Westinghouse Hematite Decommissioning Project - Final Status Survey Final Report Volume 3, Chapter 4, Survey Area Release Record for Land Survey Area 10, Survey Unit 12, Rev. 2, FSS Field Log (P-6)
ML18074A225
Person / Time
Site: 07000036
Issue date: 02/08/2018
From:
Westinghouse
To:
Office of Nuclear Material Safety and Safeguards
Shared Package
ML18074A285 List:
References
HEM-18-6
Download: ML18074A225 (2)


Text

Hematite Decommissioning Project Procedure: HDP-PR-FSS-701, Final Status Survey Plan Development Westinghouse Non-Proprietary Class 3 APPENDIX P-6 FSS FIELD LOG Revision: 4 Appendix P-6, Page 1 of 1 Survey Area:

LSA IO

==

Description:==

Burial Pits Open Land Area Survey Unit:

12

==

Description:==

East Central Survey Unit (N. Burial Pit Area)

FSS Field Log:

Date/Time:

02/10/15 02/11/15 02/13/15 Quality Record Observation or Comment:

Technician Prior to beginning GWS, a task-specific safety briefing was performed by the J.Williams FSS Supervisor. At -1000 before commencing GWS the FSS crew

-,,,. d confirmed I & C integrity. Instruments B and C background levels were

~~

measured at I lK and 12K gross cpm respectively. Weather conditions were sunny and cold (30s F). Approximately 20% of the SU was inaccessible due to standing water. Coordinated with Operations to conduct dewatering. Exited I & Cat 1215. Received confirmation that dewatering efforts were successful at 1350 and entered I & C to continue GWS. Exited I & C at 1710 to perform instrument post-use checks. GWS files generated:

LSA_l O _ 12_021015 _ B _ MC LSA_l 0_12_021015 _ C _JW LSA_10_12_021015 _C2_JW Prior to GWS and systematic sampling, a task-specific safety briefing was J. Williams performed by the FSS Supervisor. Entered I & C at 0920 to confirm mtegrity

,,-_/

prior to concurrently commencing systematic sampling and GWS. General ar~.,A: *,

background was measured at about 12 K gross cpm. No anomalous conditions, impediments, or foreign debris were noted. Weather conditions were windy, overcast, and cold (30s F).Exited I & Cat 1200. Reconvened concurrent systematic sampling and GWS at 1340. Concluded GWS ofLSA 10-12 at -1610. Concluded systematic sampling ofLSA 10-12 and exited I &

C at 1705 to perform instrument post-use checks. GWS files generated were:

LSA_IO_l2_021 I I5_C_JW LSA_10_12_021115_C2_JW Prior to conducting biased sampling, a task-specific safety briefing was performed by the FSS Supervisor. Entered I & C at 1440 to confirm integrity prior to attaining to bias samples. Weather conditions were sunny and relatively warm (40s F). Collected two samples and exited I & Cat 1550.

J.Williams r"7~

FSS Field Log __ I_ of_!_

Hematite Decommissioning Project Procedure: HDP-PR-FSS-701, Final Status Survey Plan Development Westinghouse Non-Proprietary Class 3 APPENDIX P-6 FSS FIELD LOG Revision: 4 Appendix P-6, Page 1 of 1 Survey Area:

LSA 10

==

Description:==

Burial Pits Open Land Area Survey Unit:

12

==

Description:==

East Central Survey Unit (N. Burial Pit Area)

FSS Field Log:

Date/Time:

05/08/15 Quality Record Observation or Comment:

Technician At 0800 a task-specific safety briefing was performed by the FSS Supervisor Jahmai in preparations for sidewall biased soil sampling in LSA 10-04 per an NRC Williams Directive. Entered LSA 10-04 at -0845 to confirm I&C integrity and perform

,?'~-

a quality walk-down. Commenced sidewall sampling at 0900. Concluded

~...., * "

sidewaJI sampling and exited the I&C boundary at 0940. Sample coordinates and void readings were recorded via GPS and Nal 2"x 2". Files generated:

LSA 10 12 050815 E JW Sample IDs:

Ll0-12-15-B-E-B-OO Ll 0-12-16-B-E-B-OO FSS Field Log __ I_ of_l_