Letter Sequence Draft RAI |
|---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance...
- Supplement, Supplement, Supplement
Results
Other: ML17156A098, ML17346A732, ML17347A383, ML17348B142, ML18078A747, ML18107A504, ML18120A135, ML18124A190, ML18127A034, ML18129A356, ML18143B396, ML18151A082, ML18155A550, RBG-47807, Response to License Renewal Application NRC Requests for Additional Information Set 3
|
MONTHYEARML17156A0982017-06-19019 June 2017 Receipt and Availability FRN - License Renewal Application for River Bend, Unit 1 Project stage: Other RBG-47773, Supplement to License Renewal Application2017-08-0101 August 2017 Supplement to License Renewal Application Project stage: Supplement ML17320B0992017-11-16016 November 2017 NRR E-mail Capture - Final Requests for Additional Information for the Safety Review of the River Bend Station License Renewal Application Project stage: RAI ML17335A0982017-11-29029 November 2017 NRR E-mail Capture - Final Requests for Additional Information for the Safety Review of the River Bend Station License Renewal Application Project stage: RAI ML17347B4322017-12-13013 December 2017 NRR E-mail Capture - Final Requests for Additional Information for the Safety Review of the River Bend Station License Renewal Application (CAC No. MF9757) - Set 5 Project stage: RAI ML17347B4242017-12-13013 December 2017 NRR E-mail Capture - Final Requests for Additional Information for the Safety Review of the River Bend Station License Renewal Application (CAC No. MF9757) - Set 4 Project stage: RAI ML17361A3962017-12-27027 December 2017 NRR E-mail Capture - Final Requests for Additional Information for the Safety Review of the River Bend Station License Renewal Application (CAC No. MF9757) - Set 6 Project stage: RAI ML17348B1422018-01-0808 January 2018 RBS Scoping and Screening Audit Report Project stage: Other ML17347A3832018-01-0808 January 2018 RBS Ope Audit Report Project stage: Other ML18009A9092018-01-0909 January 2018 NRR E-mail Capture - Final Requests for Additional Information for the Safety Review of the River Bend Station License Renewal Application (CAC No. MF9757) - Set 7 Project stage: RAI RBG-47807, Response to License Renewal Application NRC Requests for Additional Information Set 32018-01-10010 January 2018 Response to License Renewal Application NRC Requests for Additional Information Set 3 Project stage: Other ML18022A9412018-01-22022 January 2018 NRR E-mail Capture - Final Requests for Additional Information for the Safety Review of the River Bend Station License Renewal Application (CAC No. MF9757) - Set 8 Project stage: RAI RBG-47813, Response to License Renewal Application (LRA) NRC Request for Additional Information Set 52018-01-24024 January 2018 Response to License Renewal Application (LRA) NRC Request for Additional Information Set 5 Project stage: Request RBG-47812, Response to License Renewal Application (LRA) NRC Request for Additional Information (RAI) Set 42018-01-24024 January 2018 Response to License Renewal Application (LRA) NRC Request for Additional Information (RAI) Set 4 Project stage: Request ML17346A7322018-01-29029 January 2018 Aging Management Programs Audit Report Regarding River Bend Station, Unit 1 License Renewal Application Review Project stage: Other RBG-47818, Response to License Renewal Application NRC Request for Additional Information - Set 72018-02-0707 February 2018 Response to License Renewal Application NRC Request for Additional Information - Set 7 Project stage: Request ML18043A0082018-02-0808 February 2018 NRR E-mail Capture - Final Requests for Additional Information for the Safety Review of the River Bend Station License Renewal Application (CAC No. MF9757) - Set 10 Project stage: RAI ML18043A3512018-02-12012 February 2018 NRR E-mail Capture - Final Requests for Additional Information for the Safety Review of the River Bend Station License Renewal Application (CAC No. MF9757) - Set 11 Project stage: RAI ML18051A0922018-02-20020 February 2018 Single Positive Test Form Collected on 01/09/2017 Project stage: Request RBG-47828, Response to License Renewal Application NRC Request for Additional Information (RAI) Set 82018-02-20020 February 2018 Response to License Renewal Application NRC Request for Additional Information (RAI) Set 8 Project stage: Request RBG-47840, Request for Due Date Extension for License Renewal Application NRC Request for Additional Information from 30 Days to 45 Days2018-02-22022 February 2018 Request for Due Date Extension for License Renewal Application NRC Request for Additional Information from 30 Days to 45 Days Project stage: Request ML18065A2132018-03-0606 March 2018 NRR E-mail Capture - Final Requests for Additional Information for the Safety Review of the River Bend Station License Renewal Application (CAC No. MF9757) - Set 12 Project stage: RAI ML18078A7472018-03-0606 March 2018 Highland Mining Company, NRC Form 591 Part 1, Inspection Report 03036608/2018001 Project stage: Other ML18057A4532018-03-0707 March 2018 Summary of Telephone Conference Call Held on February 20, 2018 Between the U.S. Nuclear Regulatory Commission and Energy Regarding RAI Pertaining to the River Bend Station, Unit 1 License Renewal Application Review Project stage: RAI ML18059A8222018-03-0808 March 2018 Summary of Public Telephone Conference Call Held on February 27, 2018 Between the U.S. Nuclear Regulatory Commission and Entergy Regarding Requests for Additional Information Pertaining to the River Bend Station Unit 1 Project stage: RAI RBG-47834, Response to License Renewal Application NRC Request for Additional Information (RAI) Set 92018-03-0808 March 2018 Response to License Renewal Application NRC Request for Additional Information (RAI) Set 9 Project stage: Request ML18068A1872018-03-0909 March 2018 NRR E-mail Capture - Revision of Final Request for Additional Information (RAI 2.3.3.17-2) for the Safety Review of the River Bend Station License Renewal Application (CAC No. MF9757) - Set 11 Project stage: RAI ML18073A0482018-03-19019 March 2018 License Renewal Application Review Response to Request for Due Date Extension for Request for Additional Information Set 10 Project stage: RAI RBG-47835, Submittal of Response to License Renewal Application NRC Request for Additional Information Set 102018-03-26026 March 2018 Submittal of Response to License Renewal Application NRC Request for Additional Information Set 10 Project stage: Request RBG-47849, Response to License Renewal Application NRC Request for Additional Information Set 4 Supplement2018-03-27027 March 2018 Response to License Renewal Application NRC Request for Additional Information Set 4 Supplement Project stage: Supplement ML18078A7552018-03-28028 March 2018 Telephone Call Summary on Applicants Response to RAI B1.4-1 & B.1.4-2 (Set 5) on 030618 Rev 2 - All Edits Incorp Project stage: RAI ML18078A7482018-03-29029 March 2018 Uranium One Public Meeting Feb. 22, 2018 Project stage: Meeting ML18071A0182018-03-29029 March 2018 Telephone Call Summary RAI 3.2.2.3.2-1a Generic Filtration on 27FEB2018 v1_RBS Edits incorp._030618 Project stage: RAI RBG-47846, Response to License Renewal Application NRC Request for Additional Information (RAI) Set 122018-04-0303 April 2018 Response to License Renewal Application NRC Request for Additional Information (RAI) Set 12 Project stage: Request RBG-47850, Response to License Renewal Application NRC Request for Additional Information Set 5 Supplement2018-04-0404 April 2018 Response to License Renewal Application NRC Request for Additional Information Set 5 Supplement Project stage: Supplement ML18089A0762018-04-12012 April 2018 Summary of Public Telephone Conference Call Held on Between the U.S. Nuclear Regulatory Commission and Entergy Regarding Requests for Additional Information Pertaining to the River Bend Station, Unit 1 License Renewal Application Review Project stage: RAI ML18107A5042018-04-24024 April 2018 Summary of Public Telephone Conference Call Between the U.S. Nuclear Regulatory Commission and Entergy Regarding the Need for Additional Information to Support the River Bend Station, Unit 1 License Renewal Application Review Project stage: Other ML18115A0612018-04-25025 April 2018 Draft Response on RAI B1.21-1 Flow Accelerated Corrosion Project stage: Request ML18115A1632018-04-25025 April 2018 Draft Response on RBS LRA RAI B.1.21-2 Flow Accelerated Corrosion Project stage: Request ML18115A0722018-04-25025 April 2018 Draft Response on RAI B.1.25-1(Internal Surfaces in Miscellaneous Piping and Ducting Components) Project stage: Request ML18121A0292018-04-30030 April 2018 NRR E-mail Capture - Final Requests for Additional Information for the Safety Review of the River Bend Station License Renewal Application (CAC No. MF9757) - Set 14 Project stage: RAI ML18121A2942018-05-0101 May 2018 Draft Response to NRC Request for Additional Information (RAI) 4.6-1a Generated from Staffs Review on the River Bend License Renewal Application Project stage: Draft RAI ML18121A3022018-05-0101 May 2018 Draft Response to NRC Request for Additional Information (RAI) 4.6-2a Generated from Staffs Review on the River Bend License Renewal Application Project stage: Draft RAI ML18122A2312018-05-0202 May 2018 Draft Response to NRC Request for Additional Information (RAI) B.1.40-5 Service Water Integrity Generated from Staffs Review on the River Bend Station, Unit 1 License Renewal Application Project stage: Draft RAI ML18122A1262018-05-0202 May 2018 RAI B.1.17-1 Revised - w- header-footer-watermark Project stage: Request ML18124A0092018-05-0303 May 2018 NRR E-mail Capture - Final Requests for Additional Information for the Safety Review of the River Bend Station License Renewal Application (CAC No. MF9757) - Set 15 Project stage: RAI ML18120A1352018-05-10010 May 2018 Call Summary - Fuel Oil, Ext.-Int. Surf. Monitoring, FAC & Others 041018, Rev2 Project stage: Other ML18135A1072018-05-15015 May 2018 RBS Draft Response (RAI 4.3.1-2a_Class 1 Fatigue w-header-footer-watermark_received on 051318 Project stage: Request ML18136A7052018-05-16016 May 2018 RBS Draft Response to LRA Review RAI 4.7.3-1a Fluence Effects for Rv Internals Project stage: Request ML18136A8212018-05-16016 May 2018 Draft Response to RAI 3.6.2.2.2.2-1a High Voltage Insulators - RBS LRA Review Project stage: Request 2018-03-26
[Table View] |
Text
DRAFT - UNCERTIFIED INFORMATION DRAFT - UNCERTIFIED INFORMATION Question RAI 4.6-1a
Background
Section 4.6 of the SRP LR states that if a plants code of record requires a fatigue parameter evaluation (fatigue analysis or fatigue waiver), then this analysis may be a time limited aging analyses (TLAA) and must be evaluated in accordance with 10 CFR 54.21(c)(1) to ensure that the effects of aging on the intended functions are adequately managed for the period of extended operation.
The current licensing basis may include fatigue waiver evaluations that preclude the need for performing CUF analyses of structural components. The ASME Code Section III rules for performing fatigue waiver evaluations for structural components are analogous to those in the Code for performing fatigue waiver evaluations of mechanical components. ASME Code NE-3222.4(d) Analysis for Cyclic Operations, Vessels Not Requiring Analysis for Cyclic Operation, provides for a waiver from fatigue analysis when certain cyclic loading criteria are met.
RBS USAR Section 3.8.2.4.1 states: Fatigue analysis requirements for the steel containment cylinder and dome are evaluated in accordance with the requirements of ASME Boiler and Pressure Vessel Code Section III, Division I, Subsection NE.
In its response to RAI 4.6 1, dated February 6, 2018, the applicant stated, in part, the following:
[USAR] Table 3.8-1 indicates that fatigue is considered for operating conditions I(b), II, III(b) and IV. The free standing SCV cylinder and dome analysis reviews the operating conditions identified in USAR Table 3.8-1 and concludes that fatigue during operating conditions I(b), II,
III(b) and IV does not occur because the containment vessel is free to expand, thereby preventing cyclic loading. Therefore, the freestanding containment vessel and dome were not analyzed for fatigue and there are no cycle limits or cumulative usage factors.
Issue It is not clear if the evaluation performed for the freestanding containment vessel and dome components constitutes a fatigue waiver that relies on time dependent cycles, and whether they were evaluated and dispositioned in accordance with 10 CFR 54.21(c)(1). RBS USAR Section 3.8.2.4.1 states that the containment cylinder and dome were evaluated in accordance with the requirements of ASME Code Section III, Division I, Subsection NE, however it is not clear if and how the conditions under ASME code Subsection NE-3222.4(d) were used to waive the requirements of a fatigue analysis for the freestanding containment vessel and dome. The staff notes that the current licensing basis may include fatigue waiver evaluations that preclude the need for performing CUF analyses of structural components which may be a TLAA and must be evaluated. The staff also notes that the statement containment vessel is free to expand, thereby preventing cyclic loading does not appear consistent with regard to fatigue or fatigue waiver considerations of the ASME code, Subsection NE, and cannot be concluded from USAR Table 3.8-1. Also LRA Table 3.5-1, item 27, doesnt appear to manage cracking due to cyclic loading for these components if no CLB fatigue or fatigue waiver analysis exists.
DRAFT - UNCERTIFIED INFORMATION DRAFT - UNCERTIFIED INFORMATION Request 1.
Clarify if an evaluation was performed in accordance with ASME Code,Section III, Subsection NE 3222.4(d) to evaluate the fatigue analysis requirements for the freestanding containment vessel and dome. If an evaluation was performed, state the assumed number of cycles and limits. Otherwise, clarify what requirements of the ASME Code Section III, Division I, Subsection NE were followed to evaluate the fatigue analysis requirements for the steel containment cylinder and dome (as described in RBS USAR Section 3.8.2.4.1).
2.
State the disposition in accordance with 10 CFR 54.21(c)(1) for this evaluation.
3.
If there is no CLB fatigue analysis or fatigue waiver analysis for these components, clarify if cracking due to cyclic loading will be managed by the GALL Report AMPs XI.S1 and XI.S4 in accordance with SRP-LR Table 3.5-1, item 27, by crediting appropriate leak rate tests that can detect such cracking. If the GALL Report recommendations will not be followed, describe the proposed method to manage the aging effect of cracking due to cyclic loading for the containment vessel and dome, and provide the technical basis for concluding that the proposed method is adequate to manage the associated aging effect so that the intended function(s) will be maintained consistent with the CLB for the period of extended operation, in accordance with 10 CFR 54.21 (a)(3).
Response
- 1. An evaluation was not performed in accordance with ASME Code,Section III, Subsection NE-3222.4(d) for the freestanding containment vessel and dome. Fatigue of the freestanding containment vessel and dome was evaluated in fatigue analyses that were performed for the steel containment vessel penetrations. Therefore, the containment vessel/dome has fatigue analyses. The analyses conservatively assumed 510 thermal cycles, 100 operating basis earthquake stress cycles, 14,400 total safety relief valve (SRV) cycles, one initial pressure test and 13 containment integrated leakage tests. To simplify the containment Class MC analysis, it was assumed conservatively that all loadings from the assumed transients occur simultaneously for 14,400 cycles.
Based on projected cycles for 60 years of operation, 14,400 cycles is sufficient to qualify the containment wall for the period of extended operation. The penetration calculations that include the containment vessel were evaluated during preparation of calculation 1401192.301, Adequacy of Cycles Being Tracked for Fatigue Monitoring, and all necessary cycles are being tracked. Calculation 1401192.301 included evaluation of containment pressurization cycles and concluded that the usage contribution due to pressurization cycles is insignificant.
- 2. The Fatigue Monitoring Program is credited in accordance with 10 CFR 54.21(c)(1)(iii) to ensure locations with fatigue analyses do not exceed the analyzed numbers of cycles.
- 3. As identified in the response to Item 1, there are CLB fatigue analyses for the steel containment vessel/dome.