Public Service Electric and Gas Company Louis F. Storz Public SeNice Electric and Gas Company P.O. Box 236, Hancocks Bridge, NJ 08038 609-339-5700 Senior Vice President - Nu.clear Operations LR-N990006 United States Nuclear Regulatory Commission ~AN O7 1999 Document Control Desk

SUPPLEMENTAL INFORMATION FOR REQUEST FOR LICENSE AMENDMENT AUXILIARY BUILDING VENTILATION SALEM GENERATING STATION UNITS 1 AND 2 FACILITY OPERATING LICENSE NOS. DPR-70 AND DPR-75 DOCKET NOS. 50-272 AND 50-311 By letters dated January 8, September 21, and December 22, 1998, Public Service Electric and Gas Company (PSE&G) provided the Nuclear Regulatory Commission (NRC) with the additional information relative to the PSE&G proposed amendment to modify Technical Specification 3/4 7.7 "Auxiliary Building Exhaust Air Filtration System." (TAC Nos. M99875 and M99876). On November 2 and November 24, 1998 additional verbal information was provided to the NRC relative to the September 21 letter during a conference call.

This letter is being transmitted to document the changes agreed to between my staff and the NRC. Attachment I contains revisions to inserts as originally submitted in our October 24, 1997 letter (Ref: N97488). PSE&G has reviewed the original no significant hazards evaluation submitted in support of LR-N97488, and determined that it remains valid.

Should there be any additional questions or comments on this transmittal, please.

do not hesitate to contact us.

Sincerely, Attachment (1)

Affidavit J

  • IIt., Printed on

~ Recycled Paper

Document Control Desk JAN 0 71999 LR-N990006 C Mr. H.J. Miller, Administrator - Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406

. Mr. P. Milano, Licensing Project Manager - Salem U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 14E21 Rockville, MD 20852 Mr. S. Morris USNRC Senior Resident Inspector (X24)

Mr. K. Tosch, Manager IV Bureau of Nuclear Engineering 33 Arctic Parkway CN 415 Trenton, NJ 08625 95-4933

REF: LR-N990006 LCR S95-44 STATE OF NEW JERSEY)

) SS.

COUNTY OF SALEM )

L. F. Storz, being duly sworn according to law deposes and says:

I am Senior Vice President - Nuclear Operations of Public Service Electric and Gas Company, and as such, I find the matters set forth in the above referenced letter, concerning Salem Generating Station, Units 1 and 2, are true to the best of my knowledge, information and belief.

Subscribed and Sworn to before me this 0'1fi day of l78l\//J,4Rv, 1999 7

£)Jky,1~, A ~du)

'No'tarY* Pliblic of New Jersey DELORIS D. HADDEN Notary Public of New Jersey My Commission Expires 03-29-2000 My Commission expires on _ _ _ _ _ _ _ _ _ _ _ _ __

LR-N990006 ATTACHMENT I SUPPLEMENTAL INFORMATION FOR REQUEST FOR LICENSE AMENDMENT AUXILIARY BUILDING VENTILATION SALEM GENERATING STATION UNITS 1AND2 FACILITY OPERATING LICENSE NOS. DPR-70 AND DPR-75 DOCKET NOS. 50-272 AND 50-311 The Insert material from Request for License Amendment originally submitted in our October 24, 1997 letter (Ref: N97488) is shown below with currently proposed changes. The proposed changes are shown in Bold and underlined for emphasis.

These changes have been agreed to by PSE&G and the NRC.

Insert A (LCO UNIT 1)

Three Auxiliary Building exhaust air HEPA filter trains, one carbon adsorber bank, two supply fans, and three exhaust fans, shall be OPERABLE t}.

Auxiliary Building pressure shall be negative with respect to atmospheric pressure.

Insert B (ACTION)

a. With one HEPA filter train inoperable, restore the inoperable HEPA filter train to OPERABLE status within 7 days or be in HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
b. With no HEPA train associated with the one Carbon Adsorber operable, restore at least one associated HEPA train to operable status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in HOT STAND-BY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
c. With the carbon adsorber inoperable, restore the carbon adsorber to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
d. With one supply fan or one exhaust fan inoperable, restore the fan to OPERABLE status within 14 days or be in HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
e. With Auxiliary Building pressure at or above zero inches water column (O.OO"wc) with respect to atmospheric pressure, restore building negative pressure within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
f. With less than two exhaust fans operable restore one exhaust fan to operable status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in

LR-N990006 ATTACHMENT I SUPPLEMENTAL INFORMATION FOR REQUEST FOR LICENSE AMENDMENT AUXILIARY BUILDING VENTILATION SALEM GENERATING STATION UNITS 1AND2 FACILITY OPERATING LICENSE NOS. DPR-70 AND DPR-75 DOCKET NOS. 50-272 AND 50-311 COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

g. With no supply fans operable, be in HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

(*)One of the Supply Fans may be considered OPERABLE with its start circuit administratively controlled (removed from service) to prevent more than one supply fan from operating at any time.

(SURVEILLANCE REQUIREMENTS)

Insert C (UNIT 1 TS 4.7.7.1)

The Auxiliary Building Exhaust air filtration system shall be demonstrated OPERABLE:

a. At least once each 31 days by aligning to the ECCS flow path and initiating flow for at least 15 minutes (for each train) through:
1. filter train 11 and carbon adsorber train 14, then
2. filter train 12 and carbon adsorber train 14
b. At least once each 18 months, or (1) following painting, fire or chemical release in any ventilation zone communicating with the system, or (2) any partial or complete replacement of the HEPA or carbon filters, by:
1. Verifying that, with the ECCS duct flow path and HEPA train 11 aligned to carbon adsorber train 14 and operating at a flow rate of 21,400 CFM +/-10%, the total bypass flow is less than or equal to 1% when tested by injecting halogenated hydrocarbon refrigerant in accordance with ANSI N510-1975.
2. Verifying that, with the ECCS duct flow path and HEPA train 12 aligned to carbon adsorber train 14 and operating at a flow rate of 21,400 CFM +/-10%, the total bypass flow is less than or equal to 1% when tested by injecting halogenated hydrocarbon refrigerant in accordance with ANSI N510-1975.

LR-N990006 ATTACHMENT I SUPPLEMENTAL INFORMATION FOR REQUEST FOR LICENSE AMENDMENT AUXILIARY BUILDING VENTILATION SALEM GENERATING STATION UNITS 1AND2 FACILITY OPERATING LICENSE NOS. DPR-70 AND DPR-75 DOCKET NOS. 50-272 AND 50-311

3. Verifying that, in-place leak testing of the carbon adsorber train ,

14 removes ;:::99% of a halogenated hydrocarbon refrigerant test gas when tested at 21,400 CFM +/-10% in accordance with Regulatory Guide 1.52 Rev 2, 1978, Section C.5.d.

4. Verifying that, in-place leak testing of HEPA filter banks in trains 11, 12, 13 will remove 99% of DOP when tested at their rated design flow capacity +/-10% for each housing in accordance with Regulatory Guide 1.52 Rev 2, 1978, Section C.5.c.
5. Verifying within 31 days after removal that laboratory analysis of a representative carbon sample demonstrates a removal of
90% methyl iodine when tested at 30 degree C and 95%

RH in accordance with ANSI 03803 Revision 1989.

6. Verifying that flow rate through the carbon adsorber does not exceed 21,400 CFM +/- 10% when either HEPA+ carbon adsorber combination is aligned to the ECCS areas.

7.a. Verifying the total pressure drop across HEPA train 11 and carbon adsorber train 14 is ::;:;4" Water Gauge when tested at 21,400 CFM +/-10%.

7.b. Verifying the total pressure drop across HEPA train 12 and carbon adsorber train 14 is ::;:;4" Water Gauge when tested at 21,400 CFM +/-10%.

8. Verifying that, with HEPA train 11 aligned to the carbon adsorber 14 and HEPA train 12 aligned to the normal area duct, the system can maintain the Auxiliary Building at a slight negative pressure with respect to outside ambient pressure.

J **

  • LR-N990006 ATTACHMENT I SUPPLEMENTAL INFORMATION FOR REQUEST FOR LICENSE AMENDMENT AUXILIARY BUILDING VENTILATION SALEM GENERATING STATION UNITS 1AND2 FACILITY OPERATING LICENSE NOS. DPR-70 AND DPR-75 DOCKET NOS. 50-272 AND 50-311 Insert D (UNIT 1 4.7.7.1)
c. After every 720 hours0.00833 days <br />0.2 hours <br />0.00119 weeks <br />2.7396e-4 months <br /> of operation verify that within 31 days after removal that laboratory analysis of a representative carbon sample demonstrates a removal of ~90% methyl iodine when tested at 30 degree C and 95% RH in accordance with ANSI 03803 Revision 1989.
d. After maintenance affecting the flow distribution, verify that the airflow distribution of the system is acceptable when tested in accordance with Regulatory Guide 1.52, Revision 2, 1978 Section C.5.b.
e. After any structural maintenance on the HEPA or carbon adsorber unit mounting frames or housing, perform tests as required by surveillance 4.7.7.1.b.1through4.7.7.1.b.4.
f. After operation of Auxiliary Building. normal flow path through the carbon adsorber, prior to mode 4 entry, verify the carbon adsorber will remove ~99% of a halogenated hydrocarbon refrigerant test gas when in-place leak tested at a flow rate of 21,400 CFM +/-10%.
g. After operation of containment purge exhaust flow path through the carbon adsorber, prior to mode 4 entry, verify the carbon adsorbers will remove ~99% of a halogenated hydrocarbon refrigerant test gas when in-place leak tested at a flow rate of 21,400 CFM +/-10%.

The same changes described above are applicable to the Salem 2 Technical Specifications.

Insert J ( UNIT 1 & 2 BASES)

No changes are required from the original insert.