Hematite Decommissioning Project Procedure: HDP-PR-FSS-701, Final Status Survey Plan Development Westinghouse Non-Proprietary Class 3 APPENDIX P-6 FSS FIELD LOG Revision: 4 Appendix P-6, Page 1 of 1 Survey Area:
==
Description:==
Burial Pits Open Land Area Survey Unit:
12
==
Description:==
East Central Survey Unit (N. Burial Pit Area)
FSS Field Log:
Date/Time:
02/10/15 02/11/15 02/13/15 Quality Record Observation or Comment:
Technician Prior to beginning GWS, a task-specific safety briefing was performed by the J.Williams FSS Supervisor. At -1000 before commencing GWS the FSS crew
-,,,. d confirmed I & C integrity. Instruments B and C background levels were
~~
measured at I lK and 12K gross cpm respectively. Weather conditions were sunny and cold (30s F). Approximately 20% of the SU was inaccessible due to standing water. Coordinated with Operations to conduct dewatering. Exited I & Cat 1215. Received confirmation that dewatering efforts were successful at 1350 and entered I & C to continue GWS. Exited I & C at 1710 to perform instrument post-use checks. GWS files generated:
LSA_l O _ 12_021015 _ B _ MC LSA_l 0_12_021015 _ C _JW LSA_10_12_021015 _C2_JW Prior to GWS and systematic sampling, a task-specific safety briefing was J. Williams performed by the FSS Supervisor. Entered I & C at 0920 to confirm mtegrity
,,-_/
prior to concurrently commencing systematic sampling and GWS. General ar~.,A: *,
background was measured at about 12 K gross cpm. No anomalous conditions, impediments, or foreign debris were noted. Weather conditions were windy, overcast, and cold (30s F).Exited I & Cat 1200. Reconvened concurrent systematic sampling and GWS at 1340. Concluded GWS ofLSA 10-12 at -1610. Concluded systematic sampling ofLSA 10-12 and exited I &
C at 1705 to perform instrument post-use checks. GWS files generated were:
LSA_IO_l2_021 I I5_C_JW LSA_10_12_021115_C2_JW Prior to conducting biased sampling, a task-specific safety briefing was performed by the FSS Supervisor. Entered I & C at 1440 to confirm integrity prior to attaining to bias samples. Weather conditions were sunny and relatively warm (40s F). Collected two samples and exited I & Cat 1550.
J.Williams r"7~
FSS Field Log __ I_ of_!_
Hematite Decommissioning Project Procedure: HDP-PR-FSS-701, Final Status Survey Plan Development Westinghouse Non-Proprietary Class 3 APPENDIX P-6 FSS FIELD LOG Revision: 4 Appendix P-6, Page 1 of 1 Survey Area:
LSA 10
==
Description:==
Burial Pits Open Land Area Survey Unit:
12
==
Description:==
East Central Survey Unit (N. Burial Pit Area)
FSS Field Log:
Date/Time:
05/08/15 Quality Record Observation or Comment:
Technician At 0800 a task-specific safety briefing was performed by the FSS Supervisor Jahmai in preparations for sidewall biased soil sampling in LSA 10-04 per an NRC Williams Directive. Entered LSA 10-04 at -0845 to confirm I&C integrity and perform
- ,?'~-
a quality walk-down. Commenced sidewall sampling at 0900. Concluded
~...., * "
sidewaJI sampling and exited the I&C boundary at 0940. Sample coordinates and void readings were recorded via GPS and Nal 2"x 2". Files generated:
LSA 10 12 050815 E JW Sample IDs:
Ll0-12-15-B-E-B-OO Ll 0-12-16-B-E-B-OO FSS Field Log __ I_ of_l_