Advises That Mods to Chemical & Vol Control Sys (CVCS) Ref in Listed Ltrs Completed.Daily Insp of Level Instruments in Unit 2 Discontinued.Daily Insp in Unit 1 Will Be Discontinued Upon Completion of Mod to CVCS
ML17299B196
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 04/17/1986
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Knighton G
Office of Nuclear Reactor Regulation
References
ANPP-36278-EEVB, TAC-56648, NUDOCS 8604210091
Download: ML17299B196 (6)


Text

REQUL*

Y INFORNATION DISTR lBUTI0

'YSTEf'f (R IDB)

ACCESBIQN NBR: 86042i0091 DGC. DATE: 86/04/i7 NOTARIZED:

NO DOCKET I FAC IL:STN-50-528 Palo Verde Nuclear Station>

Unit i. Arizona Pub li 05000528 STN-50-529 Palo Verde Nuclear Station>

Unit 2> Arizona Pub 1 i 05000529 AUTH. NAl'fE AUTHOR AFFILIATION VAN BRUNT> E. E.

Arizona Nuclear Power Pro Ject

( formerly Arizona Public Serv RECIP. NAl'fE RECIPIENT AFFILIATION KNIQHTQN, Q. W.

PWR Prospect Directorate 7

SUBJECT:

Advises that mods to chemical i~ vol control sos (CVCS) ref in listed ltrs completed. Daily insp of level instruments in Unit 2 discontinued. Daily insp in Unit i will be discontinued upon completion of mod to CVCS.

DISTRIBUTION CODE:

AOOID COPIEB RECEIVED: LTR f

ENCL g BIIE:

TlTLE:

QR Submittal:

Qeneral Distribution NOTES: Standardized plant.

Standards zed plant.

05000528 05000529 RECIPIENT ID CODE/NAl'1E PWR-8 ADTB PWR-8 PEICBB PWR-8 PD7 PD 0i P lJR-8 PE ICSB COPIES LTTR ENCL 2

5i RECIPIENT ID CODE/NAl'fE PWR-8 EB PWR-8 FOB LICITRA>E PWR-8 RSB COPIES LTTR ENCL INTERNAL: ACRB ELD/HDB3 NRR/GRAS RQN5 EXTERNAL: 24X LPDR NSIC 09 03 05 6

i 0

i i

i i

i ADt"l/LFl'fB

/TBCB 04 EQ4i~Q BRUSKE> S NRC PDR 02.

TOTAL NUi~fBER OF COPIES REQUIRED:

LTTR 30 ENCL

C

Arizona Nuclear Power Project P.O. SOX 52034

~

PHOENIX, ARIZONA85072-2034 April 17, 1986 ANPP-36278-EEVB/BJA/98.05 Director of Nuclear Reactor Regulation Attention:

Mr. George W. Knighton, Project Director PWR Project Directorate I'I7 Division of Pressurized Water Reactor Licensing B U. S. Nuclear Regulatory Commission Washington, D.C.

20555

Subject:

. Palo Verde Nuclear Generating Station Unit 2 Docket No.

STN 50-529 (License No. NPF-46)

Confirmation of Completion of Modifications to the Chemical and Volume Control System File:

86-056-026

References:

(1)

Letter from E.

E.

Van Brunt, Jr.,

ANPP, to G.

W. Knighton,

NRC, dated October 15,
1985, (ANPP-33713).

Subject:

Auxiliary Pressurizer Spray Design.

(2)

Letter from E.

E.

Van Brunt, Jr.,

ANPP, to G.

W.

NRC, dated October 22,
1985, (ANPP-33771).

Additional Information Concerning the September Event at Palo Verde Unit 1.

Knighton,

Subject:

12,

1985, (3)

Letter from E.

E.

Van Brunt, Jr.,

ANPP, to G.

W. Knighton,

NRC, dated November 4,
1985, (ANPP-33905).

Subject:

Information Concerning the PVNGS Auxiliary Pressurizer Spray System.

(4)

Ietter from E.

E.

Van Brunt, Jr.,

ANPP, to G.

W. Knighton,

NRC, dated September 18, 1985 (ANPP-33407).

Subject:

Auxiliary Pressurizer Spray.

Dear Mr. Knighton:

The referenced letters committed to performing the following modifications to the PVNGS Uni,t 2 Chemical and Volume Control System (CVCS) prior to exceeding 5X power on PVNGS Unit 2.

(1)

Provide automatic realignment of valves CH-501, and 536 on Lo-Lo VCT level and Loss of Offsite

Power, to align the charging pump suction to the refueling water tank.

86042l009i 860417 F'DR ADOCK 05000528 Q

PDR

Mr. George W. Knighton Confirmation of Completion of Modifications to the Chemical and Volume Control System ANPP-36278 Page 2

(2)

Modify the VCT level instrumentation to improve the reliability of the level indication.

These modifications to the PVNGS Unit 2 CVCS have been completed in accordance with the commitments made in the referenced letters.

Reference (4) committed to perform a

daily inspection of the VCT level instrument reference leg.

This inspection was to remain in effect until the issue was properly resolved by design modifications to the VCT level instruments.

These design modifications have been completed in PVNGS Unit 2 by the addition of separate reference legs to the existing VCT level transmitters.

A signal comparator has also been added to the level transmitters which will initiate an alarm in the main control room to alert the operators of a possible malfunction of either of the level transmitters.

The signal comparator performs a

continuous monitoring function of the VCT level instruments and eliminates the need to perform the daily inspection of the level instruments.

Therefore, ANPP is discontinuing the daily inspection of the level instruments in PVNGS Unit 2

and the daily inspection will be discontinued in PVNGS Unit 1 upon completion of the modification to the Unit 1 VCT level instrumentation.

If you have any additional questions on this

matter, please contact Mr. W. F. guinn of my staff.

Very truly yours, EEVB/BJA/dim E. E.

Van Brunt, Jr.

Executive Vice President Project Director cc:

E. A. Licitra R. P.

Zimmerman C. Y. Liang A. C. Gehr

l t