ML18192A185
| ML18192A185 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 06/21/1976 |
| From: | Van Brunt E Arizona Public Service Co |
| To: | Regan W Office of Nuclear Reactor Regulation |
| References | |
| ANPP-4789 | |
| Download: ML18192A185 (6) | |
Text
U.S. NUCLEAR REGULATORV ISSION OOCKET NUBIAN NRC FORM 195 I2.7G) zo KZZ FILE NUMOE ENVIROAIENXAL
(
NRC DISTRIBUTION FDR PART 50 DOCKET MATERIAL TO:
JR FROM: ARIZONA PUBLXC SERVICE CO PHOENIX'RIZ E E VAN BRUNT'R DATE OF DOCUMENT
-KL "14 DATE RECEIVED L-s-s LETTER RSA IGINAL QCOI V QN TORIZED UNC LASS IF IE0 PROP INPUT FORM NUMBER OF COPIES RECEIVED'L Giga LETTER TRANS THE FOLLOWXNG:
- NOTE:. 1 CY. ACRS, 2
CYS EPAP 1 CY NOAA,,
2 CYS F & W & 1 CY F & D SENT TO SAFETY LIC~
ASST'OTAL CYS SENT (7)
ENCLOSURE
'CORRECTED COPY OF FIGURE $2 SHOWING LOCATION OF M)NITORING WELLS-REGIONAL AQUIFER. ~. ~ ~ ~ ~.
KNO~PjgGED'LANT NIQ>>C'CLIO Q %~
~-w-'3 0>OT @@MOVE SAFETY BRANCH CIIIEF W 1 CY LIC~ ASST.
FOR ACTION/INFOR ATION BRANC F
W 1 LXC ASST
~
ENVXRO lb LTR & MAIL CONTROL
'/cSEE NOTE LTR & MAIL CONTROL REG FXLE"'NTERNAL D ISTRI BUTION I&E 2
J ~ COLLINS BALLARD K
'GER GRIMES(OPR PLANTS LPDR:
>>Al TXC NSIC EXTERNAL DISTRIBUTION CONTROL NUMBER LxtL NcCC C-OIIM 'IOS I$.7SI
4 4 ~
~
~
~
~ 0 e ~
~
KPiSE3EaQ(Q EKRGZPEQÃ ~DEGAS~
P. O. BOX 2I666
~
PHOENIX, ARIZONA 85036 sr ice II '~~~
June 21, 1976 ANPP-4789 Regulatory Docket File C$QQ F Rgap
>tar*
4e~+egty~
O 5+IN-$O-58S saq S3e Mr. W.
H'. Regan, Jr.
Branch Ch'ief Environmental Projects Branch 3
U.
S. Nuclear Regulatory Commission Washington, D. C.
20555 Re:
Docket Nos.
CPPR-141, 142 and 143/Construction. Phase Groundwater Monitoring Program
Dear Bill:
Two minor errors were discovered'n Figure 2 of the referenced'rogram, Well 27cbc was mislabeled and the site boundary in the north-east corner.was shown incorrectly.
Enclosed are ten (10) copies of corrected Figure 2,.
Please substitute this,figure for the ones in the copies of the program now in your possession.
Very truly yours,,
HH y~
E. E. Van Brunt, Jr.
Vice. President, Nuclear Services ANPP Project Director EEVBJr/JRM/pk Enclosures cc; A. C. Gehr R.. L. Robb W. H. Wilson J.
M. Allen W. L. Hurst
,G. Mattsson (w/o encl.)
(w/o encl.)
(w/o encl.)
,(w/o encl.)
(w/o encl.)
(w/o encl.)
0 ll c
ik P
R
~C
'e r
4 U,
1
,1 p
n I
V.
3 et,
"~
~
0 C
I
900 850
%000 OO0
'b p~
20dbb 0
I 27cbc 0.
34abb 26baa '~g
~QTa1 L'EG END I
ALLUVIUM:
BROWN SILT AND CLAY,GRAVEL AND SAND LENSES (UNDIFFERENTIATED)
POORLY CEMENTED DEPOSITS OF GRAYISH BROWN SILT, SAND AND GRAVEL VOLCANICsl GRAY ANDESITE AND BROWN BASALT(UNDIFFERENTIATED)
GEOLOGICAL CONTACT PVNGS SITE 600WATER LEVELCONTOUR REGIONAL AQUIFER (1969-1973 DATA)
IN FEET, MSL DATUM Oo PROPOSED MONITORINGWELL 0
17abb 14dbb 0
0 21cbb2 0
NORTH 2 MI 700 0
SCALE 8000 FT SCALE Arizona Nuclear Power Project Palo Verde Nuclear Generating Statior)
'Units 1, 2 & 3 LOCATION OF MONITORING WELLS-REGIONAL AQUIFER Figure 2
i~
1X