Letter Referring to the April 17, 1978 Letter and Regarding an Update of Interim Report of Reportable Deficiency Regarding Potential Transformers on 4.16K Switchgear
ML18024A066
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 07/14/1978
From: Curtis N
Pennsylvania Power & Light Co
To: Grier B
NRC Region 1
References
PLA-246, PLA-271
Download: ML18024A066 (4)


Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS DISTRIBUTION FOR INCOMING MATERIAL 50-387 388 REC:

GRIER B

H ORG:

CURTIS N

W NRC PA PWR 5 LIGHT DOCTYPE' ETTER NOTARIZED:

NO

SUBJECT:

FURNIS)IING UPDATE OF INTERIM REP OF REPORTABLE TRANSFORMERS ON 4. 16K SWITCI IGEARa AND ADVISING SEPT 15 1978.

DOCDATE: 07/14/78 DATE RCVD: 07/25/78 COPIES RECEIVED LTR 1

ENCL 1

DEFICIENCY RE POTENTIAL FINAL REPT WILL SUBMITTED BY PLANT NAME: SUSQUEHANNA UNIT 1

REVIEWER INITIAL:

XJM SUSQUEHANNA UNIT 2 DIBTRIBUTER INITIAL:~

+~+~~++4H~4H~++4lw+++ DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS +44+>+>>%>+++>~~>>

NOTES:

SEND I8(E 3CYS, FSAR 8( ALL AMDTS CONSTRUCTION DEFICIENCY REPORT (10CFR50. 55E)

(DISTRIBUTION CODE 8019)

~

FOR ACTION:

INTERNAL:

EXTERNAL:

ASST 'ASSALLO+4W/ENCL PROJ MGR INER~~~W/ENCL EG

=

~W/ENCL E+4W/2 ENCL GOBS ICK'c STAFF4+W/ENCL DIRECTOR DPM>+W/ENCL QAB+~W/ENCL AD FOR ENG%+W/ENCL AD FOR PLANT SYSTEMS44W/ENCL SD~~W/ENCL FERD DREHER/IE44W/ENCL LPDR S WILKES BARREI PA++W/ENCL TERA~~W/ENCL NSIC++W/ENCL ACRS CAT B%4~W/16 ENCL BR CHIEF LWR$3 BC++W/ENCL LIC ASST LWRN3 LA<4W/ENCL NRC PDR+~W/ENCL OELD+>W/ENCL MIPC4 +W/ENCL DEPUTY DIR DPM+wW/ENCL DIRECTOR DSS4~W/ENCL AD FOR REAC SFTY>+W/ENCL AD FOR SYS h PROJ~~W/ENCL K SEYFRIT/IE+~W/ENCL DISTRIBUTION:'TR 41 ENCL 41 SIZE:

2P CONTROL NBR:

7810700~8 pn 'tg THE END

%%4%%4%%%%%%%%%%%%%%%%%%%%%%%%%%%

I'

V '

~~

p rl I

lf,3 I

II IIEET

~

'K I'

P

'\\

f

~

~

V I

p II'I I

'III t

K ~

I It KK ~

II II I I KK K~I(

K KK

'4 I

I

'I I

'I IK P

Kl

~ 'I

'll K

TWO NORTH NINTH STREET, ALLENTOWN, PA.

18101 PHONE:

(215) 821-5151 NORMAN W. CURTIS Vice President. Engineering & Construction 821-5381 July 14, 1978 Mr. Boyce H. Grier Director, Region I U. S. Nuclear Regulatory Camission 631 Park Avenue King of Prussia, Pennsylvania 19406 SUSg3EHANNA, SHAM EKZCTRIC STATICX'i

.1 DOCKER NOS:

50-387, 50-388 LICENSE MS:

CPPR-101, CPPR-102 ERs 100450/100508

'PXA-'271 '

FILE 840-4

(~(e>(>

rrt

~ %

Dear Mr. Grier:

Reference is to my letter PL@-246, dated April 17, 1978.

We have not received from Westinghouse Switchgear Division all of the docuIIIentation which we require to finalize a definitive report of said deficiency.

Pending timely receipt of an addendum to the existing seismic

~ test report, we anticipate submittal of the final report by SeptE51tber 15, 1978.

You willbe advised promptly slmuld circumstances affect our ability to meet this new schedule.

Very tniLy yours,

. g"l 0"'<0 H N, W. Curtis Vice President-Engineering 6 Co ction ARS.mcb 78'7070028 PENNSYLVANIA POWER LIGHT COMPANY

Mr. B. H. Grier July 14, 1978 cc~

Mr. Ernst Volgenau (15)

Director Office of Inspection 6 Enforcanent U. S. Huclear Regu1atory Cammission Nashinc~n, D.C.

20555 Mr. G. McDonald, Director Office of Managaaent Information and Program Control U. S. Huclear RecpQatory Camission Washington, D.C.

20555