Letter Sequence Supplement |
|---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance...
- Supplement, Supplement, Supplement
Results
Other: ML17156A098, ML17346A732, ML17347A383, ML17348B142, ML18078A747, ML18107A504, ML18120A135, ML18124A190, ML18127A034, ML18129A356, ML18143B396, ML18151A082, ML18155A550, RBG-47807, Response to License Renewal Application NRC Requests for Additional Information Set 3
|
MONTHYEARML17156A0982017-06-19019 June 2017 Receipt and Availability FRN - License Renewal Application for River Bend, Unit 1 Project stage: Other RBG-47773, Supplement to License Renewal Application2017-08-0101 August 2017 Supplement to License Renewal Application Project stage: Supplement ML17320B0992017-11-16016 November 2017 NRR E-mail Capture - Final Requests for Additional Information for the Safety Review of the River Bend Station License Renewal Application Project stage: RAI ML17335A0982017-11-29029 November 2017 NRR E-mail Capture - Final Requests for Additional Information for the Safety Review of the River Bend Station License Renewal Application Project stage: RAI ML17347B4322017-12-13013 December 2017 NRR E-mail Capture - Final Requests for Additional Information for the Safety Review of the River Bend Station License Renewal Application (CAC No. MF9757) - Set 5 Project stage: RAI ML17347B4242017-12-13013 December 2017 NRR E-mail Capture - Final Requests for Additional Information for the Safety Review of the River Bend Station License Renewal Application (CAC No. MF9757) - Set 4 Project stage: RAI ML17361A3962017-12-27027 December 2017 NRR E-mail Capture - Final Requests for Additional Information for the Safety Review of the River Bend Station License Renewal Application (CAC No. MF9757) - Set 6 Project stage: RAI ML17348B1422018-01-0808 January 2018 RBS Scoping and Screening Audit Report Project stage: Other ML17347A3832018-01-0808 January 2018 RBS Ope Audit Report Project stage: Other ML18009A9092018-01-0909 January 2018 NRR E-mail Capture - Final Requests for Additional Information for the Safety Review of the River Bend Station License Renewal Application (CAC No. MF9757) - Set 7 Project stage: RAI RBG-47807, Response to License Renewal Application NRC Requests for Additional Information Set 32018-01-10010 January 2018 Response to License Renewal Application NRC Requests for Additional Information Set 3 Project stage: Other ML18022A9412018-01-22022 January 2018 NRR E-mail Capture - Final Requests for Additional Information for the Safety Review of the River Bend Station License Renewal Application (CAC No. MF9757) - Set 8 Project stage: RAI RBG-47813, Response to License Renewal Application (LRA) NRC Request for Additional Information Set 52018-01-24024 January 2018 Response to License Renewal Application (LRA) NRC Request for Additional Information Set 5 Project stage: Request RBG-47812, Response to License Renewal Application (LRA) NRC Request for Additional Information (RAI) Set 42018-01-24024 January 2018 Response to License Renewal Application (LRA) NRC Request for Additional Information (RAI) Set 4 Project stage: Request ML17346A7322018-01-29029 January 2018 Aging Management Programs Audit Report Regarding River Bend Station, Unit 1 License Renewal Application Review Project stage: Other RBG-47818, Response to License Renewal Application NRC Request for Additional Information - Set 72018-02-0707 February 2018 Response to License Renewal Application NRC Request for Additional Information - Set 7 Project stage: Request ML18043A0082018-02-0808 February 2018 NRR E-mail Capture - Final Requests for Additional Information for the Safety Review of the River Bend Station License Renewal Application (CAC No. MF9757) - Set 10 Project stage: RAI ML18043A3512018-02-12012 February 2018 NRR E-mail Capture - Final Requests for Additional Information for the Safety Review of the River Bend Station License Renewal Application (CAC No. MF9757) - Set 11 Project stage: RAI ML18051A0922018-02-20020 February 2018 Single Positive Test Form Collected on 01/09/2017 Project stage: Request RBG-47828, Response to License Renewal Application NRC Request for Additional Information (RAI) Set 82018-02-20020 February 2018 Response to License Renewal Application NRC Request for Additional Information (RAI) Set 8 Project stage: Request RBG-47840, Request for Due Date Extension for License Renewal Application NRC Request for Additional Information from 30 Days to 45 Days2018-02-22022 February 2018 Request for Due Date Extension for License Renewal Application NRC Request for Additional Information from 30 Days to 45 Days Project stage: Request ML18065A2132018-03-0606 March 2018 NRR E-mail Capture - Final Requests for Additional Information for the Safety Review of the River Bend Station License Renewal Application (CAC No. MF9757) - Set 12 Project stage: RAI ML18078A7472018-03-0606 March 2018 Highland Mining Company, NRC Form 591 Part 1, Inspection Report 03036608/2018001 Project stage: Other ML18057A4532018-03-0707 March 2018 Summary of Telephone Conference Call Held on February 20, 2018 Between the U.S. Nuclear Regulatory Commission and Energy Regarding RAI Pertaining to the River Bend Station, Unit 1 License Renewal Application Review Project stage: RAI ML18059A8222018-03-0808 March 2018 Summary of Public Telephone Conference Call Held on February 27, 2018 Between the U.S. Nuclear Regulatory Commission and Entergy Regarding Requests for Additional Information Pertaining to the River Bend Station Unit 1 Project stage: RAI RBG-47834, Response to License Renewal Application NRC Request for Additional Information (RAI) Set 92018-03-0808 March 2018 Response to License Renewal Application NRC Request for Additional Information (RAI) Set 9 Project stage: Request ML18068A1872018-03-0909 March 2018 NRR E-mail Capture - Revision of Final Request for Additional Information (RAI 2.3.3.17-2) for the Safety Review of the River Bend Station License Renewal Application (CAC No. MF9757) - Set 11 Project stage: RAI ML18073A0482018-03-19019 March 2018 License Renewal Application Review Response to Request for Due Date Extension for Request for Additional Information Set 10 Project stage: RAI RBG-47835, Submittal of Response to License Renewal Application NRC Request for Additional Information Set 102018-03-26026 March 2018 Submittal of Response to License Renewal Application NRC Request for Additional Information Set 10 Project stage: Request RBG-47849, Response to License Renewal Application NRC Request for Additional Information Set 4 Supplement2018-03-27027 March 2018 Response to License Renewal Application NRC Request for Additional Information Set 4 Supplement Project stage: Supplement ML18078A7552018-03-28028 March 2018 Telephone Call Summary on Applicants Response to RAI B1.4-1 & B.1.4-2 (Set 5) on 030618 Rev 2 - All Edits Incorp Project stage: RAI ML18078A7482018-03-29029 March 2018 Uranium One Public Meeting Feb. 22, 2018 Project stage: Meeting ML18071A0182018-03-29029 March 2018 Telephone Call Summary RAI 3.2.2.3.2-1a Generic Filtration on 27FEB2018 v1_RBS Edits incorp._030618 Project stage: RAI RBG-47846, Response to License Renewal Application NRC Request for Additional Information (RAI) Set 122018-04-0303 April 2018 Response to License Renewal Application NRC Request for Additional Information (RAI) Set 12 Project stage: Request RBG-47850, Response to License Renewal Application NRC Request for Additional Information Set 5 Supplement2018-04-0404 April 2018 Response to License Renewal Application NRC Request for Additional Information Set 5 Supplement Project stage: Supplement ML18089A0762018-04-12012 April 2018 Summary of Public Telephone Conference Call Held on Between the U.S. Nuclear Regulatory Commission and Entergy Regarding Requests for Additional Information Pertaining to the River Bend Station, Unit 1 License Renewal Application Review Project stage: RAI ML18107A5042018-04-24024 April 2018 Summary of Public Telephone Conference Call Between the U.S. Nuclear Regulatory Commission and Entergy Regarding the Need for Additional Information to Support the River Bend Station, Unit 1 License Renewal Application Review Project stage: Other ML18115A0612018-04-25025 April 2018 Draft Response on RAI B1.21-1 Flow Accelerated Corrosion Project stage: Request ML18115A1632018-04-25025 April 2018 Draft Response on RBS LRA RAI B.1.21-2 Flow Accelerated Corrosion Project stage: Request ML18115A0722018-04-25025 April 2018 Draft Response on RAI B.1.25-1(Internal Surfaces in Miscellaneous Piping and Ducting Components) Project stage: Request ML18121A0292018-04-30030 April 2018 NRR E-mail Capture - Final Requests for Additional Information for the Safety Review of the River Bend Station License Renewal Application (CAC No. MF9757) - Set 14 Project stage: RAI ML18121A2942018-05-0101 May 2018 Draft Response to NRC Request for Additional Information (RAI) 4.6-1a Generated from Staffs Review on the River Bend License Renewal Application Project stage: Draft RAI ML18121A3022018-05-0101 May 2018 Draft Response to NRC Request for Additional Information (RAI) 4.6-2a Generated from Staffs Review on the River Bend License Renewal Application Project stage: Draft RAI ML18122A2312018-05-0202 May 2018 Draft Response to NRC Request for Additional Information (RAI) B.1.40-5 Service Water Integrity Generated from Staffs Review on the River Bend Station, Unit 1 License Renewal Application Project stage: Draft RAI ML18122A1262018-05-0202 May 2018 RAI B.1.17-1 Revised - w- header-footer-watermark Project stage: Request ML18124A0092018-05-0303 May 2018 NRR E-mail Capture - Final Requests for Additional Information for the Safety Review of the River Bend Station License Renewal Application (CAC No. MF9757) - Set 15 Project stage: RAI ML18120A1352018-05-10010 May 2018 Call Summary - Fuel Oil, Ext.-Int. Surf. Monitoring, FAC & Others 041018, Rev2 Project stage: Other ML18135A1072018-05-15015 May 2018 RBS Draft Response (RAI 4.3.1-2a_Class 1 Fatigue w-header-footer-watermark_received on 051318 Project stage: Request ML18136A7052018-05-16016 May 2018 RBS Draft Response to LRA Review RAI 4.7.3-1a Fluence Effects for Rv Internals Project stage: Request ML18136A8212018-05-16016 May 2018 Draft Response to RAI 3.6.2.2.2.2-1a High Voltage Insulators - RBS LRA Review Project stage: Request 2018-03-26
[Table View] |
Text
,.
-=:=. Enterp;y.
RBG-47849 March 27, 2018 Attn: Document Control Desk U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852-2738 Entergy Operations, Inc.
River Bend Station 5485 U.S Highway 61N St. Francisville. LA 70775 Tel 225-381-4374 William F. Maguire Site Vice President River Bend Station
SUBJECT:
Response to License Renewal Application NRC Request for Additional Information Set 4 Supplement River Bend Station, Unit 1 Docket No. 50-458 License No. NPF-47
References:
- 1) Entergy Letter: License Renewal Application (RBG-47735 dated May 25, 2017)
- 2) NRC email: River Bend Station, Unit 1, Request for Additional Information, Set 4 - dated December 13, 2017 (ADAMS Accession No. ML17347B424)
- 3) Entergy Letter: Response to Request for Additional Information Set 4 - dated January 24, 2018 (ADAMS Accession No. ML18025B544)
- 4) Public Conference Call - Discuss RAI B.1 _15-1, Fuel Oil Chemistry - dated March 8, 2018 (ADAMS Accession No ML18059A822)
Dear Sir or Madam:
In Reference 1, Entergy Operations, Inc (Entergy) submitted an application for renewal of the operating license for River Bend Station (RBS) for an additional 20 years beyond the current expiration date. In an email dated December 13, 2017, (Reference 2) the NRC staff issued set 4 Requests for Additional Information (RAI). On January 24, 2018, Entergy responded to the Set 4 RAls (Reference 3). On February 27, 2018, (Reference 4) during a public conference call, the NRC staff requested additional information on the Entergy response to RAI B.1.15-1 that was provided in Reference 3. Enclosure 1 provides a revised response to this RAI that includes the additional information requested.
If you require additional information, please contact Mr. Tim Schenk at (225)-381-4177 or tschenk@entergy_com _
RBG-47849 Page 2 of 2 In accordance with 10 CFR 50.91 (b)(1), Entergy is notifying the State of Louisiana and the State of Texas by transmitting a copy of this letter to the designated State Official.
I declare under penalty of perjury that the foregoing is true and correct. Executed on March 27, 2018.
Sincerely, WFM/RMC/alc : Set 4 Supplemental RAI Response - River Bend Station cc:
(with EnClosure)
U. S. Nuclear Regulatory Commission Attn: Emmanuel Sayoc 11555 Rockville Pike Rockville, MD 20852 cc:
(w/o Enclosure)
U. S. Nuclear Regulatory Commission Attn: Lisa Regner 11555 Rockville Pike Rockville, MD 20852 u.S. Nuclear Regulatory Commission Region IV 1600 East Lamar Blvd.
Arlington, TX 76011 -4511 NRC Resident Inspector PO Box 1050 St. Francisville, LA 70775 Central Records Clerk Public Utility Commission of Texas 1701 N. Congress Ave.
AtJstin, TX 78711 -3326 Department of Environmental Quality Office of Environmental Compliance Radiological Emergency Planning and Response Section Ji Young Wiley P.O. Box 4312 Baton Rouge, LA 70821-4312 RBF1-18-0054
RBG-47849 Response to Request for Additional Information Set 4 Supplement
RBG-47849 Page 1 of 2 REQUEST FOR ADDITIONAL INFORMATION LICENSE RENEWAL APPLICATION RIVER BEND STATION, UNIT 1 - SET 4 SUPPLEMENT DOCKET NO.: 50-458 CAC NO.: MF9757 Office of Nuclear Reactor Regulation Division of Materials and License Renewal Question RAI B.1.15-1 (Fuel Oil Chemistry)
Background
SRP-LR Table 3.0-1, "FSAR Supplement for Aging Management of Applicable Systems," summary description provides an acceptable program description for the GALL Report AMP XI.M30, "Fuel Oil Chemistry," as per 10 CFR 54.21 (d). The FSAR Supplement includes the specific ASTM Standards used for monitoring and control of fuel oil contamination to maintain fuel oil quality.
Issue LRA Section A.1.15, "Diesel Fuel Monitoring," USAR supplement does not appear to include the specific industry standards used for the program. The current licensing basis will not be consistent with the staff-issued guidance document during the period of extended operation if the industry standards recommended by the GALL Report are not used.
Reguest Justify the apparent absence of the above mentioned industry standards in the USAR supplement for the Diesel Fuel Monitoring program. Alternatively, state the changes to the USAR supplement necessary to include the GALL Report recommended industry standards that will be used for the program.
Response
Changes to the previous response are shown with additions underlined.
Changes are provided to the USAR supplement to identify ASTM standards used in the monitoring and control of diesel fuel, specifically, ASTM 04057, 01796, 02274 and 02276.
The use of ASTM standard 01796 in lieu of ASTM 02709 is appropriate for RBS. ASTM 02709-96 states that Test Method 01796, "Standard Test Method for Water and Sediment in Fuel Oils by the Centrifuge Method (Laboratory Procedure)," is intended for higher viscosity fuel oils. The use of ASTM 02709-96 is limited to fuel oils within a specific viscosity and density range. However, a review of ASTM 01796 -83 and -04 reveals no limitation on its use due to viscosity or other fuel oil parameters that would impact its use at RSS. In addition, Section B.3.8.3 of the RBS Technical Specifications Bases provides a discussion in Surveillance Requirement 3.8.3.3 on fuel oil testing that states "Following the initial new fuel oil sample, the fuel oil is analyzed to establish that the other properties specified in Table 1 of ASTM 0975-81 (Ref. 6) are met for new fuel oil when tested in accordance with ASTM 0975-81 (Ref. 6)". ASTM 0975-81 states in Section 4.1.3 that water and sediment are determined in accordance with method 01796. This test method has been used at RBS for many years
RBG-47849 Page 2 of 2 in accordance with Technical Specification requirements. The use of ASTM 02709 in lieu of ASTM 01796 at RBS is unnecessary.
The changes to LRA A.1.15 and B.1.15 follow with additions underlined and deletions lined through.
[The following revised LRA sections are unchanged from the previous RAI response submitted on January 24, 2018.]
A.1.15 Diesel Fuel Monitoring The Diesel Fuel Monitoring Program manages loss of material in piping, tanks and other components in an environment of diesel fuel oil by verifying the quality of the fuel oil source.
This is performed by receipt inspection, sampling, and limiting the quantities of contaminants before allowing it to enter the fuel oil storage tanks. Parameters monitored include water and sediment content, total particulates, and levels of microbiological organisms in the fuel oil.
Monitoring and control are performed in accordance with ASTM standards 04057,01796, 02274 and 02276. The program includes multi-level sampling of fuel oil storage tanks.
Where multi-level sampling cannot be performed due to design, a representative sample is taken from the lowest part of the tank. A stabilizer/biocide is added to new fuel.
B.1.15 Diesel Fuel Monitoring Program Description The Diesel Fuel Monitoring Program manages loss of material in piping, tanks and other components in an environment of diesel fuel oil by verifying the quality of the fuel oil source.
This is performed by receipt inspection, sampling, and limiting the quantities of contaminants before allowing it to enter the fuel oil storage tanks. Parameters monitored include water and sediment content, total particulates, and levels of microbiological organisms in the fuel oil.
Monitoring and control are performed in accordance with ASTM standards 04057, 01796, 02274 and 02276. The program includes multi-level sampling of fuel oil storage tanks.
Where multi-level sampling cannot be performed due to design, a representative sample is taken from the lowest part of the tank. A stabilizer/biocide is added to new fuel.