PS~G Public Service Electric and Gas Company P.O. Box 236 Hancocks Bridge, New Jersey 08038 Salem Generating Station August 7, 1990 U. s. Nuclear Regulatory Commission.

Document Control Desk Washington, DC 20555

Dear Sir:

SALEM GENERATING STATION LICENSE NO. DPR-70 DOCKET NO. 50-272 UNIT NO. 1 SUPPLEMENTAL SPECIAL REPORT 88-3-24 This supplemental Special Report addresses additional fire barrier penetration seal impairments (for both Salem Unit 1 and Salem Unit

2) which have not been restored to functional status within seven (7) days. These impairments have been identified by the Penetration Seal Task Force. This report has been prepared in accordance with the reporting requirements of Technical Specification Action Statement 3.7.11.a pursuant to Technical Specification 6.9~2.

Sincerely yours,

~~&ljpzhfi~

General Manager -

Salem Operations MJP:pc Distribution 900814006~ ?Q9~9Z~~

U~UUUL!L pnp s- .ADOCK PDC The En*.H*gy People

UNIT. 1 SPECIAL REPORT 8*3-24 PLANT IDENTIFICATION:

Salem Generating Station - Units 1 & 2 Public Service Electric & Gas Company Hancock's Bridge, New Jersey 08038 IDENTIFICATION OF OCCURRENCE:

Technical Specification 3.7.11; Fire Barriers Impaired For Greater Than 7 Days Event Date(s): 7/20/88, S/9/88, 9/7/88, 10/11/88,* 11/7/88, 12/7/88, 1/5/89, ~/6/89, 3/7/89, 4/6/89, 5/9/89, 6/7/89, 7/12/89, 8/8/89, 9/7/89, 10/7/89, 11/8/89, 12/8/89, 1/9/90, 2/8/90, 3/14/90, 4/9/90, 5/8/90, 6/8/90, 7/16/90 Report Date: 8/7/90 This report was initiated by Incident Report Nos.88-268, 88-531,88-536, 88-537,88-544, 89-050,89-075, 89-086,89-091, B9-092, 89:_127,89-287, 89-349, 472,90-357, and 90-359 .

.CONDITIONS PRIOR TO OCCURRENCE:

N/A DESCRIPTION OF OCCURRENCE:

As identified in PSE&G letter NLR-N88037 dated March 4, 1988, PSE&G has iriitiated a comprehensive review/inspection of fire barrier penetration seals. Due to the-additional review by the Penetration Seal Task Force; penetrations found impaired are not being repaired within seven days as specified by Technical Specification Action Statement 3.7.11.a. This report summarizes the task force findings and Technical Specification 4.7.11 surveillance activity findings associated with inadequate penetration seals for both Unit 1 and Unit

2. T_he inadequate penetration seals found, to the date of issue of this report, include:

On July 13, 1988 two fire Barrier cable penetratibn were found degraded. The penetration contained electrical sleeving containing an electrical cable surrounded by foam type fire sealant. The area (approximately 1/8" gap and 1/4" gap respectively) surrounding the electrical sleeves were not sealed thereby constituting an impaired seal. The fire barrier is in the east wall of the 100' Elevation Re1ay Room.

On July 25, 1988 three (3) degraded fire barrier cable penetration seals were found on the south wall in the*lOO' Elevation Relay Room. Two (2) of these penetrations are 3" in diameter and the other is 5.5" (located -1a feet above*~he floor). The 3" penetrations contain fire wrapped cabling. This fire wrap extends over the penetration. There is no foam behind the fire wrap.

  • It provides a 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> rated barrier, .however, the wall is a 3 hour3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> barrier. The 5.5" penetration contains a 4" conduit surrounded by foam. The foam contains an 1/8" gap at the base of the conduit.

Unit 1 SPECIAL REPORT 8*-24 -2~

DESCRIPTION OF OCCURRENCE: (cont'd)

On July 28, 1988 one (1) 3.5" degraded fire barrier cable penetration seal was found on the north wall in the 100' Elevation Relay Room. The pe:netration contains cabling surrounded by foam. The foam contains an 1/2" diameter hole.

Between August 2, 1988 and August 301 1988, 138 additional penetration seals were found impaired*of which 134 penetrations are located in the Unit 1 Relay Room and 4 penetrations are located in the Unit 1 lA 125 V Battery . Room . . The penetrations range in size from -3 inches to -6 inches in diameter. The nature of the impairments include 6 with no seal, 14 with a hole in the seal (unknown cause), 2 with foreign material imbedded in the seal (one imbedded with a rag and the other with duct tape).,

30 with a void in th.e seal (due to inadequate quantity.of foam injection upon installation) , 6 with apparent degrada"tion *(e.g. r cable pulled through) 47 with inadequate color/cell structure (reference LER 272/88-013-00) and 32 that are not deep enough into the penetration per design (less than 6 inches).

Between August 31, 1988 and July 30, 1990, 6914 Unit 1 penetration seals and 5185 Unit 2 penetration seals were reviewed. Of these, 2857 penetration seals were determined to be impaired~ The majority of penetrations range in size from -3 inches to -Q inches in diameter. There were 336 penetrations which were larger than 6 inches in. diameter .. These penetrations ranged from 3"x5" to 258"x36".

  • Page 3 of this report contains ~ table of the penetration seals found impaired, between August 2, 1988 ~nd July 30, 1990, *in.

relation to the fire zone where they were found. The impairment designator terms include:

No Seal NOS Hole in Seal HOL Void in Seal VIS Depth Not Great Enough DPT Color/Cell Structure CEL Seal Degradation DEG Foreign Material Imbedded FMT Planned Impairment PIM An hourly fire watch patrol had been established for the above areas previously due to other fire protection concerns. Therefore, the requirements of Tech. Spec. Action Statement 3.7.11.a are met.

Unit 1 Technical Specification 3.7.11 states:

"All fire penetrations (includirig cable penetration barriers, fire doors and fire dampers), in fire zone boundaries, protecting safety related areas shall be fuhctional."

.*Unit 1 Technical Specification Action Statement 3. 7 .11. a states:

"With one or more of the above required fire barrier penetrations non-functional, within one hour either establish a

UNIT 1 SPECIAL REPORT ~3-24 DESCRIPTION OF OCCURRENCE: (cont'd) continuous fire watch on at least one ~ide of the affected penetration, o~ verify the OPERABILITY of fire detectors on at least one side of the non-functi9nal- fire barrier and establish ari hourly fire watch patrol. Restore the nqn-functional fire barrier penetration(s) to functional status within 1 days or, in lieu of any other report required by Specification 6.9.1, prepare and submit a Special Report to the Commission pursuant to Specification 6.9.2 within the. next 30 days outlining the action taken, the cause of the non-functional penetration and plans and schedule for restoring the fire barrier penetration(s) to functional status."

NOTE - Unit 1 Technical Specification 3.7.11 4iffers from Unit 2. The words "functional" and "non-functional" are replaced by the words

TABLE OF INOPERABLE PENETRATION SEALS 8/02/88 - 7/30/90 AREA NOS HOL DPT CEL ,DEG PIM U-1 Relay Room 15 34 54 72 194 7 *3 l**

U-1 lA DIG Control Room 2 3 2 21 U-1 lB DIG Control Room 1 1 3 21 2 U-:-1 lC D/G Control Room 1- 1 1 11 11 2 U-1 lA 125 v Battery Room 2 3~

2 U-1 lC 125 v Battery Room 20 1 1 U-1 #1 250 v Battery Room 1 1 5 U-1 #3 Stairwell 13 1 5 U-1 64' Elevation, Aisle 3 1 6 17

  1. 1 Auxiliary Building U-1 84' Elevation, Aisle 6 4 7 7 1
  1. 1 Auxiliary Building U-1 122' Elevation; N2 1 1 Bottle Storage Area U-1 84' Corridor; Unit 1 &: 3 3 2 Common East &: West
  • U-1 78' Electrical Penetra. 1 1 1 1 7 Area U-1 100' Boric Acid Transfer 3 4 12 5 Pump Area ..

UNIT 1 SPECIAL REPORT 8*-24 TABLE OF INOPERABLE PENETRATION SEALS (cont'd) 8/02/88 - 7/30/90

.AREA NOS HOL VIS DPT CEL DEG FMT PIM U-1 100' El. Mechanical 1 5 2 8 3 1 Penetration Area - Blowdown Tanks U-1 100' El. Corridor 2 3 3 2 1 Service Building U-1 100' Elevation, Aisle 4 4 2 6 14 1

  1. 1 Auxiliary Building U-1 100' Corridor; Unit 1 & 15 11 8 30 61 1 2* Common East & West
  • U-1 84' Corridor; Unit 1 & 2 7 14 11 2 1 2 Common North & South U-1 84' Corridor; Unit 1 & 3 3 2 Common East & West
  • U-1 122' Lobby 2 U-1 100' Lobby 1 1 U-1 64' Lobby 1 u-1 11/12 Containment Spray 4 4 6 19 2 Pumps & Spray Add. Tank Area U-1 100' Corridor; Unit 1 & 2 4 3 1 185 2 2 Common North & South U-1 100' Elevation Counting 6 1 1 Room U-1 #11 Diesel Oil Tk Room 1 1 3 U-1 #12 Diesel Oil Tk Room 2 5 U-1 84' Elev. Control Area 23 14 1 22 91 1
  1. 1 Transformer Bus Rm.

u.:..1 Spent Fuel Pit Heat 3 3 6 16 Exchanger & Pump Area U-1 lA Diesel Generator Area 5 1 1 U-1 lB Diesel Generator Area 1 1 7 1 7 U-1 le Diesel Generator Area 4 1 2 3 U-1 Waste Evaporator Room 4 11 4 1 1 U-1 100' Elevation Mechanical 8 4 10 Penetration Area

UNIT 1 SPECIAL REPORT 8*-24 TABLE OF INOPERABLE PENETRATION SEALS (cont'd) 8/02/88 -. 7/30/90 VIS DPT CEL U-1 UPS Battery Room 2 U-1 Containment Rad Mon Room 4 1 *10 10 U-1 #11 Chg. & SI Pump Room 1 4 U-1 #12 Chg *. & SI Pump Room 1 U-1 #13 Chg. & SI Pump Room- 2 U-1 84' El. Pipe Trench 126 1 1 16 . 2*

U-1 100' El. Baling & Storage 7 1 3 1 1 U-1 110' El. Control Console 1 9 U-1 78' El. Contain. Rad 1 1 Mon. Room U-1 84' El. #11 Comp. Cool. 20 1 3 .2 Heat Xgr. & 12 CC Pp Room U-1 100' Elec. Penetra. Area 14 4 17 6 5 U-1 Laundry, Chem Pump Area 5 3 2 19 4 U-1 ~4' El. Coritrol Area #1 3 4 18 11 1 4KV Bus U-i #1 Letdown Heat Exch. 1 U-1 84~ El. #12 Comp. Cool. 3 3 *3 Heat Xgr. & 12 & 13 CC Pp Room U-1 #11 SI Pump Room 1 1 U-1 Pipe Trench 14 3 3 20 16 3 U-1 Rx Coolant Filter Area 9 1 U-1 84' Spent Resin Xfer Pp Rm 2 V-1 11 & 12 Mon. Tank Room 8 1 5 2 U-1 84' Elevator Lobby 1 U-1 Aux Feed Pumps 3 U-1 Valve Alley 3 2 3 U-1 Seal Water Heat XChg 2 3 1 U~l 84' El. Corridor 2 2 1

UNIT 1 SPECIAL REPORT 8At-24 e TABLE OF INOPERABLE PENETRATION SEALS (cont'd) 8/02/88 - 7/30/90 AREA NOS HOL VIS DPT CEL DEG FMT PIM U-1 A/C & Boric Acid 5 1 10 81 1 Tank Room U-1 A/C Equipment Rm 1 2 4 U-1 Boric Acid Evap. & 2 1 3 1 Gas Stripper Unit u..,...1 Water Recirc Heater 3 1 1 2 U-1 #1 Stairwell 6 5 U-1 #1 Cone. Filter Area 1 U-1 Rm Next To #11 Chg Pp 2 2 U-1 Diesel Oil C02 Area 4 1 U-1 Motor Control Center 2 1 1 U-1 Elevator - El 2 1 1 U-1 N2 Bottle Storage 3 U-1 #12 RHR XGR Room 1 U-1 55' El. Walkway 2 U-1 Future Mixed Bed 7 Demin U-1 #11 Mixed Bed Demin 2 u-1 #1 Cation Bed (NW) 2 U-1 #1 Cation Bed (SW) 8 U-1 #11 Debora ting Deroin 3 U-1 #12 Debora ting Demin 2 1 U-1* Primary Sampling Lab 3 1 U-1 78' Piping Penetration 1 4 U-1 Vent Duct Shaft 1 6 U-1 Valve Room 4 U-1 Waste Evaporator Area 1 U-1 #11 Evap. Feed Ion Xchg. 3

UNIT 1 SPECIAL REPORT 8At-24 TABLE OF INOPERABLE PENETRATION SEALS (cont'd) 8/02/88 - 7/30/90 AREA NOS HOL VIS DPT CEL JJEG FMT PIM U-1 #12 Evap. Feed Ion Xchg. 2 u:.....1 #13 Evap. Feed Ion Xchg. 4 U-1 #14 Evap. Feed Ion Xchg. 1 1 U-1 100' Aisle #1 N & s 2 U-:-1 122' Corridor 1 U-1 Ops . File & Ref Rm 1 U-1 Watch.Engineer Room 3 u--1 #1 Maint, Spare & Test 1 Equipment Room U-1 #2 Maint,. Spare & Test 2 Equipment Room U-1 Janitors Closet 1 .'

U-1 #1 Control Equip. Room 15 5 U-1 84' El. Pipe Alley 2 3 1 u:...1 Sample Room 1 U-1 Data Logging Rodin 2 16 U-1 Work Control Center 1 2 1 U-1 #11 & #12 RHR Sump Pumps 1 Room U-1 #1 Control Room 4 2 U-1 AC Equip. Room 1 2 U-1 #1 Sp~nt Fuel Pit Filter 1.

U-1 Women's Toilet 5 U-1 Containment Rad Monitor 1 Room U-2 #5 Stairwell 3 1 U-2 #4 Stairwell 7 1 1 U-2 #2 Stairwell 7 1 1

UNIT 1 SPECIAL REPORT 88--24 e TABLE OF INOPERABLE PENETRATION SEALS (cont'd) 8102188 - 1130190 AREA NOS HOL. VIS* DPT CEL DEG FMT PIM U-:-2 100' El. Mechanical Pene. 2 6 Area - Blowdown Tanks U-2 100' El. Corridor. 2 1 U-2 100' Elevatiori Mechani6al 5 3 5 6 4 3 Penetration Area U-2 AC & Bo;ric Acid Tank Room 9 9 21 4. 1 U-2 Relay Room 23 27 4 61 132 1 U-2 22 RHR Xgr Room 3 U-2 84' Control Area Trans- 17 34 4 39 31 former Bus Room

..U-2 Rad. Detector Panel 1 U-2 Battery Room 2C 125VDC 13 U-2 Battery Room 2B 125VDC 2 3 3 U-2 #2 250V Battery Room 3 U-2 Control Area #7 4KV 4 5 2 j 1 Vital Bus Area U-2 110' El. Control Console 1 3 U-2 78' Electrical Pen. Area 5 4 U~2 100' Electrical Pen. Area 2 1 3 U-2 2A DIG Control Room 1 5 4 1*

U-2 2B DIG C_ontrol Room 1 2 11 4 U-2 2C DIG Control Room 2 4 3 U-2 #21 Diesel Oil Tank Area 5 2 1 3 U-2 #22 Diesel Oil Tank Area 1 3 2 4 4 U-2 #21 Diesel Fuel Oil 1 1 Transfer Pump Area U-2 #22 Diesel Fuel Oil 1 Transfer Pump Area U-2 111' Vent. Equip. Area 19 4 ,9

UNIT 1 SPECIAL REPORT 88--24 TABLE OF INOPERABLE PENETRATION SEALS (cont'd) 8/02/88 - 7/30/90 AREA NOS HOL. VIS DPT CEL DEG FMT PIM U-2 100' Vent Duct Shaft 1 1 U-2 64' Storage Area 2 1 19 6 U-2 s*4

  • Spent Fuel Pit Heat 4 1 4 XChgr. & Pump Room U-2 Boric Acid XFer Pump Area 9 1 1 2 U-2 Aisle #1 East Section 7 1 1 '2 U-2 Aux. Feedwater Pumps 2 4 *1.

U-2 #21 & 22 Monitor Tank 3 1 1 2 Area U-2 21 & 22 Cont. Spray 11 4 1 1 Pumps & Spray Add Tank U-2 Aisle 2 East & West 1 1 U-2 Counting Room 1 5 U-2 #2 Control Room 13 7 2 1 1*

U-2 78' Containment Rad 6 5 Monitor Room U-2 21 & 22 SI Pump Room 1

  • U-2 84' Piping Pene Area 5 U-2 Aisle 2 North & South 1 1 U-2 84' Corridor 1 U~2 Calibration Room 1 U-2 #21 Component Cooling 16 1 Heat Exchanger and Pumps U-2* #22 Component Cooling 6 Heat Exchanger and Pumps U-2 84' SW Piping Room 1 U-2 C02 Fire Equipment Area 1 U-2 Concentrates Holding Tank 1 U-2 Seal Water Heat XChgr 1

UNIT 1 SPECIAL REPORT 8~-24 TABLE OF INOPERABLE PENETRATION SEALS (cont'd) 8/02/88 - .7/30/90 DPT CEL DEG FMT U-2 #2 Rx Coolant Filter Area 7 U-2 #2 Control Equip Room 1 4 U-2 84' Valve Room* 5 U-2 #100 Rad Detector Panel 1 1 u~2 Waste Evaporator Area 1 3 U-2 Vent Duct Enclosure Shaft

-U-2 Motor Control Center 1 U-2 Ref. Water Purifier Room 2 U-2 Data Logging Room 5 7 U-2 A/C Equipment Room 2 U-2 84' Pipe Alley 6 1

~.

U-2 N2 Bottle Storage Area 1 1 U-2 #24 Evap. Feed Ion Xchgr 1 U-2 100' Cation Bed Demin. 3 U-2 8.4 I Valve Alley 1

  • - The opposite*room for :the north and east walls is.the Unit 2 Relay Room.
    • - The Relay Room PIM was resealed thirteen days after _opening

. APPARENT CAUSE OF OCCURRENCE:

The cause of the degraded fire barrier penetrations _could not be positively determined.

The east wall penetrations (discovered 7/13/88) from the Relay Room side "appeared" sealed visually due tQ the use of* a bushing o~ the sleeve which hid the gap. The 3.5" south wall penetrations (discovered 7/25/88) also appeared sealed from the Relay Room side, as described in the Description of Occurrence section. Closer inspection, as required by. the Seal Penetration Review Group procedures, revealed the nature of the impairments. Technical Specification Surveillance 4~7.11 requires verification of the functional status of fire bar~ier penetrations every eighteen.months via a visual inspection. This inspection would not necessarily identify the non-functional status of the subject penetrations.

UNIT 1 SPECIAL REPORT 88.-24 APPARENT CAUSE OF OCCURRENCE: (cont'd)

The 5.~" south wall penetration (found July 25) is located in a difficult to reach location. The gap in the seal may have formed due to shrinkage. It does not appear as though a cable was ~ulled (forming the gap) .

The 3.5" north wall penetration (found July 28) is .also located in a difficult to reach location. The gap in the seal a~pears to have formed as a result of a cable pull. It has not been determined when or by whom the cable was pulled.

The penetrations with non-functional seals, found between August 2, 1988 and July 30, 1990, are similar in configuration (except as noted) to the penetrations identified in the original issue .of this Special Report. The cause of their degraded condition also could not positively be determined.

ANALYSIS OF OCCURRENCE:

The functional integrity of the penetration fire. barriers ensures that fires will be confined or adequately retarded from spreading to adjacent p9rtions of the facility. This design feature minimizes the possibility of a single fire involving several areas *of the facility.

The fire barrier* penetration* seals are a passive element in the facility fire protectiort program

  • and are subject to periodic ..
  • inspections. This report satisfi~s the repoiting ~equirements of Technical Specification 3. 7 .11. a pursuant. to . Technical Specification 6.9.2 since the time between discovery ~nd eventual repair of the fire barrier impairments is greater than seven (7) days.* Appropriate actions were already in place.in accordance with the requirements of Technical Specification Action Statement 3.7.11.a to establish a one hour roving fire watch for the impaired fire barriers once the impairments were identified.

The subject fire area contains detection in addition to the.roving fire watch patrol. Therefore, it is re~sonable to.assume that a fire in either area would be detected before it could involve an adjacent area. *This occur~ence ther~fore involved no undue ~isk to the health or safety of the public.

CORRECTIVE ACTION:

The hourly fire watch, as addressed in the

Description:

of Occurrence section, will continue until all fire protection concerns associated with these areas are resolved.

  • The repair of the penetrations was not accomplished within seven (7) days due to the additional review beirig conducted by th~ Penetration Seal Task Force. Upon completion of this review the penetrations will be sealed.

Penetration seal repair work has been initiated. The Unit 1 Relay Room was the first area worked. To date, 3241 penetrations have been sealed and accepted by ~he Penetration Seal Task Force.

The majority of those penetrations in the Unit 1 and.Unit 2 Relay Rooms (halon discharge areas) which either have no seal or holes **

UNIT 1 SPECIAL REPORT 88.-24 CORRECTIVE ACTION: (cont'd) -

through the seal have been sealed using approved station procedure M3Y, "Installation and Repair of Fire Barrier and Flood Protection Seals".

The review and corrective actions, conducted by the Penetration Seal Review Program, will be completed in accordance with the March 4, 1988 PSE&G letter NLR-N88037 to the NRC, the August 26, 1988 .

telecommunication between PSE&G and the NRC Region 1 office, and the August 15, 1989 semi-annual management meeting conducted with the NRC.

o/c:fWoL~ /:~.d General Manager - /,£ >--U Salem Operations MJP:pc SORC Mtg.90-100