Discusses Option Chosen by Util to Resolve Issues Re Spent Fuel Pool Liner Analysis.Util Will Seismically Qualify Spent Fuel Pool Cooling Sys Which Will Eliminate Need to Postulate Loss of Forced Cooling
ML18106A274
Person / Time
Site: Salem  PSEG icon.png
Issue date: 01/19/1998
From: Eric Simpson
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LR-N980008, TAC-M94465, NUDOCS 9801270069
Download: ML18106A274 (2)


Text

... i ..

  • Public Service Electric and Gas Company E. C. Simpson Public Service Electric and Gas Company P.O. Box 236, Hancocks Bridge, NJ 08038 609-339-1700 Senior Vice President - Nuclear Engineering JAN 19 1998 LR-N980008 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 SPENT FUEL POOL COOLING SYSTEM SALEM GENERATING STATION UNITS 1 AND 2 FACILITY OPERATING LICENSES DPR-70 AND DPR-75 DOCKET NOS. 50-272 AND 50-311

References:

(1) NRC Letter dated September 19, 1997, "Summary of September 19, 1997 Meeting to Discuss Analysis of the Spent Fuel Pool Liner (TAC No. M94465)"

(2) PSE&G Letter LR.:.N96218 to the NRC dated August 2, 1996, "Spent Fuel Survey Commitments" Ladies and Gentlemen:

Reference 1 *requested that Publ.ic Service Electric & Gas Company (PSE&G) notify the NRC as to the option chosen to resolve the issues associated with the Spent Fuel Pool Liner analysis. Three options were identified: revise the liner analysis to resolve NRC concerns, conduct testing, or seismically qualify the Spent Fuel Cooling System.

PSE&G will seismically qualify the Spent Fuel Pool Cooling System. This will eliminate the need to postulate a loss of forced cooling, thereby precluding the need to evaluate the liner for boiling conditions. This will also resolve other technical issues associated with boiling in the Spent Fuel Pool, as presented to the NRC in March, 1996. This effort will be completed prior to the next scheduled refueling outages for each Salem Unit, along with the establishment of a Decay Heat Management Program as previously / /

committed to in Reference 2. 0 v

Please note the Salem Spent Fuel Pool Cooling System pumps are powered from vital buses. During a loss of offsite power (LOOP) event the pumps are automatically loaded onto their respective vital bus. Therefore a LOOP event will not result in loss of 117)1)/

Spent Fuel Pool cooling and subsequent pool heatup. /V 7


9001270069 980119 .

PDR ADOCK 05000272 p PDR 11111111111111111111~ 1111111111111111F*

  • &&4&ae.

IX\ Printed on

~ Recycled Paper

Docu.ment Control Desk

  • JAN 19 1998 LR-N980008 Should you have any questions regarding this transmittal, please contact us.

\

c Mr. H. J. Miller, Administrator - Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Mr. P. Milano, Licensing Project Manager -Salem U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 14E21 Rockville, MD 20852 Ms. M. Evans USNRC Senior Resident Inspector (X24)

Mr. K. Tosch, Manager, IV Bureau of Nuclear Engineering PO Box415 Trenton, NJ 08625