Supplemental Application for Amend to License NPF-21, Changing Tech Spec Section 3.7.1.3 (UHS) to Permit Reliance on Single Spray Pond for DHR When Plant in Mode Star
ML17278A898
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 06/05/1986
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Adensam E
Office of Nuclear Reactor Regulation
References
GO2-86-537, TAC-61014, NUDOCS 8606110297
Download: ML17278A898 (7)


Text

REQU ORY INFORNATION DISTRIBUT~ SYSTEM) (RIDB)

ACCESSION NBR: 860hi i0297 DOC. DATE: 86/06/05 NOTARIZED: NO DOCKET FACIL:,50-397 WPPSB Nuclear Progecti Unit 2> Washington Public Poue 05000397 AUTH. NANE AUTHOR AFFILIATION SORENBEN~ Q. C Washing ton Public Po~er Supp I g BM stem RECIP. NANE REC IP XENT AFFILIATION ADENBAI'tp E. Q. BWR ProJect Directorate 3 Supplemental application for amend to License NPF-2ii j

SUBJECT:

changing Tech Spec Section 3. 7. 1. 3 (UHB) to permit reliance on single spray pond for DHR when plant in mode "star".

DISTRIBUTION CODE: A001D COPIES RECEIVED: LTR Q ENCL SIZE:

TITLE: OR Submittal: General Distribution NOTES:

I I REC P ENT COPIES RECIPIENT COP IEB XD CODE/NANE LTTR ENCL ID CODE/NANE LTTR ENCL BWR ADTS i 0 BWR EB i i BWR EICBB 2 2 BMR FOB BWR PD3 LA 0 BMR PD3 PD Oi 5 5 BRADFUTE> J 1 BWR PSB i i.

BWR RSB i INTERNAL: ACRB 09 6 6 ADN/LFNB 0 ELD/HDB2 0 N /TBCB i NRR/ORAB i 0 FILE 04 RQN5 i EXTERNAL: 24X i i EQEcQ BRUSQUE, S LPDR 03 i i NRC PDR 02 NBXC 05 i i TOTAL NUMBER OF COPIES REQUIRED: LTTR 3i ENCL 26

'>>l(LKg) l>> Il'<",")'el I 7<.',x)ETPJG VIQ'Jir'it'>>>>>>: 'N'i V<<'>>t ~

23>>~AHA I>Yi,',~I;>>X>'4'w, (>.>> i>>>>)'h0%68:3T G )Q>>r VF )(l I.4"!>>-'8:HUVI V>>l)7&'C; 3.l >.'

Vv~Qi'~ISO ~uo'>> f<IV'I l~n'rons rl" ~;"< ~ <inU>>P >~ago r'l r<)oL>>>Pl ~">>.'! ilk 7('C ()~ '.><<'~l)A 0 V>>QI <Ar..IK I I;> HI)>>II'lJ(>

~

IIl'y! I III< I)A

>>>>1"k4".) PB (JAN)>>>>>>>>>~2 i

'TS>>>>j.'~9 3 4r!n'I n>>).I'>>)ni <I.>>c)N ..) .'~ >>III;IVY'H>"

QTTAX I~.I"A lh IXcIK:)..IH

Wc so+ ~~~.6 *) >i, ~ r'I Hb!6 .') ..l <Il~<BVI 'nh

~ I"It >->>a~:) I o'~ I>n~~ec ".o% n>>>> <<,>> r, Xqqc k))4n>>:t>o~qqUB: l 4~4GUd fi~>>'r>>>I nf ( ~;IIV) C .J % .~<<noi fez>>'. v ~qQ rlo >l p)>~panda

'~4 ~ )m ni fnt: L,q ver!@) RHG "sr~) bn>>q parq >I>>ni nn >>

tH I:~l)i3 'TJ:GPVX3338 8'3K>>IQ ) GPOVA,~.<QQ NQLTU~IXAJ C!DL noi9 @dry I ~iG f;>> ~an@<<>>>: f;~f.>> NmdUQ $ IQ

.'1J I'7 l

.>>, -I I I'lf>><

TN'3 ".'I l":>R II'Ihb'lX,'3GQG Gi G3 RMH Gul R'<<'6 I.<) 6'3 F'GR RUG M'l >>RWG

>>so<. >>J xHGA P.Hl);E ..4)Yi>><<I'I I I l i II')QTXTRIiGXRRN l~>>.OHIO Q 3..ITH "HR 's)lQX PRIII dl'l')R r~,gHPUR>R>>=,I f)l "'

'<<0 MG l DA'4 h:0 i'(3

Washington Public Power Supply System 3000George Washington Way P.O. Box968 Richland, Washington 99352-0968 (509)372-5000 June 5, 1986 G02-86-537 Docket No. 50-397 Director of Nuclear Reactor Regulation Attn: Ms. E. G. Adensam, Project Director BWR Project Directorate No. 3 Division of BWR Licensing U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Dear Ms. Adensam:

Subject:

NUCLEAR PLANT NO. 2 OPERATING, LICENSE NPF-21, REQUEST FOR AMENDMENT TO LICENSE (ULTIMATE HEAT SINK}, SUPPLEMENTAL INFORMATION

Reference:

1) Letter, G02-86-243, G.C. Sorensen to E.G. Adensam, same subject, dated March 21, 1986.

2} Letter, G02-86-333, G.C. Sorensen to E.G. Adensam, same subject, dated April 10, 1986.

The referenced letters discuss the background to and the request for an amendment to Section 3.7. 1.3" (Ultimate Heat Sink) of the WNP-2 Technical Specification. This amendment would allow reliance on a single "

spray pond for decay heat removal when the plant is in mode "star as defined in the Technical Specification. This letter supplies additional infor-mation about the proposed technical specification amendtttent and addresses questions discussed by Messrs. J.O. Bradfute of your staff and P.L.

Powell of the Supply System, during an April 10, 1986 phone conversation on this subject.

In this phone conversation, additional information was requested on the safety impact of a postulated loss of both inflatable plugs in the siphon of the standby service water cross-connection. During startup testing it was shown that the siphon would not continue to function when the water level in the pond with the most water was below the level of the inter-connecting pipe between the ponds and the water level on the other side dropped below the end of the 30 inch siphon pipe, which is 18 inches above the pond bottom. With the siphon plugged and only one pond full of water, failure of the plugs would allow water to flow to the other pond until the levels equalized. Under this condition, the siphon is self priming because the normal water level in the full pond 8606110297 860605 PDR ADQCK 05000397 P PDR

~ P' E. G. Adensam Page Two June 5, 1986 REQUEST FOR AMENDMENT TO LICENSE (ULTIMATE HEAT SINK), SUPP. INFO.

is at least 3 feet above the centerline of the 30 inch siphon where it crosses between the ponds (see attached figure). The siphon is then functional, and the water in both ponds is available for use by the operating SW pump except for 1.5'f water in the previously dry pond that the siphon, can not access. This water could be transferred with portable pumps or the other division of SW could be put into operation.

The loss of direct access to this 1.5'f water still leaves over 19 days to effect the transfer since the balance of the water inventory will last that long. After the 19 days further flow of water through the siphon is not possible and water inventory would be transferred with portable pumps or operation of the other SW division.

The flow of water to the previously empty pond is, therefore, not a loss of water., and constitutes usable volume if the Standby Service Water (SW) pump associated with that pond is brought into service, or other temporary means are used to transfer water from one pond to the other.

Ample time is available to make provisions to transfer water back to the original pond, or to bring the other division of SW into operation.

The Supply System has analyzed this change according to the criteria of 10CFR50.92 and determined that the subject request can not create the possibility of a new or different kind of accident, as sufficient time is available to marshall the resources necessary to meet the design 30 day inventory requirement.

With these considerations in mind, and with the low probability of a loss of two independent plugs, we have concluded that the proposed design assures the safe condition of the plant. Please direct any questions regarding this matter to Mr. P. L. Powell, Manager, WNP-2 Licensing.

Very truly yours, G. C. Sorensen, Manager Regulatory Programs SIS/bk Attachment cc: JO Bradfute - NRC C Eschels EFSEC JB Martin NRC RV E Revell - BPA NS Reynolds - BLCPSR NRC Site Inspector

0 I

WATER LEVEL 432.75'L. MIN. TOW EL. 435'-0" 428.25'L. 429.5'L.

BOTTOM OF PIPE (

3Pn g SIPHON PLUG PLUG 42O'L.

SIPHON GEOMETRY