RBG-47840, Request for Due Date Extension for License Renewal Application NRC Request for Additional Information from 30 Days to 45 Days

From kanterella
(Redirected from ML18058A085)
Jump to navigation Jump to search

Request for Due Date Extension for License Renewal Application NRC Request for Additional Information from 30 Days to 45 Days
ML18058A085
Person / Time
Site: River Bend Entergy icon.png
Issue date: 02/22/2018
From: Maguire W
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RBG-47840
Download: ML18058A085 (2)


Text

,.

-=- Entergy.

RBG-47840 February 22, 2018 Attn: Document Control Desk U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852-2738 Entergy Operations, Inc.

River Beno Station 5485 U.S. Highway 61 N SI. F ranclsvllio LA 70775 Tel 225*381*4374 William F. Maguire Site Vice P,es,oent River Bend Stalion

SUBJECT:

Request for Due Date Extension for License Renewal Application NRC Request for Additional Information From 30 Days to 45 Days River Bend Station, Unit 1 Docket No. 50-458 License No. NPF-47

References:

1) Entergy Letter: License Renewal Application (RBG-47735 dated May 25, 2017)
2) NRC email: River Bend Station, Unit 1 Request for Additional Information -

RBS License Renewal Application - dated February 8, 2018 - Set 10 (ADAMS Accession No. ML18043A008)

Dear Sir or Madam:

In Reference 1, Entergy Operations, Inc. (Entergy) submitted an application for renewal of the operating license for River Bend Station (RBS) for an additional 20 years beyond the current expiration date. In an email dated February 8, 2018, (Reference 2) the NRC staff made a request for additional information (RAI), needed to complete the license renewal application review.

This letter provides a follow-up to a telephone conversation between a representative of Entergy and the Nuclear Regulatory Commission (NRC) Staff on February 15, 2018, regarding a due date extension for the Set 10 RAls noted in Reference 2. Currently, the RAI responses are due 30 days from their issue date. Due to the extensive research necessary to complete Set 10 responses, Entergy requests a revised due date of March 26, 2018.

If you require additional information, please contact Mr. Tim Schenk at (225)-381-4177 or tschenk@entergy.com.

In accordance with 10 CFR 50.91 (b)(1), Entergy is notifying the State of Louisiana and the State of Texas by transmitting a copy of this letter to the designated State Official.

RBG-47840 Page 2 of 2 Sincerely, ~~

WFM/RMC/alc cc:

U. S. Nuclear Regulatory Commission Attn: Emmanuel Sayoc 11555 Rockville Pike Rockville, MD 20852 U. S. Nuclear Regulatory Commission Attn: Lisa Regner 11555 Rockville Pike Rockville, MD 20852 U.S. Nuclear Regulatory Commission Region IV 1600 East Lamar Blvd.

Arlington, TX 76011 -4511 NRC Resident Inspector PO Box 1050 St. Francisville, LA 70775 Central Records Clerk Public Utility Commission of Texas 1701 N. Congress Ave.

Austin, TX 78711-3326 Department of Environmental Quality Office of Environmental Compliance Radiological Emergency Planning and Response Section Ji Young Wiley P.O. Box 4312 Baton Rouge, LA 70821-4312 RBF1 0044