05000277/LER-1979-039-03, /03L-0:on 790828,inadvertently Opened Drain Valve Caused Inoperability of Channel B of Main Steamline D High Flow Isolation Signal.Caused by Blow by Scaffolding Being Transported Through Area.Valve Closed

From kanterella
(Redirected from ML19249F005)
Jump to navigation Jump to search
/03L-0:on 790828,inadvertently Opened Drain Valve Caused Inoperability of Channel B of Main Steamline D High Flow Isolation Signal.Caused by Blow by Scaffolding Being Transported Through Area.Valve Closed
ML19249F005
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 09/27/1979
From: Cooney M
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
LER-79-039-03L, LER-79-39-3L, NUDOCS 7910030514
Download: ML19249F005 (1)


LER-1979-039, /03L-0:on 790828,inadvertently Opened Drain Valve Caused Inoperability of Channel B of Main Steamline D High Flow Isolation Signal.Caused by Blow by Scaffolding Being Transported Through Area.Valve Closed
Event date:
Report date:
2771979039R03 - NRC Website