ML19290D278

From kanterella
Jump to navigation Jump to search
Submits Supplemental Items Outside Restart Order Which Must Be Resolved Prior to Restart.Includes High Energy Line Breaks,Eccs Mod,Reg Guide 1.97 Implementation & Containment Valve Operations
ML19290D278
Person / Time
Site: Crane Constellation icon.png
Issue date: 02/06/1980
From: Mazetis G
Office of Nuclear Reactor Regulation
To: Silver H
Office of Nuclear Reactor Regulation
Shared Package
ML111090060 List: ... further results
References
FOIA-80-515, FOIA-80-555 NUDOCS 8002210033
Download: ML19290D278 (1)


Text

Distribution:

z g g w rff %,.d B i"

<ercke e>-'

RSB Rdg.

SEP Rdg.

rcB 0 S 'EE')

TMI Rdg.

G.Mazetis Newberry chron Docket No. 50-289 MEMORANDUM FOR:

H. Silver, LPM. THI-1 FRON:

G. Mazetis, Section Leader, Reactor Systems Branch, DSS

SUBJECT:

TMI-1RESTARTREVIEW(00RINTERFACE)

As discussed in our meeting on February 5,1980, the below items supplement my memo to you (enclosed) with rggard to areas outside tha TMI-1 restart Order. These areas should be resolved by DOR prior to restart, or a position developed to allow restart pending resolution.

1.

High Energy Line Breaks--We understand this is currently part of A-17.

2.

ECCS Modification (High pressure injection line cross connects)--We are currently reviewing impact of adding cavitating venturis to injection lines. Cross connects were previously reviewed and approved by DOR. We intend to actively interface with DDR during our review.

3.

Regulatory Guide 1.97 Implementation.

4.

Containment Purge Valve Operations.

Gerald R. Mazetis, Section Leader Reactor Systems Branch Division of Systems Safety

Enclosure:

As Stated cc:

R. Vollmer T. Novak P. Norian 032 1003)

S.'

e R. Fitzpatrick J. Wermiel B. Boger D. Dilanni S. Newberry

}h TMI Support D

oeric e,

J sum 44ngact: Scott Newberry, NRR SNewbepy:cj GM cis 49-29407 I

OATE >

._Q2/ M /EQ _ _. 021 /An NRC Form 318A (4 79) NRCM O2040 e....ov e.== = =e.aiaria. oe -ic s : m.- a.ms