ML18024A077
| ML18024A077 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 06/23/1978 |
| From: | Curtis N Pennsylvania Power & Light Co |
| To: | Grier B NRC Region 1 |
| References | |
| PLA-182, PLA-265 | |
| Download: ML18024A077 (3) | |
Text
REGULATORY DISTRIBUTION FOR INFORMATION DISTRIBUTXON SYSTEM
< BIDS) g 7 8Q INCOMING MATERIAL.-
5 DQCDATE: 06/23/78 DATE RCYD: 06f30/7:
REC:
GRIER B
hJRC ORG:
CURTIS N
W T
l PP4-L-NOTARIZED:
NO DOCTYPE:
LETTER COPIES RECEIVED SUBJ-CT:
LTR 1
ENCL 15 FORWARDING SUPPLEMENT TG APPLICANT"S LTR DTD 06f22f78 PRQUIDIhJG FIhlAL REPT QN DEFINITIVE REPT OF A REPORTABLE DEFICIT NCY RE UNSATISFACTORY FIELD WELDING AND IhJSPEC OF SHEAR STUDS.
,.sP-". Ki PLANT NAME: S IT 1
REVIEWER INITIAL:
X JM SE 2
DISTRIBUTER INITIAL:~
susc?ueWq~w N ypZ DISTRIBUTION OF ThIS MATERIAL IS AS FOLLOWS +4<4+<+++++++~<+<+
NOTES:
M.
CUNNINGHAM ALL AMENDMENTS TO FSAR AND CHANGES TO TECH SPECS CGN TRUCTIGN DEFICIENCY RPT (10CFR50. 55E>
LIMITED 4 GF COPIES (DISTRIBUTIOhJ CODE 8004)
FGR ACTION:
INTERNAL:
EXTERNAL:
ASST DIR YASSALLO++LTR ONLY P
uP IgpJe.C i EG FIL
. W/ENCL
/.
ENCL GQSSICK 5 STAFF+~P$~CA DIRECTOR DPM++LTR ONLY QAB++W/ENCL AD FOR ENG++LTR ONLY AD FGR PLANT SYSTEMS++LTR ONLY STANDARDS DEV. ~+A/ENCL LPDR S~iL.was @Ance. ef C
. ~W/ENCL TIC>+W/ENCL NSIC~~W/ENCL FERD DREHER/IE++LTR ONLY ACRS CAT A~+16 LTRS BR CHIEF LWR09 BC++LTR ONLY LIC ASST LWR~ LA>+LTR ONLY NRC PDR~~W/ENCL OELD<4LTR ONLY MIPC~+W/ENCL DEPUTY DIR DPM++IJ/El JCL DIRECTOR DSS++LTR ONLY AD FOR REAC SFTY<+LTR ONLY AD FOR SYS i. PRGJ+~LTR ONLY K SEYFRIT/IE+~W/EhJCL DISTR IBUTIOhJ:
1P ~3.00P l3 CONTROL hJBR:
78 18 10269 THE END W%WWM+M5-'A 6H %%%%4 %%O~H%W+
-" ~P--'~RCW gg<q~ppq
TWO NORTH NINTH STREET, ALLENTOWN, PA.
18101 PHONE:
(215) 821.5151 NORMAN W. CURTIS Vice President. Engineering 8 Construction 821-5381 June 23, 1978 Mr. Boyce H.
Grier'irector, Region I U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 17406 SUSQUEHANNA STEAM ELECTRIC STATION DEFINITIVE REPORT OF A REPORTABLE DEFICIENCY REGARDING UNSATISFACTORY FIELD WELDING AND INSPECTION OF SHEAR STUDS ERs 100450/100508 FILE 840-4 PLA-265 This supplements PP&L's letter PLA-182, dated June 22, 1977, and provides a Definitive Report of the subject deficiency as required by 10CFR50.55(e)
The Definitive Report, which has been prepared by Bechtel Power Corporation, provides a statistical analysis and evaluation of field test data relative to the reported deficiency.
Please advise should you require further relevant information.
Very truly yours, N. W. Curtis Vice President-Engineering
& Construction Attachment.
U. S. Nuclear Regulatory Commission Washington, D. C.
20555 a~curt WwlJlLE I 4 lieI>> LlUlf Is Mr. G. McDonald (1)
DirectorWffice of Inspection
& Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.
20555 78 I Qi02&7 ua:
Mr. Eruat Volgeuau (15)
IIr.lIII@IQ(go/(I I ffIf [OP(
DirectorOffice of Inspection
& Enforcement j
PENNSYLVANIA POWER 8
LIGHT COPAPANY