MONTHYEARIR 05000528/19840481985-01-31031 January 1985 Insp Repts 50-528/84-48,50-529/84-41 & 50-530/84-31 on 840905-1214.No Violations or Deviations Identified.Major Areas Inspected:Licensee & Ae Activities in Area of as-built Configuration Control for Pipe Supports Project stage: Request ML17299A3861985-06-27027 June 1985 Requests Exemption from Tech Spec 3.4.1.2,3.4.1.3 & 3.7.1.6 Requirements for Performing Tests During Power Ascension Testing Program.Justification to Show Exemption Will Not Cause Risk to Public Health & Safety Encl Project stage: Other ML17299A4071985-07-0505 July 1985 Proposed Tech Spec one-time Exception,Allowing Performance of Startup Natural Circulation Test Program Project stage: Other ML17299A4041985-07-0505 July 1985 Application for Amend to License NPF-41,requesting Tech Spec one-time Exception to Allow for Performance of Startup Natural Circulation Test Program.Fee Paid Project stage: Request ML17299A5881985-08-27027 August 1985 Summary of 850627 Meeting W/Util & C-E in Bethesda,Md Re Procedure Used for Natural Circulation Cooldown Test.List of Meeting Attendees Encl Project stage: Meeting ML17299A5541985-08-29029 August 1985 Documents Actions to Resolve NRC Concerns Re Natural Circulation Testing Program.Testing Capability to Cool Down Plant from Hot Standby to Cold Shutdown Under Natural Circulation Will Be Demonstrated Project stage: Other ML17299A5461985-08-29029 August 1985 Forwards,For Review,Changes to FSAR Sections 1.15 & 1.9. Changes Involve Updated Schedules for Completion & Commercial Operation Dates & Exceptions to Cessar.Changes Will Be Included in Next FSAR Update Project stage: Request ML17299A6531985-09-18018 September 1985 Confirms 850917 Conference Call to Discuss 850912 Unscheduled Reactor Shutdown & Impact on Chemical & Vol Control Sys Design & Operation.Util Interim Resolution of NRC Concerns Listed Project stage: Other ML17299A6601985-10-0202 October 1985 Forwards Request for Addl Info Re Pressurizer Auxiliary Spray Sys,Based on 850912 Loss of All Three Charging Pumps During loss-of-load Test at Approx 55% Power.Response Requested within 20 Days of Ltr Date Project stage: RAI ML17299A6691985-10-15015 October 1985 Responds to Request & Commitments Made During 851008 Meeting & in Re Auxiliary Pressurizer Spray Sys. Implementation of Listed Enhancements Scheduled for First Refueling Outage for Unit 1.Concurrence Requested by 851022 Project stage: Meeting ML17299A7261985-10-31031 October 1985 Approves Revised Procedure for Boron Mixing & Natural Circulation Cooldown Test Per .Test Date requested.Post-test Rept Re Conformance W/Branch Technical Position Rsb 5-1 Requested Following Test Completion Project stage: Other ML17299A7131985-11-0404 November 1985 Forwards Results of Steam Generator Tube Rupture W/Loss of Offsite Power & 851015 Schedule for Implementation of Mods, Per 851029 Telcon Re Auxiliary Pressurizer Spray Sys Project stage: Other ML17299A7781985-11-20020 November 1985 Forwards Summary & Anticipated Schedule for Remaining Chapter 14 Power Ascension Testing & Applicability of 851003 Loss of Power Event to Testing Requirements for Loss of Offsite Power,Per 851104 Meeting Project stage: Meeting ML17299A8191985-11-25025 November 1985 Forwards Addl Info Requested in 851120 Telcon Re Auxiliary Pressurizer Spray Sys,Including Pressurizer Vent Sys Description & Charging Pump Operation to Permit Issuance of Unit 2 OL Project stage: Other ML17299A7751985-11-27027 November 1985 Informs That Commitment Not to Exceed 5% Power in Unit 2 Until Natural Circulation Cooldown Test of Unit 1 Complete Acceptable,Unless Testing Schedule Changed,Per 851125 Request Project stage: Other ML17299A9251986-01-0707 January 1986 Summary of 850920 Meeting W/Representatives of Licensee in Bethesda,Md Re 850912 Loss of Load Test at 50% Power.List of Meeting Attendees Encl Project stage: Meeting ML17299B0581986-02-13013 February 1986 Summary of 860206 Meeting W/Util & C-E in Bethesda,Md Re Natural Circulation Cooldown Test Procedure.Attendee List & Viewgraphs Encl Project stage: Meeting ML17299B1961986-04-17017 April 1986 Advises That Mods to Chemical & Vol Control Sys (CVCS) Ref in Listed Ltrs Completed.Daily Insp of Level Instruments in Unit 2 Discontinued.Daily Insp in Unit 1 Will Be Discontinued Upon Completion of Mod to CVCS Project stage: Other ML17303A2541987-01-23023 January 1987 Confirms That Listed Mods to Charging Sys,Remote Shutdown Panel & Valves CHE-PDY-239B & CHE-PDY-240B Control Circuitry Completed,Per Commitments Project stage: Other ML17303A2921987-02-0909 February 1987 Forwards Rev 0 to Evaluation of Natural Circulation Cooldown Test Performed at Palo Verde Nuclear Generating Station:Compliance W/Testing Requirements of Branch Technical Position Rsb 5-1 Project stage: Other ML17303B0701988-04-18018 April 1988 Forwards Safety Evaluation Supporting Util Natural Circulation Cooldown Capability.Test Results Combined W/ Supporting Analysis Demonstrate That Plant Meets Requirements of BTP Rsb 5-1 for Class 2 Plant Project stage: Approval 1985-07-05
[Table View] |
Text
REGUL'ATORY, INFORMATION DISTRIBUTION'YS EM (RIDS)
ACCESSION NBR: 8512020rr 02 DOC ~ DATE s 85/11/27 NOTARIZED:
NO FACIL:STN 50"528 Palo; Verde Nuclear Station(
Unit 1) Arizona Publ STN-50-529 P'alo Verde Nuclear Station(
Unit 2) Arizona Publ AUTH ~ NAME.
AUTHOR AFFILIATION VAN BRUNTEE;E, Arizona>> Nuclear Power-Project (formerly Arizona RECIP ~ NAME REC'IPIENT AFFILIATION KNIGHTONEG,N, PriR Project Directorate 7
DOCKE~T 050008?8 050005?9'ubl,ic Serv.
SUBSECT:
Informs that commitment not to exceed 5/ power in Unit 2
Until natural>> circulation cooldown test oif Unit 1 complete acceptableEunless testing schedule changedEper 8511?5 request..
DISTRIBUTION CODE:
AOS2D COPIES RECEI YES:LiTR J
< ENCL SIZE':
TITLE:
OR Submit ta!1: N'atural>> Circ Cooldown GL 81-21, Multiplant Action. 8"66 NOTES;Standardized plant ~
OL!'2/31/Brl Standardized pla'nt ~
05000528'5000529 RECIPIENT ID CODE'/NAMEl PAR B
PD7 PD>> 01.
INTERNAI.!'CRS 09 ELD/HDS3 DIR REG FILE>>
O~l' 10 1
1 1
1 0
1 1
CO~IES LlTTR ENCL RECIPIENT ID CODE'/>>NAME>>
ADM/LFMB NRR/DL, DIR NRR/ORAS RG>>V5 COPIES LTTR ENCL EXTERNALS: 2rlX NRC PDR 02 LPDR NSIC 03=
05 TOTAL NUMBER. OF"'OPIES RENDU JRED'TTR 28 ENCL"
V I
'l I 0
K
') r~
a
~c
'5'~<,'
a li'
~
f,t Il'g Q
/FSI I
W t
~ag-' "...,
4 f
f fj '$,,
K g i li e
I k '-'5 C
0
/
I ~ $
H l
l I /
h I
II I
Ih IE A
P g II
Arizona Nuclear Povver Project P.o. BOX 52034 4
PHOENIX. ARIZONA85072-2034 November 27, 1985 ANPP 34124 EEVB/MAJ Palo Verde Nuclear Generating Station (PVNGS)
Units 1 and 2
Docket Nos.
STN 50-528 (License No. NPF-41)/529 Unit 1 Natural Circulation Cooldown Test File: 85-056-026 Director of Nuclear Reactor Regulation Attention:
Mr. George W. Knighton, Project Director PWR Project Directorate ¹7 Division of Pressurized Mater Reactor Licensing B
U.S. Nuclear Regulatory Commission Washington, D.C. 20555
Subject:
References:
(1) Letter from G.
M. Knighton, NRC, to E. E.
Van Brunt, Jr.,
ANPP, dated October 31, 1985.
Subject:
Issuance of Amendment 2 to Facility Operating License NPF-41 for Palo Verde Unit 1
(2) Telecon between G.
M. Knighton,
- NRC, and J.
G. Haynes, ANPP, dated November 25, 1985.
Subject:
Natural Circulation Cooldown Test for PVNGS Unit 1
Dear Mr. Knighton:
Reference (1) provided approval of the one-time exception to the PVNGS Unit 1
Technical Specification to allow for the performance of the NCCD test and also Specification 3.10.9 which provided compensatory measures to be taken while the test is being performed.
During the Reference (2) telecon, the subject of the PVNGS Unit 1 Natural Circula-tion Cooldown (NCCD) test schedule was discussed.
During the
- telecon, you had requested that APS make an additional commitment not to exceed 5X power in Unit 2 until the NCCD test in Unit 1
had been completed.
We have reviewed our Unit 1
and Unit 2 test schedules and have found that making such a
commitment, at this time, is acceptable.
However, situations could arise in the future beyond our control which could alter our present testing schedule.
Should a situation arise which would delay completion of the Unit 1
NCCD test until after Unit 2
is ready to exceed 5X
- power, we will review the circumstances and resulting schedule change with the NRC staff prior to Unit 2 exceeding 5X power.
8512020402 851127 PDR ADOCK 05000528 P
PDR
@gal
/o
I a
f f
Mr. George N. Knighton, Project Director Unit 1 Natural Circulation Cooldown Test ANPP-34124 Page 2
If you have any questions or require additional information, please contact me.
Very truly yours, Executive Vice President Project Director EEVB/MAJ/rw cc: E. A. Licitra M. Ley A. C. Gehr R. P.