Letter Sequence RAI |
---|
|
Results
Other: ML17156A098, ML17347A383, ML17348B142, ML18078A747, ML18107A504, ML18120A135, ML18124A190, ML18127A034, ML18129A356, ML18143B396, ML18151A082, ML18155A550, ML18241A321
|
MONTHYEARML17156A0982017-06-19019 June 2017 Receipt and Availability FRN - License Renewal Application for River Bend, Unit 1 Project stage: Other RBG-47773, Supplement to License Renewal Application2017-08-0101 August 2017 Supplement to License Renewal Application Project stage: Supplement ML17320B0992017-11-16016 November 2017 Final Requests for Additional Information for the Safety Review of the River Bend Station License Renewal Application Project stage: RAI ML17335A0982017-11-29029 November 2017 Final Requests for Additional Information for the Safety Review of the River Bend Station License Renewal Application Project stage: RAI ML17347B4242017-12-13013 December 2017 Final Requests for Additional Information for the Safety Review of the River Bend Station License Renewal Application (CAC No. MF9757) - Set 4 Project stage: RAI ML17347B4322017-12-13013 December 2017 Final Requests for Additional Information for the Safety Review of the River Bend Station License Renewal Application (CAC No. MF9757) - Set 5 Project stage: RAI ML17361A3962017-12-27027 December 2017 Final Requests for Additional Information for the Safety Review of the River Bend Station License Renewal Application (CAC No. MF9757) - Set 6 Project stage: RAI ML17348B1422018-01-0808 January 2018 RBS Scoping and Screening Audit Report Project stage: Other ML17347A3832018-01-0808 January 2018 RBS Ope Audit Report Project stage: Other ML18009A9092018-01-0909 January 2018 Final Requests for Additional Information for the Safety Review of the River Bend Station License Renewal Application (CAC No. MF9757) - Set 7 Project stage: RAI ML18022A9412018-01-22022 January 2018 Final Requests for Additional Information for the Safety Review of the River Bend Station License Renewal Application (CAC No. MF9757) - Set 8 Project stage: RAI ML17346A7322018-01-29029 January 2018 Aging Management Programs Audit Report Regarding River Bend Station, Unit 1 License Renewal Application Review Project stage: Acceptance Review RBG-47818, Response to License Renewal Application NRC Request for Additional Information - Set 72018-02-0707 February 2018 Response to License Renewal Application NRC Request for Additional Information - Set 7 Project stage: Request ML18043A0082018-02-0808 February 2018 Final Requests for Additional Information for the Safety Review of the River Bend Station License Renewal Application (CAC No. MF9757) - Set 10 Project stage: RAI ML18043A3512018-02-12012 February 2018 Final Requests for Additional Information for the Safety Review of the River Bend Station License Renewal Application (CAC No. MF9757) - Set 11 Project stage: RAI ML18078A7472018-03-0606 March 2018 Highland Mining Company, NRC Form 591 Part 1, Inspection Report 03036608/2018001 Project stage: Other ML18065A2132018-03-0606 March 2018 Final Requests for Additional Information for the Safety Review of the River Bend Station License Renewal Application (CAC No. MF9757) - Set 12 Project stage: RAI ML18057A4532018-03-0707 March 2018 Summary of Telephone Conference Call Held on February 20, 2018 Between the U.S. Nuclear Regulatory Commission and Energy Regarding RAI Pertaining to the River Bend Station, Unit 1 License Renewal Application Review Project stage: RAI ML18059A8222018-03-0808 March 2018 Summary of Public Telephone Conference Call Held on February 27, 2018 Between the U.S. Nuclear Regulatory Commission and Entergy Regarding Requests for Additional Information Pertaining to the River Bend Station Unit 1 Project stage: RAI ML18068A1872018-03-0909 March 2018 Revision of Final Request for Additional Information (RAI 2.3.3.17-2) for the Safety Review of the River Bend Station License Renewal Application (CAC No. MF9757) - Set 11 Project stage: RAI ML18073A0912018-03-14014 March 2018 NRC and Energy Public Meeting on Fatigue Analysis Related to River Bend License Renewal Project stage: Meeting ML18073A0482018-03-19019 March 2018 License Renewal Application Review Response to Request for Due Date Extension for Request for Additional Information Set 10 Project stage: RAI ML18078A7552018-03-28028 March 2018 Telephone Call Summary on Applicant'S Response to RAI B1.4-1 & B.1.4-2 (Set 5) on 030618 Rev 2 - All Edits Incorp Project stage: RAI ML18078A7482018-03-29029 March 2018 Uranium One Public Meeting Feb. 22, 2018 Project stage: Meeting ML18071A0182018-03-29029 March 2018 Telephone Call Summary RAI 3.2.2.3.2-1a Generic Filtration on 27FEB2018 v1_RBS Edits incorp._030618 Project stage: RAI ML18089A0762018-04-12012 April 2018 03/13/2018 Summary of Public Telephone Conference Call Held on Between the U.S. Nuclear Regulatory Commission and Entergy Regarding Requests for Additional Information Pertaining to the River Bend Station, Unit 1 License Renewal Application Project stage: RAI ML18107A5042018-04-24024 April 2018 03/29/2018 Summary of Public Telephone Conference Call Between the U.S. Nuclear Regulatory Commission and Entergy Regarding the Need for Additional Information to Support the River Bend Station, Unit 1 License Renewal Application Review Project stage: Other ML18121A0292018-04-30030 April 2018 Final Requests for Additional Information for the Safety Review of the River Bend Station License Renewal Application (CAC No. MF9757) - Set 14 Project stage: RAI RBG-47863, Annual Radioactive Effluent Release Report for 20172018-05-0101 May 2018 Annual Radioactive Effluent Release Report for 2017 Project stage: Request RBG-47862, Annual Radiological Environmental Operating Report for 20172018-05-0101 May 2018 Annual Radiological Environmental Operating Report for 2017 Project stage: Request ML18124A0092018-05-0303 May 2018 Final Requests for Additional Information for the Safety Review of the River Bend Station License Renewal Application (CAC No. MF9757) - Set 15 Project stage: RAI ML18120A1352018-05-10010 May 2018 Call Summary - Fuel Oil, Ext.-Int. Surf. Monitoring, FAC & Others 041018, Rev2 Project stage: Other ML18127A0342018-05-25025 May 2018 Summary of Public Telephone Conference Call Held on April 18, 2018, Between the U.S. Nuclear Regulatory Commission and Entergy Regarding the Need for Additional Information to Support the RBS Unit 1 License Renewal Application Review Project stage: Other ML18124A1902018-05-25025 May 2018 Summary of a Telephone Conference Call Held on April 25, 2018, Between the U.S. Nuclear Regulatory Commission and Entergy Regarding the Need for Additional Information to Support the River Bend Station, Unit 1 License Renewal Application Re Project stage: Other ML18129A3562018-05-29029 May 2018 April 26, 2018 Summary of a Telephone Conference Call Between NRC and Entergy Regarding the Need for Additional Information to Support the River Bend Station, Unit 1 License Renewal Application Review Project stage: Other ML18151A0822018-05-30030 May 2018 Summary of a Telephone Conference Call Held on May 21, 2018, Between NRC and Entergy Regarding the Need for Additional Information to Support the River Bend Station License Renewal Application Project stage: Other ML18143B3962018-06-0404 June 2018 05/03/2018 Summary Telephone Conference with Entergy Regarding the Need for Additional Information to Support the River Bend Station Unit 1 License Renewal Application Review. Project stage: Other ML18155A5502018-06-14014 June 2018 Summary of a Telephone Conference Call Held on May 17, 2018, Between the U.S. Nuclear Regulatory Commission and Entergy Regarding the Need for Additional Information to Support the River Bend Station Unit 1 License Renewal Application Revie Project stage: Other RBG-47879, Comments on Plant-Specific Supplement 58 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding River Bend Station, Unit 1, Draft Report for Comment2018-07-12012 July 2018 Comments on Plant-Specific Supplement 58 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding River Bend Station, Unit 1, Draft Report for Comment NRC-2017-0141, Comment (4) of Anonymous Individual on Entergy Operations, Inc.; River Bend Station, Unit 1 Renewal2018-07-23023 July 2018 Comment (4) of Anonymous Individual on Entergy Operations, Inc.; River Bend Station, Unit 1 Renewal Project stage: Request ML18206A4532018-07-23023 July 2018 Comment (3) of Anonymous Individual Opposing to Entergy Operations, Inc.; River Bend Station, Unit 1 Renewal Project stage: Request ML18206A4512018-07-23023 July 2018 Comment (2) from Anonymous on Entergy Operations, Inc.; River Bend Station, Unit 1 Project stage: Request ML18206A4502018-07-23023 July 2018 Comment (1) of Edward Festner Opposing to Entergy Operations, Inc.; River Bend Station, Unit 1 Renewal Project stage: Request ML18212A1792018-07-31031 July 2018, 16 August 2018 Safety Evaulation Report Related to the License Renewal of River Bend Station, Unit 1, Docket No. 50-458, Entergy Operations, Inc. and Entergy Louisiana, LLC Project stage: Request ML18241A3212018-08-29029 August 2018 Fws to NRC, Concurrence with the Nrc'S Determination That River Bend License Renewal Is Not Likely to Adversely Affect the Pallid Sturgeon Project stage: Other ML18291B1472018-10-18018 October 2018 Revision of the River Bend License Renewal Safety Evaluation Report Project stage: Approval ML18310A0722018-11-30030 November 2018 NUREG-1437, Supplement 58, Generic Environment Impact Statement for License Renewal of Nuclear Plants Supplement 58 Regarding River Bend Station, Unit 1, Final Report Project stage: Acceptance Review ML18277A2872018-12-20020 December 2018 Issuance of Renewed Facility Operating License No. NPF-47 for River Bend Station, Unit 1 Project stage: Approval 2018-03-29
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML24289A1442024-10-15015 October 2024 NRR E-mail Capture - Acceptance Review - Entergy (Grand Gulf Nuclear Station and River Bend Station) - CNRO2024-00017 - Adopt TSTF-592 - CLIIP (L-2024-LLA-0133) ML24137A2702024-05-16016 May 2024 NRR E-mail Capture - Entergy Fleet - Acceptance Review of License Amendment Request to Remove Obsolete License Conditions from Operating Licenses for GGNS, RBS, and WF3 (L-2024-LLA-0062) ML24088A0092024-03-27027 March 2024 NRR E-mail Capture - Entergy Fleet - Final Request for Confirmation of Information (RCI) Re Alternative Request EN-RR-22-001 Concerning ASME Code Case N-752 (L-2022-LLR-0054) ML23348A1222023-12-14014 December 2023 NRR E-mail Capture - Grand Gulf, River Bend, and Waterford, Unit 3 - 2nd Round of Official RAIs for RR EN-RR-22-001, Use ASME Code Case N-752, Risk Informed Categorization for Class 2 and 3 Systems ML24031A2772023-11-27027 November 2023 (05000458/2024040) IP 95001 Regarding EA-23-071 Initial Request for Information ML24102A2442023-09-22022 September 2023 NRR E-mail Capture - Audit Question TSTF-505 and 50.69 ML23240A3412023-08-28028 August 2023 NRR E-mail Capture - ANO-2, Grand Gulf, and River Bend - Acceptance Review of LAR Revising TSs to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions ML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 ML23159A0052023-06-0505 June 2023 56557-EN 56557 - Paragon - Redlined ML23116A1462023-04-26026 April 2023 NRR E-mail Capture - Entergy Fleet (Grand Gulf and River Bend) - Final RAI for Request to Update ASME Code Relief Request Safety Evaluations with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020, and RBS-ISI-019) ML23103A4662023-04-0404 April 2023 NRR E-mail Capture - River Bend Station, Unit 1 - Acceptance Review for LAR to Adopt TSTF-505, Rev. 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML23103A4672023-04-0404 April 2023 NRR E-mail Capture - River Bend Station, Unit 1 - Acceptance Review for LAR to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML23089A0702023-03-29029 March 2023 TSTF-505 Email Providing Reference for 0.3g HCLPF Value ML23072A3672023-03-0909 March 2023 NRR E-mail Capture - Entergy Fleet - Acceptance Review of Quality Assurance Program Manual Reduction in Commitment ML23009B6912023-01-0909 January 2023 NRR E-mail Capture - Grand Gulf, Unit 1 and River, Unit 1 - Acceptance of Requested Licensing Action Request to Update ASME Code RR SE with NRC-Approved Revision of BWRVIP Guidelines ML22206A0152022-07-21021 July 2022 NRR E-mail Capture - Entergy (Grand Gulf, River Bend, and Waterford-3) - Acceptance Review of the RR EN-RR-22-001, Case N-752, Risk-informed Cat & Treatment for Repair/Replacement Activities in Class 2 & 3 Systems ML22173A0372022-06-21021 June 2022 NRR E-mail Capture - Entergy (Grand Gulf and River Bend) - Acceptance Review of the License Amendment Request to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML21356A5882021-12-22022 December 2021 NRR E-mail Capture - Acceptance for Review: River Bend Station 1 - IST Program Relief Request for PIV Testing Frequency ML21312A4792021-11-0505 November 2021 Email: NRC Staff Preliminary Questions Regarding X Energy LLC Xe-100 Topical Report: Risk-Informed Performance-Based Licensing Basis Development ML21308A5602021-11-0404 November 2021 NRR E-mail Capture - Arkansas Nuclear One, Units 1 and 2, Grand Gulf, River Bend, and Waterford, Unit 3 - Acceptance Review of LAR to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements ML21292A0112021-10-18018 October 2021 NRR E-mail Capture - ANO, 1 and 2, Grand Gulf, River Bend, Waterford, 3 - Acceptance Review of LAR to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML21218A0412021-07-19019 July 2021 NRR E-mail Capture - River Bend Unit 1 - Acceptance of License Amendment Request to Add License Condition Concerning Receipt, Possession ML21174A0342021-06-22022 June 2021 NRR E-mail Capture - Entergy Fleet (ANO, Ggulf, Rbend, & Waterford) - Acceptance Review for Relief Request to Use a Provision of a Later Edition of the ASME Code, Section XI for Periodic System Pressure Tests Exemptions ML21109A2142021-04-19019 April 2021 NRR E-mail Capture - Entergy Fleet (Grand Gulf and River Bend) - Rev. Est Hours for Review of Relief Request (RR) - ASME Code RR Safety Eval with NRC-Approved Rev of BWRVIP Guidelines (GG-ISI-020 and RBS-ISI-019) ML21099A0312021-03-30030 March 2021 Email 3-30-2021 - Request for Information_ RBS EP Exercise Inspection (Week of 5_10_2021) ML21109A2132021-03-23023 March 2021 NRR E-mail Capture - Entergy Fleet (Grand Gulf and River Bend) - Relief Request (RR) Associated with ASME Code RR Safety Evaluations with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020 and RBS-ISI-019) ML21068A4092021-03-0909 March 2021 NRR E-mail Capture - Entergy Fleet (GGNS and RBS) -Approval of TSTF-501 LAR, Relocate Sored Fuel Oil and Lube Oil Volume Values to Licensee Control ML21022A1692021-01-22022 January 2021 NRR E-mail Capture - Entergy Fleet (ANO, Grand Gulf, River Bend, and Waterford) - Acceptance Review for RR EN-20-RR-003, Proposed Alternative to Use ASME Code Case N-711-2 ML21015A3452021-01-14014 January 2021 NRR E-mail Capture - Grand Gulf and River Bend - Revised Estimated Hours for Relief Request Associated with ASME Code RR SEs with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020 and RBS-ISI-019) ML20337A1382020-11-23023 November 2020 Acceptance of License Amendment Request to Adopt GL 86-10 Standard License Condition for Fire Protection ML20329A1442020-11-20020 November 2020 Terrapower QAPD Preliminary Questions Email ML20317A2922020-10-15015 October 2020 Entergy Operations, Inc. (River Bend Station, Unit 1) - Acceptance Review of License Amendment Request to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements ML20289A3542020-10-14014 October 2020 NRR E-mail Capture - Entergy Fleet (Grand Gulf and River Bend) - Acceptance Review of TSTF-563 LAR, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML20255A1892020-09-0909 September 2020 Email 09Sept2020 - RFI for RBS EP Exercise Inspection ML20260H4422020-09-0808 September 2020 NRR E-mail Capture - Entergy Fleet (Grand Gulf and River Bend) - Official RAIs for RR Associated with Updating ASME Code RR SEs with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020 and RBS-ISI-019) ML20169A3782020-06-16016 June 2020 Email-20-0196-NRC Riv Response V. Dricks to Tom Gurdziel Inquiry: Extent of Condition Flex Equipment ML20169A6752020-05-20020 May 2020 Email-20-0196, Tom Gurdziel Inquiry to NRC Chairman Resource, Extent of Condition FLEX Equipment, 05/20/2020 ML20093C3072020-04-0101 April 2020 NRR E-mail Capture - (External_Sender) Entergy Fleet - Performance-Based Cyber Security Testing Plan Fee Waiver Response Letter (EPID P-2020-PRF-0000; CAC No. 001648) ML20086J6572020-03-26026 March 2020 NRR E-mail Capture - River Bend Station, Unit 1 -Acceptance Review of the LAR Associated with Extending the Implementation Date from 5/13/2020 to 9/30/2020 for Emergency Action Level Scheme ML20079D9302020-03-19019 March 2020 NRR E-mail Capture - Entergy Fleet (Grand Gulf and River Bend) - Acceptance Review of LAR Associated with Adopting TSTF-501, Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control ML20057G1752020-02-24024 February 2020 NRR E-mail Capture - Entergy Fleet (Grand Gulf and River Bend) - Acceptance Review of LAR Associated with TSTF-566, Revise Actions for Inoperable RHR-Shutdown Cooling Subsystems ML20057G1592020-02-24024 February 2020 NRR E-mail Capture - Entergy Fleet (Grand Gulf and River Bend) - Acceptance Review of LAR Associated with TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO ML20038A2092020-02-0404 February 2020 05000458 Request for Information IR2020-001 Occupational Radiation Safety ML19352F5222019-12-17017 December 2019 NRR E-mail Capture - Acceptance Review Results for License Amend Request to Revise TS 3.3.5.2 to Adopt TSTF-425, Rev 3, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5b, for River Bend, ML19102A0722019-04-11011 April 2019 NRR E-mail Capture - River Bend Station, Unit 1 - Final Request for Additional Information Relief Request RBS-ISI-021 ML19095B7622019-04-0303 April 2019 Acceptance Review Results for License Amendment Request to Adopt TSTF-564, Revision 2, Safety Limit MCPR (Minimum Critical Power Ratio), for Grand Gulf Nuclear Station, Unit 1 and River Bend Station, Unit 1 (EPID L-22019-LLA-0051) ML19059A1782019-02-28028 February 2019 Acceptance Review Results for Relief Request No. EN-19-RR-1 to Use ASME Code Case N-831-1 for Entergy Fleet ML19059A0292019-02-27027 February 2019 NRR E-mail Capture - Acceptance Review Results for License Amendment Request to Adopt TSTF-529, Revision 4, Clarify Use and Application Rules, for Entergy Fleet ML19008A3592019-01-0808 January 2019 NRR E-mail Capture - Acceptance Review: RR Volumetric Exams (L-2018-LLR-0388) ML18365A1422018-12-28028 December 2018 NRR E-mail Capture - Acceptance Review Results - Removal of TS Table of Contents (L-2018-LLA-0489) 2024-05-16
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24255A1192024-09-16016 September 2024 Notification of NRC Follow Up Inspection for One Severity Level (SL) III and Two SL IV or Three or More SL IV Violations and Request for Additional Information ML24106A0432024-04-11011 April 2024 June 2024 Emergency Preparedness Exercise Inspection Request for Information ML24088A0092024-03-27027 March 2024 NRR E-mail Capture - Entergy Fleet - Final Request for Confirmation of Information (RCI) Re Alternative Request EN-RR-22-001 Concerning ASME Code Case N-752 (L-2022-LLR-0054) ML23348A1222023-12-14014 December 2023 NRR E-mail Capture - Grand Gulf, River Bend, and Waterford, Unit 3 - 2nd Round of Official RAIs for RR EN-RR-22-001, Use ASME Code Case N-752, Risk Informed Categorization for Class 2 and 3 Systems ML23311A4322023-11-0909 November 2023 Notification of NRC Supplemental Inspection (95001) and Request for Information ML23195A0692023-07-24024 July 2023 2023 River Bend Station Notification of Biennial Problem Identification and Resolution Inspection and Request for Information ML23116A1462023-04-26026 April 2023 NRR E-mail Capture - Entergy Fleet (Grand Gulf and River Bend) - Final RAI for Request to Update ASME Code Relief Request Safety Evaluations with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020, and RBS-ISI-019) ML23081A4602023-03-22022 March 2023 RFI River Bend CETI 2023012 Drr ML23004A0422023-01-0404 January 2023 License Renewal Phase 1 Request for Information ML22354A0812022-12-20020 December 2022 Inservice Inspection Request for Information ML22235A1082022-08-19019 August 2022 RBS Emergency Preparedness (EP) Exercise Inspection October 2022 RFI ML22180A0612022-06-29029 June 2022 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000458/2022010) and Request for Information ML20350B8112020-12-11011 December 2020 2021 RBS PIR Request for Information ML20337A4452020-12-0202 December 2020 Riverbend Station Inservice Inspection Request for Information ML20255A1892020-09-0909 September 2020 Email 09Sept2020 - RFI for RBS EP Exercise Inspection ML20260H4422020-09-0808 September 2020 NRR E-mail Capture - Entergy Fleet (Grand Gulf and River Bend) - Official RAIs for RR Associated with Updating ASME Code RR SEs with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020 and RBS-ISI-019) ML20162A1122020-06-10010 June 2020 Notification of Inspection (NRC Inspection Report 05000458/2020003) and Request for Information ML20126G3922020-05-0101 May 2020 Request for Information, May 01, 2020, River Bend Station Special Inspection, NRC Inspection Report 2020050 ML20038A2092020-02-0404 February 2020 05000458 Request for Information IR2020-001 Occupational Radiation Safety ML19102A0722019-04-11011 April 2019 NRR E-mail Capture - River Bend Station, Unit 1 - Final Request for Additional Information Relief Request RBS-ISI-021 ML18250A3112018-09-0404 September 2018 NRR E-mail Capture - Final RAI - RBS EAL Scheme Change LAR (L-2018-LLA-0130) ML18229A0082018-08-16016 August 2018 NRR E-mail Capture - Final Request for Additional Information for P-T Curves - NON-PROPRIETARY Version ML18250A3102018-08-0101 August 2018 NRR E-mail Capture - Draft RAI - RBS EP EAL Scheme Change LAR (L-2018-LLA-0130) ML18151A0822018-05-30030 May 2018 Summary of a Telephone Conference Call Held on May 21, 2018, Between NRC and Entergy Regarding the Need for Additional Information to Support the River Bend Station License Renewal Application RBG-47861, Response to License Renewal Application NRC Request for Additional Information Sets 14,15 and Operating Experience Review Clarification2018-05-29029 May 2018 Response to License Renewal Application NRC Request for Additional Information Sets 14,15 and Operating Experience Review Clarification ML18149A2882018-05-24024 May 2018 NRR E-mail Capture - River Bend Station Request for Additional Information - Reactor Core Isolation Cooling Piping Modification (L-2018-LLA-0029) ML18141A4882018-05-21021 May 2018 Draft Response (RAI 3.6.2.2.2.2-1a) from LRA Review Revised After the May 17, 2018 Call ML18141A3172018-05-21021 May 2018 OE Draft RAI 3-0-5 Rogers ML18131A2412018-05-11011 May 2018 RBS 012 Item 158a Response (RAI 3.2.2.3.2-1a) Revised - Received on 05/10/2018 ML18124A0092018-05-0303 May 2018 Final Requests for Additional Information for the Safety Review of the River Bend Station License Renewal Application (CAC No. MF9757) - Set 15 ML18122A2312018-05-0202 May 2018 Draft Response to NRC Request for Additional Information (RAI) B.1.40-5 Service Water Integrity Generated from Staffs Review on the River Bend Station, Unit 1 License Renewal Application ML18122A1262018-05-0202 May 2018 RAI B.1.17-1 Revised - w- header-footer-watermark ML18121A3022018-05-0101 May 2018 Draft Response to NRC Request for Additional Information (RAI) 4.6-2a Generated from Staff'S Review on the River Bend License Renewal Application ML18121A0292018-04-30030 April 2018 Final Requests for Additional Information for the Safety Review of the River Bend Station License Renewal Application (CAC No. MF9757) - Set 14 ML18115A1632018-04-25025 April 2018 Draft Response on RBS LRA RAI B.1.21-2 Flow Accelerated Corrosion ML18113A3322018-04-23023 April 2018 035 RB Buried Pipe 3rd Round RAI - Allik Holston ML18103A0152018-04-12012 April 2018 NRR E-mail Capture - Summary of Public Telephone Conference Call Held on March 27, 2018, Between the U.S. Nuclear Regulatory Commission and Entergy and Final Requests for Additional Information for the Safety Review of the River Bend Statio ML18073A0912018-03-14014 March 2018 NRC and Energy Public Meeting on Fatigue Analysis Related to River Bend License Renewal ML18068A1872018-03-0909 March 2018 Revision of Final Request for Additional Information (RAI 2.3.3.17-2) for the Safety Review of the River Bend Station License Renewal Application (CAC No. MF9757) - Set 11 RBG-47834, Response to License Renewal Application NRC Request for Additional Information (RAI) Set 92018-03-0808 March 2018 Response to License Renewal Application NRC Request for Additional Information (RAI) Set 9 ML18065A2132018-03-0606 March 2018 Final Requests for Additional Information for the Safety Review of the River Bend Station License Renewal Application (CAC No. MF9757) - Set 12 ML18060A1532018-03-0101 March 2018 NRR E-mail Capture - River Bend Station: Request for Additional Information Concerning New Technical Specification for Control Building Air Conditioning (L-2017-LLA-0291) ML18058A0572018-02-23023 February 2018 Enclosurequest for Additional Information (Letter to J. Giddens Request for Additional Information Regarding Entergy Operations, Inc.'S Decommissioning Funding Plan Update) ML18043A3512018-02-12012 February 2018 Final Requests for Additional Information for the Safety Review of the River Bend Station License Renewal Application (CAC No. MF9757) - Set 11 ML18043A0082018-02-0808 February 2018 Final Requests for Additional Information for the Safety Review of the River Bend Station License Renewal Application (CAC No. MF9757) - Set 10 ML18038B4702018-02-0707 February 2018 NRR E-mail Capture - Fyi_River Bend Station RAIs Set 9 ML18022A9412018-01-22022 January 2018 Final Requests for Additional Information for the Safety Review of the River Bend Station License Renewal Application (CAC No. MF9757) - Set 8 ML18011A0462018-01-10010 January 2018 Notification of Cyber Security Inspection (NRC Inspection Report 05000458/2018406) and Request for Information IR 05000458/20184062018-01-10010 January 2018 River Bend Station - Notification of Cyber Security Inspection (NRC Inspection Report 05000458/2018406) and Request for Information ML18009A9092018-01-0909 January 2018 Final Requests for Additional Information for the Safety Review of the River Bend Station License Renewal Application (CAC No. MF9757) - Set 7 2024-09-16
[Table view] |
Text
NRR-DMPSPEm Resource From: Sayoc, Emmanuel Sent: Wednesday, December 27, 2017 9:22 AM To: wmagui1@entergy.com Cc: RidsNrrDmlr Resource; RidsNrrDmlrMrpb Resource; RidsNrrPMRiverBend Resource; RidsOgcMailCenter Resource; Wilson, George; Donoghue, Joseph; Wong, Albert; Billoch, Araceli; Casto, Greg; Rogers, Bill; Burton, William; Alley, David; Martinez Navedo, Tania; Bailey, Stewart; Wittick, Brian; Ruffin, Steve; Bloom, Steven; Regner, Lisa; Turk, Sherwin; Sowa, Jeffrey; Parks, Brian; Pick, Greg; Kozal, Jason; Young, Cale; Young, Matt; Werner, Greg; McIntyre, David; Oesterle, Eric; Dricks, Victor; Moreno, Angel; Burnell, Scott; 'Broussard, Thomas Ray'; Lach, David J; SCHENK, TIMOTHY A; 'Coates, Alyson';
Alley, David; Lopez, Juan; Mink, Aaron
Subject:
FINAL REQUESTS FOR ADDITIONAL INFORMATION FOR THE SAFETY REVIEW OF THE RIVER BEND STATION LICENSE RENEWAL APPLICATION (CAC NO. MF9757) - SET 6 Attachments: RAI Set 6 Enclosure - Final.docx Importance: High Docket No. 50-458 By letter dated May 25, 2017 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML17153A282), Entergy Operations, Inc. (the applicant) submitted an application pursuant to Title 10 of the Code of Federal Regulations Part 54, Requirements for Renewal of Operating Licenses for Nuclear Power Plants, to renew the operating license NPF-47 for River Bend Station.
On December 7, 11, and 15, 2017, the U.S Nuclear Regulatory Commission (NRC) staff sent Entergy Operations, Inc. the draft Requests for Additional Information (RAIs) for technical review packages (TRPs) 63 (Fatigue Analysis), 120.2 (High Energy Line Break), and 36 (Small Bore Piping) respectively. Entergy Operations, Inc. subsequently informed the NRC staff that a clarification call was needed to discuss the information requested. The clarification calls between NRC staff and Entergy Operations, Inc. representatives were held on December 12, 2017, for TRP 63, and December 20, 2017, for TRPs 120.2 and 36. During these calls the subject information requests were discussed. The draft RAIs were modified based on these discussions.
For TRP 63, RAIs 4.6-1, 4.6-2, 4.6-3, and 3.5.1.9-1 were discussed and modified. RAI 3.5.1.9-2, was discussed and no modifications resulted from the discussion. For TRP 120.2, RAI 4.7.2-1 was discussed and modified. For TRP 36, RAI B.1.33-1 was discussed and modified. The final RAIs are enclosed.
David Lach of your staff agreed to provide a response to the final RAIs within 30 days of the date of this email.
The NRC staff will be placing a copy of this email in the NRCs Agencywide Documents Access and Management System.
Sincerely, Emmanuel Sayoc, Project Manager License Renewal Projects Branch (MRPB)
Division of Materials and License Renewal Office of Nuclear Reactor Regulation Docket No. 50-458 1
Enclosure:
As stated 2
OFFICE PM:RPGB:DMLR BC:RPGB:DMLR PM:RPGB:DMLR NAME ESayoc EOesterle ESayoc DATE 12/20/2017 12/21/2017 12/21/2017 OFFICIAL RECORD COPY 3
Hearing Identifier: NRR_DMPS Email Number: 72 Mail Envelope Properties (Emmanuel.Sayoc@nrc.gov20171227092200)
Subject:
FINAL REQUESTS FOR ADDITIONAL INFORMATION FOR THE SAFETY REVIEW OF THE RIVER BEND STATION LICENSE RENEWAL APPLICATION (CAC NO. MF9757) -
SET 6 Sent Date: 12/27/2017 9:22:21 AM Received Date: 12/27/2017 9:22:00 AM From: Sayoc, Emmanuel Created By: Emmanuel.Sayoc@nrc.gov Recipients:
"RidsNrrDmlr Resource" <RidsNrrDmlr.Resource@nrc.gov>
Tracking Status: None "RidsNrrDmlrMrpb Resource" <RidsNrrDmlrMrpb.Resource@nrc.gov>
Tracking Status: None "RidsNrrPMRiverBend Resource" <RidsNrrPMRiverBend.Resource@nrc.gov>
Tracking Status: None "RidsOgcMailCenter Resource" <RidsOgcMailCenter.Resource@nrc.gov>
Tracking Status: None "Wilson, George" <George.Wilson@nrc.gov>
Tracking Status: None "Donoghue, Joseph" <Joseph.Donoghue@nrc.gov>
Tracking Status: None "Wong, Albert" <Albert.Wong@nrc.gov>
Tracking Status: None "Billoch, Araceli" <Araceli.Billoch@nrc.gov>
Tracking Status: None "Casto, Greg" <Greg.Casto@nrc.gov>
Tracking Status: None "Rogers, Bill" <Bill.Rogers@nrc.gov>
Tracking Status: None "Burton, William" <William.Burton@nrc.gov>
Tracking Status: None "Alley, David" <David.Alley@nrc.gov>
Tracking Status: None "Martinez Navedo, Tania" <Tania.MartinezNavedo@nrc.gov>
Tracking Status: None "Bailey, Stewart" <Stewart.Bailey@nrc.gov>
Tracking Status: None "Wittick, Brian" <Brian.Wittick@nrc.gov>
Tracking Status: None "Ruffin, Steve" <Steve.Ruffin@nrc.gov>
Tracking Status: None "Bloom, Steven" <Steven.Bloom@nrc.gov>
Tracking Status: None "Regner, Lisa" <Lisa.Regner@nrc.gov>
Tracking Status: None "Turk, Sherwin" <Sherwin.Turk@nrc.gov>
Tracking Status: None "Sowa, Jeffrey" <Jeffrey.Sowa@nrc.gov>
Tracking Status: None "Parks, Brian" <Brian.Parks@nrc.gov>
Tracking Status: None "Pick, Greg" <Greg.Pick@nrc.gov>
Tracking Status: None "Kozal, Jason" <Jason.Kozal@nrc.gov>
Tracking Status: None "Young, Cale" <Cale.Young@nrc.gov>
Tracking Status: None "Young, Matt" <Matt.Young@nrc.gov>
Tracking Status: None "Werner, Greg" <Greg.Werner@nrc.gov>
Tracking Status: None "McIntyre, David" <David.McIntyre@nrc.gov>
Tracking Status: None "Oesterle, Eric" <Eric.Oesterle@nrc.gov>
Tracking Status: None "Dricks, Victor" <Victor.Dricks@nrc.gov>
Tracking Status: None "Moreno, Angel" <Angel.Moreno@nrc.gov>
Tracking Status: None "Burnell, Scott" <Scott.Burnell@nrc.gov>
Tracking Status: None
"'Broussard, Thomas Ray'" <tbrous1@entergy.com>
Tracking Status: None "Lach, David J" <DLach@entergy.com>
Tracking Status: None "SCHENK, TIMOTHY A" <TSCHENK@entergy.com>
Tracking Status: None
"'Coates, Alyson'" <alacey@entergy.com>
Tracking Status: None "Alley, David" <David.Alley@nrc.gov>
Tracking Status: None "Lopez, Juan" <Juan.Lopez@nrc.gov>
Tracking Status: None "Mink, Aaron" <Aaron.Mink@nrc.gov>
Tracking Status: None "wmagui1@entergy.com" <wmagui1@entergy.com>
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 2084 12/27/2017 9:22:00 AM RAI Set 6 Enclosure - Final.docx 31918 Options Priority: High Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received:
REQUEST FOR ADDITIONAL INFORMATION LICENSE RENEWAL APPLICATION RIVER BEND STATION, UNIT 1 DOCKET NO.: 50-458 CAC NO.: MF9757 Office of Nuclear Reactor Regulation Division of Materials and License Renewal 10 CFR § 54.21(a)(3) of 10 CFR requires an applicant to demonstrate that the effects of aging for structures and components will be adequately managed so that the intended function(s) will be maintained consistent with the current licensing basis for the period of extended operation.
One of the findings that the staff must make to issue a renewed license (10 CFR § 54.29(a)) is that actions have been identified and have been or will be taken with respect to the managing the effects of aging during the period of extended operation on the functionality of structures and components that have been identified to require review under § 54.21, such that there is reasonable assurance that the activities authorized by the renewed license will continue to be conducted in accordance with the current licensing basis (CLB). As described in SRP LR, an applicant may demonstrate compliance with 10 CFR 54.21(a)(3) by referencing the GALL Report. In order to complete its review and enable making a finding under 10 CFR § 54.29(a),
the staff requires additional information in regard to the matters described below.
RAI B.1.33-1 (TRP 36 - One-Time Inspection - Small-Bore Piping)
Background:
LRA Section B.1.33 states that the One-Time Inspection - Small-Bore Piping Program will be consistent with GALL Report AMP XI.M35. It also states that this program provides a one-time volumetric or opportunistic destructive inspection of a 3-percent sample or maximum of 10 ASME Class 1 piping butt weld locations and a 3-percent sample or a maximum of 10 ASME Class 1 socket weld locations that are susceptible to cracking.
GALL Report AMP XI.M35 states that This inspection should be performed at a sufficient number of locations to ensure an adequate sample.
Issue:
LRA Section B.1.33 does not appear to provide the total population of welds for each weld type or the total number of these welds that will be included in the volumetric examinations. Based on discussions with the applicant, it appears the number of socket welds estimated is unusually low compared to similar plants.
Request:
Please provide the total population for each weld type.
RAI 4.6-1 (TRP 63 Fatigue Analysis)
Background:
ASME Section III, Division 2, Code for Concrete Reactor Vessel and Containments, Subsection CC, Concrete Containments, and Division 1, Subsection NE, Class MC Components, require a fatigue analysis for liner plates, metal containments, and penetrations that considers all cyclic loads based on the anticipated number of cycles. Section 4.6 of the SRP LR states that if a plants code of record requires a fatigue analysis, then this analysis may be a time limited aging analyses (TLAA) and must be evaluated in accordance with 10 CFR 54.21(c)(1) to ensure that the effects of aging on the intended functions are adequately managed for the period of extended operation.
License renewal application (LRA) Section 4.6, Containment Liner Plate, Metal Containments, and Penetrations Fatigue Analysis, identifies (1) the fatigue analysis for the steel containment cylinder and dome as evaluated in accordance with ASME Section III, Division 1, Subsection NE, and (2) the fatigue analysis for the floor liner plate as evaluated in accordance with ASME Section III, Division 2. This LRA section appears to disposition these analyses in accordance with 10 CFR 54.21(c)(1)(iii) by stating that the Fatigue Monitoring Program will manage the aging effects due to cumulative fatigue. Section 6A.15.1.3.3 of the Updated Safety Analysis Report (USAR) describes the transients associated with the floor liner plate fatigue analysis.
Issue:
Section 4.6 of the LRA does not describe the transients considered for the steel containment cylinder and dome fatigue analysis, their design limits, and their calculated cumulative usage factor values. Additionally, it is not clear if the applicant's general disposition in LRA Section 4.6 was intended for these analyses.
Request:
- 1. Clarify the disposition, in accordance with 10 CFR 54.21(c)(1), for the steel containment cylinder and dome fatigue analysis and describe the following:
- a. list the transients considered in the analysis (event name),
- b. the design cycle limits of each transient, and
- c. the review of the calculated cumulative usage factor (CUF)
Otherwise, provide technical justification for not requiring a disposition under 10 CFR 54.21(c)(1) and describe how the aging effect of cumulative fatigue damage due to cyclic loading will be adequately managed pursuant to 10 CFR 54.21(a)(3).
- 2. Clarify the disposition, in accordance with 10 CFR 54.21(c)(1), for the floor liner plate fatigue analysis.
- 3. Update the LRA and USAR supplement, as appropriate, to be consistent with the response to the above requests.
RAI 4.6-2 (TRP 63 Fatigue Analysis)
Background:
ASME Section III, Division 2, Code for Concrete Reactor Vessel and Containments, Subsection CC, Concrete Containment, and Division 1, Subsection NE, Class MC Components, requires a fatigue analysis for liner plates, metal containments, and penetrations that considers all cyclic loads based on the anticipated number of cycles. Section 4.6 of the SRP LR states that if a plants code of record requires a fatigue analysis, then this analysis may be a time limited aging analyses (TLAA) and must be evaluated in accordance with 10 CFR 54.21(c)(1) to ensure that the effects of aging on the intended functions are adequately managed for the period of extended operation.
License renewal application (LRA) Section 4.6, Containment Liner Plate, Metal Containments, and Penetrations Fatigue Analysis, identifies the fatigue analyses for the following containment structural components: personnel airlock, polar crane, equipment hatch, drywell airlock, drywell combination door/hatch assembly, and drywell head. The LRA generally describes the normal and upset loading conditions considered in the analyses as to include earthquakes and safety relief valves (SRV) lifts. The applicant dispositioned these analyses in accordance with 10 CFR 54.21(c)(1)(iii) by stating that the Fatigue Monitoring Program will manage the aging effects due to cumulative fatigue.
Issue:
Section 4.6 of the LRA does not clearly identify the transients considered for each of the containment structural components analyses referenced above, the design cycle limits for each transient, and any analyzed cumulative usage factor against which the transients will be monitored. Additionally, based on the staff review of the components specifications during the audit, the staff is not clear whether earthquakes and SRV lift are the only transients considered in the fatigue analyses.
Request:
- 1. For each of the fatigue analyses dispositioned under LRA section 4.6 for the containment structural components listed in the Background section above, describe the following:
- a. identify the transients considered in each analysis (event name),
- b. the design cycle limits of each transient against which they will be monitored by the Fatigue Monitoring Program, and
- c. the review of the calculated cumulative usage factor (CUF)
- 2. Clarify if earthquakes and SRV lifts are the only transients considered for all the fatigue analyses referenced above. Otherwise, state any other transient(s) evaluated.
- 3. Update the LRA and USAR supplement, as appropriate, to be consistent with the response to the above requests.
RAI 4.6-3 (TRP 63 Fatigue Analysis)
Background:
Section 4.6 of the SRP-LR states that penetration bellows may be designed and/or analyzed in accordance with ASME code requirements. The SRP-LR also states that if a plants code of record requires a fatigue analysis, then this analysis may be a time-limited aging analyses (TLAA) and must be evaluated in accordance with 10 CFR 54.21(c)(1) to ensure that the effects of aging on the intended functions are adequately managed for the period of extended operation.
License renewal application (LRA) Section 4.6, Containment Liner Plate, Metal Containments, and Penetrations Fatigue Analysis, identifies the fatigue analyses for expansion joints (bellows) in sleeved penetrations, and fuel transfer tubes bellows. The LRA states that transient cycles for plant startups, operating basis earthquake (OBE) cycles, and safety relief valves (SRV) lifts are tracked for these expansion joints (bellows) as shown in LRA Section 4.3.2. The LRA also states that these analyses remain adequate for the period of extended operation. For the fuel transfer tube bellows, the LRA states that the bellows is designed for seismic events that are tracked and 150 cycles of flexing.
Issue:
Based on the information provided in LRA Section 4.6, it is not clear what is the applicants disposition under 10 CFR 54.21(c)(1) for the fatigue analyses of expansion joints (bellows) in sleeved penetrations, and the fatigue analysis for the fuel transfer tube bellows. Additionally, the staff is not clear where the cycles of flexing is considered in LRA Table 4.3-1 for tracking purposes under the Fatigue Monitoring Program, and what is the designed cycle limit considered for earthquakes in the fatigue analysis of the fuel transfer tube bellows.
Request:
- 1. State, with supporting justification, the disposition under 10 CFR 54.21(c)(1) for the fatigue analyses of expansion joints (bellows) in sleeved penetrations
- 2. State, with supporting justification, the disposition under 10 CFR 54.21(c)(1) for the fatigue analyses of fuel transfer tube bellows.
- 3. Clarify the following for the fatigue analysis of fuel transfer tube bellows:
- a. how the cycles of flexing is considered in LRA Table 4.3-1 and how they are tracked under the Fatigue Monitoring Program,
- b. list any other transients considered in the analysis (e.g. temperatures cycles),
and
- c. specify the design cycle limits for seismic OBE.
- 4. Update the LRA and USAR supplement, as appropriate, to be consistent with the response to the above requests.
RAI 3.5.1.9-1 (TRP 63 Fatigue Analysis)
Background:
Section 4.6 of the SRP-LR states that dissimilar metal welds that connect the piping penetrations to the bellows or stainless steel plates provides a leak-tight penetration, and they may be designed in accordance with the requirements of Section III of the ASME Code. The SRP-LR also states that if a plants code of record requires a fatigue analysis, then this analysis may be a time-limited aging analyses (TLAA) and must be evaluated in accordance with 10 CFR 54.21(c)(1) to ensure that the effects of aging on the intended functions are adequately managed for the period of extended operation. GALL Report item II.B4.C-13, associated with SRP Table 3.5.1, item 9, addresses, in part, the cumulative fatigue damage due to fatigue for penetrations with dissimilar metal welds.
Section 3.5.2.2.1.6 of the license renewal application (LRA) states that there are dissimilar metal welds associated with stainless steel bellows welded to carbon steel penetration sleeves.
Issue:
It is not clear to the staff if dissimilar metal welds were considered in the fatigue analyses of piping penetrations and whether they were properly evaluated in accordance with 10 CFR 54.21(c)(1) to ensure that the aging effects of cumulative fatigue damage due to cyclic loading are adequately managed for the period of extended operation. The staff notes that LRA Section 4.6, Containment Liner Plate, Metal Containments, and Penetrations Fatigue Analysis, item 3.5.1-9 of LRA Table 3.5.1, and LRA Section 3.5.2.2.1.5, Cumulative Fatigue Damage, do not address dissimilar metal welds.
Request:
- 1. Clarify if dissimilar metal welds were considered in the fatigue analyses of piping penetrations.
- 2. If considered, address the disposition under 10 CFR 54.21(c)(1) for dissimilar metal welds in piping penetration. If not considered, how will the aging effect of cumulative fatigue damage due to cyclic loading be adequately managed for dissimilar metal welds pursuant to 10 CFR 54.21(a)(3).
- 3. Update the LRA and USAR supplement, as appropriate, to be consistent with the response to the above requests.
RAI 3.5.1.9-2 (TRP 63 Fatigue Analysis)
Background:
Section 4.6 of the license renewal application (LRA) identify the following components as being managed for fatigue by the Fatigue Monitoring Program: steel containment cylinder and dome, floor liner plate, personnel airlocks, polar crane, equipment hatch, drywell airlock, drywell combination door/hatch assembly, drywell head, expansion joints (bellows) from sleeved penetrations, and fuel transfer tube bellows.
LRA Table 3.5.2-1 provides, in part, aging management review results for the following components associated with LRA Table 3.5.1 item 3.5.1-9: sleeved penetrations, penetration bellows, accessible steel elements, and steel components: drywell personnel airlock, drywell combination equipment hatch and personnel door.
Issue:
The staff did not find aging management review results in LRA Table 3.5.2-1 for the following steel components associated with TLAAs being dispositioned under LRA Section 4.6 as being managed by the Fatigue Monitoring Program:
- fuel transfer tube bellows Request:
- 1. Clarify whether the components listed in the Issue section above will be managed for cracking due to cumulative fatigue damage by the Fatigue Monitoring Program as dispositioned in LRA Section 4.6.
- 2. Update LRA Table 3.5.2-1 as necessary to be consistent with response.
RAI 4.7.2-1 (TRP 102.2 - High Energy Line Break)
Background:
LRA Section 4.7.2 describes the applicant's TLAA for the Class 1 systems associated with the high energy line break (HELB) analysis, which is also discussed in USAR Section 3.6. The disposition for this TLAA is in accordance with 10 CFR 54.21 (c)(1)(iii), which requires the applicant to demonstrate that the effects of aging on the intended functions will be adequately managed for the period of extended operation. The applicant credits the Fatigue Monitoring Program for tracking transient cycles and determining the necessary corrective actions if transient cycle limits are reached.
USAR Section 3.6 provides the applicant's basis for the HELB analysis and how it complies with general design criteria No. 4, "Dynamic Effects. USAR Table 3.6A-21 identifies the high-energy piping inside containment. USAR Section 3.9 and Table 3.9A-1 provide a summary of the design basis transients and the cycle limits that are applicable to Class 1 piping systems.
Issue:
- a. LRA Section 4.7.2 does not appear to identify which high energy piping systems are within the scope of the Fatigue Monitoring Programs cycle counting activities.
- b. LRA Section 4.7.2 does not appear to identify the HELB component transients that are tracked by the Fatigue Monitoring Program.
Request:
- a. Identify the high energy piping systems subject to the HELB TLAA that are within the scope of the Fatigue Monitoring Programs cycle counting activities.
- b. Identify the HELB component transients that are tracked by the Fatigue Monitoring Program.