Category:Letter type:L
MONTHYEARL-20-006, Unit 2, Emergency Plan Implementing Procedure Revision2020-02-10010 February 2020 Unit 2, Emergency Plan Implementing Procedure Revision L-12-001, Revised Response to NRC Bulletin 2012-01, Design Vulnerability in Electrical Power System2019-12-26026 December 2019 Revised Response to NRC Bulletin 2012-01, Design Vulnerability in Electrical Power System L-19-061, Unit 2 - Emergency Plan Implementing Procedure Revision2019-12-16016 December 2019 Unit 2 - Emergency Plan Implementing Procedure Revision L-19-058, Statement of Payment of Civil Penalty2019-12-11011 December 2019 Statement of Payment of Civil Penalty L-19-054, Unit 2 - Emergency Plan Implementing Procedure Revision2019-12-0505 December 2019 Unit 2 - Emergency Plan Implementing Procedure Revision L-19-046, Notification of Readiness for NRC Independent Review to Confirm Chilling Effect Letter and Cross-Cutting Issue Closure Criteria Have Been Met2019-10-0303 October 2019 Notification of Readiness for NRC Independent Review to Confirm Chilling Effect Letter and Cross-Cutting Issue Closure Criteria Have Been Met L-19-052, Revision 47 to Emergency Plan Implementing Procedure EPIP 12, Emergency Equipment and Supplies2019-09-30030 September 2019 Revision 47 to Emergency Plan Implementing Procedure EPIP 12, Emergency Equipment and Supplies L-19-048, Response to Apparent Violation in NRC Inspection Report 05000390/2019013 and 05000391/2019013, EA-19-0422019-09-12012 September 2019 Response to Apparent Violation in NRC Inspection Report 05000390/2019013 and 05000391/2019013, EA-19-042 L-19-041, Cycle 2 Steam Generator Tube Inspection Report2019-08-27027 August 2019 Cycle 2 Steam Generator Tube Inspection Report L-19-045, American Society of Mechanical Engineers, Section XI, First 10-Year Inspection Interval, Inservice Inspection Owner'S Activity Report for Cycle 2 Operation2019-08-14014 August 2019 American Society of Mechanical Engineers, Section XI, First 10-Year Inspection Interval, Inservice Inspection Owner'S Activity Report for Cycle 2 Operation L-19-044, Unit 2 - Forward Emergency Plan Implementing Procedure Revisions2019-08-0808 August 2019 Unit 2 - Forward Emergency Plan Implementing Procedure Revisions L-19-036, Notification of Readiness for NRC Inspection Procedure 95001 Inspection2019-06-20020 June 2019 Notification of Readiness for NRC Inspection Procedure 95001 Inspection L-19-034, Wafts Bar Nuclear Plant, Unit 1 - Technical Specification (TS) 5.9.8 - Post Accident Monitoring System (Pams) Report2019-06-18018 June 2019 Wafts Bar Nuclear Plant, Unit 1 - Technical Specification (TS) 5.9.8 - Post Accident Monitoring System (Pams) Report L-19-031, Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2019-02 - Preparation and Scheduling of Operator Licensing Examinations2019-05-15015 May 2019 Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2019-02 - Preparation and Scheduling of Operator Licensing Examinations L-19-016, Annual Radiological Environmental Operating Report - 20182019-05-15015 May 2019 Annual Radiological Environmental Operating Report - 2018 L-19-029, Submittal of Revision 0 of Cycle 3 Core Operating Limits Report2019-04-24024 April 2019 Submittal of Revision 0 of Cycle 3 Core Operating Limits Report L-19-015, Annual Non-Radiological Environmental Operating Report - 20182019-04-11011 April 2019 Annual Non-Radiological Environmental Operating Report - 2018 L-19-026, Revised Pressure and Temperature Limits Report (PTLR)2019-04-0404 April 2019 Revised Pressure and Temperature Limits Report (PTLR) L-19-023, Periodic Submission for Changes Made to the WBN Technical Specification Bases and Technical Requirements Manual2019-03-19019 March 2019 Periodic Submission for Changes Made to the WBN Technical Specification Bases and Technical Requirements Manual L-19-024, Unit 2 - Emergency Plan Implementing Procedures Revision2019-03-0707 March 2019 Unit 2 - Emergency Plan Implementing Procedures Revision L-19-019, Transmittal of 10 CFR 50.46 - 30-Day and Annual Report for Watts Bar Nuclear Plant, Units 1 and 22019-03-0707 March 2019 Transmittal of 10 CFR 50.46 - 30-Day and Annual Report for Watts Bar Nuclear Plant, Units 1 and 2 L-19-011, Plant, Unit 1 - Revision 1 of the Cycle 16 Core Operating Limits Report (COLR)2019-01-29029 January 2019 Plant, Unit 1 - Revision 1 of the Cycle 16 Core Operating Limits Report (COLR) L-19-008, American Society of Mechanical Engineers, Section Xl, Third 10-Year Inspection Interval, Inservice Inspection Owner'S Activity Report for Cycle 15 Operation2019-01-24024 January 2019 American Society of Mechanical Engineers, Section Xl, Third 10-Year Inspection Interval, Inservice Inspection Owner'S Activity Report for Cycle 15 Operation L-18-001, Notification of Readiness for NRC Inspection Procedure 95001 Inspection2018-11-26026 November 2018 Notification of Readiness for NRC Inspection Procedure 95001 Inspection L-04-001, Completion of Action Required in Response to NRC Bulletin 2004-01: Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized-Water Reactors2018-01-25025 January 2018 Completion of Action Required in Response to NRC Bulletin 2004-01: Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized-Water Reactors L-11-001, Submittal of 30-Day Response to NRC Bulletin 2011-01, Mitigating Strategies.2015-09-24024 September 2015 Submittal of 30-Day Response to NRC Bulletin 2011-01, Mitigating Strategies. L-11-011, Transmittal of Response to NRC Bulletin 2011-01, Mitigating Strategies.2015-06-29029 June 2015 Transmittal of Response to NRC Bulletin 2011-01, Mitigating Strategies. L-88-017, Response Clarification to Generic Letter 88-0172013-08-13013 August 2013 Response Clarification to Generic Letter 88-017 L-03-004, Tennessee Valley Authority Response to Nuclear Regulatory Commission Bulletin 2003-04, Rebaselining of Data in the Nuclear Materials Management and Safeguards System, Dated October 8, 20032003-12-18018 December 2003 Tennessee Valley Authority Response to Nuclear Regulatory Commission Bulletin 2003-04, Rebaselining of Data in the Nuclear Materials Management and Safeguards System, Dated October 8, 2003 2020-02-10
[Table view] Category:License-Operator
MONTHYEARML22314A0312022-11-10010 November 2022 2B ML22217A0842022-08-0303 August 2022 NRC Operator Licensing Examination Approval 05000390/2022301 and 05000391/2022301 ML22007A1562022-01-0707 January 2022 Notification of Licensed Operator Initial Examination 05000390/2022301 and 05000391/2022301 WBL-21-023, Preparation and Scheduling of Operator Licensing Examination2021-04-20020 April 2021 Preparation and Scheduling of Operator Licensing Examination ML21111A3522021-04-16016 April 2021 March 2021 GFE IR 05000390/20203012021-01-19019 January 2021 Reissue - Watts Bar Nuclear Plant - NRC Operator License Examination Report 05000390/2020301 and 05000391/2020301 ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 ML20300A5892020-10-26026 October 2020 File 2B - Normal Release - Exam Administrative Items ML20300A5842020-10-26026 October 2020 Wb 2020301 Exam Final Items - Delayed Release - File 2A-2 ML20300A5852020-10-26026 October 2020 Wb 2020301 File 2A-3 Exam Administrative Items - Delayed Release ML20276A2052020-10-0202 October 2020 SRO Exam ML20276A1512020-10-0202 October 2020 RO Exam WBL-20-008, Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2020-01 - Preparation and Scheduling of Operator Licensing Examinations2020-03-10010 March 2020 Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2020-01 - Preparation and Scheduling of Operator Licensing Examinations ML20043F0702020-01-23023 January 2020 301, 2B, Exam Administrative Items (Normal Release) ML20007F7572020-01-0707 January 2020 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2020 ML19256B0322019-09-13013 September 2019 Wb 2019-301, Post Exam Comments (Normal Release) L-19-031, Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2019-02 - Preparation and Scheduling of Operator Licensing Examinations2019-05-15015 May 2019 Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2019-02 - Preparation and Scheduling of Operator Licensing Examinations ML19116A1442019-04-26026 April 2019 301 ADAMS-2C Exam QA Material ML19116A1392019-04-26026 April 2019 301 ADAMS-2A Draft Exam Material ML19100A2512019-04-10010 April 2019 March 6, 2019, NRC Generic Fundamentals Examination Results for Watts Bar Nuclear Plant ML19099A3022019-04-0909 April 2019 Confirmation of Requested Initial Operator License Examination for Watts Bar Nuclear Plant, Units 1 and 2 ML19045A3712019-02-12012 February 2019 March 2019 GFE Cover Letter Rii ML19029B1122019-01-29029 January 2019 Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2018-02 - Revised Preparation and Scheduling of Operator Licensing Examinations ML19018A2252019-01-18018 January 2019 Notification of Licensed Operator Initial Examination 05000390/2019301, 05000391/2019301 ML19018A0882019-01-17017 January 2019 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2019 IR 05000390/20183012018-11-0808 November 2018 NRC Operator License Examination Report 05000390/2018301 and 05000391/2018301 ML18298A1632018-10-25025 October 2018 301 Post Exam Comments ML18122A1412018-05-0202 May 2018 Nuclear Regulatory Commission (Nrg) Regulatory Issue Summary (RIS) 2018-02 - Preparation and Scheduling of Operator Licensing Examinations ML18044A9892018-02-13013 February 2018 Notification of Licensed Operator Initial Examination 05000390/2018301, 05000391/2018301 ML17191B4242017-07-10010 July 2017 Exam Administrative Items - Delay Release 2 Yrs ML17191B3462017-07-10010 July 2017 Exam Final Items - Delay Release 2 Yrs ML17165A4912017-06-14014 June 2017 302 Final Administrative Documents ML17165A4952017-06-14014 June 2017 302 Final Administrative JPMs ML17165A5152017-06-14014 June 2017 302 General Correspondence Redacted ML17165A5372017-06-14014 June 2017 302 Draft RO Written Exam ML17165A4942017-06-14014 June 2017 302 Final Simulator and in Plant JPMs ML17165A4932017-06-14014 June 2017 302 Final Simulator Scenarios ML17165A4852017-06-14014 June 2017 302 Draft Simulator and in Plant JPMs ML17165A4872017-06-14014 June 2017 302 Draft Administrative JPMs ML17165A4832017-06-14014 June 2017 302 Draft Simulator Scenarios ML17165A5412017-06-14014 June 2017 302 Draft SRO Written Exam ML17165A4772017-06-14014 June 2017 302 Draft Administrative Documents ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 ML16257A7232016-09-13013 September 2016 Initial Exam 2016-301 Post Exam Comments ML16257A7142016-09-13013 September 2016 Initial Exam 2016-301 Final RO Written Exam - Delay Release 2 Years ML16257A7212016-09-13013 September 2016 Initial Exam 2016-301 Final SRO Written Exam - Delay Release 2 Years ML16200A1202016-07-15015 July 2016 Operator Licensing Written Examination Approval 05000390/2016301 and 05000391/2016301 ML16197A0392016-07-15015 July 2016 NRC Regulatory Issue Summary 2016-09 - Preparation and Scheduling of Operator Licensing Examinations ML16054A2772016-02-19019 February 2016 Notification of Licensed Operator Initial Examination 05000390/2016301, 05000391/2016301 ML15259A2822015-09-16016 September 2015 301 Draft Administrative Documents 2022-08-03
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML22314A0312022-11-10010 November 2022 2B ML22217A0842022-08-0303 August 2022 NRC Operator Licensing Examination Approval 05000390/2022301 and 05000391/2022301 ML22007A1562022-01-0707 January 2022 Notification of Licensed Operator Initial Examination 05000390/2022301 and 05000391/2022301 WBL-21-023, Preparation and Scheduling of Operator Licensing Examination2021-04-20020 April 2021 Preparation and Scheduling of Operator Licensing Examination IR 05000390/20203012021-01-19019 January 2021 Reissue - Watts Bar Nuclear Plant - NRC Operator License Examination Report 05000390/2020301 and 05000391/2020301 ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 ML20300A5892020-10-26026 October 2020 File 2B - Normal Release - Exam Administrative Items ML20300A5852020-10-26026 October 2020 Wb 2020301 File 2A-3 Exam Administrative Items - Delayed Release ML20300A5842020-10-26026 October 2020 Wb 2020301 Exam Final Items - Delayed Release - File 2A-2 ML20276A2052020-10-0202 October 2020 SRO Exam ML20276A1512020-10-0202 October 2020 RO Exam WBL-20-008, Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2020-01 - Preparation and Scheduling of Operator Licensing Examinations2020-03-10010 March 2020 Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2020-01 - Preparation and Scheduling of Operator Licensing Examinations ML20043F0702020-01-23023 January 2020 301, 2B, Exam Administrative Items (Normal Release) ML19256B0322019-09-13013 September 2019 Wb 2019-301, Post Exam Comments (Normal Release) L-19-031, Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2019-02 - Preparation and Scheduling of Operator Licensing Examinations2019-05-15015 May 2019 Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2019-02 - Preparation and Scheduling of Operator Licensing Examinations ML19116A1392019-04-26026 April 2019 301 ADAMS-2A Draft Exam Material ML19116A1442019-04-26026 April 2019 301 ADAMS-2C Exam QA Material ML19100A2512019-04-10010 April 2019 March 6, 2019, NRC Generic Fundamentals Examination Results for Watts Bar Nuclear Plant ML19099A3022019-04-0909 April 2019 Confirmation of Requested Initial Operator License Examination for Watts Bar Nuclear Plant, Units 1 and 2 ML19029B1122019-01-29029 January 2019 Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2018-02 - Revised Preparation and Scheduling of Operator Licensing Examinations ML19018A2252019-01-18018 January 2019 Notification of Licensed Operator Initial Examination 05000390/2019301, 05000391/2019301 IR 05000390/20183012018-11-0808 November 2018 NRC Operator License Examination Report 05000390/2018301 and 05000391/2018301 ML18298A1632018-10-25025 October 2018 301 Post Exam Comments ML18122A1412018-05-0202 May 2018 Nuclear Regulatory Commission (Nrg) Regulatory Issue Summary (RIS) 2018-02 - Preparation and Scheduling of Operator Licensing Examinations ML18044A9892018-02-13013 February 2018 Notification of Licensed Operator Initial Examination 05000390/2018301, 05000391/2018301 ML17191B3462017-07-10010 July 2017 Exam Final Items - Delay Release 2 Yrs ML17191B4242017-07-10010 July 2017 Exam Administrative Items - Delay Release 2 Yrs ML17165A4772017-06-14014 June 2017 302 Draft Administrative Documents ML17165A4912017-06-14014 June 2017 302 Final Administrative Documents ML17165A4952017-06-14014 June 2017 302 Final Administrative JPMs ML17165A5152017-06-14014 June 2017 302 General Correspondence Redacted ML17165A5372017-06-14014 June 2017 302 Draft RO Written Exam ML17165A4942017-06-14014 June 2017 302 Final Simulator and in Plant JPMs ML17165A4932017-06-14014 June 2017 302 Final Simulator Scenarios ML17165A4852017-06-14014 June 2017 302 Draft Simulator and in Plant JPMs ML17165A4872017-06-14014 June 2017 302 Draft Administrative JPMs ML17165A4832017-06-14014 June 2017 302 Draft Simulator Scenarios ML17165A5412017-06-14014 June 2017 302 Draft SRO Written Exam ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 ML16257A7212016-09-13013 September 2016 Initial Exam 2016-301 Final SRO Written Exam - Delay Release 2 Years ML16257A7232016-09-13013 September 2016 Initial Exam 2016-301 Post Exam Comments ML16257A7142016-09-13013 September 2016 Initial Exam 2016-301 Final RO Written Exam - Delay Release 2 Years ML16200A1202016-07-15015 July 2016 Operator Licensing Written Examination Approval 05000390/2016301 and 05000391/2016301 ML16054A2772016-02-19019 February 2016 Notification of Licensed Operator Initial Examination 05000390/2016301, 05000391/2016301 ML15259A2822015-09-16016 September 2015 301 Draft Administrative Documents ML15259A2902015-09-16016 September 2015 301 Draft RO Written Exam ML15259A2922015-09-16016 September 2015 301 Draft SRO Written Exam ML15259A2952015-09-16016 September 2015 301 Draft Simulator Scenarios ML15259A2962015-09-16016 September 2015 301 Draft Simulator and In-Plant JPMs ML15259A3962015-09-16016 September 2015 301 Draft Administrative JPMs 2022-08-03
[Table view] |
Text
Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402 wBL-19-031 May 15, 2019 10 cFR 50.4 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Watts Bar Nuclear Plant, Units 1 and 2 Facility Operating License No. NPF-90 and NPF-96 NRC Docket Nos. 50-390 and 50-391
Subject:
Nuclear Regulatory Gommission (NRC) Regulatory lssue Summary (RlS) 2019 Preparation and Scheduling of Operator Licensing Examinations
Reference:
NRC RIS 2019-02, "Preparation and Scheduling of Operator Licensing Examinations," dated April 17, 2019 Regulatory lssue Summary (RlS) 2019-02 requested information regarding Watts Bar Nuclear Plant's (WBN's) projected operator licensing examination schedules and the estimated number of applicants. The enclosure to this letter addresses the NRC's request and provides an estimate of the examination requirements for WBN on NRC Form 536.
There are no new regulatory commitments in this letter. Should you have any questions regarding this submittal, please contact Leon Neat, Operations Training Manager at (423) 365-1256 or Kim Hulvey, Site Licensing Manager at (423) 365-7720.
hony L Williams, lV Site Vice President Watts Bar Nuclear Plant
U.S. Nuclear Regulatory Commission Page 2 May 15, 2019
Enclosure:
NRC Form 536 - Operator Licensing Examination Data cc (Enclosure):
NRC Project Manager - Watts Bar Nuclear Plant NRC RegionalAdministrator - Region ll NRC Senior Resident lnspector
Enclosure NRC Form 536 Operator Licensing Examination Data Tennessee Valley Authority Watts Bar Nuclear Plant, Units I and 2 NRG Docket Nos. 50-390 and 50-391
NRC FORM 536 U. S. NUCLEAR REGULATORY COMMISSION APPRoVED BY oMB: No. 3150-013i
-ffi ExptREs: 11t30t2020 (11-20171 Estimated burden per response to comply witr this voluntary information mllection request" t hour. This OPERATOR LICENSING information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the lnformation Services Branch (T-2 F43), U.S. Nuclear EXAMINATION DATA Regulatory Commission, Washington, DC2055$0001, or by e-mail to lnfocollects.Resource@nrc.gov, and to the Desk Officer, ffice of lnformation and Regulatory Affairs, NE0B-10202, (315G013t1, Omce of Man4ement and Budget, Washington, DC 20503. lf a means used to impose an informalion collecton does not display a cunently valid OMB control number, the NRC may nol conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY NRC REGION Watts Bar Units 1 and 2 2 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER cY 2021 cY 2022 cY 2023 cY 2024 ESTIMATED NUMBER OF LICENSEE.PREPARED 0 I 0 I EXAMINATIONS ESTIMATED NUMBER OF NRC.PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMI NATIONS PROPOSED NUMBER cY 202t cY 2023 cY 2024 "rrw NUMBER OF REACTOR OPERATORS 0 6 0 6 NUMBER OF SENIOR REACTOR OPERATORS. INSTANT 0 6 0 6 NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 0 3 0 3 NUMBER OF SENIOR REACTOR OPERATORS. LIMITED 0 0 0 0 PROPOSED DATES A.rg,Sept 2022 Aug,S ept 2024 PRIMARY DATE 81812022 08/ t212024 ALTERNATE DATE elt2l2022 09t09t2024 NRC FORM 536 (11-2017)