ML17299A775

From kanterella
Jump to navigation Jump to search

Informs That Commitment Not to Exceed 5% Power in Unit 2 Until Natural Circulation Cooldown Test of Unit 1 Complete Acceptable,Unless Testing Schedule Changed,Per 851125 Request
ML17299A775
Person / Time
Site: Palo Verde  
Issue date: 11/27/1985
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Knighton G
Office of Nuclear Reactor Regulation
References
ANPP-34124-EEVB, TAC-56647, NUDOCS 8512020402
Download: ML17299A775 (6)


Text

REGUL'ATORY, INFORMATION DISTRIBUTION'YS EM (RIDS)

ACCESSION NBR: 8512020rr 02 DOC ~ DATE s 85/11/27 NOTARIZED:

NO FACIL:STN 50"528 Palo; Verde Nuclear Station(

Unit 1) Arizona Publ STN-50-529 P'alo Verde Nuclear Station(

Unit 2) Arizona Publ AUTH ~ NAME.

AUTHOR AFFILIATION VAN BRUNTEE;E, Arizona>> Nuclear Power-Project (formerly Arizona RECIP ~ NAME REC'IPIENT AFFILIATION KNIGHTONEG,N, PriR Project Directorate 7

DOCKE~T 050008?8 050005?9'ubl,ic Serv.

SUBSECT:

Informs that commitment not to exceed 5/ power in Unit 2

Until natural>> circulation cooldown test oif Unit 1 complete acceptableEunless testing schedule changedEper 8511?5 request..

DISTRIBUTION CODE:

AOS2D COPIES RECEI YES:LiTR J

< ENCL SIZE':

TITLE:

OR Submit ta!1: N'atural>> Circ Cooldown GL 81-21, Multiplant Action. 8"66 NOTES;Standardized plant ~

OL!'2/31/Brl Standardized pla'nt ~

05000528'5000529 RECIPIENT ID CODE'/NAMEl PAR B

PD7 PD>> 01.

INTERNAI.!'CRS 09 ELD/HDS3 DIR REG FILE>>

O~l' 10 1

1 1

1 0

1 1

CO~IES LlTTR ENCL RECIPIENT ID CODE'/>>NAME>>

ADM/LFMB NRR/DL, DIR NRR/ORAS RG>>V5 COPIES LTTR ENCL EXTERNALS: 2rlX NRC PDR 02 LPDR NSIC 03=

05 TOTAL NUMBER. OF"'OPIES RENDU JRED'TTR 28 ENCL"

V I

'l I 0

K

') r~

a

~c

'5'~<,'

a li'

~

f,t Il'g Q

/FSI I

W t

~ag-' "...,

4 f

f fj '$,,

K g i li e

I k '-'5 C

0

/

I ~ $

H l

l I /

h I

II I

Ih IE A

P g II

Arizona Nuclear Povver Project P.o. BOX 52034 4

PHOENIX. ARIZONA85072-2034 November 27, 1985 ANPP 34124 EEVB/MAJ Palo Verde Nuclear Generating Station (PVNGS)

Units 1 and 2

Docket Nos.

STN 50-528 (License No. NPF-41)/529 Unit 1 Natural Circulation Cooldown Test File: 85-056-026 Director of Nuclear Reactor Regulation Attention:

Mr. George W. Knighton, Project Director PWR Project Directorate ¹7 Division of Pressurized Mater Reactor Licensing B

U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Subject:

References:

(1) Letter from G.

M. Knighton, NRC, to E. E.

Van Brunt, Jr.,

ANPP, dated October 31, 1985.

Subject:

Issuance of Amendment 2 to Facility Operating License NPF-41 for Palo Verde Unit 1

(2) Telecon between G.

M. Knighton,

NRC, and J.

G. Haynes, ANPP, dated November 25, 1985.

Subject:

Natural Circulation Cooldown Test for PVNGS Unit 1

Dear Mr. Knighton:

Reference (1) provided approval of the one-time exception to the PVNGS Unit 1

Technical Specification to allow for the performance of the NCCD test and also Specification 3.10.9 which provided compensatory measures to be taken while the test is being performed.

During the Reference (2) telecon, the subject of the PVNGS Unit 1 Natural Circula-tion Cooldown (NCCD) test schedule was discussed.

During the

telecon, you had requested that APS make an additional commitment not to exceed 5X power in Unit 2 until the NCCD test in Unit 1

had been completed.

We have reviewed our Unit 1

and Unit 2 test schedules and have found that making such a

commitment, at this time, is acceptable.

However, situations could arise in the future beyond our control which could alter our present testing schedule.

Should a situation arise which would delay completion of the Unit 1

NCCD test until after Unit 2

is ready to exceed 5X

power, we will review the circumstances and resulting schedule change with the NRC staff prior to Unit 2 exceeding 5X power.

8512020402 851127 PDR ADOCK 05000528 P

PDR

@gal

/o

I a

f f

Mr. George N. Knighton, Project Director Unit 1 Natural Circulation Cooldown Test ANPP-34124 Page 2

If you have any questions or require additional information, please contact me.

Very truly yours, Executive Vice President Project Director EEVB/MAJ/rw cc: E. A. Licitra M. Ley A. C. Gehr R. P.