MONTHYEARIR 05000528/19840481985-01-31031 January 1985 Insp Repts 50-528/84-48,50-529/84-41 & 50-530/84-31 on 840905-1214.No Violations or Deviations Identified.Major Areas Inspected:Licensee & Ae Activities in Area of as-built Configuration Control for Pipe Supports Project stage: Request ML17299A3861985-06-27027 June 1985 Requests Exemption from Tech Spec 3.4.1.2,3.4.1.3 & 3.7.1.6 Requirements for Performing Tests During Power Ascension Testing Program.Justification to Show Exemption Will Not Cause Risk to Public Health & Safety Encl Project stage: Other ML17299A4071985-07-0505 July 1985 Proposed Tech Spec one-time Exception,Allowing Performance of Startup Natural Circulation Test Program Project stage: Other ML17299A4041985-07-0505 July 1985 Application for Amend to License NPF-41,requesting Tech Spec one-time Exception to Allow for Performance of Startup Natural Circulation Test Program.Fee Paid Project stage: Request ML17299A5881985-08-27027 August 1985 Summary of 850627 Meeting W/Util & C-E in Bethesda,Md Re Procedure Used for Natural Circulation Cooldown Test.List of Meeting Attendees Encl Project stage: Meeting ML17299A5541985-08-29029 August 1985 Documents Actions to Resolve NRC Concerns Re Natural Circulation Testing Program.Testing Capability to Cool Down Plant from Hot Standby to Cold Shutdown Under Natural Circulation Will Be Demonstrated Project stage: Other ML17299A5461985-08-29029 August 1985 Forwards,For Review,Changes to FSAR Sections 1.15 & 1.9. Changes Involve Updated Schedules for Completion & Commercial Operation Dates & Exceptions to Cessar.Changes Will Be Included in Next FSAR Update Project stage: Request ML17299A6531985-09-18018 September 1985 Confirms 850917 Conference Call to Discuss 850912 Unscheduled Reactor Shutdown & Impact on Chemical & Vol Control Sys Design & Operation.Util Interim Resolution of NRC Concerns Listed Project stage: Other ML17299A6601985-10-0202 October 1985 Forwards Request for Addl Info Re Pressurizer Auxiliary Spray Sys,Based on 850912 Loss of All Three Charging Pumps During loss-of-load Test at Approx 55% Power.Response Requested within 20 Days of Ltr Date Project stage: RAI ML17299A6691985-10-15015 October 1985 Responds to Request & Commitments Made During 851008 Meeting & in Re Auxiliary Pressurizer Spray Sys. Implementation of Listed Enhancements Scheduled for First Refueling Outage for Unit 1.Concurrence Requested by 851022 Project stage: Meeting ML17299A7261985-10-31031 October 1985 Approves Revised Procedure for Boron Mixing & Natural Circulation Cooldown Test Per .Test Date requested.Post-test Rept Re Conformance W/Branch Technical Position Rsb 5-1 Requested Following Test Completion Project stage: Other ML17299A7131985-11-0404 November 1985 Forwards Results of Steam Generator Tube Rupture W/Loss of Offsite Power & 851015 Schedule for Implementation of Mods, Per 851029 Telcon Re Auxiliary Pressurizer Spray Sys Project stage: Other ML17299A7781985-11-20020 November 1985 Forwards Summary & Anticipated Schedule for Remaining Chapter 14 Power Ascension Testing & Applicability of 851003 Loss of Power Event to Testing Requirements for Loss of Offsite Power,Per 851104 Meeting Project stage: Meeting ML17299A8191985-11-25025 November 1985 Forwards Addl Info Requested in 851120 Telcon Re Auxiliary Pressurizer Spray Sys,Including Pressurizer Vent Sys Description & Charging Pump Operation to Permit Issuance of Unit 2 OL Project stage: Other ML17299A7751985-11-27027 November 1985 Informs That Commitment Not to Exceed 5% Power in Unit 2 Until Natural Circulation Cooldown Test of Unit 1 Complete Acceptable,Unless Testing Schedule Changed,Per 851125 Request Project stage: Other ML17299A9251986-01-0707 January 1986 Summary of 850920 Meeting W/Representatives of Licensee in Bethesda,Md Re 850912 Loss of Load Test at 50% Power.List of Meeting Attendees Encl Project stage: Meeting ML17299B0581986-02-13013 February 1986 Summary of 860206 Meeting W/Util & C-E in Bethesda,Md Re Natural Circulation Cooldown Test Procedure.Attendee List & Viewgraphs Encl Project stage: Meeting ML17299B1961986-04-17017 April 1986 Advises That Mods to Chemical & Vol Control Sys (CVCS) Ref in Listed Ltrs Completed.Daily Insp of Level Instruments in Unit 2 Discontinued.Daily Insp in Unit 1 Will Be Discontinued Upon Completion of Mod to CVCS Project stage: Other ML17303A2541987-01-23023 January 1987 Confirms That Listed Mods to Charging Sys,Remote Shutdown Panel & Valves CHE-PDY-239B & CHE-PDY-240B Control Circuitry Completed,Per Commitments Project stage: Other ML17303A2921987-02-0909 February 1987 Forwards Rev 0 to Evaluation of Natural Circulation Cooldown Test Performed at Palo Verde Nuclear Generating Station:Compliance W/Testing Requirements of Branch Technical Position Rsb 5-1 Project stage: Other ML17303B0701988-04-18018 April 1988 Forwards Safety Evaluation Supporting Util Natural Circulation Cooldown Capability.Test Results Combined W/ Supporting Analysis Demonstrate That Plant Meets Requirements of BTP Rsb 5-1 for Class 2 Plant Project stage: Approval 1985-07-05
[Table View] |
Text
REGULAT NFORMATION DISTRIBUTION EM (RIDS)
ACCESSION NBR; 8509000159 DOC ~ DATE: 85/08/29 NOTARIZED:
NO DOCKET FACIL:STN"50-528 Palo Yerde Nuclear Stationi Unit 1P Arizona Publi 05000528 AUTH BYNAME AUTHOR AFFILIATION YAN BRUNTiE;E ~
Arizona Nuclear Power Project (for meri y Arizona Publ ic Serv RECIP ~ NAME, RECIPIENT AFFILIATION KNIGHTONg G ~ N ~
Licensing Branch 3
SUBJECT; Documents actions to resolve NRC concerns re natural circulation testing program. Testing capability to cool down plant from hot standby to cold shutdown under natural circulation will be demonstrated, DISTRISUTION CODE:
A0580 COPIES RECEIVED:LTR QENCL SIZE:
TITLE:
OR Submittal:
Natural Circ Cooldown GL 81 21 Multiplant Action B.-66 NOTES:Standardized plant ~
OL: 12/31/84 05000528 RECIPIENT ID CODE/NAME NRR LB3 BC 01 INTERNAL: ACRS 09 ELD/HDS3 NRR/DL/ORAB NRR/DSI/RSB RGN5 COPIES LTTR ENCL 10 1
1 1
1 RECIPIENT ID CODE/NAME ADM/LFMB NRR/DL D IR RB3 REG FILE 04 COPIES LTTR ENCL EXTERNAL; 24X NRC PDR 02 LPDR NSIC 03 05 TOTAL NUMBER OF COPIES REQUIRED:
LTTR 35 ENCL 32
1 4
'i pl
&4 i
~ f
Arizona Nuclear Power Project P.o. BOX 52034
~
PHOENIX, ARIZONA85072-2034 Director of Nuclear Reactor Regulation Attention:
Mr. George W. Knighton, Chief
Licensing Branch No.
3 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D. C.
20555 August 29, 1985 ANPP-33282-EEVB/BJA
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Unit 1 Docket No.
STN 50-528, License No. NPF-41 PVNGS Unit 1 Natural Circulation Testing Program File:
85-056-026'.l.01.10
References:
(1)
Letter from E. E. Van Brunt, Jr.,
ANPP, to G.
W. Knighton, NRC, dated January 31, 1985 (ANPP=31829).
Subject:
Natural Circulation Cooldown Testing.
(2)
ANPP meeting with the NRC Staff on June 27, 1985, at Bethesda, MD.
Subject:
PVNGS Natural Circulation Cooldown Testing.
(3)
Telecon of July 10, 1985 with E. A. Licitra and C. Liang of the NRC Staff.
Subject:
PVNGS Natural Circulation Cooldown Testing.
Dear Mr. Knighton:
ANPP held a meeting with the NRC Staff on June 27,.1985 to discuss the PVNGS Unit 1 Natural Circulation Testing Program.
,The NRC Staff raised several questions during this meeting which were discussed in the telecon of Reference (3).
The purpose of this submittal is to formally document the actions that ANPP has taken to resolve the NRC concerns.
ANPP has revised the Natural Circulation Cooldown Test Procedure which has been submitted previously by Reference (1).
The following changes have been made to the procedure.
It should be noted that these changes were discussed during the telecon of Reference (3).
iv)
The procedure has been modified to assume a single failure (i.e., failure of one of the emergency diesel generators).
Only one train 'of safety related equipment will be used during the 'test.
The letdown portion of the Chemical and Volume Control System will be secured during the portion of the depressurization where the auxiliary pressurizer spray system is utilized.
The pressurizer heaters will not be utilized during the test.
However, the pressurizer heaters will be available for use during the test.
Only two of, the three charging pumps will be used during the test.
However, the third charging pump will be available for use during the test.
ANPP will demonstrate by testing the capability to cooldown the plant under natu-ral circulation conditions from hot standby conditions to cold shutdown conditions.
8509040159 850829 t
PDR ADOCK 05000528 P
PD~R
d' h
I
G.
M. Knfghton
'Natural Circulation Testing Program
The demonstration will be conducted by one of'he following two methods:
A single test that conducts a Natural Circulation Cooldown from hot standby to cold shutdown conditions.
Two separate tests:
The first test will perform a Natural Circulation Cooldown from hot standby to shutdown cooling initiation conditions.
The second test will demonstrate the capability to cooldown the plant from shutdown cooling initiation conditions to cold shutdown.
Additionally, data from the Natural Circulation Cooldown Test will be used to verify the effectiveness of the auxiliary pressurizer spray system for the Steam Generator Tube Rupture Event.
If you have any additional questions on this matter, please contact Mr. N. F. Quinn of my staff.
Very truly ou CRA'A E. E.
Van Brunt, Jr.
Executive Vice President Project Director EEVB/BJA/slh cc:
E. A. Licitra A. C. Gehr R. P.
Zimmerman C. Liang
C 4
l