ML17298A841

From kanterella
Jump to navigation Jump to search
Revision 27 to Updated Final Safety Analysis Report, List of Effective Pages - Table of Contents
ML17298A841
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 09/25/2017
From:
Duke Energy Progress
To:
Office of Nuclear Reactor Regulation
Shared Package
ML17298A847 List:
References
RNP-RA/17-0063
Download: ML17298A841 (57)


Text

HBR 2 UPDATED FSAR Page Amendment/Revision Page Amendment/Revision EPL-1 Revision No. 27 General Information Tab - Table of Contents Tab - i 27 ii 27 iii 27 iv 27 v 27 vi 27 vii 27 viii 27 ix 27 x 27 xi 27 xii 27 xiii 27 xiv 27 xv 27 xvi 27 xvii 27 xviii 27 xix 27 xx 27 xxi 27 xxii 27 xxiii 27 xxiv 27

Chapter 1 Tab - Chapter 1 Cover Sheet i 11 1-ii 20 1-iii 20 1-iv 20

Section 1.1 Tab - 1.1.0-1 27

1.1.0-2 18

1.1.0-3 3

1.1.0-4 7

1.1.0-5 3

1.1.0-6 3

1.1.0-7 3

1.1.0-8 3

1.1.0-8a 15

1.1.0-9 10

1.1.0-10 0

1.1.0-11 0

1.1.0-12 0

1.1.0-13 0 1.1.0-14 0

1.1.0-15 0

Section 1.2 Tab - 1.2.1-1 10

1.2.2-1 9

1.2.2-1a 9

1.2.2-2 22

1.2.2-3 24

1.2.2-4 20

Fig. 1.2.2-1 27 Fig. 1.2.2-2 25 Fig. 1.2.2-3 17 Fig. 1.2.2-4 24 Fig. 1.2.2-5 26 Fig. 1.2.2-6 14 Fig. 1.2.2-7 18 Fig. 1.2.2-8 16 Fig. 1.2.2-9 26 Fig. 1.2.2-10 15 Fig. 1.2.2-11 0 Fig. 1.2.2-12 15 Section 1.3 Tab - 1.3.1-1 20

Section 1.4 Tab - 1.4.0-1 0

Section 1.5 Tab - 1.5.1-1 11

1.5.2-1 0

1.5.3-1 18

1.5.4-1 0

1.5.5-1 15

HBR 2 UPDATED FSAR Page Amendment/Revision Page Amendment/Revision EPL-2 Revision No. 27 1.5.6-1 0

1.5R-1 11

Section 1.6 Tab - 1.6.0-1 0

Section 1.7 Tab - 1.7.0-1 0

Section 1.8 Tab - 1.8.0-1 27

1.8.0-2 27

1.8.0-3 27

1.8.0-4 27

1.8.0-5 27

1.8.0-6 27

1.8.0-7 27

1.8.0-8 27

1.8.0-9 27

1.8.0-10 27

1.8.0-11 27

1.8.0-12 27

1.8.0-13 27

1.8.0-14 27

1.8.0-15 27

1.8.0-16 27

1.8.0-17 27

1.8.0-18 27

1.8.0-19 27

1.8.0-20 27

1.8.0-21 27

1.8.0-22 27

1.8.0-23 27

1.8.0-24 27

1.8.0-25 27

1.8.0-26 27

1.8.0-27 27

1.8.0-28 27

1.8.0-29 27

1.8.0-30 27

1.8.0-31 27

1.8.0-32 27

1.8.0-33 27

1.8.0-34 27 Chapter 2 Tab - Chapter 2 Cover Sheet i 12 2-ii 11 2-iii 21 2-iv 21 2-v 1 2-vi 21 2-vii 21 2-viii 20

2-ix 11 2-x 11

Section 2.0 Tab - 2.0-1 27

Section 2.1 Tab - 2.1.1-1 27

2.1.1-2 15

2.1.2-1 27

2.1.3-1 19

2.1.3-2 19

2.1.3-3 26

2.1.3-4 0

2.1.3-5 0

2.1.3-6 0

2.1.3-7 0

2.1.3-8 0

2.1.3-9 0

2.1.3-10 0

2.1.3-11 0

2.1.3-12 0

2.1.3-13 0

2.1.3-14 27

2.1.3-15 15

2.1.3-16 12

HBR 2 UPDATED FSAR Page Amendment/Revision Page Amendment/Revision EPL-3 Revision No. 27 2.1R-1 12

Fig. 2.1.1-1 0 Fig. 2.1.1-2 15 Fig. 2.1.1-3 13 Fig. 2.1.1-4 0

Section 2.2 Tab - 2.2.1-1 27

2.2.2-1 27

2.2R-1 0

Section 2.3 Tab - 2.3.1-1 20

2.3.1-2 25

2.3.1-3 0

2.3.1-4 20

2.3.1-4a 10

2.3.1-5 10

2.3.1-6 0

2.3.1-7 0

2.3.1-8 20

2.3.1-9 10

2.3.1-10 10

2.3.1-11 0

2.3.1-12 0

2.3.2-1 10

2.3.2-2 26

2.3.2-3 20

2.3.2-4 0

2.3.2-5 0

2.3.2-6 0

2.3.2-7 0

2.3.2-8 0

2.3.2-9 0

2.3.2-10 0

2.3.2-11 8

2.3.2-12 0

2.3.2-13 0

2.3.2-14 0

2.3.2-15 0

2.3.2-16 0

2.3.2-17 0

2.3.2-18 0 2.3.2-19 0

2.3.2-20 0

2.3.2-21 0

2.3.2-22 25

2.3.2-23 10

2.3.2-24 0

2.3.3-1 26

2.3.3-1a 17

2.3.3-2 17

2.3.3-3 17

2.3.3-4 17

2.3.3-5 Deleted 15 2.3.3-5a Deleted 15 2.3.3-6 Deleted 15 2.3.3-7 17

2.3.3-8 17

2.3.3-9 0

2.3.3-10 0

2.3.3-11 0

2.3.3-12 0

2.3.3-13 0

2.3.3-14 0

2.3.3-15 0

2.3.3-16 0

2.3.3-17 0

2.3.3-18 0

2.3.3-19 0

2.3.3-20 0

2.3.3-21 0

2.3.3-22 0

2.3.3-23 0

2.3.3-24 0

2.3.4-1 20

2.3.4-2 20

2.3.4-2a 20 2.3.4-2b 20 2.3.4-3 0

2.3.4-4 0

2.3.4-5 0

2.3.4-6 0

2.3.4-7 0

2.3.4-8 0

HBR 2 UPDATED FSAR Page Amendment/Revision Page Amendment/Revision EPL-4 Revision No. 27 2.3.4-9 0 2.3.4-10 0

2.3.4-11 0

2.3.4-12 20

2.3.4-13 20

2.3.4-14 20

2.3.4-15 20

2.3R-1 20

2.3R-2 26

Fig. 2.3.1-1 0 Fig. 2.3.1-2 0

Fig. 2.3.2-1 0 Fig. 2.3.2-2 0

Fig. 2.3.4-1 0 Fig. 2.3.4-2 0 Fig. 2.3.4-3 0

Section 2.4 Tab - 2.4.1-1 27

2.4.1-2 0

2.4.1-3 0

2.4.1-4 0

2.4.1-5 0

2.4.2-1 0

2.4.3-1 0

2.4.4-1 27

2.4.4-2 27

2.4.4-3 0

2.4.5-1 0

2.4.6-1 19

2.4.6-2 19

2.4.6-3 19

2.4.6-4 19

2.4.6-4a 19

2.4.6-5 19

2.4.7-1 1

2.4.7-2 1

2.4.7-2a 1 2.4.7-2b 27

2.4.7-3 0

2.4R-1 0

Fig. 2.4.1-1 0 Fig. 2.4.1-2 0

Fig. 2.4.7-1 1 Fig. 2.4.7-2 1 Fig. 2.4.7-3 1 Fig. 2.4.7-4 1 Fig. 2.4.7-5 1 Fig. 2.4.7-6 1 Fig. 2.4.7-7 1

Section 2.5 Tab - 2.5.1-1 0

2.5.1-2 0

2.5.1-3 0

2.5.1-4 0

2.5.1-5 0

2.5.2-1 0

2.5.2-2 0

2.5.2-3 0

2.5.2-4 0

2.5.2-5 0

2.5.3-1 0

2.5.4-1 0

2.5.5-1 0

2.5R-1 0

Fig. 2.5.1-1 0 Fig. 2.5.1-2 0

Fig. 2.5.2-1 0 Fig. 2.5.2-2 0 Fig. 2.5.2-3 0

HBR 2 UPDATED FSAR Page Amendment/Revision Page Amendment/Revision EPL-5 Revision No. 27 Section 2.5A Tab - App. 2.5A Cover Sheet 0 2.5A-1 0 2.5A-2 0 2.5A-3 0 2.5A-4 0 2.5A-5 0 2.5A-6 0 2.5A-7 0 2.5A-8 0

Section 2.5B Tab - App. 2.5B Cover Sheet - 2.5B-1 0 2.5B-2 0 2.5B-3 0 2.5B-4 0 2.5B-5 0

Section 2.5C Tab - App. 2.5C Cover Sheet - 2.5C-1 0 2.5C-2 0 2.5C-3 0 2.5C-4 0 2.5C-5 0 2.5C-6 0 2.5C-7 0 2.5C-8 0 2.5C-9 0 2.5C-10 0

2.5C-11 0

2.5C-12 0

2.5C-13 0

2.5C-14 0

2.5C-15 0

2.5C-16 0

Section 2.5D Tab - App. 2.5D Cover Sheet - 2.5D-1 0 2.5D-2 0 2.5D-3 0 2.5D-4 0 2.5D-5 0 2.5D-6 0 2.5D-7 0 2.5D-8 0 2.5D-9 0 2.5D-10 0

2.5D-11 0

2.5D-12 0

2.5D-13 0

2.5D-14 0

2.5D-15 0

2.5D-16 0

2.5D-17 0

2.5D-18 0

Section 2.5E Tab - App. 2.5E Cover Sheet - 2.5E-1 0 2.5E-2 0 2.5E-3 0 2.5E-4 0 2.5E-5 0 2.5E-6 0

Chapter 3 Tab - Chapter 3 Cover Sheet i 0 3-ii 15 3-iii 15 3-iv 15 3-v 16 3-vi 11 3-vii 22 3-viii 22

3-ix 4 3-x 21 3-xi 0 3-xii 2 3-xiii 11

3-xiv 21 3-xiv-a 11

3-xv 22 3-xvi 12 3-xvii 14 3-xviii 11

3-xix 11 3-xx 12 3-xxi 12

HBR 2 UPDATED FSAR Page Amendment/Revision Page Amendment/Revision EPL-6 Revision No. 27 Section 3.1 Tab - 3.1.1-1 25 3.1.1-2 10

3.1.1-3 20

3.1.1-4 10

3.1.1-5 10

3.1.1-6 25

3.1.1-7 11

3.1.1-8 0

3.1.2-1 0

3.1.2-2 0

3.1.2-3 15

3.1.2-4 27

3.1.2-5 10

3.1.2-6 26

3.1.2-7 0

3.1.2-8 0

3.1.2-9 20

3.1.2-10 0

3.1.2-11 25

3.1.2-12 10

3.1.2-13 15E2

3.1.2-14 15

3.1.2-15 15

3.1.2-16 15

3.1.2-17 15

3.1.2-18 15

3.1.2-19 15

3.1.2-20 23

3.1.2-21 15

3.1.2-22 15

3.1.2-23 15

3.1.2-24 25

3.1.2-25 19

3.1.2-26 15

3.1.2-27 26

3.1.2-28 15

3.1.2-29 15

3.1.2-30 15

3.1.2-31 15

3.1.2-32 15

3.1.2-33 15

3.1.2-34 15

3.1.2-35 15

3.1.2-36 15

3.1.2-37 15

3.1.2-38 0 3.1.2-39 19

3.1.2-40 0

3.1.2-41 0

3.1.2-42 10

Section 3.2 Tab - 3.2.1-1 22

3.2.1-2 27

3.2.1-3 12

3.2.1-4 10

3.2.1-5 0

3.2.1-6 18

3.2.1-7 3

3.2.2-1 3

3.2.2-2 27

3.2.2-3 0

3.2.2-4 0

3.2.2-5 16

3.2.2-6 1

3.2.2-7 9

3.2.2-8 0

3.2.2-9 0

3.2.2-10 0

3.2.2-11 9

Section 3.3 Tab - 3.3.1-1 0

3.3.1-2 0

3.3.2-1 0

3.3.2-2 16

3.3.2-2a 16

3.3.2-3 12

3.3R-1 12

Fig. 3.3.1-1 0

Section 3.4 Tab - 3.4.0-1 0

Section 3.5 Tab - 3.5.0-1 0

3.5.1-1 19

3.5.1-2 26

3.5.1-3 14

HBR 2 UPDATED FSAR Page Amendment/Revision Page Amendment/Revision EPL-7 Revision No. 27 3.5.1-4 24 3.5.1-4a 15

3.5.1-5 26

3.5.1-6 24

3.5.2-1 0

3.5R-1 24

Fig. 3.5.1-1 14 Fig. 3.5.1-2 14 Section 3.6 Tab - 3.6.1-1 19

3.6.1-2 22

3.6.2-1 19

3.6.2-2 27

3.6R-1 19

Section 3.7 Tab - 3.7.1-1 22

3.7.2-1 22

3.7.2-2 22

3.7.2-3 22

3.7.2-4 22

3.7.2-5 22

3.7.2-6 22

3.7.2-7 22

3.7.3-1 22

3.7.3-2 26

3.7.3-3 22

3.7.3-4 22

3.7.3-4a 22

3.7.3-5 22

3.7.3-6 22

3.7.3-7 22

3.7.3-8 22

3.7.3-8a 22

3.7.3-9 22

3.7.3-10 22

3.7.3-10a 22

3.7.3-11 22

3.7.3-11a 22

3.7.3-11b 22 3.7.3-12 22

3.7.3-13 22

3.7.3-14 22

3.7.3-14a 22

3.7.3-15 22

3.7.3-16 22

3.7.3-17 22

3.7.4-1 22

3.7R-1 24

Fig. 3.7.2-1 0 Fig. 3.7.2-2 0 Fig. 3.7.2-3 0 Fig. 3.7.2-4 0 Fig. 3.7.2-5 0 Fig. 3.7.2-6 0

Fig. 3.7.3-1 0 Fig. 3.7.3-2 0 Fig. 3.7.3-3 3 Fig. 3.7.3-4 0 Fig. 3.7.3-5 0

Section 3.8 Tab - 3.8.1-1 0

3.8.1-2 0

3.8.1-3 21

3.8.1-4 21

3.8.1-4a 21

3.8.1-5 15

3.8.1-6 27

3.8.1-6a 4

3.8.1-7 0

3.8.1-8 0

3.8.1-9 0

3.8.1-10 0

3.8.1-11 25

3.8.1-12 15

3.8.1-13 0

3.8.1-14 25

3.8.1-14a 16

3.8.1-15 0

3.8.1-16 0

3.8.1-17 0

3.8.1-18 0

3.8.1-19 0

3.8.1-20 15

HBR 2 UPDATED FSAR Page Amendment/Revision Page Amendment/Revision EPL-8 Revision No. 27 3.8.1-21 15 3.8.1-22 0

3.8.1-23 0

3.8.1-24 0

3.8.1-25 0

3.8.1-26 0

3.8.1-27 0

3.8.1-28 0

3.8.1-29 0

3.8.1-30 0

3.8.1-31 23

3.8.1-31a 19

3.8.1-32 0

3.8.1-33 0

3.8.1-34 0

3.8.1-35 0

3.8.1-36 0

3.8.1-37 0

3.8.1-38 0

3.8.1-39 0

3.8.1-40 0

3.8.1-41 0

3.8.1-42 0

3.8.1-43 0

3.8.1-44 18

3.8.1-45 27

3.8.1-45a 10

3.8.1-46 15

3.8.1-47 0

3.8.1-48 0

3.8.1-49 0

3.8.1-50 0

3.8.1-51 0

3.8.1-52 0

3.8.1-53 0

3.8.1-54 0

3.8.1-55 0

3.8.1-56 26

3.8.1-57 25

3.8.1-58 0

3.8.1-59 0

3.8.1-60 0

3.8.1-61 0

3.8.1-62 0

3.8.2-1 0 3.8.3-1 0

3.8.3-2 0

3.8.3-3 0

3.8.3-4 0

3.8.3-5 0

3.8.4-1 0

3.8.4-2 0

3.8.4-3 2

3.8.4-4 2

3.8.4-4a 2

3.8.4-4b 3

3.8.4-4c 17

3.8.4-4d 2

3.8.4-5 1

3.8.4-6 1

3.8.4-7 11

3.8.4-8 11

3.8.5-1 0

3.8.5-2 0

3.8.5-3 0

3.8.5-4 0

3.8.5-5 0

3.8.5-6 0

3.8.5-7 0

3.8.5-8 0

3.8.5-9 0

3.8.5-10 0

3.8.5-11 0

3.8.5-12 27

3.8.5-13 0

3.8.5-14 0

3.8.5-15 0

3.8.5-16 0

3.8.5-17 0

3.8R-1 0 3.8R-2 0 3.8R-3 15E2

3.8R-4 15

Fig. 3.8.1-1 12 Fig. 3.8.1-2 0 Fig. 3.8.1-3 0 Fig. 3.8.1-4 12 Fig. 3.8.1-5 12 Fig. 3.8.1-6 12 HBR 2 UPDATED FSAR Page Amendment/Revision Page Amendment/Revision EPL-9 Revision No. 27 Fig. 3.8.1-7 0 Fig. 3.8.1-8 0 Fig. 3.8.1-9 6 Fig. 3.8.1-10 12 Fig. 3.8.1-11 0 Fig. 3.8.1-12 0 Fig. 3.8.1-13 0 Fig. 3.8.1-14 16 Fig. 3.8.1-14a 3 Fig. 3.8.1-15 18 Fig. 3.8.1-16 18 Fig. 3.8.1-17 12 Fig. 3.8.1-18 0 Fig. 3.8.1-19 0 Fig. 3.8.1-20 0 Fig. 3.8.1-21 0 Fig. 3.8.1-22 0 Fig. 3.8.1-23 0 Fig. 3.8.1-24 0 Fig. 3.8.1-25 0 Fig. 3.8.1-26 0 Fig. 3.8.1-27 0 Fig. 3.8.1-28 0 Fig. 3.8.1-29 0 Fig. 3.8.1-30 0 Fig. 3.8.1-31 0 Fig. 3.8.1-32 0 Fig. 3.8.1-33 0 Fig. 3.8.1-34 0 Fig. 3.8.1-35 0 Fig. 3.8.1-36 0 Fig. 3.8.1-37 0 Fig. 3.8.1-38 0 Fig. 3.8.1-39 0 Fig. 3.8.1-40 0 Fig. 3.8.1-41 0 Fig. 3.8.1-42 0 Fig. 3.8.1-43 0 Fig. 3.8.1-44 0 Fig. 3.8.1-45 0 Fig. 3.8.1-46 0 Fig. 3.8.1-47 0 Fig. 3.8.1-48 0 Fig. 3.8.3-1 19 Fig. 3.8.3-2 19 Fig. 3.8.3-3 19 Fig. 3.8.3-4 19 Fig. 3.8.3-5 0

Fig. 3.8.4-1 0 Fig. 3.8.4-2 11 Fig. 3.8.5-1 0 Fig. 3.8.5-2 0 Fig. 3.8.5-3 0 Fig. 3.8.5-4 0 Fig. 3.8.5-5 0 Fig. 3.8.5-6 0 Fig. 3.8.5-7 0 Fig. 3.8.5-8 0 Fig. 3.8.5-9 0 Fig. 3.8.5-10 0 Fig. 3.8.5-11 0 Fig. 3.8.5-12 0 Fig. 3.8.5-13 0 Fig. 3.8.5-14 0 Fig. 3.8.5-15 0 Fig. 3.8.5-16 0 Fig. 3.8.5-17 0 Fig. 3.8.5-18 0 Fig. 3.8.5-19 0 Fig. 3.8.5-20 0 Fig. 3.8.5-21 0 Fig. 3.8.5-22 0

Section 3.9 Tab - 3.9.1-1 19

3.9.1-2 21

3.9.2-1 0

3.9.2-2 0

3.9.2-3 0

3.9.3-1 0 3.9.3-2 3

3.9.3-3 2

3.9.3-4 21

3.9.3-5 21

3.9.3-6 21

3.9.3-6a 21

3.9.3-7 0

3.9.3-8 21

3.9.3-9 21

HBR 2 UPDATED FSAR Page Amendment/Revision Page Amendment/Revision EPL-10 Revision No. 27 3.9.3-10 3 3.9.3-11 0

3.9.4-1 21

3.9.4-2 0

3.9.4-3 19

3.9.4-4 21

3.9.5-1 0

3.9.5-2 0

3.9.5-3 15

3.9.5-4 15

3.9.5-5 0

3.9.5-6 0

3.9.5-7 0

3.9.5-8 0

3.9.6-1 19

3.9R-1 21

3.9R-2 15

Fig. 3.9.2-1 0

Fig. 3.9.4-1 21 Fig. 3.9.4-2 0

Fig. 3.9.5-1 0 Fig. 3.9.5-2 19 Fig. 3.9.5-3 0

Section 3.10 Tab - 3.10.0-1 10

3.10.0-2 17

3.10R-1 17

Section 3.11 Tab - 3.11.1-1 10

3.11.1-2 10

3.11.2-1 10

3.11.2-2 10

3.11.3-1 10

3.11.4-1 12

3.11.5-1 23

3.11R-1 16

Fig. 3.11.1-1 25 Fig. 3.11.1-2 25 Fig. 3.11.2-1 thru 2-4 Deleted

Fig. 3.11.5-1 10 Fig. 3.11.5-2 10 Chapter 4 Tab - Chapter 4 Cover Sheet i 21 4-ii 21 4-iii 15 4-iv 11 4-v 26 4-vi 3 4-vii 26 4-viii 26

Section 4.1 Tab - 4.1.1-1 27

4.1.2-1 26

4.1.2-2 25

4.1.2-3 27

4.1.2-4 27

4.1.2-5 24

4.1.2-6 26

4.1R-1 15

Fig. 4.1.1-1 21 Fig. 4.1.1-2 0 Fig. 4.1.1-3 12 Fig. 4.1.2-1 3 Fig. 4.1.2-2 0 Fig. 4.1.2-3 26 Fig. 4.1.2-4 26 Fig. 4.1.2-5 26 Fig. 4.1.2-6 26 Section 4.2 Tab - 4.2.1-1 27

4.2.1-2 27

4.2.1-3 24

4.2.1-4 27

4.2.1-5 24

4.2.1-6 24

4.2.1-7 25 HBR 2 UPDATED FSAR Page Amendment/Revision Page Amendment/Revision EPL-11 Revision No. 27 4.2.2-1 26 4.2.2-2 27

4.2.2-3 24

4.2.2-4 24

4.2.2-5 24

4.2.2-6 26

4.2.2-7 26

4.2.2-8 24

4.2.2-9 25

4.2.3-1 27

4.2.3-2 27

4.2.3-3 27

4.2.3-4 27

4.2.3-5 26

4.2.3-6 15

4.2.3-7 15

4.2.4-1 26

4.2R-1 27

Fig. 4.2.2-1 Deleted 13 Fig. 4.2.2-2 13 Fig. 4.2.2-2A 20 Fig. 4.2.2-2B 21 Fig. 4.2.2-2C 22 Fig. 4.2.2-2D 27 Fig. 4.2.2-3 3

Section 4.3 Tab - 4.3.1-1 24

4.3.1-2 15

4.3.2-1 26

4.3.2-2 17

4.3.2-3 26

4.3.2-4 26

4.3.2-5 0

4.3.2-6 13

4.3.2-7 0

4.3.2-8 0

4.3.2-9 0

4.3.3-1 26

4.3.3-2 26

4.3R-1 26

Fig. 4.3.2-1 3 Fig. 4.3.2-2 0 Section 4.4 Tab - 4.4.1-1 10

4.4.2-1 26

4.4.2-2 16E1

4.4.3-1 26

4.4.3-2 26

4.4.3-3 16

4.4R-1 21

Fig. 4.4.3-1 25 Fig. 4.4.3-2 19 Section 4.5 Tab - 4.5.1-1 21

4.5.2-1 0

Section 4.6 Tab - 4.6.0-1 21

Chapter 5 Tab - Chapter 5 Cover Sheet i 3 5-ii 11 5-iii 21 5-iv 11 5-v 20 5-vi 20

Section 5.1 Tab - 5.1.0-1 8

5.1.0-2 25

5.1.0-2a 25

5.1.0-3 25

5.1.1-1 0

Fig. 5.1.1-1 7

Fig. 5.1.2-1 26 Fig. 5.1.2-2 9

Fig. 5.1.3-1 5

HBR 2 UPDATED FSAR Page Amendment/Revision Page Amendment/Revision EPL-12 Revision No. 27 Section 5.2.Tab - 5.2.1-1 19

5.2.2-1 16

5.2.2-2 25

5.2.3-1 0

5.2.3-2 19

5.2.3-3 3

5.2.3-4 21

5.2.3-5 18

5.2.3-6 26

5.2.4-1 19

5.2.4-2 19

5.2.4-3 19

5.2.4-4 0

5.2.4-5 0

5.2.4-6 0

5.2.4-7 0

5.2.4-8 0

5.2.5-1 16

5.2.5-2 15

5.2.5-3 0

5.2.5-4 9

5.2.5-5 26

5.2.5-6 12

5.2.5-7 26

5.2.5-8 19

5.2.5-9 0

5.2.5-10 12

5.2R-1 16

Section 5.3 Tab - 5.3.0-1 0

5.3.0-2 19

5.3.1-1 6

5.3.1-2 6

5.3.1-3 20

5.3.1-4 20

5.3.1-5 20

5.3.1-6 24

5.3.1-7 20

5.3.1-8 15

5.3.1-9 3

5.3.1-10 10

5.3.1-11 20

5.3.1-12 20

5.3.2-1 20

5.3.2-2 20

5.3R-1 20

5.3R-2 20

Fig. 5.3.0-1 21 Fig. 5.3.1-1 20 Fig. 5.3.1-2 1 Fig. 5.3.1-3 6 Fig. 5.3.1-4 24 Fig. 5.3.1-5-Deleted 20 Fig. 5.3.1-6-Deleted 15 Fig. 5.3.1-7-Deleted 15 Fig. 5.3.1-8-Deleted 15 Fig. 5.3.1-9-Deleted 15 Fig. 5.3.1-10-Deleted 15 Fig. 5.3.1-11-Deleted 15 Section 5.4 Tab - 5.4.1-1 26

5.4.1-2 0

5.4.1-3 24

5.4.1-4 0

5.4.2-1 19

5.4.2-2 19

5.4.2-3 19

5.4.3-1 0

5.4.3-2 0

5.4.4-1 15

5.4.4-2 22

5.4.5-1 0

5.4.6-1 15

5.4.6-2 25

5.4.6-3 0

5.4.7-1 14

5.4.8-1 17

5.4.9-1 25 5.4.10-1 20 5.4.10-2 3

HBR 2 UPDATED FSAR Page Amendment/Revision Page Amendment/Revision EPL-13 Revision No. 27 5.4R-1 2 Fig. 5.4.1-1 0 Fig. 5.4.1-2 0

Fig. 5.4.2-1 3 Fig. 5.4.4-1 19 Fig. 5.4.6-1 0 Chapter 6 Tab - Chapter 6 Cover Sheet i 21 6-ii 25 6-iii 25 6-iv 25 6-v 21 6-vi 21 6-vii 21 6-viii 21 6-ix 21 6-x 21 6-xi 17 6-xii 25 6-xiii 25 6-xiv 25 6-xv 21 6-xvi 17 6-xvii 17 6-xviii 17

6-xix 21 6-xx 21 Section 6.0 Tab - 6.0-1 20

Section 6.1 Tab 6.1.1-1 16 6.1.1-1a 16

6.1.1-2 26 6.1.1-3 18 6.1.1-4 25

6.1.1-5 19 6.1.1-6 22 6.1.1-7 19

6.1.1-8 23 6.1.1-9 15 6.1.1-10 Deleted 22 6.1.1-11 15 6.1.1-12 15 6.1.2-1 27

6.1.2-2 17 6.1R-1 0 Section 6.2 Tab 0 6.2.1-1 20

6.2.1-2 21

6.2.1-3 25 6.2.1-4 25 6.2.1-5 25

6.2.1-6 25 6.2.1-7 17 6.2.1-8 17

6.2.1-9 17 6.2.1-10 17 6.2.1-11 25 6.2.1-12 21

6.2.1-13 24

6.2.1-14 25 6.2.1-15 21 6.2.1-16 25

6.2.1-17 25

6.2.1-18 25

6.2.1-19 17

6.2.1-20 17

6.2.1-21 17

6.2.1-22 17

6.2.1-23 25

6.2.1-23a 25

6.2.1-23b 25

6.2.1-24 25

6.2.1-25 25

6.2.1-26 25

6.2.1-27 19

6.2.1-28 19

6.2.1-29 19

6.2.1-30 27

6.2.1-31 19

6.2.1-32 19

6.2.1-33 17

6.2.1-34 25

6.2.1-35 25

6.2.1-36 25

6.2.1-37 25

6.2.1-38 25

6.2.1-39 25

6.2.1-39a 25

6.2.1-40 19

6.2.1-41 25

6.2.1-42 25

6.2.1-43 21

6.2.1-44 21

6.2.1-45 21

6.2.1-46 25

6.2.1-47 25

6.2.1-48 25

6.2.1-49 25

6.2.1-50 25

6.2.1-51 25

6.2.1-52 25

6.2.1-53 25

6.2.1-54 25

6.2.1-55 25 HBR 2 UPDATED FSAR Page Amendment/Revision Page Amendment/Revision EPL-14 Revision No. 27 6.2.1-56 25 6.2.1-57 25

6.2.1-58 25

6.2.1-59 25

6.2.1-60 25

6.2.1-61 25

6.2.1-62 25

6.2.1-63 Deleted 25 6.2.1-64 Deleted 25 6.2.1-65 Deleted 25 6.2.1-66 Deleted 25 6.2.1-67 Deleted 25 6.2.1-68 Deleted 25 6.2.1-69 25

6.2.1-70 25 6.2.1-71 25 6.2.1-72 25

6.2.1-73 25

6.2.1-74 25

6.2.1-75 25

6.2.1-76 25

6.2.1-77 25

6.2.1-78 25

6.2.1-79 25

6.2.1-80 25

6.2.1-81 25

6.2.1-82 25

6.2.1-83 25

6.2.1-84 25

6.2.1-85 25

6.2.1-86 25

6.2.1-87 25

6.2.1-88 25

6.2.1-89 25

6.2.1-90 25

6.2.1-91 25

6.2.1-92 25

6.2.1-93 25

6.2.1-94 25

6.2.1-95 25

6.2.1-96 25

6.2.1-97 25

6.2.1-98 25

6.2.1-99 25

6.2.1-100 25

6.2.2-1 15

6.2.2-2 21

6.2.2-3 15

6.2.2-4 21

6.2.2-5 21

6.2.2-6 21

6.2.2-7 17

6.2.2-8 17 6.2.2-8a 15

6.2.2-9 22

6.2.2-10 15

6.2.2-11 0

6.2.2-12 15E2

6.2.2-13 0

6.2.2-14 0

6.2.2-15 15

6.2.2-16 15

6.2.2-17 15

6.2.2-18 15

6.2.2-19 15

6.2.2-20 22

6.2.2-21 21

6.2.2-22 15

6.2.2-23 15

6.2.2-24 15

6.2.2-25 15

6.2.2-26 21

6.2.2-27 0

6.2.2-28 0

6.2.2-29 15

6.2.2-30 15

6.2.2-31 15

6.2.2-32 0

6.2.3-1 0

6.2.4-1 15

6.2.4-2 27

6.2.4-3 27

6.2.4-4 27

6.2.4-5 27

6.2.4-6 15

6.2.4-7 17

6.2.4-8 17

6.2.4-9 13

6.2.4-10 27

6.2.4-11 12

6.2.4-12 12

6.2.4-13 19

6.2.4-14 12

6.2.4-15 23

6.2.4-16 18

6.2.4-17 14

6.2.4-18 17

6.2.4-19 20

6.2.4-20 14

6.2.4-21 14

6.2.4-22 26

HBR 2 UPDATED FSAR Page Amendment/Revision Page Amendment/Revision EPL-15 Revision No. 27 6.2.4-23 18 6.2.4-24 13

6.2.4-25 24

6.2.4-26 12

6.2.5-1 20

6.2.6-1 27

6.2.6-2 19

6.2.6-3 27

6.2R-1 25

6.2R-1a 25

6.2R-2 25

6.2R-3 27

Fig. 6.2.1-1 25 Fig. 6.2.1-2 25 Fig. 6.2.1-3 Deleted 21 Fig. 6.2.1-4 Deleted 21 Fig. 6.2.1-5 Deleted 21 Fig. 6.2.1-6 Deleted 21 Fig. 6.2.1-7 through Fig. 6.2.1-12 -Deleted 17 Fig. 6.2.1-13 0 Fig. 6.2.1-14 through Fig. 6.2.1-15 Deleted 17 Fig. 6.2.1.4-1 19 Fig. 6.2.1.4-2 19 Fig. 6.2.1.4-3 25 Fig. 6.2.1.4-4 25 Fig. 6.2.1.4-5 19 Fig. 6.2.1.4-6 19 Fig. 6.2.1.4-7 19 Fig. 6.2.1.4-8 19 Fig. 6.2.1.4-9 17 Fig. 6.2.1.4-10 17 Fig. 6.2.1.4-11 17 Fig. 6.2.1.4-12 17 Fig. 6.2.2-1 21 Fig. 6.2.2-2 15 Fig. 6.2.2-3 0 Fig. 6.2.2-4 0 Fig. 6.2.2-5 0 Fig. 6.2.2-6 6

Fig. 6.2.4-1 12 Fig. 6.2.4-2 23 Fig. 6.2.4-3 17 Fig. 6.2.4-4 15 Fig. 6.2.4-5 22 Fig. 6.2.4-6 21 Fig. 6.2.4-7 12 Fig. 6.2.4-8 17 Fig. 6.2.4-9 14 Fig. 6.2.4-10 20 Fig. 6.2.4-11 14 Fig. 6.2.4-12 14 Fig. 6.2.4-13 12 Fig. 6.2.4-14 12 Fig. 6.2.4-15 17 Fig. 6.2.4-16 26 Fig. 6.2.4-17 14 Fig. 6.2.4-18 15 Fig. 6.2.4-19 15 Fig. 6.2.4-20 Deleted Fig. 6.2.4-21 14 Fig. 6.2.5-2 15 Section 6.3 Tab - 6.3.1-1 7

6.3.1-2 15

6.3.1-3 0

6.3.2-1 24

6.3.2-2 21

6.3.2-3 27

6.3.2-4 21

6.3.2-4a 21 6.3.2-5 16E1 6.3.2-6 16

6.3.2-6a 16E1 6.3.2-7 15

6.3.2-8 15

6.3.2-8a 15

6.3.2-9 11

6.3.2-10 15

6.3.2-11 24

6.3.2-12 26

6.3.2-13 11

6.3.2-14 22

6.3.2-15 17

6.3.2-16 19

6.3.2-17 27

HBR 2 UPDATED FSAR Page Amendment/Revision Page Amendment/Revision EPL-16 Revision No. 27 6.3.2-18 20 6.3.2-19 20

6.3.2-20 24

6.3.2-21 21

6.3.2-22 22

6.3.2-23 7

6.3.2-24 11

6.3.2-25 23

6.3.2-26 23

6.3.2-27 15

6.3.2-28 27

6.3.2-29 15

6.3.2-30 21

6.3.2-31 7

6.3.2-32 12

6.3.2-33 0

6.3.2-34 15

6.3.2-35 0

6.3.2-36 0

6.3.3-1 0

6.3.3-2 5

6.3.3-3 0

6.3.4-1 15

6.3.4-2 25

6.3.4-3 25

6.3.4-4 21

6.3.5-1 0

6.3R-1 27

Fig. 6.3.2-1 26 Fig. 6.3.2-2 25 Fig. 6.3.2-3 27 Fig. 6.3.2-4a 15 Fig. 6.3.2-4b 15 Fig. 6.3.2-4c 15 Fig. 6.3.2-5 0

Section 6.4 Tab - 6.4.1-1 27

6.4.1-2 19

6.4.2-1 10

6.4.2-2 Deleted 10 6.4.2-3 25

6.4.2-4 21 6.4.3-1 24

6.4.4-1 25

6.4.4-2 19

6.4.4-3 Deleted 19 6.4.4-4 19

6.4.4-5 19

6.4.4-6 19

6.4.5-1 15

6.4.6-1 10

6.4R-1 20

Fig. 6.4.2-1 25 Section 6.5 Tab - 6.5.1-1 20

6.5.2-1 21

6.5.2-2 21

6.5.2-3 21

6.5.2-4 21

6.5.2-5 21

6.5.3-1 21

6.5R-1 21

Section 6.6 Tab - 6.6.0-1 19

Section 6.7 Tab - 6.7.0-1 0

Section 6.8 Tab - 6.8.1-1 0

6.8.2-1 22

6.8.2-2 22

6.8.2-3 18

6.8.2-4 27

6.8.2-5 0

6.8.2-6 15

6.8.3-1 15

6.8.3-2 0

HBR 2 UPDATED FSAR Page Amendment/Revision Page Amendment/Revision EPL-17 Revision No. 27 6.8.4-1 22

6.8.5-1 22

6.8.5-2 22

Fig. 6.8.2-1 22 Fig. 6.8.2-2 0

Section 6.9 Tab - 6.9.1-1 19

6.9.2-1 15

6.9.2-2 22

6.9.2-3 14

6.9.3-1 14

6.9.4-1 14

Chapter 7 Tab - Chapter 7 Cover Sheet i 11 7-ii 11 7-iii 15 7-iv 27 7-v 21 7-vi 21 7-vii 21 7-viii 21

7-ix 15 7-x 21

Section 7.1 Tab - 7.1.0-1 25

7.1.0-2 24

Section 7.2 Tab - 7.2.1-1 10

7.2.1-2 26

7.2.1-2a 26

7.2.1-3 7

7.2.1-4 13

7.2.1-4a 13

7.2.1-5 24

7.2.1-6 25

7.2.1-7 17

7.2.1-8 0

7.2.1-9 14

7.2.1-10 15

7.2.1-11 15

7.2.1-12 15

7.2.1-13 15

7.2.1-14 15

7.2.1-15 15

7.2.1-16 19

7.2.1-17 15

7.2.1-18 15

7.2.1-19 24

7.2.1-20 17

7.2.1-21 17

7.2.1-22 19

7.2.1-23 19

7.2.1-24 15

7.2.1-25 10

7.2.1-26 13

7.2.1-27 0

7.2.1-28 20

7.2.1-29 3

7.2.1-30 0

7.2.1-31 25

7.2.1-32 24

7.2.1-33 17

7.2.1-34 0

7.2.1-35 11

7.2.1-36 19

7.2.1-37 22

7.2.1-38 15

7.2.2-1 22

7.2.2-2 15

7.2.2-3 22

7.2.2-4 25

7.2.2-5 25

7.2.2-6 15

7.2.2-7 15

7.2.2-8 24

7.2.2-9 0

7.2.2-10 0

7.2.2-11 0

7.2.2-12 0

7.2R-1 0

HBR 2 UPDATED FSAR Page Amendment/Revision Page Amendment/Revision EPL-18 Revision No. 27 Fig. 7.2.1-1 25 Fig. 7.2.1-2 0 Fig. 7.2.1-3 3 Fig. 7.2.1-4 3 Fig. 7.2.1-5 0 Fig. 7.2.1-6 15 Fig. 7.2.1-7 22 Fig. 7.2.1-8 15 Fig. 7.2.1-9 15 Fig. 7.2.1-10 0 Fig. 7.2.1-11 3 Fig. 7.2.1-12 24 Fig. 7.2.1-13 15 Fig. 7.2.1-14 25 Fig. 7.2.1-15 15 Fig. 7.2.1-16 25 Fig. 7.2.1-17 15E2 Fig. 7.2.1-18 25 Fig. 7.2.1-19 15 Fig. 7.2.1-20 15 Fig. 7.2.1-21 15E2 Fig. 7.2.1-22 0 Fig. 7.2.1-23 25 Fig. 7.2.1-24 27 Fig. 7.2.1-25 17 Fig. 7.2.1-26 24 Fig. 7.2.1-27 15 Fig. 7.2.1-28 27 Fig. 7.2.1-29 18E Fig. 7.2.1-30 16 Fig. 7.2.1-31 15 Fig. 7.2.1-32 15 Fig. 7.2.1-33 25 Fig. 7.2.1-34 25 Fig. 7.2.1-35 18 Section 7.3 Tab - 7.3.1-1 24

7.3.1-2 24

7.3.1-3 24

7.3.1-4 15

7.3.1-5 15

7.3.1-6 15

7.3.1-6a 15

7.3.1-7 0

7.3.1-8 8

7.3.1-9 24 7.3.2-1 0

7.3.2-2 1

7.3.2-3 18

Section 7.4 Tab - 7.4.1-1 27

7.4.1-2 27

7.4.1-3 27

7.4.1-4 27

7.4.1-5 27

7.4.1-6 27

7.4.1-7 27

7.4.2-1 27

7.4.2-2 27

7.4.2-3 15 7.4R-1 16

Section 7.5 Tab - 7.5.1-1 15

7.5.1-2 18

7.5.1-3 19

7.5.2-1 15

Section 7.6 Tab - 7.6.1-1 13

7.6.2-1 0

7.6R-1 0

Fig. 7.6.1-1 25 Fig. 7.6.1-2 7

Section 7.7 Tab - 7.7.1-1 25

7.7.1-2 25

7.7.1-3 0

7.7.1-4 24

7.7.1-5 17

7.7.1-6 17

7.7.1-7 19

7.7.1-8 7

7.7.1-9 15

7.7.1-10 15

HBR 2 UPDATED FSAR Page Amendment/Revision Page Amendment/Revision EPL-19 Revision No. 27 7.7.1-11 18 7.7.1-12 18

7.7.1-13 23

7.7.1-14 18

7.7.1-15 18

7.7.1-16 18

7.7.2-1 19

7.7.2-2 24

7.7.2-3 0

7.7R-1 24

Fig. 7.7.1-1 22 Fig. 7.7.1-2 24 Fig. 7.7.1-3 25 Chapter 8 Tab - Chapter 8 Cover Sheet i 11 8-ii 10 8-iii 20 8-iv 24

Section 8.1 Tab - 8.1.1-1 10

8.1.2-1 15

8.1.2-2 15

8.1.3-1 20

Fig. 8.1.2-1 27 Fig. 8.1.2-1a 25 Section 8.2 Tab - 8.2.1-1 27

8.2.1-2 27

8.2.1-3 27

8.2.2-1 27

Fig. 8.2.1-1 27 Section 8.3 Tab - 8.3.1-1 15

8.3.1-2 20

8.3.1-2a 24

8.3.1-3 15

8.3.1-4 20

8.3.1-5 24

8.3.1-6 20

8.3.1-6a 16

8.3.1-7 18

8.3.1-8 15

8.3.1-9 20

8.3.1-10 10

8.3.1-11 25

8.3.1-12 25

8.3.1-13 25

8.3.1-14 20

8.3.1-15 20

8.3.1-16 22

8.3.1-17 20

8.3.1-18 20

8.3.1-19 20

8.3.2-1 25

8.3.2-2 26 8.3.3-1 21

8.3.3-2 15

8.3.3-3 10

8.3R-1 16

8.3R-2 21

Fig. 8.3.1-1 27 Fig. 8.3.1 Sh. 1 27 Fig. 8.3.1.2 - Sh. 2 15E2 Fig. 8.3.1-3 25 Fig. 8.3.1-4 16 Fig. 8.3.1-5 27 Chapter 9 Tab - Chapter 9 Cover Sheet i 21 9-ii 21 9-iii 25 9-iiia 22

9-iv 21 9-v 15 9-vi 21 9-vii 13 9-viii 21

9-ix 17 9-x 26 9-xi 15 9-xii 15

HBR 2 UPDATED FSAR Page Amendment/Revision Page Amendment/Revision EPL-20 Revision No. 27 9-xiii 21 9-xiv 24 9-xv 27

Section 9.1 Tab - 9.1.1-1 15

9.1.1-2 15

9.1.2-1 19

9.1.2-1a 19

9.1.2-2 24

9.1.2-3 19

9.1.2-4 20

9.1.2-4a 26

9.1.2-5 19

9.1.2-6 19

9.1.3-1 19

9.1.3-2 26

9.1.3-3 15

9.1.3-4 15

9.1.3-5 20

9.1.3-6 17

9.1.3-7 23

9.1.3-8 14

9.1.4-1 20

9.1.4-1a 20

9.1.4-2 17

9.1.4-3 24

9.1.4-3a 24

9.1.4-4 25

9.1.4-5 25

9.1.4-5a 25

9.1.4-6 15

9.1.4-7 25

9.1.4-7a 25

9.1.4-8 25

9.1.4-9 22

9.1.5-1 24

9.1.5-2 27

9.1.5-3 24

9.1.5-4 26

9.1.5-5 27

9.1.5-6 24

9.1.5-7 24

9.1R-1 22

9.1R-2 22

9.1R-3 22 Fig. 9.1.1-1 14 Fig. 9.1.2-1 Deleted 24 Fig. 9.1.2-2 2 Fig. 9.1.2-3 2 Fig. 9.1.2-4 2 Fig. 9.1.2-5 19 Fig. 9.1.3-1 26 Fig. 9.1.4-1 11 Section 9.2 Tab - 9.2.1-1 15

9.2.1-2 25

9.2.1-3 15

9.2.1-4 27

9.2.1-5 19

9.2.1-5a 16

9.2.1-6 18

9.2.1-7 18

9.2.2-1 15

9.2.2-2 24

9.2.2-3 21

9.2.2-4 27

9.2.2-5 27

9.2.2-6 19

9.2.2-7 17

9.2.2-8 20

9.2.2-9 0

9.2.2-10 0

9.2.3-1 19

9.2.3-2 11 9.2.3-3 25

9.2.4-1 0

9.2.5-1 16

Fig. 9.2.1-1 26 Fig. 9.2.2-1 23 Fig. 9.2.2-2 26 Fig. 9.2.2-3 25 Fig. 9.2.3-1 27 Fig. 9.2.3-2 20 HBR 2 UPDATED FSAR Page Amendment/Revision Page Amendment/Revision EPL-21 Revision No. 27 Section 9.3 Tab - 9.3.1-1 19 9.3.1-2 18

9.3.1-3 18

9.3.1-4 22

9.3.1-5 17

9.3.2-1 19

9.3.2-2 15

9.3.2-3 15

9.3.2-4 21

9.3.2-5 15

9.3.2-5a 19

9.3.2-5b 19

9.3.2-5c 19

9.3.2-5d 19

9.3.2-5e 19

9.3.2-6 0

9.3.2-7 0

9.3.2-8 0

9.3.2-9 1

9.3.3-1 14

9.3.4-1 15E2

9.3.4-1a 15

9.3.4-2 25

9.3.4-3 14

9.3.4-4 14

9.3.4-5 15

9.3.4-6 15

9.3.4-7 18

9.3.4-8 19

9.3.4-9 15

9.3.4.10 24

9.3.4.11 15

9.3.4-12 15

9.3.4-13 15

9.3.4-14 15

9.3.4-15 17

9.3.4-16 15

9.3.4-17 15

9.3.4-18 15

9.3.4-19 15

9.3.4-20 15

9.3.4-21 23

9.3.4-22 15

9.3.4-23 20

9.3.4-24 15

9.3.4-25 12

9.3R-1 0 Fig. 9.3.2-1 21 Fig. 9.3.2-2 21 Fig. 9.3.2-3 19 Fig. 9.3.4-1 24 Fig. 9.3.4-2 15E2 Fig. 9.3.4-3 26 Fig. 9.3.4-4 15E2 Fig. 9.3.4-5 15E2 Fig. 9.3.4-6 15 Section 9.4 Tab - 9.4.1-1 25

9.4.1-2 24

9.4.1-3 15

9.4.2-1 22

9.4.2-2 24

9.4.2-3 24

9.4.3-1 22

9.4.3-2 22

9.4.3-3 22

9.4.3-4 22

9.4.3-4a 22

9.4.3-5 22

9.4.3-5a 22

9.4.3-6 19

9.4.3-7 15

9.4.3-8 20

9.4.4-1 25

9.4.4-2 25

9.4.5-1 22

9.4.6-1 22

9.4.7.1 22

9.4.8-1 15

9.4.9-1 22

9.4.10-1 17E1

9.4.11-1 26

9.4R-1 25 HBR 2 UPDATED FSAR Page Amendment/Revision Page Amendment/Revision EPL-22 Revision No. 27 Fig. 9.4.1-1 15 Fig. 9.4.1-2 22 Fig. 9.4.1-3 15 Fig. 9.4.1-4 15 Fig. 9.4.1-5 20 Section 9.5 Tab - 9.5.1-1 15

9.5.1-2 15

9.5.1-3 15

9.5.1-4 27

9.5.1-5 27

9.5.1-6 27

9.5.1-7 27

9.5.1-8 27

9.5.1-9 27

9.5.1-10 27

9.5.1-11 27

9.5.1-12 27

9.5.1-13 27

9.5.1-14 27

9.5.1-15 27

9.5.1-16 27

9.5.2-1 27

9.5.2-2 27

9.5.2-3 26

9.5.2-4 27

9.5.3-1 22

9.5R-1 27

Fig. 9.5.1-1 Sh. 1 27 Fig. 9.5.1-1 Sh. 2 25 Fig. 9.5.1-1 Sh. 3 15 Fig. 9.5.1-2 27 Fig. 9.5.1-3 27 Fig. 9.5.1-4 27 Fig. 9.5.1-5 27 Fig. 9.5.1-6 27 Fig. 9.5.1-7 27 Fig. 9.5.1-8 27 Fig. 9.5.1-9 27 Fig. 9.5.1-10 27 Fig. 9.5.1-11 27 Fig. 9.5.1-12 27 Fig. 9.5.2-1 27 Appendix 9.5.1A Cover - 9.5.1A-i 27 9.5.1A-ii 27 9.5.1A-iii 27

9.5.1A-iv 27 9.5.1A-v 27 9.5.1A-1 27

9.5.1A-2 27 9.5.1A-3 27 9.5.1A-4 27

9.5.1A-5 27 9.5.1A-6 27 9.5.1A-7 27

9.5.1A-8 27 9.5.1A-9 27 9.5.1A-10 27

9.5.1A-11 27 9.5.1A-12 27 9.5.1A-13 27

9.5.1A-14 27 9.5.1A-15 27 9.5.1A-16 27

9.5.1A-17 27 9.5.1A-18 27 9.5.1A-19 27

9.5.1A-20 27 9.5.1A-21 27 9.5.1A-22 27

9.5.1A-23 27 9.5.1A-24 27 9.5.1A-25 27

9.5.1A-26 27 9.5.1A-27 27 9.5.1A-28 27

9.5.1A-29 27 9.5.1A-30 27 9.5.1A-31 27

9.5.1A-32 27 9.5.1A-33 27 9.5.1A-34 27

9.5.1A-35 27 9.5.1A-36 27 9.5.1A-37 27

9.5.1A-38 27 9.5.1A-39 27 9.5.1A-40 27

9.5.1A-41 27 9.5.1A-42 27 9.5.1A-43 27

9.5.1A-44 27 9.5.1A-45 27 9.5.1A-46 27

9.5.1A-47 27 9.5.1A-48 27 9.5.1A-49 27

9.5.1A-50 27 9.5.1A-51 27 9.5.1A-52 27

9.5.1A-53 27 9.5.1A-54 27 9.5.1A-55 27

9.5.1A-56 27 HBR 2 UPDATED FSAR Page Amendment/Revision Page Amendment/Revision EPL-23 Revision No. 27 9.5.1A-57 27 9.5.1A-58 27 9.5.1A-59 27

9.5.1A-60 27 9.5.1A-61 27 9.5.1A-62 27

9.5.1A-63 27 9.5.1A-64 27 9.5.1A-65 27

9.5.1A-66 27 9.5.1A-67 27 9.5.1A-68 27

9.5.1A-69 27 9.5.1A-70 27 9.5.1A-71 27

9.5.1A-72 27 9.5.1A-73 27 9.5.1A-74 27

9.5.1A-75 27 9.5.1A-76 27 9.5.1A-77 27

9.5.1A-78 27 9.5.1A-79 27 9.5.1A-80 27

9.5.1A-81 27 9.5.1A-82 27 9.5.1A-83 27

Appendix 9.5.1B Cover 14 9.5.1B-i 14 9.5.1B-ii 14 9.5.1B-1 17

9.5.1B-2 14 9.5.1B-3 14 9.5.1B-4 27

9.5.1B-5 26 9.5.1B-6 27 9.5.1B-7 26

9.5.1B-8 15 9.5.1B-9 15 9.5.1B-10 25

9.5.1B-11 15 9.5.1B-12 26 9.5.1B-13 27

9.5.1B-14 26 9.5.1B-15 15 9.5.1B-16 27

9.5.1B-17 27 9.5.1B-18 14 9.5.1B-19 15

9.5.1B-20 24 9.5.1B-21 24 9.5.1B-22 27

9.5.1B-23 15 9.5.1B-24 26 9.5.1B-25 15 9.5.1B-26 26

9.5.1B-27 27 9.5.1B-28 27

9.5.1B-29 18

Appendix 9.5.1C Cover Sheet 10

9.5.1C-i 14

9.5.1C-1 27

9.5.1C-2 10

9.5.1C-3 24

9.5.1C-4 17

9.5.1C-4A 17

9.5.1C-4B 27

9.5.1C-4C 17

9.5.1C-5 27

9.5.1C-6 27

9.5.1C-7 27

9.5.1C-8 25

9.5.1C-9 27

9.5.1C-10 15

9.5.1C-11 27

9.5.1C-12 27

9.5.1C-13 27

9.5.1C-14 27

9.5.1C-15 27

9.5.1C-16 15

9.5.1C-17 27

9.5.1C-18 15

Appendix 9.5.1D-1 27 Chapter 10 Tab - Chapter 10 Cover Sheet i 1 10-ii 21 10-iii 11

10-iv 15 10-v 24

Section 10.1 Tab - 10.1.0-1 0

Fig. 10.1.0-1 19 Fig. 10.1.0-2 15E2 Fig. 10.1.0-3 17 Fig. 10.1.0-4 17 Fig. 10.1.0-5 26 Fig. 10.1.0-6 18 Fig. 10.1.0-7 19 Fig. 10.1.0-8 27 Section 10.2 Tab - 10.2.1-1 24

10.2.1-2 24 HBR 2 UPDATED FSAR Page Amendment/Revision Page Amendment/Revision EPL-24 Revision No. 27 10.2.2-1 24 10.2.2-2 15

10.2.3-1 24

10.2.3-2 24

10.2.3-3 24

10.2.3-4 24

10.2.3-5 24

10.2.3-6 0

10.2.3-7 24

10.2.3-8 24

10.2.3-9 Deleted 7 10.2.3-10 Deleted 7 10.2.3-11 24

10.2.4-1 24

10.2R-1 24

Fig. 10.2.2-1 12 Fig. 10.2.3-1 24 Fig. 10.2.3-2 0 Fig. 10.2.3-3 24 Fig. 10.2.3-4 24 Section 10.3 Tab - 10.3.1-1 0

10.3.2-1 26

10.3.2-2 19

10.3.3-1 19

10.3.4-1 13

10.3.5-1 24

10.3.6-1 0

10.3R-1 16

Section 10.4 Tab - 10.4.1-1 17

10.4.1-2 2

10.4.2-1 15

10.4.2-2 15 10.4.3-1 0

10.4.4-1 19

10.4.5-1 16

10.4.6-1 27

10.4.6-1a 15E2

10.4.6-2 15

10.4.6-3 3

10.4.6-4 15

10.4.6-5 15

10.4.6-6 3

10.4.7-1 25

10.4.7-2 6

10.4.8-1 25

10.4.8-1a 16

10.4.8-2 25

10.4.8-2a 16

10.4.8-3 12

10.4.8-3a 12

10.4.8-4 15

10.4.8-5 0

10.4R-1 16

Chapter 11 Tab - Chapter 11 Cover Sheet i 25 11-ii 21 11-iii 25

11-iv 21 11-v 14

Section 11.1 Tab - 11.1.1-1 0

11.1.1-2 19

11.1.1-3 16

11.1.1-4 19

11.1.1-5 16

11.1.2-1 13

11.1.2-2 13

11.1.2-3 20

11.1.2-4 16

11.1R-1 13 HBR 2 UPDATED FSAR Page Amendment/Revision Page Amendment/Revision EPL-25 Revision No. 27 Fig. 11.1.2-1 13 Fig. 11.1.2-2 13 Fig. 11.1.2-3 13 Fig. 11.1.2-4 13 Fig. 11.1.2-5 13 Fig. 11.1.2-6 13 11.1.3-1 17

Section 11.2 Tab - 11.2.1-1 21

11.2.1-1a 17

11.2.1-2 15

11.2.1-3 0

11.2.1-4 15

11.2.1-5 15

11.2.1-6 15

11.2.1-7 14

11.2.1-8 25

11.2.2-1 17

11.2.2-2 17

11.2.2-3 17

11.2.2-4 15

11.2.2-4a 25

11.2.3-1 27

11.2.3-2 15

Fig. 11.2.2-1 27 Fig. 11.2.2-2 23 Fig. 11.2.2-3 23 Fig. 11.2.2-4 23 Fig. 11.2.2-5 15 Section 11.3 Tab - 11.3.1-1 15 11.3.2-1 15E1

11.3.2-2 19

11.3.2-3 15

11.3.2-4 19

11.3.2-5 15

11.3.3-1 15E2

Fig. 11.3.2-1 17 Fig. 11.3.2-2 15 Section 11.4 Tab - 11.4.1-1 15

11.4.2-1 18

11.4.2-2 17

Section 11.5 Tab - 11.5.1-1 24

11.5.2-1 27

11.5.2-1a 25

11.5.2-2 13

11.5.2-3 10

11.5.2-4 22

11.5.2-4a 21

11.5.2-4b 10

11.5.2-5 16

11.5.2-6 27

11.5.2-6a 17

11.5.2-6b 25

11.5.2-6c 19

11.5.2-7 25

11.5.2-8 25

Chapter 12 Tab - Chapter 12 Cover Sheet i 21 12-ii 21 12-iii 16

12-iv 25 12-v 10 12-vi 19

Section 12.1 Tab - 12.1.1-1 27

12.1.1-2 27

12.1.1-3 26

12.1.1-4 18

12.1.2-1 0 12.1.3-1 18 12.1.3-2 17

Section 12.2 Tab - 12.2.0-1 19 HBR 2 UPDATED FSAR Page Amendment/Revision Page Amendment/Revision EPL-26 Revision No. 27 Section 12.3 Tab - 12.3.1-1 21 12.3.1-2 16

12.3.1-3 20

12.3.1-4 14

12.3.1-5 19

12.3.1-6 19

12.3.1-7 19

12.3.1-8 0

12.3.1-9 19

12.3.2-1 0

12.3.3-1 26

12.3.3-2 15

12.3.3-3 26

12.3.3-4 15

12.3.3-5 25

12.3.3-6 16

12.3.3-7 19

12.3.3-8 20

Section 12.4 Tab - 12.4.0-1 27

Section 12.5 Tab - 12.5.1-1 19

12.5.1-2 18

12.5.1-3 22

12.5.2-1 18

12.5.2-2 21

12.5.2-3 14

12.5.3-1 25

12.5.3-2 19

12.5.3-3 19

12.5.3-4 18

12.5.3-5 15

12.5.3-6 15

12.5.3-7 26

12.5.3-8 26

12.5.3-9 26

12.5.3-10 26

Fig. 12.5.2-1 26 Fig. 12.5.2-2 14 Chapter 13 Tab - Chapter 13 Cover Sheet i 21 13-ii 24 Section 13.1 Tab - 13.1.1-1 27

13.1.1-2 27

13.1.1-3 27

13.1.2-1 27

13.1.2-2 27

13.1.2-3 26

13.1.2-4 27

13.1.2-5 27

13.1.2-6 27

13.1.2-7 27

13.1.2-8 27

13.1.3-1 27

13.1R-1 23

Fig. 13.1.1-1 27 Fig. 13.1.2-1 27 Section 13.2 Tab - 13.2.1-1 15

13.2.2-1 25

13.2R-1 14

Section 13.3 Tab - 13.3.0-1 15

13.3R-1 13

Section 13.4 Tab - 13.4.0-1 15

Section 13.5 Tab - 13.5.0-1 27

Section 13.6 Tab - 13.6.0-1 21

Chapter 14 Tab - Chapter 14 Cover Sheet i 27 14-ii 0 14-iii 0 14-iv 0 14-v 0

HBR 2 UPDATED FSAR Page Amendment/Revision Page Amendment/Revision EPL-27 Revision No. 27 Section 14.1 Tab - 14.1.0-1 0

Section 14.2 Tab - 14.2.1-1 0

14.2.1-2 0

14.2.1-3 27

14.2.1-4 26

14.2.1-5 0

14.2.1-6 24

14.2.2-1 0

14.2.2-2 0

14.2.2-3 0

14.2.2-4 0

14.2.2-5 0

14.2.2-6 0

14.2.2-7 24

14.2.2-8 0

14.2.2-9 0

14.2.2-10 0

14.2.2-11 0

14.2.2-12 0

14.2.2-13 0

14.2.2-14 0

14.2.2-15 0

14.2.2-16 0

14.2.2-17 0

14.2.2-18 0

14.2.2-19 0

14.2.2-20 0

14.2.2-21 0

14.2.2-22 0

14.2.2-23 0

14.2.2-24 0

14.2.2-25 0

14.2.2-26 0

14.2.2-27 0

14.2.2-28 0

14.2.2-29 0

14.2.2-30 0

14.2.2-31 0

14.2.2-32 0

14.2.2-33 0

14.2.2-34 0

14.2.2-35 0 14.2.2-36 0

14.2.2-37 0

14.2.2-38 0

14.2.2-39 0

14.2.2-40 0

14.2.2-41 0

14.2.3-1 0

14.2.4-1 0

14.2.4-2 24

14.2.5-1 0

14.2.6-1 0

14.2.6-2 0

14.2.6-3 0

14.2.6-4 0

14.2.6-5 0

14.2.6-6 0

14.2.6-7 0

14.2.6-8 0

14.2.6-9 0

14.2.6-10 0

14.2.6-11 24

14.2.6-12 0

14.2.6-13 24

14.2.6-14 0

Fig. 14.2.2-1 0

Section 14.3 Tab

-

14.3.0-1 0

Chapter 15 Tab - Chapter 15 Cover Sheet i 20 15-ii 21 15-iii 15

15-iv 20 15-v 21 15-vi 21 15-vii 21

15-viii 21

15-ix 23 15-ixa 21

15-x 22 15-xi 24 15-xii 22

HBR 2 UPDATED FSAR Page Amendment/Revision Page Amendment/Revision EPL-28 Revision No. 27 15-xiii 22 15-xiv 25 15-xiva 17

15-xv 17 15-xvi 22 15-xvii 24

15-xviii 24

15-xix 22

Section 15.0 Tab - 15.0.1-1 15

15.0.1-2 21

15.0.1-3 14

15.0.1-4 17

15.0.2-1 26

15.0.2-2 25

15.0.2-3 25

15.0.3-1 25

15.0.3-2 26

15.0.4-1 19

15.0.4-2 26

15.0.4-3 27

15.0.5-1 26

15.0.5-2 25

15.0.6-1 13

15.0.7-1 25

15.0.7-2 25

15.0.7-3 19

15.0.8-1 3

15.0.8-2 25

15.0.8-2a 25

15.0.9-1 3

15.0.9-2 17

15.0.9-3 17

15.0.9-4 14

15.0.9-5 17

15.0.10-1 26

15.0.11-1 3

15.0.11-2 17 15.0.11-3 17

15.0.11-4 22

15.0.11-5 17

15.0.12-1 20

15.0.12-2 20

15.0.12-3 20

15.0.12-4 20

15.0.12-5 20

15.0.12-6 25

15.0.12-7 20

15.0R-1 24

15.0R-2 20

Fig. 15.0.3-1 27 Fig. 15.0.6-1 3

Section 15.1 Tab -

15.1.0-1 0

15.1.1-1 19

15.1.2-1 25

15.1.3-1 22

15.1.3-2 26

15.1.3-3 27

15.1.3-4 27

15.1.4-1 19

15.1.5-1 24

15.1.5-2 24

15.1.5-3 25

15.1.5-4 26

15.1.5-5 27

15.1.5-5a 22

15.1.5-5b 25

15.1.5-6 22

15.1.5-6a 24

15.1.5-7 22

15.1.5-8 22

15.1.5-9 27

15.1.5-10 26

15.1.5-10a 17

HBR 2 UPDATED FSAR Page Amendment/Revision Page Amendment/Revision EPL-29 Revision No. 27 15.1.5-11 27 15.1.5-12 27

15.1.5-13 16

15.1R-1 27

Fig. 15.1.3-1 22 Fig. 15.1.3-2 22 Fig. 15.1.3-3 22 Fig. 15.1.3-4 22 Fig. 15.1.3-5 22 Fig. 15.1.3-6 22 Fig. 15.1.3-7 22 Fig. 15.1.5-1 13 Fig. 15.1.5-2 13 Fig. 15.1.5-3 26 Fig. 15.1.5-4 26 Fig. 15.1.5-5 26 Fig. 15.1.5-6 26 Fig. 15.1.5-7 26 Fig. 15.1.5-8 26 Fig. 15.1.5-9 26 Fig. 15.1.5-10 26 Fig. 15.1.5-11 26 Fig. 15.1.5-12 Deleted 22 Fig. 15.1.5-13 26 Fig. 15.1.5-14 26 Fig. 15.1.5-15 27 Fig. 15.1.5-16 27 Fig. 15.1.5-17 27 Section 15.2 Tab - 15.2.0-1 14

15.2.1-1 0

15.2.2-1 27

15.2.2-2 26

15.2.2-3 27

15.2.2-3a 27

15.2.2-4 25

15.2.2-4a 27

15.2.3-1 3

15.2.4-1 19

15.2.5-1 19 15.2.6-1 19

15.2.7-1 15

15.2.7-2 18

15.2.7-3 19

15.2.7-4 15

15.2.7-5 27

15.2.8-1 19

15.2R-1 20

Fig. 15.2.2-1 18 Fig. 15.2.2-1a 25 Fig. 15.2.2-2 17 Fig. 15.2.2-2a 25 Fig. 15.2.2-3 17 Fig. 15.2.2-3a 25 Fig. 15.2.2-4 17 Fig. 15.2.2-4a 25 Fig. 15.2.2-5 17 Fig. 15.2.2-5a 25 Fig. 15.2.2-6 18 Fig. 15.2.2-7 15 Fig. 15.2.2-8 15 Fig. 15.2.2-9 15 Fig. 15.2.2-10 17 Fig. 15.2.2-11 15 Fig. 15.2.2-12 17 Fig. 15.2.7-1 18 Fig. 15.2.7-2 13 Fig. 15.2.7-3 13 Fig. 15.2.7-4 13 Fig. 15.2.7-5 13 Fig. 15.2.7-6 13 Fig. 15.2.7-7 13 Fig. 15.2.7-8 18 Fig. 15.2.7-9 13 Fig. 15.2.7-10 13 Fig. 15.2.7-11 13 Fig. 15.2.7-12 13 Fig. 15.2.7-13 13 Fig. 15.2.7-14 13 HBR 2 UPDATED FSAR Page Amendment/Revision Page Amendment/Revision EPL-30 Revision No. 27 Section 15.3 Tab - 15.3.1-1 14 15.3.1-2 26

15.3.1-3 27

15.3.1-4 27

15.3.2-1 15E2

15.3.2-2 27

15.3.2-3 20

15.3.2-3a 25

15.3.2-4 27

15.3.3-1 19

15.3R-1 20

Fig. 15.3.1-1 18 Fig. 15.3.1-2 13 Fig. 15.3.1-3 13 Fig. 15.3.1-4 13 Fig. 15.3.1-5 13 Fig. 15.3.1-6 17 Fig. 15.3.2-1 18 Fig. 15.3.2-2 15 Fig. 15.3.2-3 15 Fig. 15.3.2-4 15 Fig. 15.3.2-5 Deleted 15 Fig. 15.3.2-6 17 Section 15.4 Tab - 15.4.1-1 20

15.4.1-2 27

15.4.1-2a 27

15.4.1-3 27

15.4.2-1 19

15.4.2-2 26

15.4.2-3 27

15.4.2-4 27

15.4.3-1 22

15.4.3-2 22

15.4.3-3 27

15.4.3-3a 27

15.4.3-4 27

15.4.3-5 27

15.4.3-6 27

15.4.3-6a 22

15.4.3-7 27

15.4.4-1 3

15.4.5-1 3

15.4.6-1 25

15.4.6-2 26

15.4.6-2a 24

15.4.6-3 22

15.4.6-4 27

15.4.7-1 25

15.4.7-2 27

15.4.7-2a 27

15.4.8-1 22

15.4.8-2 20

15.4.8-3 27

15.4.8-4 27

15.4.9-1 3

15.4R-1 26

Fig. 15.4.1-1 27 Fig. 15.4.1-2 18 Fig. 15.4.1-3 16 Fig. 15.4.1-4 17 Fig. 15.4.2-1 22 Fig. 15.4.2-2 22 Fig. 15.4.2-2a 22 Fig. 15.4.2-3 25 Fig. 15.4.2-4 25 Fig. 15.4.2-5 25 Fig. 15.4.2-6 25 Fig. 15.4.2-7 25 Fig. 15.4.2-8 25 Fig. 15.4.2-9 25 Fig. 15.4.3-1 22 Fig. 15.4.3-2 22 Fig. 15.4.3-3 Deleted 17 Fig. 15.4.3-4 22 Fig. 15.4.3-5 22 HBR 2 UPDATED FSAR Page Amendment/Revision Page Amendment/Revision EPL-31 Revision No. 27 Fig. 15.4.3-6 22 Fig. 15.4.3-7 22 Fig. 15.4.3-8 22 Fig. 15.4.3-9 22 Fig. 15.4.3-10 22 Fig. 15.4.3-11 22 Fig. 15.4.3-12 22 Fig. 15.4.8-1 18 Fig. 15.4.8-2 17 Fig. 15.4.8-3 17 Fig. 15.4.8-4 17 Section 15.5 Tab - 15.5.1-1 18

15.5.2-1 19

Section 15.6 Tab - 15.6.1-1 25

15.6.1-2 18

15.6.1-2a 27

15.6.1-3 27

15.6.2-1 24

15.6.2-2 26

15.6.2-3 24

15.6.2-3a 24

15.6.2-4 26

15.6.2-4a 18

15.6.2-5 26

15.6.2-6 24

15.6.2-7 27

15.6.2-8 24

15.6.3-1 20

15.6.3-2 20

15.6.3-3 25

15.6.3-4 20

15.6.4-1 0

15.6.5-1 26

15.6.5-2 24

15.6.5-3 22

15.6.5-3a 26

15.6.5-4 22

15.6.5-5 21

15.6.5-6 21

15.6.5-7 21

15.6.5-8 25

15.6.5-9 21

15.6.5-10 26

15.6.5-10a 26

15.6.5-11 24

15.6.5-12 26

15.6.5-13 21

15.6.5-14 22

15.6R-1 24

15.6R-2 22

Fig. 15.6.1-1 18 Fig. 15.6.1-2 13 Fig. 15.6.1-3 13 Fig. 15.6.1-4 13 Fig. 15.6.2-1 Deleted 12 Fig. 15.6.2-2 Deleted 13 Fig. 15.6.2-3 7 Fig. 15.6.2-4 24 Fig. 15.6.2-5 24 Fig. 15.6.2-6 24 Fig. 15.6.2-7 24 Fig. 15.6.2-8 24 Fig. 15.6.2-9 24 Fig. 15.6.2-10 24 Fig. 15.6.5-1 Deleted 22 Fig. 15.6.5-2 Deleted 22 Fig. 15.6.5-3 24 Fig. 15.6.5-4 24 Fig. 15.6.5-5 24 Fig. 15.6.5-6 24 Fig. 15.6.5-7 24 Fig. 15.6.5-8 24 Fig. 15.6.5-9 24 Fig. 15.6.5-10 24 Fig. 15.6.5-11 Deleted 17 Fig. 15.6.5-12 Deleted 17 Fig. 15.6.5-13 Deleted 17 Fig. 15.6.5-14 Deleted 22 Fig. 15.6.5-15 Deleted 22 Fig. 15.6.5-16 24 Fig. 15.6.5-17 24 Fig. 15.6.5-18 Deleted 17 HBR 2 UPDATED FSAR Page Amendment/Revision Page Amendment/Revision EPL-32 Revision No. 27 Fig. 15.6.5-19 Deleted 17 Fig. 15.6.5-20 24 Fig. 15.6.5-21 24 Fig. 15.6.5-22 24 Fig. 15.6.5-23 Deleted 22 Fig. 15.6.5-24 Deleted 22 Fig. 15.6.5-25 24 Fig. 15.6.5-26 24 Fig. 15.6.5-27 24 Fig. 15.6.5-28 through 13 Fig. 15.6.5-32 Deleted Fig. 15.6.5-33 24 Section 15.7 Tab - 15.7.1-1 20

15.7.2-1 23

15.7.2-2 23

15.7.2-3 23

15.7.3-1 23

15.7.4-1 17

15.7.4-2 17

15.7.4-3 25

15.7.4-4 18

15.7.4-4a 26

15.7.4-5 18

15.7.4-5a 18

15.7.4-6 18

15.7.4-6a 18

15.7.4-7 18

15.7.4-8 18

15.7.5-1 16

15.7.5-1a 16

15.7.5-2 20

15.7.5-3 20

15.7.5-4 20

15.7.5-5 14

15.7.5-6 16

15.7.6-1 19

15.7R-1 20

Chapter 16 Tab - Chapter 16 Cover Sheet i 0

16.0.0-1 0

16.0R-1 0

Chapter 17 Tab - Chapter 17 Cover Sheet i 27 17-ii 27 17-iii 27

17-iv 27

Section 17.1 Tab - 17.1.0-1 27

17.1.1-1 27

17.1.2-1 27

17.1.2-2 27

17.1.2-3 27

17.1.2-4 27

17.1.2-5 27

17.1.2-6 27

17.1.2-7 27

17.1.3-1 27

17.1.3-2 27

17.1.3-3 27

17.1.3-4 27

17.1.3-5 27

17.1.3-6 27

17.1.3-7 27

17.1.3-8 27

17.1.3-9 27

17.1.3-10 27

17.1.3-11 27

17.1.3-12 27

17.1.3-13 27

17.1.3-14 27

17.1.3-15 27

HBR 2 UPDATED FSAR Page Amendment/Revision Page Amendment/Revision EPL-33 Revision No. 27 17.1.4-1 27 17.1.4-2 27

17.1.4-3 27

17.1.4-4 27

17.1.4-5 27

17.1.4-6 27

17.1.4-7 27

Fig. 17.1.3-1 27 Fig. 17.1.3-2 27 Fig. 17.1.4-1 27 Fig. 17.1.4-2 27 Fig. 17.1.4-3 27 Section 17.2 Tab - 17.2.0-1 Deletion Sheet 13 Section 17.3 Tab - 17.3.1-1 27

Chapter 18 Tab i 23 18-ii 23 18-iii 27

18-iv 23

Section 18.1 Tab

18.1-1 26

18.1-2 23

18.1-3 23

18.1-4 26

18.1-5 25

18.1-6 23

18.1-7 23

18.1-8 27

18.1-9 23

18.1-10 27

18.1-11 27

18.1-12 27

18.1-13 27

18.1-14 27

18.1-15 27

18.1-16 23

18.1R-1 23 Section 18.2 Tab

18.2-1 23

18.2-2 27

18.2-3 23

18.2-4 26

18.2-5 23

18.2-6 23

18.2-7 23

18.2R-1 23

HBR 2 UPDATED FSAR

GENERAL TABLE OF CONTENTS HBRSEP Unit No. 2 i Revision No. 27 SECTION TITLE PAGE

1.0 INTRODUCTION

AND GENERAL DESCRIPTION OF PLANT 1.1.0-1

1.1 INTRODUCTION

1.1.0-1

1.2 GENERAL

PLANT DESCRIPTION 1.2.1-1

1.2.1 SITE AND ENVIRONMENT 1.2.1-1

1.2.2

SUMMARY

PLANT DESCRIPTION 1.2.2-1

1.3 COMPARISON

TABLES 1.3.1-1

1.4 IDENTIFICATION

OF CONTRACTORS 1.4.0-1

1.5 REQUIREMENTS

FOR FURTHER TECHNICAL INFORMATION 1.5.1-1

1.5.1 DELETED

BY AMENDMENT NO. 11

1.5.2 SAFETY

INJECTION SYSTEM DESIGN 1.5.2-1

1.5.3 SYSTEMS

FOR REACTOR CONTROL DURING XENON INSTABILITIES 1.5.3-1

1.5.4 CONTAINMENT

SPRAY ADDITIVE FOR IODINE REMOVAL 1.5.4-1

1.5.5 BLOWDOWN

CAPABILITY OF REACTOR INTERNALS 1.5.5-1

1.5.6 PROGRAMS

CONDUCTED DURING OPERATION 1.5.6-1

1.6 MATERIAL

INCORPORATED BY REFERENCE 1.6.0-1

1.7 DRAWINGS

AND OTHER DETAILED INFORMATION 1.7.0-1

1.8 CONFORMANCE

TO NRC REGULATORY GUIDES 1.8.0-1

2.0 SITE CHARACTERISTICS 2.0-1

On April 29, 2013, the name Carolina Power and Light Company (CP&L) was changed to

Duke Energy Progress, Inc. (DEP). On Sept ember 13, 2016, the name Duke Energy Progress, Inc. was changed to Duke Energy Progress, LLC.

HBR 2 UPDATED FSAR

GENERAL TABLE OF CONTENTS HBRSEP Unit No. 2 ii Revision No. 27 SECTION TITLE PAGE

2.1 GEOGRAPHY

AND DEMOGRAPHY 2.1.1-1

2.1.1 SITE LOCATION AND DESCRIPTION 2.1.1-1

2.1.2 EXCLUSION

AREA AUTHORITY AND CONTROL 2.1.2-1

2.1.3 POPULATION

DISTRIBUTION 2.1.3-1

2.2 NEARBY

INDUSTRIAL, TRANSPORTATIONS, AND MILITARY FACILITIES 2.2.1-1

2.2.1 LOCATIONS

AND ROUTES 2.2.1-1

2.

2.2 DESCRIPTION

S 2.2.2-1

2.3 METEOROLOGY

2.3.1-1

2.3.1 REGIONAL

CLIMATOLOGY 2.3.1-1

2.3.2 LOCAL

METEOROLOGY 2.3.2-1

2.3.3 ONSITE

METEOROLOGICAL MEASUREMENTS PROGRAM 2.3.3-1

2.3.4 DIFFUSION

ESTIMATES 2.3.4-1

2.4 HYDROLOGIC

ENGINEERING 2.4.1-1

2.4.1 HYDROLOGIC

DESCRIPTION 2.4.1-1

2.4.2 FLOODS

2.4.2-1

2.4.3 PROBABLE

MAXIMUM FLOOD (PMF) ON STREAMS AND RIVERS 2.4.3-1

2.4.4 COOLING

WATER CANALS AND RESERVOIRS 2.4.4-1

2.4.5 LOW WATER CONSIDERATIONS 2.4.5-1

2.4.6 DISPERSION, DILUTION, AND TRAVEL TIMES OF ACCIDENTAL RELEASES OF LIQUID EFFLUENTS IN SURFACE WATER 2.4.6-1

2.4.7 GROUND

WATER 2.4.7-1

On April 29, 2013, the name Carolina Power and Light Company (CP&L) was changed to

Duke Energy Progress, Inc. (DEP). On Septem ber 13, 2016, the name Duke Energy Progress, Inc. was changed to Duke Energy Progress, LLC.

HBR 2 UPDATED FSAR

GENERAL TABLE OF CONTENTS HBRSEP Unit No. 2 iii Revision No. 27 SECTION TITLE PAGE

2.5 GEOLOGY, SEISMOLOGY, AND GEOTECHNICAL ENGINEERING 2.5.1-1

2.5.1 BASIC

GEOLOGIC AND SEISMIC INFORMATION 2.5.1-1

2.5.2 VIBRATORY

GROUND MOTIONS 2.5.2-1

2.5.3 SURFACE

FAULTING 2.5.3-1

2.5.4 STABILITY

OF SUBSURFACE MATERIALS AND FOUNDATIONS 2.5.4-1

2.5.5 STABILITY

OF SLOPES 2.5.5-1

2.5A APPENDIX 2.5A - GENERAL GEOLOGY AND SEISMICITY OF SOUTH CAROLINA Tab 2.5A-1

2.5B APPENDIX 2.5B - SITE ENVIRONMENTAL STUDIES ADDITIONAL FIELD INVESTIGATION PROPOSED NUCLEAR POWER PLANT HARTSVILLE, SOUTH CAROLINA Tab 2.5B-1

2.5C APPENDIX 2.5C - GEOLOGICAL ANALYSIS FOR THE SITE FOR H. B. ROBINSON UNIT NO. 2 NUCLEAR POWER PLANT AT HARTSVILLE, SOUTH CAROLINA Tab 2.5C-1

2.5D APPENDIX 2.5D - REPORT ON THE HARTSVILLE SITE EARTHQUAKE HAZARD Tab 2.5D-1

2.5E APPENDIX 2.5E - DR. HOUSNER LETTER, JULY 22, 1966, RECOMMENDED EARTHQUAKE DESIGN SPECTRUM Tab 2.5E-1

3.0 DESIGN

OF STRUCTURES, COMPONENTS, EQUIPMENT, AND SYSTEMS 3.1.1-1

3.1 CONFORMANCE

WITH GENERAL DESIGN CRITERIA 3.1.1-1

3.

1.1 INTRODUCTION

AND

SUMMARY

3.1.1-1

3.1.2 EVALUATION

PER GENERAL DESIGN CRITERIA 3.1.2-1

On April 29, 2013, the name Carolina Power and Light Company (CP&L) was changed to

Duke Energy Progress, Inc. (DEP). On Sept ember 13, 2016, the name Duke Energy Progress, Inc. was changed to Duke Energy Progress, LLC.

HBR 2 UPDATED FSAR

GENERAL TABLE OF CONTENTS HBRSEP Unit No. 2 iv Revision No. 27 SECTION TITLE PAGE

3.2 CLASSIFICATION

OF STRUCTURES, COMPONENTS, AND SYSTEMS 3.2.1-1

3.2.1 SEISMIC

CLASSIFICATION 3.2.1-1

3.2.2 SYSTEM

QUALITY GROUP CLASSIFICATION 3.2.2-1

3.3 WIND AND TORNADO LOADINGS 3.3.1-1

3.3.1 WIND LOADINGS 3.3.1-1

3.3.2 TORNADO

LOADINGS 3.3.2-1

3.4 WATER

LEVEL (FLOOD) DESIGN 3.4.0-1

3.5 MISSILE

PROTECTION 3.5.0-1

3.5.1 MISSILE

SELECTION AND DESCRIPTION 3.5.1-1

3.5.2 STRUCTURES, SYSTEMS AND COMPONENTS TO BE PROTECTED FROM EXTERNALLY GENERATED MISSILES 3.5.2-1

3.6 PROTECTION

AGAINST DYNAMIC EFFECTS ASSOCIATED WITH THE POSTULATED RUPTURE OF PIPING 3.6.1-1

3.6.1 POSTULATED

PIPING FAILURES IN FLUID SYSTEMS INSIDE CONTAINMENT 3.6.1-1

3.6.2 POSTULATED

PIPING FAILURES IN FLUID SYSTEMS OUTSIDE OF CONTAINMENT 3.6.2-1

3.7 SEISMIC

DESIGN 3.7.1-1

3.7.1 SEISMIC

INPUT 3.7.1-1

3.7.2 SEISMIC

SYSTEM ANALYSIS 3.7.2-1

3.7.3 SEISMIC

SUBSYSTEM ANALYSIS 3.7.3-1

3.7.4 SEISMIC

INSTRUMENTATION 3.7.4-1

On April 29, 2013, the name Carolina Power and Light Company (CP&L) was changed to

Duke Energy Progress, Inc. (DEP). On Sept ember 13, 2016, the name Duke Energy Progress, Inc. was changed to Duke Energy Progress, LLC.

HBR 2 UPDATED FSAR

GENERAL TABLE OF CONTENTS HBRSEP Unit No. 2 v Revision No. 27 SECTION TITLE PAGE

3.8 DESIGN

OF CATEGORY I STRUCTURES 3.8.1-1

3.8.1 CONCRETE

CONTAINMENT 3.8.1-1

3.8.2 STEEL

CONTAINMENT 3.8.2-1

3.8.3 CONCRETE

AND STRUCTURAL STEEL INTERNAL STRUCTURES OF THE CONCRETE CONTAINMENT 3.8.3-1

3.8.4 OTHER

SEISMIC CATEGORY I STRUCTURES 3.8.4-1

3.8.5 FOUNDATIONS

3.8.5-1

3.9 MECHANICAL

SYSTEMS AND COMPONENTS 3.9.1-1

3.9.1 SPECIAL

TOPICS FOR MECHANICAL SYSTEMS 3.9.1-1

3.9.2 DYNAMIC

TESTING AND ANALYSIS 3.9.2-1

3.9.3 AMERICAN

SOCIETY OF MECHANICAL ENGINEERS (ASME)

CODE CLASS 1, 2, AND 3 COMPONENTS, COMPONENT SUPPORTS, AND CORE SUPPORT STRUCTURES 3.9.3-1

3.9.4 CONTROL

ROD DRIVE SYSTEM (CRDS) 3.9.4-1

3.9.5 REACTOR

PRESSURE VESSEL INTERNALS 3.9.5-1

3.9.6 IN-SERVICE TESTING OF PUMPS AND VALVES 3.9.6-1

3.10 SEISMIC QUALIFICATION OF SEISMIC CATEGORY I INSTRUMENTATION AND ELECTRICAL EQUIPMENT 3.10.0-1

3.11 ENVIRONMENTAL DESIGN OF MECHANICAL AND ELECTRICAL EQUIPMENT 3.11.1-1

3.11.0 GENERAL 3.11.1-1

3.11.1 EQUIPMENT IDENTIFICATION AND ENVIRONMENTAL CONDITIONS 3.11.1-2

3.11.2 QUALIFICATION TESTS AND ANALYSIS 3.11.2-1

3.11.3 QUALIFICATION TESTS RESULTS 3.11.3-1

On April 29, 2013, the name Carolina Power and Light Company (CP&L) was changed to

Duke Energy Progress, Inc. (DEP). On Sept ember 13, 2016, the name Duke Energy Progress, Inc. was changed to Duke Energy Progress, LLC.

HBR 2 UPDATED FSAR

GENERAL TABLE OF CONTENTS HBRSEP Unit No. 2 vi Revision No. 27 SECTION TITLE PAGE 3.11.4 LOSS OF VENTILATION 3.11.4-1

3.11.5 ESTIMATED CHEMICAL AND RADIATION ENVIRONMENT 3.11.5-1

4.0 REACTOR

4.1.1-1

4.1

SUMMARY

DESCRIPTION 4.1.1-1

4.1.1 GENERAL

DESCRIPTION OF CORE 4.1.1-1

4.1.2 GENERAL

DESCRIPTION OF FUEL 4.1.2-1

4.2 FUEL SYSTEM DESIGN 4.2.1-1

4.2.1 DESIGN

BASES 4.2.1-1

4.2.2 DESIGN

DESCRIPTION 4.2.2-1

4.2.3 MECHANICAL

DESIGN EVALUATION 4.2.3-1

4.2.4 TESTING

AND INSPECTION PLAN 4.2.4-1

4.3 NUCLEAR

DESIGN 4.3.1-1

4.3.1 DESIGN

BASIS 4.3.1-1

4.

3.2 DESCRIPTION

4.3.2-1

4.3.3 ANALYTICAL

METHODS 4.3.3-1

4.4 THERMAL

AND HYDRAULIC DESIGN 4.4.1-1

4.4.1 DESIGN

BASES 4.4.1-1

4.

4.2 DESCRIPTION

4.4.2-1

4.4.3 INSTRUMENTATION

REQUIREMENTS 4.4.3-1

4.5 REACTOR

MATERIALS 4.5.1-1

4.5.1 CONTROL

ROD DRIVE SYSTEM STRUCTURAL MATERIALS 4.5.1-1

4.5.2 REACTOR

INTERNALS MATERIALS 4.5.2-1

On April 29, 2013, the name Carolina Power and Light Company (CP&L) was changed to

Duke Energy Progress, Inc. (DEP). On Sept ember 13, 2016, the name Duke Energy Progress, Inc. was changed to Duke Energy Progress, LLC.

HBR 2 UPDATED FSAR

GENERAL TABLE OF CONTENTS HBRSEP Unit No. 2 vii Revision No. 27 SECTION TITLE PAGE

4.6 FUNCTIONAL

DESIGN OF REACTIVITY CONTROL SYSTEMS 4.6.0-1

5.0 REACTOR

COOLANT SYSTEM AND CONNECTED SYSTEMS 5.1.0-1

5.1

SUMMARY

DESCRIPTION 5.1.0-1

5.1.1 SCHEMATIC

FLOW DIAGRAM 5.1.1-1

5.1.2 PIPING

AND INSTRUMENTATION DIAGRAM 5.1.2-1

5.1.3 ELEVATION

DRAWING 5.1.3-1

5.2 INTEGRITY

OF REACTOR COOLANT PRESSURE BOUNDARY 5.2.1-1

5.2.1 COMPLIANCE

WITH CODE 5.2.1-1

5.2.2 OVERPRESSURIZATION

PROTECTION 5.2.2-1

5.2.3 REACTOR

COOLANT BOUNDARY MATERIALS 5.2.3-1

5.2.4 IN-SERVICE INSPECTION AND TESTING OF REACTOR COOLANT PRESSURE BOUNDARY 5.2.4-1

5.2.5 DETECTION

OF LEAKAGE THROUGH REACTOR COOLANT PRESSURE BOUNDARY 5.2.5-1

5.3 REACTOR

VESSEL 5.3.0-1

5.3.1 REACTOR

VESSEL MATERIALS 5.3.1-1

5.3.2 PRESSURE

- TEMPERATURE LIMITS 5.3.2-1

5.4 COMPONENT

AND SUBSYSTEM DESIGN 5.4.1-1

5.4.1 REACTOR

COOLANT PUMPS 5.4.1-1

5.4.2 STEAM

GENERATORS 5.4.2-1

On April 29, 2013, the name Carolina Power and Light Company (CP&L) was changed to

Duke Energy Progress, Inc. (DEP). On Sept ember 13, 2016, the name Duke Energy Progress, Inc. was changed to Duke Energy Progress, LLC.

HBR 2 UPDATED FSAR

GENERAL TABLE OF CONTENTS HBRSEP Unit No. 2 viii Revision No. 27 SECTION TITLE PAGE

5.4.3 REACTOR

COOLANT PIPING 5.4.3-1

5.4.4 RESIDUAL

HEAT REMOVAL SYSTEM 5.4.4-1

5.4.5 MAIN STEAM LINE AND FEEDWATER PIPING 5.4.5-1

5.4.6 PRESSURIZER

5.4.6-1

5.4.7 PRESSURIZER

RELIEF DISCHARGE SYSTEM 5.4.7-1

5.4.8 VALVES

5.4.8-1

5.4.9 SAFETY

AND RELIEF VALVES 5.4.9-1

5.4.10 REACTOR COOLANT GAS VENT SYSTEM 5.4.10-1

6.0 ENGINEERED

SAFETY FEATURES 6.0-1

6.1 ENGINEERED

SAFETY FEATURES MATERIALS 6.1.1-1

6.1.1 METALLIC

MATERIALS 6.1.1-1

6.1.2 ORGANIC

MATERIALS 6.1.2-1

6.2 CONTAINMENT

SYSTEMS 6.2.1-1

6.2.1 CONTAINMENT

FUNCTIONAL DESIGN 6.2.1-1

6.2.2 CONTAINMENT

HEAT REMOVAL SYSTEMS 6.2.2-1

6.2.3 SECONDARY

CONTAINMENT FUNCTIONAL DESIGN 6.2.3-1

6.2.4 CONTAINMENT

ISOLATION SYSTEM (CIS) 6.2.4-1

6.2.5 COMBUSTIBLE

GAS CONTROL IN CONTAINMENT 6.2.5-1

6.2.6 CONTAINMENT

LEAKAGE TESTING 6.2.6-1

6.3 EMERGENCY

CORE COOLING SYSTEM 6.3.1-1

6.3.1 DESIGN

BASES 6.3.1-1

On April 29, 2013, the name Carolina Power and Light Company (CP&L) was changed to

Duke Energy Progress, Inc. (DEP). On Sept ember 13, 2016, the name Duke Energy Progress, Inc. was changed to Duke Energy Progress, LLC.

HBR 2 UPDATED FSAR

GENERAL TABLE OF CONTENTS HBRSEP Unit No. 2 ix Revision No. 27 SECTION TITLE PAGE

6.3.2 SYSTEM

DESIGN 6.3.2-1

6.3.3 PERFORMANCE

EVALUATION 6.3.3-1

6.3.4 TESTS

AND INSPECTIONS 6.3.4-1

6.3.5 INSTRUMENTATION

REQUIREMENTS 6.3.5-1

6.4 HABITABILITY

SYSTEM 6.4.1-1

6.4.1 DESIGN

BASES 6.4.1-1

6.4.2 SYSTEM

DESIGN 6.4.2-1

6.4.3 SYSTEM

OPERATIONAL PROCEDURES 6.4.3-1

6.4.4 DESIGN

EVALUATIONS 6.4.4-1

6.4.5 TESTING

AND INSPECTION 6.4.5-1

6.4.6 INSTRUMENTATION

REQUIREMENTS 6.4.6-1

6.5 FISSION

PRODUCT REMOVAL AND CONTROL SYSTEMS 6.5.1-1

6.5.1 ENGINEERED

SAFETY FEATURE (ESF) FILTER SYSTEMS 6.5.1-1

6.5.2 CONTAINMENT

SPRAY SYSTEMS 6.5.2-1

6.5.3 FISSION

PRODUCT CONTROL SYSTEMS 6.5.3-1

6.6 IN-SERVICE INSPECTION OF CLASS 2 AND 3 COMPONENTS 6.6.0-1

6.7 MAIN STEAM LINE ISOLATION VALVE LEAKAGE CONTROL SYSTEM (MSIV-LCS) 6.7.0-1

6.8 ISOLATION

VALVE SEAL WATER SYSTEM 6.8.1-1

6.8.1 DESIGN

BASIS 6.8.1-1

On April 29, 2013, the name Carolina Power and Light Company (CP&L) was changed to

Duke Energy Progress, Inc. (DEP). On Sept ember 13, 2016, the name Duke Energy Progress, Inc. was changed to Duke Energy Progress, LLC.

HBR 2 UPDATED FSAR

GENERAL TABLE OF CONTENTS HBRSEP Unit No. 2 x Revision No. 27 SECTION TITLE PAGE

6.8.2 SYSTEM

DESIGN 6.8.2-1

6.8.3 DESIGN

EVALUATION 6.8.3-1

6.8.4 TESTS

AND INSPECTION 6.8.4-1

6.8.5 INSTRUMENTATION

REQUIREMENTS 6.8.5-1

6.9 CONTAINMENT

PENETRATION PRESSURIZATION SYSTEM 6.9.1-1

6.9.1 DESIGN

BASES 6.9.1-1

6.9.2 SYSTEM

DESIGN 6.9.2-1

6.9.3 DESIGN

EVALUATION 6.9.3-1

6.9.4 INSPECTIONS

AND TESTS 6.9.4-1

7.0 INSTRUMENTATION

AND CONTROLS 7.1.0-1

7.1 INTRODUCTION

7.1.0-1

7.2 REACTOR

TRIP SYSTEM 7.2.1-1

7.

2.1 DESCRIPTION

7.2.1-1

7.2.2 ANALYSIS

7.2.2-1

7.3 ENGINEERED

SAFETY FEATURE SYSTEMS 7.3.1-1

7.

3.1 DESCRIPTION

7.3.1-1

7.3.2 ANALYSIS

7.3.2-1

7.4 SYSTEMS

REQUIRED FOR SAFE SHUTDOWN 7.4.1-1

7.

4.1 DESCRIPTION

7.4.1-1

7.4.2 ANALYSIS

7.4.2-1

On April 29, 2013, the name Carolina Power and Light Company (CP&L) was changed to

Duke Energy Progress, Inc. (DEP). On Sept ember 13, 2016, the name Duke Energy Progress, Inc. was changed to Duke Energy Progress, LLC.

HBR 2 UPDATED FSAR

GENERAL TABLE OF CONTENTS HBRSEP Unit No. 2 xi Revision No. 27 SECTION TITLE PAGE 7.5 SAFETY-RELATED DISPLAY INSTRUMENTATION 7.5.1-1

7.

5.1 DESCRIPTION

7.5.1-1

7.5.2 ANALYSIS

7.5.2-1

7.6 ALL OTHER INSTRUMENTATION REQUIRED FOR SAFETY 7.6.1-1

7.6.1 REACTOR

OVERPRESSURE PROTECTION 7.6.1-1

7.6.2 CONTAINMENT

AIR RECIRCULATION SYSTEM 7.6.2-1

7.7 CONTROL

SYSTEMS NOT REQUIRED FOR SAFETY 7.7.1-1

7.

7.1 DESCRIPTION

7.7.1-1

7.7.2 ANALYSIS

7.7.2-1

8.0 ELECTRIC

POWER 8.1.1-1

8.1 INTRODUCTION

8.1.1-1

8.1.1 NETWORK

INTERCONNECTIONS 8.1.1-1

8.1.2 POWER

DISTRIBUTION SYSTEM 8.1.2-1

8.1.3 SAFETY

LOADS 8.1.3-1

8.2 OFFSITE

POWER SYSTEM 8.2.1-1

8.

2.1 DESCRIPTION

8.2.1-1

8.2.2 ANALYSIS

8.2.2-1

8.3 ONSITE

POWER SYSTEMS 8.3.1-1

8.3.1 AC POWER SYSTEMS 8.3.1-1

8.3.2 DC POWER SYSTEM (125 VOLT) 8.3.2-1

8.3.3 FIRE PROTECTION FOR CABLE SYSTEMS 8.3.3-1

On April 29, 2013, the name Carolina Power and Light Company (CP&L) was changed to

Duke Energy Progress, Inc. (DEP). On Sept ember 13, 2016, the name Duke Energy Progress, Inc. was changed to Duke Energy Progress, LLC.

HBR 2 UPDATED FSAR

GENERAL TABLE OF CONTENTS HBRSEP Unit No. 2 xii Revision No. 27 SECTION TITLE PAGE

9.0 AUXILIARY

SYSTEMS 9.1.1-1

9.1 FUEL STORAGE AND HANDLING 9.1.1-1

9.1.1 NEW FUEL STORAGE 9.1.1-1

9.1.2 SPENT

FUEL STORAGE 9.1.2-1

9.1.3 SPENT

FUEL POOL COOLING AND CLEANUP SYSTEM 9.1.3-1

9.1.4 FUEL HANDLING SYSTEM 9.1.4-1

9.1.5 CONTROL

OF HEAVY LOADS 9.1.5-1

9.2 WATER

SYSTEMS 9.2.1-1

9.2.1 SERVICE

WATER 9.2.1-1

9.2.2 COMPONENT

COOLING SYSTEM 9.2.2-1

9.2.3 PRIMARY

AND DEMINERALIZED WATER MAKEUP SYSTEM 9.2.3-1

9.2.4 ULTIMATE

HEAT SINK 9.2.4-1

9.2.5 CONDENSATE

STORAGE FACILITIES 9.2.5-1

9.3 PROCESS

AUXILIARIES 9.3.1-1

9.3.1 STATION

AND INSTRUMENT AIR SYSTEMS 9.3.1-1

9.3.2 PROCESS

SAMPLING SYSTEM 9.3.2-1

9.3.3 EQUIPMENT

AND FLOOR DRAINAGE SYSTEM 9.3.3-1

9.3.4 CHEMICAL

AND VOLUME CONTROL SYSTEM 9.3.4-1

9.4 AIR CONDITIONING, HEATING, COOLING, AND VENTILATION SYSTEM 9.4.1-1

9.4.1

SUMMARY

DESCRIPTION 9.4.1-1

9.4.2 CONTROL

ROOM AIR CONDITIONING SYSTEM 9.4.2-1

On April 29, 2013, the name Carolina Power and Light Company (CP&L) was changed to

Duke Energy Progress, Inc. (DEP). On Sept ember 13, 2016, the name Duke Energy Progress, Inc. was changed to Duke Energy Progress, LLC.

HBR 2 UPDATED FSAR

GENERAL TABLE OF CONTENTS HBRSEP Unit No. 2 xiii Revision No. 27 SECTION TITLE PAGE

9.4.3 REACTOR

CONTAINMENT BUILDING VENTILATION SYSTEM 9.4.3-1

9.4.4 REACTOR

AUXILIARY BUILDING VENTILATION SYSTEM 9.4.4-1

9.4.5 FUEL HANDLING BUILDING VENTILATION SYSTEM 9.4.5-1

9.4.6 TURBINE

BUILDING VENTILATION SYSTEM 9.4.6-1

9.4.7 RELAY

ROOM NO. 2 AND CABLE ROOM NO. 2 VENTILATION SYSTEM 9.4.7-1

9.4.8 ENGINEERED

SAFETY FEATURES VENTILATION SYSTEM 9.4.8-1

9.4.9 E&RC BUILDING HOOD EXHAUST SYSTEM 9.4.9-1

9.4.10 RADWASTE FACILITY 9.4.10-1

9.4.11 TECHNICAL SUPPORT CENTER/EMERGENCY OPERATIONS FACILITY VENTILATION SYSTEM 9.4.11-1

9.5 OTHER

AUXILIARY SYSTEMS 9.5.1-1

9.5.1 FIRE PROTECTION SYSTEM 9.5.1-1

9.5.2 COMMUNICATION

SYSTEMS 9.5.2-1

9.5.3 LIGHTING

SYSTEMS 9.5.3-1

9.5.1A FIRE HAZARDS ANALYSIS 9.5.1A-1

9.5.1B FIRE PROTECTION PROGRAM DESCRIPTION AND REVIEW PER APPENDIX A TO BTP APCSB 9.5-1 9.5.1B-1

9.5.1C POST-FIRE SAFE SHUTDOWN ANALYSIS REPORT 9.5.1C-1

9.5.1D REFERENCE DOCUMENTATION INDEX 9.5.1D-1

10.0 STEAM AND POWER CONVERSION SYSTEM 10.1.0-1

10.1

SUMMARY

DESCRIPTION 10.1.0-1

On April 29, 2013, the name Carolina Power and Light Company (CP&L) was changed to

Duke Energy Progress, Inc. (DEP). On Sept ember 13, 2016, the name Duke Energy Progress, Inc. was changed to Duke Energy Progress, LLC.

HBR 2 UPDATED FSAR

GENERAL TABLE OF CONTENTS HBRSEP Unit No. 2 xiv Revision No. 27 SECTION TITLE PAGE 10.2 TURBINE GENERATOR 10.2.1-1

10.2.1 DESIGN BASIS 10.2.1-1

10.

2.2 DESCRIPTION

10.2.2-1

10.2.3 TURBINE DISK INTEGRITY 10.2.3-1

10.2.4 EVALUATION 10.2.4-1

10.3 MAIN STEAM SUPPLY STEAM 10.3.1-1

10.3.1 DESIGN BASIS 10.3.1-1

10.3.2 SYSTEM DESCRIPTION 10.3.2-1

10.3.3 EVALUATION 10.3.3-1

10.3.4 INSPECTION AND TESTING REQUIREMENTS 10.3.4-1

10.3.5 WATER CHEMISTRY 10.3.5-1

10.3.6 STEAM AND FEEDWATER SYSTEM MATERIALS 10.3.6-1

10.4 OTHER FEATURES OF THE STEAM AND POWER CONVERSION SYSTEM 10.4.1-1

10.4.1 MAIN CONDENSER 10.4.1-1

10.4.2 MAIN CONDENSER EVACUATION SYSTEM 10.4.2-1

10.4.3 TURBINE GLAND SEALING SYSTEM 10.4.3-1

10.4.4 STEAM DUMP SYSTEM 10.4.4-1

10.4.5 CIRCULATING WATER SYSTEM 10.4.5-1

10.4.6 CONDENSATE AND FEEDWATER SYSTEM 10.4.6-1

10.4.7 STEAM GENERATOR BLOWDOWN AND WET LAYUP SYSTEM 10.4.7-1

10.4.8 AUXILIARY FEEDWATER SYSTEM 10.4.8-1

On April 29, 2013, the name Carolina Power and Light Company (CP&L) was changed to

Duke Energy Progress, Inc. (DEP). On Sept ember 13, 2016, the name Duke Energy Progress, Inc. was changed to Duke Energy Progress, LLC.

HBR 2 UPDATED FSAR

GENERAL TABLE OF CONTENTS HBRSEP Unit No. 2 xv Revision No. 27 SECTION TITLE PAGE 11.0 RADIOACTIVE WASTE MANAGEMENT 11.1.1-1

11.1 SOURCE TERMS 11.1.1-1

11.1.1 REACTOR COOLANT ACTIVITIES 11.1.1-1

11.1.2 TRITIUM 11.1.2-1

11.1.3 LEAKAGE PREVENTION 11.1.3-1

11.2 LIQUID WASTE MANAGEMENT SYSTEMS 11.2.1-1

11.2.1 DESIGN BASES 11.2.1-1

11.2.2 SYSTEM DESCRIPTION 11.2.2-1

11.2.3 RADIOACTIVE RELEASES 11.2.3-1

11.3 GASEOUS WASTE MANAGEMENT SYSTEMS 11.3.1-1

11.3.1 DESIGN BASIS 11.3.1-1

11.3.2 SYSTEM DESCRIPTION 11.3.2-1

11.3.3 RADIOACTIVE RELEASES 11.3.3-1

11.4 SOLID WASTE PROCESSING SYSTEM 11.4.1-1

11.4.1 DESIGN BASIS 11.4.1-1

11.4.2 SYSTEM DESCRIPTION 11.4.2-1

11.5 PROCESS AND EFFLUENT, RADIOLOGICAL MONITORING AND SAMPLING SYSTEMS 11.5.1-1

11.5.1 DESIGN BASIS 11.5.1-1

11.5.2 SYSTEM DESCRIPTION 11.5.2-1

12.0 RADIATION PROTECTION 12.1.1-1

On April 29, 2013, the name Carolina Power and Light Company (CP&L) was changed to

Duke Energy Progress, Inc. (DEP). On Sept ember 13, 2016, the name Duke Energy Progress, Inc. was changed to Duke Energy Progress, LLC.

HBR 2 UPDATED FSAR

GENERAL TABLE OF CONTENTS HBRSEP Unit No. 2 xvi Revision No. 27 SECTION TITLE PAGE 12.1 ENSURING THAT OCCUPATIONAL RADIATION EXPOSURES ARE AS LOW AS REASONABLY ACHIEVABLE (ALARA) 12.1.1-1

12.1.1 POLICY CONSIDERATIONS 12.1.1-1

12.1.2 DESIGN CONSIDERATIONS 12.1.2-1

12.1.3 OPERATIONAL CONSIDERATIONS 12.1.3-1

12.2 RADIATION SOURCES 12.2.0-1

12.3 RADIATION PROTECTION DESIGN FEATURES 12.3.1-1

12.3.1 SHIELDING 12.3.1-1

12.3.2 VENTILATION 12.3.2-1

12.3.3 AREA RADIATION AND AIRBORNE RADIOACTIVITY MONITORING INSTRUMENTATION 12.3.3-1

12.3.4 CRITICALITY MONITORS 12.3.4-1

12.4 DOSE ASSESSMENT 12.4.0-1

12.5 HEALTH PHYSICS PROGRAM 12.5.1-1

12.5.1 ORGANIZATION 12.5.1-1

12.5.2 EQUIPMENT, INSTRUMENTATION, AND FACILITIES 12.5.2-1

12.5.3 PROCEDURES 12.5.3-1

13.0 CONDUCT OF OPERATIONS 13.1.1-1

13.1 ORGANIZATIONAL STRUCTURE OF APPLICANT 13.1.1-1

13.1.1 MANAGEMENT AND TECHNICAL SUPPORT ORGANIZATION 13.1.1-1

13.1.2 OPERATING ORGANIZATION 13.1.2-1

13.1.3 QUALIFICATION OF NUCLEAR PLANT PERSONNEL 13.1.3-1

On April 29, 2013, the name Carolina Power and Light Company (CP&L) was changed to

Duke Energy Progress, Inc. (DEP). On Sept ember 13, 2016, the name Duke Energy Progress, Inc. was changed to Duke Energy Progress, LLC.

HBR 2 UPDATED FSAR

GENERAL TABLE OF CONTENTS HBRSEP Unit No. 2 xvii Revision No. 27 SECTION TITLE PAGE 13.2 TRAINING 13.2.1-1

13.2.1 ACCREDIATED TRAINING PROGRAMS 13.2.1-1

13.2.2 GENERAL EMPLOYEE AND FITNESS FOR DUTY TRAINING PROGRAMS 13.2.1-1

13.2.3 OTHER TRAINING PROGRAMS 13.2.1-1

13.3 EMERGENCY PLANNING 13.3.0-1

13.4 REVIEW AND AUDIT 13.4.0-1

13.5 PLANT PROCEDURES 13.5.0-1

13.6 INDUSTRIAL SECURITY 13.6.0-1

14.0 INITIAL TEST PROGRAM 14.1.0-1

14.1 SPECIFIC INFORMATION TO BE INCLUDED IN PRELIMINARY SAFETY ANALYSIS REPORTS 14.1.0-1

14.2 SPECIFIC INFORMATION TO BE INCLUDED IN FINAL SAFETY ANALYSIS REPORT 14.2.1-1

14.2.1

SUMMARY

OF TEST PROGRAM AND OBJECTIVES 14.2.1-1

14.2.2 ORGANIZATION AND STAFFING 14.2.2-1

14.2.3 TEST PROCEDURES 14.2.3-1

14.2.4 CONDUCT OF TEST PROGRAM 14.2.4-1

14.2.5 REVIEW, EVALUATION, AND APPROVAL OF TEST RESULTS 14.2.5-1

14.2.6 INDIVIDUAL TEST DESCRIPTIONS 14.2.6-1

14.3 RESULTS OF STARTUP TEST PROGRAMS 14.3.0-1

On April 29, 2013, the name Carolina Power and Light Company (CP&L) was changed to

Duke Energy Progress, Inc. (DEP). On Sept ember 13, 2016, the name Duke Energy Progress, Inc. was changed to Duke Energy Progress, LLC.

HBR 2 UPDATED FSAR

GENERAL TABLE OF CONTENTS HBRSEP Unit No. 2 xviii Revision No. 27 SECTION TITLE PAGE 15.0 ACCIDENT ANALYSIS 15.0.1-1

15.0.1 CLASSIFICATION OF PLANT CONDITIONS 15.0.1-1

15.0.2 PLANT CHARACTERISTICS AND INITIAL CONDITIONS USED IN THE ACCIDENT ANALYSES 15.0.2-1

15.0.3 POWER DISTRIBUTION 15.0.3-1

15.0.4 RANGE OF PLANT OPERATING PARAMETERS AND STATES USED IN THE ANALYSIS 15.0.4-1

15.0.5 REACTIVITY COEFFICIENTS USED IN THE SAFETY ANALYSIS 15.0.5-1

15.0.6 RCCA INSERTION CHARACTERISTICS USED IN THE ANALYSIS 15.0.6-1

15.0.7 TRIP SETPOINTS AND TIME DELAYS 15.0.7-1

15.0.8 COMPONENT CAPACITIES AND SETPOINTS USED IN THE ANALYSIS 15.0.8-1

15.0.9 PLANT SYSTEMS AND COMPONENTS AVAILABLE FOR MITIGATION OF ACCIDENT EFFECTS 15.0.9-1

15.0.10 EFFECTS OF FUEL ASSEMBLY HYDRAULIC DESIGN AND FUEL ROD BOWING 15.0.10-1

15.0.11 SINGLE ACTIVE FAILURES 15.0.11-1

15.1 INCREASE IN HEAT REMOVAL BY THE SECONDARY SYSTEM 15.1.0-1

15.1.1 FEEDWATER SYSTEM MALFUNCTIONS THAT RESULT IN A DECREASE IN FEEDWATER TEMPERATURE 15.1.1-1

15.1.2 FEEDWATER SYSTEM MALFUNCTIONS THAT RESULT IN AN INCREASE IN FEEDWATER FLOW 15.1.2-1

On April 29, 2013, the name Carolina Power and Light Company (CP&L) was changed to

Duke Energy Progress, Inc. (DEP). On Sept ember 13, 2016, the name Duke Energy Progress, Inc. was changed to Duke Energy Progress, LLC.

HBR 2 UPDATED FSAR

GENERAL TABLE OF CONTENTS HBRSEP Unit No. 2 xix Revision No. 27 SECTION TITLE PAGE 15.1.3 INCREASE IN STEAM FLOW (EXCESS LOAD) 15.1.3-1

15.1.4 INADVERTENT OPENING OF A STEAM GENERATOR RELIEF OR POWER OPERATED RELIEF VALVE 15.1.4-1

15.1.5 MAIN STEAMLINE BREAK EVENT 15.1.5-1

15.2 DECREASE IN HEAT REMOVAL BY THE SECONDARY SYSTEM 15.2.0-1

15.2.1 STEAM PRESSURE REGULATOR MALFUNCTION OR FAILURE THAT RESULTS IN DECREASING STEAM FLOW 15.2.1-1

15.2.2 LOSS OF EXTERNAL ELECTRICAL LOAD 15.2.2-1

15.2.3 TURBINE TRIP 15.2.3-1

15.2.4 LOSS OF CONDENSER VACUUM AND OTHER EVENTS RESULTING IN TURBINE TRIP 15.2.4-1

15.2.5 INADVERTENT CLOSURE OF MAIN STEAM ISOLATION VALVES (MSIVS) 15.2.5-1

15.2.6 LOSS OF NON-EMERGENCY AC POWER TO THE STATION AUXILIARIES 15.2.6-1

15.2.7 LOSS OF NORMAL FEEDWATER FLOW 15.2.7-1

15.2.8 FEEDWATER SYSTEM PIPE BREAK 15.2.8-1

15.3 DECREASE IN REACTOR COOLANT SYSTEM (RCS) FLOW RATE 15.3.1-1

15.3.1 LOSS OF FORCED REACTOR COOLANT FLOW 15.3.1-1

15.3.2 REACTOR COOLANT PUMP SHAFT SEIZURE (LOCKED ROTOR) 15.3.2-1

15.3.3 REACTOR COOLANT PUMP SHAFT BREAK 15.3.3-1

On April 29, 2013, the name Carolina Power and Light Company (CP&L) was changed to

Duke Energy Progress, Inc. (DEP). On Sept ember 13, 2016, the name Duke Energy Progress, Inc. was changed to Duke Energy Progress, LLC.

HBR 2 UPDATED FSAR

GENERAL TABLE OF CONTENTS HBRSEP Unit No. 2 xx Revision No. 27 SECTION TITLE PAGE 15.4 REACTIVITY AND POWER DISTRIBUTION ANOMALIES 15.4.1-1

15.4.1 UNCONTROLLED ROD CLUSTER CONTROL ASSEMBLY BANK WITHDRAWAL FROM SUBCRITICAL OR LOW POWER 15.4.1-1

15.4.2 UNCONTROLLED CONTROL ROD ASSEMBLY BANK WITHDRAWAL AT POWER 15.4.2-1

15.4.3 CONTROL ROD MISOPERATION (SYSTEM MALFUNCTION OR OPERATOR ERROR) 15.4.3-1

15.4.4 STARTUP OF AN INACTIVE REACTOR COOLANT LOOP AT AN INCORRECT TEMPERATURE 15.4.4-1

15.4.5 RECIRCULATION LOOP AT INCORRECT TEMPERATURE OR FLOW CONTROLLER MALFUNCTION 15.4.5-1

15.4.6 CHEMICAL AND VOLUME CONTROL SYSTEM MALFUNCTION THAT RESULTS IN A DECREASE IN THE BORON CONCENTRATION IN THE REACTOR COOLANT 15.4.6-1

15.4.7 INADVERTENT LOADING OF A FUEL ASSEMBLY INTO THE IMPROPER POSITION 15.4.7-1

15.4.8 SPECTRUM OF ROD CLUSTER CONTROL ASSEMBLY (RCCA) EJECTION ACCIDENTS 15.4.8-1

15.4.9 SPECTRUM OF ROD DROP ACCIDENTS 15.4.9-1

15.5 INCREASES IN REACTOR COOLANT SYSTEM INVENTORY 15.5.1-1

15.5.1 INADVERTENT OPERATION OF EMERGENCY CORE COOLING SYSTEM 15.5.1-1

15.5.2 CVCS MALFUNCTION THAT INCREASES REACTOR COOLANT INVENTORY 15.5.2-1

On April 29, 2013, the name Carolina Power and Light Company (CP&L) was changed to

Duke Energy Progress, Inc. (DEP). On Sept ember 13, 2016, the name Duke Energy Progress, Inc. was changed to Duke Energy Progress, LLC.

HBR 2 UPDATED FSAR

GENERAL TABLE OF CONTENTS HBRSEP Unit No. 2 xxi Revision No. 27 SECTION TITLE PAGE 15.6 DECREASES IN REACTOR COOLANT SYSTEM INVENTORY 15.6.1-1

15.6.1 INADVERTENT OPENING OF A PRESSURIZER SAFETY OR POWER OPERATED RELIEF VALVE 15.6.1-1

15.6.2 SMALL BREAK LOSS-OF-COOLANT ACCIDENTS 15.6.2-1

15.6.3 STEAM GENERATOR TUBE RUPTURE 15.6.3-1

15.6.4 SPECTRUM OF BOILING WATER REACTOR (BWR) STEAM PIPING FAILURES OUTSIDE CONTAINMENT 15.6.4-1

15.6.5 LOSS-OF-COOLANT ACCIDENTS 15.6.5-1

15.7 RADIOACTIVE RELEASE FROM A SUBSYSTEM OR COMPONENT 15.7.1-1

15.7.1 RADIOACTIVE WASTE GAS SYSTEM LEAK OR FAILURE 15.7.1-1

15.7.2 LIQUID WASTE SYSTEM LEAK OR FAILURE 15.7.2-1

15.7.3 POSTULATED RADIOACTIVITY RELEASES DUE TO LIQUID TANK FAILURE 15.7.3-1

15.7.4 DESIGN BASIS FUEL HANDLING ACCIDENTS 15.7.4-1

15.7.5 SPENT FUEL CASK DROP ACCIDENTS 15.7.5-1

15.7.6 SPENT FUEL PIT WATER LOSS 15.7.6-1

16.0 TECHNICAL SPECIFICATIONS 16.0.0-1

17.0 QUALITY ASSURANCE 17.1.0-1

17.1 QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTION 17.1.0-1 17.1.1 QUALITY ASSURANCE PLANNING

[HISTORICAL] 17.1.1-1

17.1.2 CAROLINA POWER & LIGHT COMPANY QUALITY ASSURANCE PROGRAM [HISTORICAL] 17.1.2-1

On April 29, 2013, the name Carolina Power and Light Company (CP&L) was changed to

Duke Energy Progress, Inc. (DEP). On Sept ember 13, 2016, the name Duke Energy Progress, Inc. was changed to Duke Energy Progress, LLC.

HBR 2 UPDATED FSAR

GENERAL TABLE OF CONTENTS HBRSEP Unit No. 2 xxii Revision No. 27 SECTION TITLE PAGE 17.1.3 WESTINGHOUSE PWR SYSTEMS DIVISION QUALITY ASSURANCE PLAN

[HISTORICAL] 17.1.3-1

17.1.4 EBASCO ORGANIZATION AND ADMINISTRATION 17.1.4-1

[HISTORICAL]

17.2 DELETED BY REVISION NO. 13 17.2.0-1

17.3 RNP QUALITY ASSURANCE PROGRAM DESCRIPTION 17.3.1-1

18.0 AGING MANAGEMENT PROGRAMS AND ACTIVITIES 18.1-1

18.1 AGING MANAGEMENT PROGRAMS AND ACTIVITIES 18.1-1

18.1.1.1 ASME SECTION XI, SUBSECTION IWB, IWC, AND IWD PROGRAM

18.1.2 WATER CHEMISTRY PROGRAM 18.1-1

18.1.3 REACTOR HEAD CLOSURE STUDS PROGRAM 18.1-2

18.1.4 STEAM GENERATOR TUBE INTEGRITY PROGRAM 18.1-2

18.1.5 CLOSED-CYCLE COOLING WATER SYSTEM PROGRAM 18.1-2

18.1.6 ASME SECTION XI, SUBSECTION IWF PROGRAM 18.1-2

18.1.7 10 CFR 50, APPENDIX J PROGRAM 18.1-3

18.1.8 FLUX THIMBLE EDDY CURRENT INSPECTION PROGRAM 18.1-3

18.1.9 FIRE PROTECTION PROGRAM 18.1-3

18.1.10 BORIC ACID CORROSION PROGRAM 18.1-4

On April 29, 2013, the name Carolina Power and Light Company (CP&L) was changed to

Duke Energy Progress, Inc. (DEP). On Sept ember 13, 2016, the name Duke Energy Progress, Inc. was changed to Duke Energy Progress, LLC.

HBR 2 UPDATED FSAR

GENERAL TABLE OF CONTENTS HBRSEP Unit No. 2 xxiii Revision No. 27 SECTION TITLE PAGE 18.1.11 FLOW-ACCELERATED CORROSION PROGRAM 18.1-4

18.1.12 BOLTING INTEGRITY PROGRAM 18.1-4

18.1.13 OPEN CYCLE COOLING WATER SYSTEM PROGRAM 18.1-5

18.1.14 INSPECTION OF OVERHEAD HEAVY LOAD AND LIGHT LOAD HANDLING 18.1-5

18.1.15 FIRE WATER SYSTEM PROGRAM 18.1-6

18.1.16 BURIED PIPING AND TANKS SURVEILLANCE PROGRAM 18.1-7

18.1.17 ABOVE GROUND CARBON STEEL TANKS PROGRAM 18.1-7 18.1.18 FUEL OIL CHEMISTRY PROGRAM 18.1-7

18.1.19 REACTOR VESSEL SURVEILLANCE PROGRAM 18.1-8

18.1.20 BURIED PIPING AND TANKS INSPECTION PROGRAM 18.1-8

18.1.21 ASME SECTION XI, SUBSECTION IWE PROGRAM 18.1-8

18.1.22 ASME SECTION XI, SUBSECTION IWL PROGRAM 18.1-8

18.1.23 STRUCTURES MONITORING PROGRAM 18.1-9

18.1.24 DAM INSPECTION PROGRAM 18.1-9

18.1.25 SYSTEMS MONITORING PROGRAM 18.1-10

18.1.26 PREVENTIVE MAINTENANCE PROGRAM 18.1-10

18.1.27 METAL FATIGUE OF REACTOR COOLANT PRESSURE BOUNDARY (FATIGUE MONITORING PROGRAM) 18.1-10

18.1.28 NICKEL-ALLOY NOZZLES AND PENETRATIONS PROGRAM 18.1-11

18.1.29 THERMAL AGING EMBRITTLEMENT OF CAST AUSTENITIC STAINELSS STEEL (CASS) PROGRAM 18.1-11

18.1.30 PWR VESSEL INTERNALS PROGRAM 18.1-12

On April 29, 2013, the name Carolina Power and Light Company (CP&L) was changed to

Duke Energy Progress, Inc. (DEP). On Sept ember 13, 2016, the name Duke Energy Progress, Inc. was changed to Duke Energy Progress, LLC.

HBRSEP Unit No. 2 xxiv Revision No. 27 SECTION TITLE PAGE 18.1.31 ONE-TIME INSPECTION PROGRAM 18.1-12

18.1.32 SELECTIVE LEACHING OF MATERIALS PROGRAM 18.1-12

18.1.33 NON-EQ INSULATED CABLES AND CONNECTIONS PROGRAM 18.1-13

18.1.34 AGING MANAGEMENT PROGRAM FOR NON-EQ ELECTRICAL 18.1-13 CABLES USED IN INSTRUMENTATION CIRCUITS

18.1.35 AGING MANAGEMENT FOR NEUTRON FLUX INSTRUMENTATION CIRCUITS 18.1-13

18.1.36 FUSE HOLDER PROGRAM 18.1-13

18.1.37 AGING MANAGEMENT PROGRAM FOR BUS DUCTS 18.1-14

18.1.38 ENVIRONMENTAL QUALIFICATION (EQ) OF ELECTRICAL COMPONENTS 18.1-14

18.2 EVALUATION OF TIME LIMITED AGING ANALYSES 18.2-1

18.2.1 REACTOR VESSEL NEUTRON EMBRITTLEMENT 18.2-1

18.2.2 METAL FATIGUE 18.2-1

18.2.3 CRANE FATIGUE 18.2-4

18.2.4 ENVIRONMENTAL QUALIFICATION 18.2-5

18.2.5 CONTAINMENT TENDON LOSS OF PRESTRESS 18.2-5

18.2.6 THERMAL AGING EMBRITTLEMENT 18.2-6

18.2.7 FRACTURE MECHANICS ANALYSIS FOR REACTOR COOLANT PUMP 18.2-6

18.2.8 FOUNDATION PILE CORROSION 18.2-6

18.2.9 ELIMINATION OF CONTAINMENT PENETRATION COOLERS 18.2-7

18.2.10 AGING OF BORAFLEX IN SPENT FUEL POOL 18.2-7

References 18.2R-1

On April 29, 2013, the name Carolina Power and Light Company (CP&L) was changed to

Duke Energy Progress, Inc. (DEP). On Sept ember 13, 2016, the name Duke Energy Progress, Inc. was changed to Duke Energy Progress, LLC.