MONTHYEARIR 05000528/19840481985-01-31031 January 1985 Insp Repts 50-528/84-48,50-529/84-41 & 50-530/84-31 on 840905-1214.No Violations or Deviations Identified.Major Areas Inspected:Licensee & Ae Activities in Area of as-built Configuration Control for Pipe Supports Project stage: Request ML17299A3861985-06-27027 June 1985 Requests Exemption from Tech Spec 3.4.1.2,3.4.1.3 & 3.7.1.6 Requirements for Performing Tests During Power Ascension Testing Program.Justification to Show Exemption Will Not Cause Risk to Public Health & Safety Encl Project stage: Other ML17299A4071985-07-0505 July 1985 Proposed Tech Spec one-time Exception,Allowing Performance of Startup Natural Circulation Test Program Project stage: Other ML17299A4041985-07-0505 July 1985 Application for Amend to License NPF-41,requesting Tech Spec one-time Exception to Allow for Performance of Startup Natural Circulation Test Program.Fee Paid Project stage: Request ML17299A5881985-08-27027 August 1985 Summary of 850627 Meeting W/Util & C-E in Bethesda,Md Re Procedure Used for Natural Circulation Cooldown Test.List of Meeting Attendees Encl Project stage: Meeting ML17299A5541985-08-29029 August 1985 Documents Actions to Resolve NRC Concerns Re Natural Circulation Testing Program.Testing Capability to Cool Down Plant from Hot Standby to Cold Shutdown Under Natural Circulation Will Be Demonstrated Project stage: Other ML17299A5461985-08-29029 August 1985 Forwards,For Review,Changes to FSAR Sections 1.15 & 1.9. Changes Involve Updated Schedules for Completion & Commercial Operation Dates & Exceptions to Cessar.Changes Will Be Included in Next FSAR Update Project stage: Request ML17299A6531985-09-18018 September 1985 Confirms 850917 Conference Call to Discuss 850912 Unscheduled Reactor Shutdown & Impact on Chemical & Vol Control Sys Design & Operation.Util Interim Resolution of NRC Concerns Listed Project stage: Other ML17299A6601985-10-0202 October 1985 Forwards Request for Addl Info Re Pressurizer Auxiliary Spray Sys,Based on 850912 Loss of All Three Charging Pumps During loss-of-load Test at Approx 55% Power.Response Requested within 20 Days of Ltr Date Project stage: RAI ML17299A6691985-10-15015 October 1985 Responds to Request & Commitments Made During 851008 Meeting & in Re Auxiliary Pressurizer Spray Sys. Implementation of Listed Enhancements Scheduled for First Refueling Outage for Unit 1.Concurrence Requested by 851022 Project stage: Meeting ML17299A7261985-10-31031 October 1985 Approves Revised Procedure for Boron Mixing & Natural Circulation Cooldown Test Per .Test Date requested.Post-test Rept Re Conformance W/Branch Technical Position Rsb 5-1 Requested Following Test Completion Project stage: Other ML17299A7131985-11-0404 November 1985 Forwards Results of Steam Generator Tube Rupture W/Loss of Offsite Power & 851015 Schedule for Implementation of Mods, Per 851029 Telcon Re Auxiliary Pressurizer Spray Sys Project stage: Other ML17299A7781985-11-20020 November 1985 Forwards Summary & Anticipated Schedule for Remaining Chapter 14 Power Ascension Testing & Applicability of 851003 Loss of Power Event to Testing Requirements for Loss of Offsite Power,Per 851104 Meeting Project stage: Meeting ML17299A8191985-11-25025 November 1985 Forwards Addl Info Requested in 851120 Telcon Re Auxiliary Pressurizer Spray Sys,Including Pressurizer Vent Sys Description & Charging Pump Operation to Permit Issuance of Unit 2 OL Project stage: Other ML17299A7751985-11-27027 November 1985 Informs That Commitment Not to Exceed 5% Power in Unit 2 Until Natural Circulation Cooldown Test of Unit 1 Complete Acceptable,Unless Testing Schedule Changed,Per 851125 Request Project stage: Other ML17299A9251986-01-0707 January 1986 Summary of 850920 Meeting W/Representatives of Licensee in Bethesda,Md Re 850912 Loss of Load Test at 50% Power.List of Meeting Attendees Encl Project stage: Meeting ML17299B0581986-02-13013 February 1986 Summary of 860206 Meeting W/Util & C-E in Bethesda,Md Re Natural Circulation Cooldown Test Procedure.Attendee List & Viewgraphs Encl Project stage: Meeting ML17299B1961986-04-17017 April 1986 Advises That Mods to Chemical & Vol Control Sys (CVCS) Ref in Listed Ltrs Completed.Daily Insp of Level Instruments in Unit 2 Discontinued.Daily Insp in Unit 1 Will Be Discontinued Upon Completion of Mod to CVCS Project stage: Other ML17303A2541987-01-23023 January 1987 Confirms That Listed Mods to Charging Sys,Remote Shutdown Panel & Valves CHE-PDY-239B & CHE-PDY-240B Control Circuitry Completed,Per Commitments Project stage: Other ML17303A2921987-02-0909 February 1987 Forwards Rev 0 to Evaluation of Natural Circulation Cooldown Test Performed at Palo Verde Nuclear Generating Station:Compliance W/Testing Requirements of Branch Technical Position Rsb 5-1 Project stage: Other ML17303B0701988-04-18018 April 1988 Forwards Safety Evaluation Supporting Util Natural Circulation Cooldown Capability.Test Results Combined W/ Supporting Analysis Demonstrate That Plant Meets Requirements of BTP Rsb 5-1 for Class 2 Plant Project stage: Approval 1985-07-05
[Table View] |
Text
4s REQULATOR NFORNATION
.DISTR IBUTI ON EN
( R IDS )
r ACCESSION NBR: 8702020590, DOC. DATE: 87/01/23 NOTARIZED:
NO DOCKET 0 FACIL:STN-50-530 Palo Verde Nuclear Station>
Unit 3. Arizona Publi 05000530 AUTH. NANE AUTHOR AFFILIATION HAYNES> S. Q.
Arizona Nuclear Pouer Prospect (formerly Arizona Publ'ic Serv RECIP. NANE RECIPIENT AFFILIATION KNIQHTONiQ. W.
PWR Prospect Directorate 7
SUBJECT:
Confirms that listed mods
+o charging sgsiremote shutdown panel 5 Valves CHE-PDY-2398 8c CHE-PDY-2408 control circuitrg completed> per commitments.
DISTRIBVTION CODE:
BOOID COPIES RECEIVED: LTR Q ENCL ~
SIZE:
TITLE: Licensing Submittal:
PSAR/FSAR. Amdts 0, Related Correspondence NOTES: Standardized, plant. N..Davis'RR: iCg.
'05000530 RECIPIENT ID CODE/NANE PWR-8 EB PWR-8 FOB PWR-8 PD7 PD PWR-8 PEICSB INTERNAL: ACRS 41 ELD/HDS3 IE/DEPER/EPB Sh NRR BWR ADTS N
Ro REQ FIL 04 EXTERNAL: BNL(ANDTS ONLY)
L'PDR 03
'NSIC 05 NOTES:
COPIES L'TTR ENCL 1
1 1
1 6
1 1
1 1
RECIPIENT ID CODE/NANE.
PWR-8.PEICSB PWR-8 PD7 LA.
,LICITRAa E 01
'PWR-8 RSB
- DN/LFNB IE FILE IE/DGAVT/GAB 21 NRR PWR-8 ADTS'RR/DHFT/MTB RN/DDANI/RIB DNB/DSS (ANDTS)
NRC PDR 02, PNL GRUEL' COPIES LTTR ENCL 2
'1 1
1 1
1 TOTAL NU<BER OF COPIES REQUIRED,LTTR'4 ENCL
1 j.tj ve, I v U
1 ij h
I 1.I
~
it je')
hi' I
a H
) jt,il.
'> f; ee<<I<<',
lifhl 5 h
h i'
<<u<<.'
j, f H<< I "t 1 jj-Hh 'I f
j'ajji,>>
H "ii i<<
e'i
<<'i 4
~ g.
>>I.IO'htv H
H h
h<<
<<I m
II V
Hl jj~
~
~
<<4 Jt
>f'Qi<<
<<'egg II << I jj <.I I
I i IH
'tj IC>>
<<'V'
8702020590 870123 P
R ADOCK 05000530 PDR Arizona Nuclear Power Project P.o. BOX 52034
~
PHOENIX, ARIZONA85072-2034 January 23, 1987 ANPP-39829-JGH/BJA/98.05 Director of Nuclear Reactor Regulation Attention:
Mr. George W. Knighton, Project Director PWR Project Directorate P7 Division of Pressurized Water Reactor Licensing B
U.ST Nuclear Regulatory Commission Washington, D.C. 20555
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Unit 3 Docket No.
STN 50-530 Confirmation of Completion of Unit 3 Modifications File: 87-G-056-026
References:
(1)
(2)
(3)
(4)
(5)
Letter from E.
E.
Van Brunt, Jr.,
- ANPP, to G.
W.
- Knighton, NRC, dated October 15, 1985 (ANPP-33713).
Subject:
Auxiliary Pressurizer Spray Design.
Letter from E.
E.
Van Brunt, Jr.,
- ANPP, to G.
W.
- Knighton, NRC, dated November 4,
1985 (ANPP-33905).
Subject:
Information Concerning the PVNGS Auxiliary Pressurizer Spray System.
Letter from E.
E.
Van Brunt, Jr.,
- ANPP, to G.
W.
- Knighton, NRC, dated December 5,
1985 (ANPP-34174).
Subject:
Charging Pump Operability.
Letter from E.
E.
Van Brunt, Jr.,
- ANPP, to G.
W.
- Knighton, NRC, dated May 17, 1983 (ANPP-23782).
Subject:
PVNGS Remote Shutdown Panel.
Letter from E.
E.
Van Brunt, Jr.,
- ANPP, to G.
W.
- Knighton, NRC, dated December 18, 1984 (ANPP-31501).
Subject:
Auxiliary Pressurizer Spray Modification.
Dear Mr. Knighton:
The purpose of this letter is to provide confirmation that the following modifica-tions have been completed in PVNGS Unit 3 in accordance with the previous commit-ments.
The specific modifications are listed below along with a reference to the previous correspondence which initiated the commitment.
2.
The Unit 3 charging system was modified to provide power to valves CH-501 and CH-536 from a
Class 1E motor control center that does not get stripped from the bus following a safety injection actua-tion signal.
(Reference (1)).
The Unit 3 charging system was modified to provide for the auto-matic re-alignment of valves CH-501 and CH-536 on a low-low Volume Control Tank (VCT) leve3, and loss of offsite power (Reference (1)).
Qyo l I/Q
~i 4'
~pr
M
~,
~ ~
Mr. George W. Knighton
Subject:
Confirmation of Completion of Unit 3 Modifications ANPP-39829 Page 2
3.
The Unit 3 charging system was modified to enhance the VCT level instrumentation (Reference (1)).
4, A procedure change has been completed to lock open charging system valves CH-532 and CH-524 (Reference (2)).
5.
6.
The Unit 3 charging system has been modified to install vent piping to ensure that hydrogen gas will not be vented into an area that does not receive essential ventilation.
(Reference (3)).
Reactor coolant system cold leg temperature indication has been provided on the Unit 3 remote shutdown panel.
(Reference (4)).
7.
Class lE overvoltage protection isolation relays have been installed in the control circuitry for valves CHE-PDY-239B and CHE-PDY-240B.
(Reference (5)).
If you have any additional questions on this matter, please contact Mr.
M. F.
Quinn of my staff.
Very truly yours, J.
G.
Haynes Vice President Nuclear Production JGH/BJA/rw cc:
0.
M. De Michele E. E.
Van Brunt, Jr.
E. A. Licitra R.
P.
Zimmerman A. C. Gehr
w IP