|
---|
Category:Deficiency Correspondence (per 10CFR50.55e and Part 21)
MONTHYEARML24302A2772024-10-28028 October 2024 57243-EN 57243_5 - Rssc Dba Marmon - Update 20241030 ML17223A1982017-07-21021 July 2017 Part 21 Notification - Eaton/Cutler Hammer A200 Series Starter PLA-7613, Interim Report of a Deviation, Units 1 & 2 - (PLA-7613)2017-06-0909 June 2017 Interim Report of a Deviation, Units 1 & 2 - (PLA-7613) ML17081A4532017-03-20020 March 2017 Part 21 - Plastic Jar Dedication Sampling ML16313A0622016-10-18018 October 2016 C&D Technologies, Inc. - 10 CFR Part 21 Evaluation Regarding Terminal Welding Failure in 3DCU-9 Batteries ML14204A7072014-07-23023 July 2014 Completed Evaluation of Part 21 Potentially Reportable Condition Notification: Unseating of Valve Spring on SSPV ML14210A0102014-07-23023 July 2014 Part 21 - Unseating of Valve Spring on Scram Solenoid Pilot Valve ML13165A3422013-06-12012 June 2013 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML13044A0752013-02-0808 February 2013 Part 21 - Completed Evaluation for Potential Error in Main Steam Line High Flow Calculational Methodology ML12347A3082012-12-12012 December 2012 Part 21 60-Day Interim Report Notification: Error in Main Steam Line High Flow Calculational Methodology ML12319A0122012-09-27027 September 2012 Error in Main Steam Line High Flow Calculational Methodology ML12158A4472012-06-0606 June 2012 Part 21 60-Day Interim Report Notification - Closufailure of CRD Collet Retainer Tube/Outer Tube Weld ML1127000672011-09-26026 September 2011 GE-Hitachi Part 21 Reportable Condition Notification: Failure to Include Seismic Input in Channel-Control Blade Interference Customer Guidance ML11115A0392011-04-14014 April 2011 Notice of Deviation Pursuant to 10 CFR 21, NPKC-7-21A(N) Splice Kit with Possible Compromised Jacket Seal ML1025202192010-09-0303 September 2010 Part 21 - Failure to Include Seismic Input in Reactor Control Blade Customer Guidance ML1018907392010-07-0101 July 2010 Part 21 Report Concerning Failure of Turbine Overspeed Reset Control Valve Diaphragm ML1015305642010-05-28028 May 2010 Part 21 Notification from C & D Technologies, Inc., Post Corrosion on Dcu Batteries ML1009604492010-04-0202 April 2010 Part 21 Report by Tyco Valves and Controls, LP Possible Failure of Solenoid Valves with Dual Function Main Steam Safety Valves ML0934301402009-12-0202 December 2009 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 1OCFR21-0098, Rev. 0, Amot Thermostatic Valve Element, P/N: 9760X ML0232901622002-11-18018 November 2002 Final Report, Stability Option III: Possible Successive Confirmation Count Resets - Not Reportable ML18024A0581978-09-18018 September 1978 Letter Attaching a Final Report of a Deficiency in Carriage Bolt Fasteners Used on 480 Volt Motor Control Center Bus Splices ML18024A1011978-07-19019 July 1978 Letter Attaching a Report of Defects Discovered During Qualification and Manufacturing of Control Room Systems ML18024A0661978-07-14014 July 1978 Letter Referring to the April 17, 1978 Letter and Regarding an Update of Interim Report of Reportable Deficiency Regarding Potential Transformers on 4.16K Switchgear ML18024A0681978-07-0505 July 1978 Letter Referring to the April 26, 1978 Letter and Advising the Commission That a Definitive Report Will Be Submitted by September 29, 1978 ML18024A0771978-06-23023 June 1978 Letter Referring to the June 22, 1977 Letter and Relating to the Definitive Report, Prepared by Bechtel Power Corp., of a Reportable Deficiency Regarding Unsatisfactory Field Welding and Inspection of Shear Suds ML18024A0691978-05-31031 May 1978 Letter Referring to the December 1, 1977 Letter Providing an Interim Report of a Deficiency in Physical Separation of Electrical Circuits and Advising the Commission That the Definitive Report Will Be Submitted by September ML18024A0711978-04-26026 April 1978 Letter Attaching Bechtel Engineering'S Interim Report on Spot Welding of Struts for SSES Units 1 and 2 and Advising the Commission That the Definitive Report Will Be Submitted by July 31, 1978 ML18025A4791976-11-0505 November 1976 Interim Report of Reportable Deficiency Defect in RPV Susquehanna Unit 2 Bottom Head Side Plate ML18025A4901975-08-29029 August 1975 Letter Regarding the Definitive Report of Deficiencies in Box Column Supports Which Supplements PLA-74 ML18025A4921975-04-0404 April 1975 Letter Attaching an Interim Report on Potential Deficiency Which Was Discussed with Mr. Heishman on March 6, 1975 2024-10-28
[Table view] |
Text
REGULATORY INFORNATION DISTRIBUTION SYSTEN (RIBS> D5"F/~'F&'I "TRI'BUTION FGR INCOMING MATERIAL REC: QRIER B H ORG: CURTIS N W DQCDATE: 07/05/78 NRC PA PWR S. LIGHT DATE RCVD:. 07/10/78 DQCTYPE: LETTER NOTARIZED: NO COPIES RECEIVED
SUBJECT:
LTR 1 ENCL 0 IN ORMING OF NEW DATE 09/29/78 FGR SUBMITTAL OF UPDATE OF INTERIM REPT'F REPORTABLE DEFICIENCY RE SPOT WELDING GF STRUTS MATERIAL.
f uQI7 PLANT NAMF:SUSQUEHANNA UNIT 2 REVIEWER INITIAL: X JM DISTRIBUTER INITIAL:
Hc~qp DISTRIBUTION GF THIS MATERIAL IS AS FOLI GRIS NOTFS:
SEND ISE 3CYS FSAR 5 ALL AMDTS CONSTRUCTION DEFICIENCY REf ORT (10CFRS0. 5SE>
<DISTRIBUTION CODE B019)
FOR ACTION ASST DIR VASSALLO~~4~I TR ONLY( 1) BR Cl-IIEF LNRN3 BC<<LTR ONLY<.1)
PRO J MGR M INER4Hl LTR ONLY ( 1 ) LIC ASST LNR53 LA>+LTR ONLY(i>
INTERNAL: ECr' .LF4l+LTR ONLY ( NRC PDR+slLTR ONLY(i>
Est+ OELD~<LTR ONLY<i)
GOSSICK 5 STAFF4k4tLTR ONLY(1 > MIPC4~~~LTR ONLY(1 >
DIRECTOR DPM~~~~LTR ONLY < 1 ) DEPUTY DIR DPM~~<LTR ONLY(1)
GAB~~<<LTR ONLY(1) D I RECTOR l3SS4HI LTR ONLY ( 1 )
AD FOR EN64~+LTR ONLY < 1) AD FQR REAC SFTY<~LTR ONLY< 1)
A13 FOR PLANT SYSTEMS<t4~LTR ONLY ( AD FOR SYS 5 PRQJ>+LTR ONLY(1>
SD~~~LTR ONLY<1) K SEYFRIT/IE+%LTR ONLY< 1)
FERD BREWER/IE~~~~LTR ONLY(i)
W EXTERNAL: LPDR'S lAlILKES BARREr PA4~4~LTR QNLY <
TERA4~4LTR ONLY(i)
NSIC+<I TR GNI Y<i)
ACRS CAT B~~+LTR ONLY ( ih >
DISTRIBUTION: LTR 41 ENCL 0 CONTROL NBR: 781920008 SIZE: 2P 4%%%%% %0M 4 %4 0HF+0F+0F+dt%%8M%%%%%%%%%%% THE END %4 4 4%%4%% %%%%%%%%4%%%%%%%%%% r%%%%0
~ '
~
tt j
TWO NORTH NINTH STREET, AllENTOWN, PA. 18101 PHONE: (215) 821.5151 NORMAN W CURTIS Vice President Engineering 8 Construction 821.5381 July 5, 1978 Mr, Boyce H. Grier Director, Region I U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 P "P c.o SUSQUEHANNA STEAM ELECTRIC STATION UPDATE OF INTERIM REPORT OF REPORTABLE DEFICIENCy REGARDING SPOT WELDING OF STRUT MATERIAL DOCKET NOS: 50-397P 50-388 LICENSE NOS: CPPR-101, CPPR-102 ERs 100450/100508 FILE 840-4 PLA-267
Dear Mr. Grier:
Reference is to my letter PLA-249, dated April 26, 1978.
We have recently decided to take and test additional samples for the purpose of evaluating the subject deficiency. Based upon our recently established time requirements for obtaining, testing and evaluating the test results, we conclude that it will not be possible to submit a definitive report by the date (7/31/78) originally identified.
We therefore submit. for your information a new date, September 29, 1978, by which time we expect to submit the required report.
Very truly yours, N, W, Curtis Vice President;Engineering 8 Construction ARS:mcb 781920008 PENNSYLVANIA POWER 8, LIGHT COMPANY
f Mr. B. H. Grier July 5, 1978 cc: Mr. Ernst Volgenau (15)
Director Office of Inspection 6 Enforcement U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Mr. G. McDonald, Director Office of Management Information and Program Control U.S. Nuclear Regulatory Commission Washington, D.C. 20555