Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20184A287 | 1 July 2020 | LLC Submittal of Presentation Materials Entitled ACRS Full Committee Presentation: NuScale Topic - Boron Redistribution and General Design Criterion 33, PM-0720-70785, Revision 0 | |
ML20150C517 | 29 May 2020 | LLC Submittal of Presentation Materials Entitled NRC Public Meeting Presentation: Boron Redistribution and Associated Design and DCA Changes, PM-0620-70336, Revision 0 | Shutdown Margin Anticipated operational occurrence Probabilistic Risk Assessment Flow Induced Vibration |
ML20150C881 | 29 May 2020 | LLC Submittal of Presentation Materials Entitled ACRS Full Committee Presentation: NuScale Topic - Boron Redistribution and Associated Design and DCA Changes, PM-0620-70244, Revision 0 | Shutdown Margin Anticipated operational occurrence Probabilistic Risk Assessment Flow Induced Vibration |
ML20099H080 | 8 April 2020 | LLC - Submittal of Presentation Materials Entitled NRC Public Meeting: Revisions to Nuscale'S EPZ Sizing Methodology Topical Report, PM-0420-69598, Revision 0 | Safe Shutdown Earthquake Fatality |
ML20094H674 | 3 April 2020 | LLC Submittal of Presentation Materials Entitled ACRS Full Committee Presentation NuScale Topic-Probabilistic Risk Assessment with a Focus on Emergency Core Cooling System Analysis PM-0420-69559, Revision 0 | Probabilistic Risk Assessment |
ML20072H327 | 9 March 2020 | LLC - Public Meeting Presentation: Topic - Emergency Core Cooling System Boron (ECCS) Distribution, PM-0320-69218, Revision 0 | |
ML20069A969 | 5 March 2020 | ACRS Full Committee Presentation: NuScale Topical Report, Loss-of-Coolant Accident Evaluation Model, PM-0320-69138, Revision O | Ultimate heat sink |
ML20069A163 | 5 March 2020 | ACRS Full Committee Presentation: NuScale Topical Report-Rod Ejection Accident Methodology, PM-0320-69146, Revision 0 | Fuel cladding |
ML20069A154 | 4 March 2020 | ACRS Full Committee Presentation: NuScale Topical Report- Non-Loss-of-Coolant Accident, PM-0320-69141, Revision 0 | Fuel cladding |
ML20066G280 | 3 March 2020 | LLC, Submittal of Presentation Materials Entitled ACRS Subcommittee Presentation: NuScale Topic - Hydrogen Monitoring, PM-0220-69071, Revision 0 | Severe Accident Management Guideline |
ML20066G277 | 28 February 2020 | ACRS Full Committee Presentation: NuScale - Steam Generator Design, PM-0220-69051, Revision 0 | |
ML20054A962 | 19 February 2020 | ACRS Subcommittee Presentation: NuScale Topical Report - Non-Loss-of-Coolant Accident, PM-0220-68852, Revision 0 | Fuel cladding |
ML20054B634 | 17 February 2020 | Nuscale - ACRS Subcommittee Presentation: NuScale Topical Report - Rod Ejection Accident Methodology, PM-1019-67365, Revision 0 | Fuel cladding |
ML20054A406 | 17 February 2020 | ACRS Subcommittee Presentation: NuScale Topical Report- Loss-of-Coolant Accident Evaluation Model, PM-0220-68917, Revision 0 | Ultimate heat sink |
ML20035C789 | 4 February 2020 | Nuscale - ACRS Subcommittee Presentation, FSAR, Steam Generator Design | |
ML19340B591 | 6 December 2019 | Public Meeting - NuScale Incorporated by Reference (Ibr) Slides | Incorporated by reference |
ML19324C836 | 13 November 2019 | LLC Submittal of Presentation Materials Entitled ACRS Subcommittee Presentation: NuScale Source Term Methodology Application, PM-1119-67928, Revision 0 | Exemption Request |
ML19204A277 | 22 July 2019 | Discussion Topic July 22, 2019 Public Meeting to Discuss Interface Requirement Associated with the NuScale Design Certification Application | |
ML19190A088 | 3 July 2019 | LLC Submittal of Presentation Materials Entitled ACRS Subcommittee Presentation, NuScale FSAR Chapter 20, Mitigation of Beyond-Design-Basis Events, PM-0719-66189, Revision 0 | Safe Shutdown Ultimate heat sink |
ML19169A166 | 14 June 2019 | Mitigation of Beyond-Design-Basis-Events, NuScale FSAR Chapter 20, PM-0619-65964, Revision 0 | Safe Shutdown |
ML19135A064 | 9 May 2019 | LLC - Submittal of Presentation Materials Entitled ACRS Subcommittee Presentation: NuScale FSAR Chapter 21, Multi-Module Design Considerations, PM-0519-65533, Revision 0 | Ultimate heat sink Probabilistic Risk Assessment |
ML19134A074 | 9 May 2019 | LLC Submittal of Presentation Materials Entitled ACRS Subcommittee Presentation: NuScale FSAR Chapter 19, Probabilistic Risk Assessment and Severe Accident Evaluation, PM-0519-65372, Revision 0 | High winds Ultimate heat sink Mission time Fire Barrier Probabilistic Risk Assessment Severe Accident Management Guideline Earthquake |
ML19105A135 | 11 April 2019 | ACRS Presentation: NuScale Chapter 5, Reactor Coolant System and Connecting Systems Overview, PM-0419-65159, Revision 0 | Boric Acid Ultimate heat sink Non-Destructive Examination Pressure Boundary Leakage Flow Induced Vibration |
ML19098A780 | 2 April 2019 | LLC - Submittal of Presentation Materials Entitled ACRS Full Committee Presentation: NuScale Chapter 9, Auxiliary Systems, PM-0319-64807, Revision 0 | Shutdown Margin Ultimate heat sink Nondestructive Examination Overtravel Earthquake |
ML19079A238 | 20 March 2019 | Enclosure 1: ACRS Presentation: NuScale Chapter 9, Auxiliary Systems, PM-0319-64807, Revision 0 | Safe Shutdown Ultimate heat sink Fire Barrier Safe Shutdown Earthquake Probabilistic Risk Assessment Emergency Lighting Fire Protection Program |
ML19073A048 | 11 March 2019 | LLC - ACRS Presentation Chapter 10 - Steam and Power Conversion System, PM-0219-64501, Revision 1 | |
ML19073A051 | 11 March 2019 | ACRS Presentation Chapter 11 - Radioactive Waste Management, PM-0219-64543, Revision 1 | Offsite Dose Calculation Manual Process Control Program |
ML19050A163 | 20 February 2019 | Enclosure 1: ACRS Presentation Chapter 11 - Radioactive Waste Management, PM-0219-64543, Revision 0 | Offsite Dose Calculation Manual Process Control Program |
ML19053A518 | 19 February 2019 | Nuscale - Dhrs and ECCS Logic Changes, PM-0219-64563, Revision 0 | Post Accident Monitoring |
ML19045A306 | 12 February 2019 | PM-0219-64475-NP, Revision 0, Reactor Vessel Flange Tool (Rft) Design Plan and Schedule. | |
ML19042A073 | 5 February 2019 | Nuscale - Chapters 2 and 17 ACRS Full Committee, PM-0219-64333, Revision 0 | |
ML19024A204 | 23 January 2019 | ECCS Valve DCA Demonstration Testing, PM-0119-64160-NP, Revision 0 | Boric Acid |
ML18362A142 | 19 December 2018 | Enclosure 2: Absorption Coefficient for Pool Water and Reactor Building Floor Interaction, PM-1218-63882, Revision 0 | |
ML18347A203 | 18 December 2018 | Enclosure 1: ACRS Presentation Chapter 17 - Quality Assurance and Reliability Assurance, PM-1218-63732, Revision 0 | Ultimate heat sink |
ML18347A207 | 18 December 2018 | ACRS Presentation Chapter 2 - Site Characteristics and Site Parameters, PM-1218-63753, Revision 0 | Tornado Generated Missile |
ML18331A160 | 20 November 2018 | Enclosure 2: Addressing Component Fatigue for NuScale DCA, November 20, 2018 | Operating Basis Earthquake Flow Induced Vibration |
ML18338A103 | 14 November 2018 | Nuscale - LTC RAI Closure Plan, PM-1118-63594-NP, Revision 0, Nonproprietary Version | |
ML18235A315 | 23 August 2018 | LLC - Presentation Materials Entitled ACRS Presentation: NuScale Instrumentation and Controls Design Overview, PM-0618-60212, Revision 0 | Mission time |
ML18222A193 | 8 August 2018 | Enclosure 1: NuScale Accident Source Terms Methodology Options PM-0818-61166, Revision 0 | |
ML18213A157 | 1 August 2018 | Risk-Informed Review of NuScale Initial Test Program, PM-0718-61123, Revision 0 | |
ML18220A874 | 25 July 2018 | Enclosunuscale CIRLT-RAI 9474 | |
ML18205A318 | 24 July 2018 | NRC Staff Questions for the August 1, 2018 Public Meeting with NuScale on ITP | |
ML18116A442 | 24 April 2018 | Enclosure 2: NuScale Power Comprehensive Vibration Assessment Program - Audit Report Summary Discussion, Revision 0, PM-0218-58803-NP (Non-Proprietary Version) | |
ML18090A003 | 2 April 2018 | Handout for the April 2, 2018 Public Meeting to Discuss NuScale Plans to Respond to the NRC Staff RAIs Related to Sections 3.7 and 3.8 | Safe Shutdown Ultimate heat sink Safe Shutdown Earthquake Hydrostatic Earthquake Pressure Boundary Leakage |
ML18085A072 | 26 March 2018 | NRC Staff Questions for April 9, 2018 Public Meeting with NuScale on DCA Chapter 20 | |
ML18037A673 | 8 February 2018 | PM-0218-58480, Revision 0, Shutdown Capability of the NuScale Power Module. | Shutdown Margin |
ML18019A161 | 23 January 2018 | LLC - Shutdown Capability of the NuScale Power Module | Safe Shutdown |
ML18019A163 | 23 January 2018 | Source Term Revision, Revision 0, PM-0118-58201 |