004-02, "Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors" (ML042360586).
Accordingly, Exelon withdraws the LAR as documented in Reference 1 and supplemented in References 2, 3, and 4.
There are no regulatory commitments contained in this letter.
In accordance with 10 CFR 50.91, "Notice for public comment: State consultation," Exelon is transmitting a copy of this letter to the designated State Official.
If you should have any questions regarding this submittal, please contact Enrique Villar at 610-765-5736.
Respectfully, David T. Gudger Senior Manager - Licensing Exelon Generation Company, LLC cc: NRC Regional Administrator, Region I NRC Senior Resident Inspector, CCNPP NRC Project Manager, NRR, CCNPP D. A. Tancabel, State of Maryland