MONTHYEARIR 05000528/19840481985-01-31031 January 1985 Insp Repts 50-528/84-48,50-529/84-41 & 50-530/84-31 on 840905-1214.No Violations or Deviations Identified.Major Areas Inspected:Licensee & Ae Activities in Area of as-built Configuration Control for Pipe Supports Project stage: Request ML17299A3861985-06-27027 June 1985 Requests Exemption from Tech Spec 3.4.1.2,3.4.1.3 & 3.7.1.6 Requirements for Performing Tests During Power Ascension Testing Program.Justification to Show Exemption Will Not Cause Risk to Public Health & Safety Encl Project stage: Other ML17299A4071985-07-0505 July 1985 Proposed Tech Spec one-time Exception,Allowing Performance of Startup Natural Circulation Test Program Project stage: Other ML17299A4041985-07-0505 July 1985 Application for Amend to License NPF-41,requesting Tech Spec one-time Exception to Allow for Performance of Startup Natural Circulation Test Program.Fee Paid Project stage: Request ML17299A5881985-08-27027 August 1985 Summary of 850627 Meeting W/Util & C-E in Bethesda,Md Re Procedure Used for Natural Circulation Cooldown Test.List of Meeting Attendees Encl Project stage: Meeting ML17299A5541985-08-29029 August 1985 Documents Actions to Resolve NRC Concerns Re Natural Circulation Testing Program.Testing Capability to Cool Down Plant from Hot Standby to Cold Shutdown Under Natural Circulation Will Be Demonstrated Project stage: Other ML17299A5461985-08-29029 August 1985 Forwards,For Review,Changes to FSAR Sections 1.15 & 1.9. Changes Involve Updated Schedules for Completion & Commercial Operation Dates & Exceptions to Cessar.Changes Will Be Included in Next FSAR Update Project stage: Request ML17299A6531985-09-18018 September 1985 Confirms 850917 Conference Call to Discuss 850912 Unscheduled Reactor Shutdown & Impact on Chemical & Vol Control Sys Design & Operation.Util Interim Resolution of NRC Concerns Listed Project stage: Other ML17299A6601985-10-0202 October 1985 Forwards Request for Addl Info Re Pressurizer Auxiliary Spray Sys,Based on 850912 Loss of All Three Charging Pumps During loss-of-load Test at Approx 55% Power.Response Requested within 20 Days of Ltr Date Project stage: RAI ML17299A6691985-10-15015 October 1985 Responds to Request & Commitments Made During 851008 Meeting & in Re Auxiliary Pressurizer Spray Sys. Implementation of Listed Enhancements Scheduled for First Refueling Outage for Unit 1.Concurrence Requested by 851022 Project stage: Meeting ML17299A7261985-10-31031 October 1985 Approves Revised Procedure for Boron Mixing & Natural Circulation Cooldown Test Per .Test Date requested.Post-test Rept Re Conformance W/Branch Technical Position Rsb 5-1 Requested Following Test Completion Project stage: Other ML17299A7131985-11-0404 November 1985 Forwards Results of Steam Generator Tube Rupture W/Loss of Offsite Power & 851015 Schedule for Implementation of Mods, Per 851029 Telcon Re Auxiliary Pressurizer Spray Sys Project stage: Other ML17299A7781985-11-20020 November 1985 Forwards Summary & Anticipated Schedule for Remaining Chapter 14 Power Ascension Testing & Applicability of 851003 Loss of Power Event to Testing Requirements for Loss of Offsite Power,Per 851104 Meeting Project stage: Meeting ML17299A8191985-11-25025 November 1985 Forwards Addl Info Requested in 851120 Telcon Re Auxiliary Pressurizer Spray Sys,Including Pressurizer Vent Sys Description & Charging Pump Operation to Permit Issuance of Unit 2 OL Project stage: Other ML17299A7751985-11-27027 November 1985 Informs That Commitment Not to Exceed 5% Power in Unit 2 Until Natural Circulation Cooldown Test of Unit 1 Complete Acceptable,Unless Testing Schedule Changed,Per 851125 Request Project stage: Other ML17299A9251986-01-0707 January 1986 Summary of 850920 Meeting W/Representatives of Licensee in Bethesda,Md Re 850912 Loss of Load Test at 50% Power.List of Meeting Attendees Encl Project stage: Meeting ML17299B0581986-02-13013 February 1986 Summary of 860206 Meeting W/Util & C-E in Bethesda,Md Re Natural Circulation Cooldown Test Procedure.Attendee List & Viewgraphs Encl Project stage: Meeting ML17299B1961986-04-17017 April 1986 Advises That Mods to Chemical & Vol Control Sys (CVCS) Ref in Listed Ltrs Completed.Daily Insp of Level Instruments in Unit 2 Discontinued.Daily Insp in Unit 1 Will Be Discontinued Upon Completion of Mod to CVCS Project stage: Other ML17303A2541987-01-23023 January 1987 Confirms That Listed Mods to Charging Sys,Remote Shutdown Panel & Valves CHE-PDY-239B & CHE-PDY-240B Control Circuitry Completed,Per Commitments Project stage: Other ML17303A2921987-02-0909 February 1987 Forwards Rev 0 to Evaluation of Natural Circulation Cooldown Test Performed at Palo Verde Nuclear Generating Station:Compliance W/Testing Requirements of Branch Technical Position Rsb 5-1 Project stage: Other ML17303B0701988-04-18018 April 1988 Forwards Safety Evaluation Supporting Util Natural Circulation Cooldown Capability.Test Results Combined W/ Supporting Analysis Demonstrate That Plant Meets Requirements of BTP Rsb 5-1 for Class 2 Plant Project stage: Approval 1985-07-05
[Table View] |
Text
Docket No.:
50-528 Mr. E.
E.
Van Brunt, Jr.
Executive Vice President Arizona Nuclear Power Project Post Office Box 52034 Phoenix, Arizona 85072-2034
Dear Mr. Van Brunt:
DISTRIBUTION V~55:525~
NRC PDR BGrimes LPDR
- Attorney, OELD NSIC ACRS (16)
PRC System TMarsh LB¹3 Reading CLiang JLee EALicitra JPartlow EJordan
Subject:
Boron Mixing and Natural Circulation Cooldown Test - Palo Verde Unit 1 By letter dated January 31, 1985, you submitted the procedure to be used for the Boron Mixing and Natural Circulation Cooldown Test.
In response to staff comments, the procedure has been revised as described in your letter of August 29, 1985.
The staff has completed its review of the procedure, as modified by your August 29, 1985 letter, and finds that it is acceptable for the conduct of the test.
As you are aware, the staff plans on witnessing the performance of the Natural Circulation Cooldown Test.
Therefore, we request that you advise us of the planned test date so that the staff can make appropriate arrangements.
Following completion of the test, we request that you submit a post-test
.report which should include an evaluation of how plant's performance is in conformance with Branch Technical Position RSB 5-1.
If you have any questions regarding this letter, you should contact, Mr. E. A. Licitra, the Licensing Project Manager.
Sincerely, cc:
See next page George W. Knighton, Chief Licensing Branch No.
3 Division of Licensing DL:LB¹3 g DL:LB¹3 EALicitrag GWKnighton 10/y] /85 10+/t/85 y
85ii070464 050D0528 851031 poR APQCK o pDR P
N
'I E
W I'!
3 I
~
113!
II lt jj 3(>t 1
I >>
~>> I I
I
! 1
)
>>th>>II II 4
'4 3
T.,
Ir 1
4
~. ~
t V
1,
'lijj'
<<",3 1
~,h!I ll Th>>$ $
t>>
~ T>>tj
<<T "
1 hl ) f
~
I,
~
~
4 8
~
1
~
~
~ I I
I
'j 1
Mr. E.
E.
Van Brunt, Jr.
Arizona Nuclear Power Project Pal o Verde CC:
Arthur C. Gehr, Esq.
Snell
& Wilmer 3100 Valley Center Phoenix, Arizona 85073 Mr. James M. Flenner, Chief Counsel Arizona Corporation Commission 1200 West Washington
- Phoenix, Arizona 85007 Charles R. Kocher, Esq. Assistant Council James A. Boeletto, Esq.
Southern California Edison Company P. 0.
Box 800
- Rosemead, California 91770 Mr. Mark Ginsberg Energy Director Office of Economic Planning and Development 1700 West Washington - 5th Floor Phoenix, Arizona 85007 Mr. Wayne Shirley Assistant Attorney General Bataan Memorial Building Santa Fe, New Mexico 87503 Kenneth Berlin, Esq.
Winston
& Strawn Suite 500 2550 M Street, NW Washington, DC 20037 Ms. Lynne Bernabei Government Accountability Project of the Institute for Policy Studies 1901 gue Street, NW Washington, DC 20009 Ms. Jill Morrison 522 E. Colgate Tempi, Arizona 85238 Mr. Charles B. Brinkman, Manager Washington Nuclear Operations Combustion Engineering, Inc.
7910 Woodmont Avenue Suite 1310
- Bethesda, Maryland 20814 Mr. Ron Rayner P. 0.
Box 1509
- Goodyear, AZ 85338 Mr. Roy Zimmerman U.S. Nuclear Regulatory Commission P. 0.
Box 239 Arlington, Arizona 85322 Ms. Patricia Lee Hourihan 6413 S. 26th Street
- Phoenix, Arizona 85040 Regional Administrator, Region V
U. S. Nuclear Regulatory Commission 1450 Maria Lane Suite 210 Walnut Creek, California 94596
I 0
io.
r l
(