|
---|
Category:Deficiency Correspondence (per 10CFR50.55e and Part 21)
MONTHYEARML24302A2772024-10-28028 October 2024 57243-EN 57243_5 - Rssc Dba Marmon - Update 20241030 ML17223A1982017-07-21021 July 2017 Part 21 Notification - Eaton/Cutler Hammer A200 Series Starter PLA-7613, Interim Report of a Deviation, Units 1 & 2 - (PLA-7613)2017-06-0909 June 2017 Interim Report of a Deviation, Units 1 & 2 - (PLA-7613) ML17081A4532017-03-20020 March 2017 Part 21 - Plastic Jar Dedication Sampling ML16313A0622016-10-18018 October 2016 C&D Technologies, Inc. - 10 CFR Part 21 Evaluation Regarding Terminal Welding Failure in 3DCU-9 Batteries ML14204A7072014-07-23023 July 2014 Completed Evaluation of Part 21 Potentially Reportable Condition Notification: Unseating of Valve Spring on SSPV ML14210A0102014-07-23023 July 2014 Part 21 - Unseating of Valve Spring on Scram Solenoid Pilot Valve ML13165A3422013-06-12012 June 2013 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML13044A0752013-02-0808 February 2013 Part 21 - Completed Evaluation for Potential Error in Main Steam Line High Flow Calculational Methodology ML12347A3082012-12-12012 December 2012 Part 21 60-Day Interim Report Notification: Error in Main Steam Line High Flow Calculational Methodology ML12319A0122012-09-27027 September 2012 Error in Main Steam Line High Flow Calculational Methodology ML12158A4472012-06-0606 June 2012 Part 21 60-Day Interim Report Notification - Closufailure of CRD Collet Retainer Tube/Outer Tube Weld ML1127000672011-09-26026 September 2011 GE-Hitachi Part 21 Reportable Condition Notification: Failure to Include Seismic Input in Channel-Control Blade Interference Customer Guidance ML11115A0392011-04-14014 April 2011 Notice of Deviation Pursuant to 10 CFR 21, NPKC-7-21A(N) Splice Kit with Possible Compromised Jacket Seal ML1025202192010-09-0303 September 2010 Part 21 - Failure to Include Seismic Input in Reactor Control Blade Customer Guidance ML1018907392010-07-0101 July 2010 Part 21 Report Concerning Failure of Turbine Overspeed Reset Control Valve Diaphragm ML1015305642010-05-28028 May 2010 Part 21 Notification from C & D Technologies, Inc., Post Corrosion on Dcu Batteries ML1009604492010-04-0202 April 2010 Part 21 Report by Tyco Valves and Controls, LP Possible Failure of Solenoid Valves with Dual Function Main Steam Safety Valves ML0934301402009-12-0202 December 2009 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 1OCFR21-0098, Rev. 0, Amot Thermostatic Valve Element, P/N: 9760X ML0232901622002-11-18018 November 2002 Final Report, Stability Option III: Possible Successive Confirmation Count Resets - Not Reportable ML18024A0581978-09-18018 September 1978 Letter Attaching a Final Report of a Deficiency in Carriage Bolt Fasteners Used on 480 Volt Motor Control Center Bus Splices ML18024A1011978-07-19019 July 1978 Letter Attaching a Report of Defects Discovered During Qualification and Manufacturing of Control Room Systems ML18024A0661978-07-14014 July 1978 Letter Referring to the April 17, 1978 Letter and Regarding an Update of Interim Report of Reportable Deficiency Regarding Potential Transformers on 4.16K Switchgear ML18024A0681978-07-0505 July 1978 Letter Referring to the April 26, 1978 Letter and Advising the Commission That a Definitive Report Will Be Submitted by September 29, 1978 ML18024A0771978-06-23023 June 1978 Letter Referring to the June 22, 1977 Letter and Relating to the Definitive Report, Prepared by Bechtel Power Corp., of a Reportable Deficiency Regarding Unsatisfactory Field Welding and Inspection of Shear Suds ML18024A0691978-05-31031 May 1978 Letter Referring to the December 1, 1977 Letter Providing an Interim Report of a Deficiency in Physical Separation of Electrical Circuits and Advising the Commission That the Definitive Report Will Be Submitted by September ML18024A0711978-04-26026 April 1978 Letter Attaching Bechtel Engineering'S Interim Report on Spot Welding of Struts for SSES Units 1 and 2 and Advising the Commission That the Definitive Report Will Be Submitted by July 31, 1978 ML18025A4791976-11-0505 November 1976 Interim Report of Reportable Deficiency Defect in RPV Susquehanna Unit 2 Bottom Head Side Plate ML18025A4901975-08-29029 August 1975 Letter Regarding the Definitive Report of Deficiencies in Box Column Supports Which Supplements PLA-74 ML18025A4921975-04-0404 April 1975 Letter Attaching an Interim Report on Potential Deficiency Which Was Discussed with Mr. Heishman on March 6, 1975 2024-10-28
[Table view] Category:Letter
MONTHYEARML24289A1252024-10-22022 October 2024 – Authorized Alternative to Requirements of the ASME OM Code PLA-8145, Biennial 10 CFR 50.59 and 72.48 Summary Report and Changes to Regulatory Commitments - PLA-81452024-10-21021 October 2024 Biennial 10 CFR 50.59 and 72.48 Summary Report and Changes to Regulatory Commitments - PLA-8145 ML24291A1562024-10-16016 October 2024 Missed Annual Inventory Required by 40 CFR 266, Subpart in PLE 0026645 PLA-8148, Registration for the Use of Spent Fuel Storage Casks 311, 308, and 3102024-10-15015 October 2024 Registration for the Use of Spent Fuel Storage Casks 311, 308, and 310 PLA-8141, Response to Request for Additional Information Regarding Relief Request 1RR06, PLA-81412024-09-18018 September 2024 Response to Request for Additional Information Regarding Relief Request 1RR06, PLA-8141 PLA-8142, Registration for the Use of Spent Fuel Storage Casks 306, 309, and 307 - PLA-81422024-09-18018 September 2024 Registration for the Use of Spent Fuel Storage Casks 306, 309, and 307 - PLA-8142 ML24260A2312024-09-17017 September 2024 Senior Reactor and Reactor Operator Initial License Examinations 05000387/LER-2024-002, B Diesel Generator Inoperable Due to Failed Excitation System Linear Reactor2024-09-16016 September 2024 B Diesel Generator Inoperable Due to Failed Excitation System Linear Reactor ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 ML24233A2192024-09-0303 September 2024 – Authorized Alternative to Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code IR 05000387/20240052024-08-29029 August 2024 Updated Inspection Plan for Susquehanna Steam Electric Station, Units 1 and 2 (Report 05000387/2024005 and 05000388/2024005) 05000387/LER-2023-004-01, Manual Reactor Scram Due to Degraded Main Condenser Vacuum2024-08-26026 August 2024 Manual Reactor Scram Due to Degraded Main Condenser Vacuum 05000387/LER-2024-001-01, Main Steam Isolation Valve Leakage Due to Valve Body Seat Wear2024-08-21021 August 2024 Main Steam Isolation Valve Leakage Due to Valve Body Seat Wear IR 05000387/20240022024-08-12012 August 2024 Integrated Inspection Report 05000387/2024002 and 05000388/2024002 ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification PLA-8117, 23rd Refueling Outage Owners Activity Report (PLA-8117)2024-07-23023 July 2024 23rd Refueling Outage Owners Activity Report (PLA-8117) ML24197A0982024-07-15015 July 2024 Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000387/2024010 and 05000388/2024010 PLA-8126, Response to Request for Confirmation of Information Regarding Relief Request 1RR062024-05-29029 May 2024 Response to Request for Confirmation of Information Regarding Relief Request 1RR06 ML24127A2262024-05-29029 May 2024 Issuance of Amendment Nos. 288 and 272 Adoption of TSTF-563 PLA-8122, Annual Radiological Environmental Operating Report (PLA-8122)2024-05-28028 May 2024 Annual Radiological Environmental Operating Report (PLA-8122) 05000387/LER-2024-001, Main Steam Isolation Valve Leakage2024-05-23023 May 2024 Main Steam Isolation Valve Leakage PLA-8115, Relief Request IRR06 One Time Extension to the Fourth 10-Year Inservice Testing Program Interval (PLA-8115)2024-05-23023 May 2024 Relief Request IRR06 One Time Extension to the Fourth 10-Year Inservice Testing Program Interval (PLA-8115) IR 05000387/20240012024-05-13013 May 2024 Integrated Inspection Report 05000387/2024001 and 05000388/2024001 IR 05000387/20244042024-05-0707 May 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000387/2024404 and 05000388/2024404 PLA-8095, 2023 Annual Radiological Environmental Operating Report (PLA-8095)2024-04-22022 April 2024 2023 Annual Radiological Environmental Operating Report (PLA-8095) PLA-8094, Radioactive Effluent Release Report and Offsite Dose Calculation Manual PLA-80942024-04-22022 April 2024 Radioactive Effluent Release Report and Offsite Dose Calculation Manual PLA-8094 PLA-8101, Re 2023 Annual Report of Radiation Exposure2024-04-22022 April 2024 Re 2023 Annual Report of Radiation Exposure ML24082A1372024-04-22022 April 2024 Issuance of Amendment Nos. 287 and 271 Adoption of TSTF-568, Revision 2 and Associated Technical Specification Changes PLA-8102, Annual Environmental Operating Report (Nonradiological) PLA-81022024-04-11011 April 2024 Annual Environmental Operating Report (Nonradiological) PLA-8102 PLA-8113, Response to Request for Additional Information Regarding Relief Request 4RR-11 (PLA-8113)2024-04-11011 April 2024 Response to Request for Additional Information Regarding Relief Request 4RR-11 (PLA-8113) PLA-8112, Relief Request 4RR-11 Relief from End of Interval Boundary Leakage Test PLA-81122024-04-0909 April 2024 Relief Request 4RR-11 Relief from End of Interval Boundary Leakage Test PLA-8112 PLA-8110, Submittal of Unit 1 Cycle 24 Core Operating License Report (Pla 8110)2024-04-0404 April 2024 Submittal of Unit 1 Cycle 24 Core Operating License Report (Pla 8110) PLA-8100, Property Insurance Program (PLA-8100)2024-04-0101 April 2024 Property Insurance Program (PLA-8100) ML24092A4022024-04-0101 April 2024 Annual Financial Report (PLA-8098) PLA-8109, Supplement to Request for Exemption from Certain Requirements of 10 CR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance (PLA-8109)2024-03-21021 March 2024 Supplement to Request for Exemption from Certain Requirements of 10 CR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance (PLA-8109) PLA-8107, Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance2024-03-19019 March 2024 Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance ML24067A2512024-03-19019 March 2024 Authorized Alternative to Requirements of the ASME Code ML24044A2532024-03-14014 March 2024 Associated Independent Spent Fuel Storage Installation – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0077 (Security Notifications, Reports, and Recordkeeping & Suspicious Activity Reporting)) IR 05000387/20240112024-02-29029 February 2024 Commercial Grade Dedication Inspection Report 05000387/2024011 and 05000388/2024011 IR 05000387/20230062024-02-28028 February 2024 Annual Assessment Letter for Susquehanna Steam Electric Station, Units 1 and 2 (Reports 05000387/2023006 and 05000388/2023006) ML24039A1882024-02-27027 February 2024 Issuance of Amendment Nos. 286 and 270 Changes to Technical Specifications for Control Rods ML24037A3072024-02-22022 February 2024 Summary of Regulatory Audit in Support of Relief Request 5RR-02 PLA-8099, Proof of Financial Protection and Guarantee of Payment of Deferred Premiums (PLA-8099)2024-02-13013 February 2024 Proof of Financial Protection and Guarantee of Payment of Deferred Premiums (PLA-8099) IR 05000387/20230042024-02-0707 February 2024 Integrated Inspection Report 05000387/2023004 and 05000388/2023004 05000387/LER-2023-004, Manual Reactor Scram Due to Degraded Main Condenser Vacuum2024-01-0909 January 2024 Manual Reactor Scram Due to Degraded Main Condenser Vacuum PLA-8096, Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval2024-01-0404 January 2024 Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval PLA-8077, Emergency Plan Revision 67 (PLA-8077)2023-12-27027 December 2023 Emergency Plan Revision 67 (PLA-8077) IR 05000387/20230102023-12-11011 December 2023 Fire Protection Team Inspection Report 05000387/2023010 and 05000388/2023010 PLA-8088, Request for Exemption from Enhanced Weapons, Firearms Background Checks and Security Event Notifications Implementation (PLA-8088)2023-12-0505 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks and Security Event Notifications Implementation (PLA-8088) 2024-09-06
[Table view] |
Text
NR- ISTRIBUTION FOR PART 50 DOC T MATERIAL (TEMPORARY FORM)
CONTRQL NO:
FILE:
FROM. Pennsylvania Power 6 Lig t DATE OF DOC 'ATE REC'D LTR TW5 RPT OTHER Co. Allentown, Pa N.W Curtis TO:'r ORIG CC OTHER SENT NRC PDR J,P,O'e i 1 ly not ..igned SENT LOCAL PDR PROP INFO INPUT NO CYS REC'D DOCKET NO: "
CLASS //CLASS
"'(
xxx 0-38 aii 6888)
DESCR IPTION: ENCLOSURES:
i 'I ~ 'i - ~
Ltr notarized 9-3-75 ~,. ~ trans the following
~
Report On Deficiency In Box Column Supports for The Susquehanna Nuclear Plant Dist Per H; Rushbrook
( 15 cys enc'1 rec'd)
I PLANT NAME:
Susquehana 1 6c 2 Ev .t-tu , ~ i8 l )$ 7~~~
FOR ACTION/INFORMATION 9-8-75 JGB TLER (L) SCHWENCER (L) ZIEMANN (L) BEGAN (E) REID(L)
W/ Copies W/ Copies W/ Copies W/ Copies W/ COPIES CLARK (L) STOLZ (L) i W/ Copies DICKER (E) LEAR (L)
W/ Copies W/ Copies W/ Copies PARR (L) VASSALLO (L) KNIGHTON (E) SBICS W/ Copies W/ Copies W/ Copies W/ Copies KNI EL,(L) PURPLE (L) YOUNGBLOOD (E)
W/ Copies W/ Copies W/ Copies W/( oples INTERNAL DISTR I BUT ION ECH REVIEYif DENTON A/T IND MGC, ROOM P-SOBA SCHROEOER "
%IACCARY>~ gAMMILL
~R IMES LIC ASST R. DIGGS (L)
H. G EAR IN (L)
B RAITMAN SALTZMAN
~
GOSSICK/STAFF ~NI'GHT KASTNER GOULBOURNE (L) ME LTZ CASE GIAMBUSSO 'HAO PAWLICKI BALLARD SPANGLER P. KREUTZER (E)
EE (L) PLANS BOYD STELLO .R U3:iBROOQL) + MCDONALD MOORE (L) HOUSTON ENVI RO CHAPMAN
~YOUNG (L) M~
S. REED(E)
NOVAK MULLER M. S (L)
'RVICE DUBE (Ltr)
SKOVHOLT (L) ROSS DICKER S. S HEPPARD (L) E. COUPE GOLLER (L) (Ltr) IPPOLITO KNIGHTON M. S LATER (E) PETERSON P. COLI INS ~
~DESCO+~~ YOUNGBLOOD H. S MITH (L) HARTFIELD. (2)
DEN ISE J.COLLINS BEGAN S. TEETS (L) KLECKER
~G FILE OPR Si AAP REGION (2I It LAIHAS BENAROYA PROJECT LDR G. WILLIAMS(E)
~
EISENHUT WIGG INTON V, WILSON (L)
MIPC VOLLMER . HAR LESS R. INGRAM (L)
~ ~
1 H. DUE'CAN EXTERNAL DISTRIBUTION LOCAL PDR Wilks Barre, Pa 1TIC (ABERNATHY) (1)(2)(10) NATIONALLABS 1 PD R-SAN/LA/NY 1NSIC (BUCHANAN) 1 W. PENNINGTON, Rm E-20'I GT 1 BROOKI1AVEN NAT LAB 1ASLB 1 CONSU LTANlS 1 G. ULBII<SON ORNL Newton Anderson NEWMARK/0 LUME/AGBADI AN ACRS . ENT fo
~l f
TWO NORTH NINTH STREET, ALLENTOWN, PA. 18101 PHONEME t215) 821 5 151 August 29, 1975' r Cj .-, &W<).WQ'/(0 <Yi Mr. Z. P. O'Reilly Director Region I U.S. Nuclear Regulatory Commission ,+>>
931 Park Avenue King of Prussia, Pennsylvania 19406 ~i <<,,";~ gj SUSQUEHANNA S TEAM ELECTRXC STATION DEFINITIVE REPORT OF DEFICIENCIES IN <
i/'re BOX COLUMN SUPPORTS DOCKET NOS.: 50-387 and 50-388 LICENSE NOS.: CPPR-101 and CPPR-102 ERs 100450/100508 FILE 840-4 PLA-82 Dear Mr. O'ReillyI This letter transmits the subject report which supplements PLA-7 1, 1 dated July 25, 1975 and is intended to complete PPKL's responsibility in reporting the deficiencies in fabricated structural steel members (Box Column Supports) which had 'been located in position for installa-tion in Susquehanna Unit 1 8c 2 structures.
As indicated in the attached report, the decision has 'been made to redesign the structures and, to replace all eight units, including those found not to contain defects. The replacement units employ material changes and weld )oint configurations vhich vill facilitate fabrication and should preclude the recurrence of the lamellar tearing phenomenon experienced in original units.
Xn addition to those corrective measures identified in PLA-74 and the attached Bechtel detailed. report,, PPkL has concurred in an increase in Bechtel surveillance activities at the vendor's fabrication facility (BeMhlehem Steel Company's Pottstown, PA plant,).
Additionally, receiving and preinstallation activities at the SSES site will be aligned to perform a final visual examination before the new units are permanently committed to the plant structure.
We await your advice should you have any further questions or concerns on this matter.
Very truly yours N. W. Curtis Vice President - Engineering 5 Construction CJ QQQ ARS:b PENNSYLVANIA POWER 8 LIGHT COMPANY
0 )
J/