MONTHYEARML17284A9101999-10-13013 October 1999 Application for Amend to License NPF-21,revising TS 3.3.6.1, Table 3.3.6.1-1, Primary Containment Isolation Instrumentation. Footnote (D) Is Removed Since Both Inboard & Outboard Trip Sys Are Now Functional in All Modes ML17284A8501999-07-29029 July 1999 Application for Amend to License NPF-21,revising TS 3.4.9, RHR Shutdown Cooling Sys - Hot Shutdown. ML17284A8471999-07-29029 July 1999 Application for Amend to License NPF-21,revising Tech Specs SR 3.5.2.2, Condensate Storage Tank Water Level. ML17284A8441999-07-29029 July 1999 Application for Amend to License NPF-21,revising TS Table 3.3.5.1-1, ECCS Instrumentation Items 1.a,2.a,4.a & 5.a. ML17284A8431999-07-29029 July 1999 Application for Amend to License NPF-21,removing License Condition 2.C.(16),Attachment 2,Item 3(b) Re post-accident Neutron Flux Monitoring ML17284A8401999-07-29029 July 1999 Application for Amend to License NPF-21,amending Tech Specs SR 3.8.4.6 of TS 3.8.5, DC Sources - Operating & SR 3.8.5.1 of TS 3.8.5, DC Sources - Shutdown. ML17292B6891999-06-0303 June 1999 Application for Amend to License NPF-21,reflecting Change in Name of Washington Public Power Supply Sys to Energy Northwest.Marked-up Copy of Affected Pages of OL for Plant, Encl ML17292B6441999-04-20020 April 1999 Application for Amend to License NPF-21,revising TS 3.4.11 to Replace Existing Reactor Pressure Temp Limit Curves by 000630 ML17292B6321999-04-0707 April 1999 Application for Amend to License NPF-21,requesting Mod to MCPR Safety Limits by 990930 to Allow Continued Power Operation at Plant Following Restart from R-14 RFO ML17292B4861998-12-17017 December 1998 Application for Amend to License NPF-21,revising TS SR 3.8.1.8 to Allow for Capability to Manually Transfer Between Preferred & Alternate Offsite Power Sources During Modes 1 & 2 by 990125 ML17284A8071998-11-0909 November 1998 Supplemental Application for Amend to License NPF-21, Requesting Minor Wording Changes to Clarify Intent of Proposed New License Section 2.B.(6).Addl Info That Describes Physical Storage of Matls,Encl ML17284A7161998-08-0505 August 1998 Application for Amend to License NPF-21,modifying TS SR 3.8.4.7 to Allow Performance Discharge Test to Be Performed in Lieu of Battery Svc Test for Div 1 & 3,125 Vdc Batteries E-B1-1 & HPCS-B1-DG3 & Div 1,250 Vdc Battery E-B2-1 ML17284A7051998-07-17017 July 1998 Application for Exigent Amend to License NPF-21,modifying TS SR 3.8.4.7 to Allow Performance Discharge Test to Be Performed in Lieu of Battery Svc Test for Div 2,125 Vdc, Battery E-B1-2 ML17292B3401998-04-16016 April 1998 Application for Amend to License NPF-21,modifying Requirement That cold-worked Austenitic Stainless Steel Used in Newly Designed ECCS Pump Suction Strainers Must Have Yield Strength Not Greater than 90,000 Psi ML17292B1301997-12-0404 December 1997 Application for Amend to License NPF-21,modifying Min Critical Power Ratio Safety Limits by 980515 to Allow Continued Power Operation at WNP-2 Following Restart from R-13 Refueling Outage ML17292B0261997-08-14014 August 1997 Application for Amend to License NPF-21,modifying Inservice Testing Requirements Specified in TS 5.5.6 for Inboard Primary Containment Isolation Valve on Transvering in-core Probe (TIP) Sys Nitrogen Purge Line ML17292A9401997-07-16016 July 1997 Application for Amend to License NPF-21,adding New Min Reactor Vessel Pressure Versus Reactor Vessel Metal Temp (P/T) Curves,Applicable Up to 12 Efpys.Changes Support Vessel Leak Testing ML17292A8631997-05-20020 May 1997 Application for Amend to License NPF-21,requesting Mod of Minimum Critical Power Ratio Safety Limits by 970615 ML17292A7561997-03-22022 March 1997 Application for Amend to License NPF-21,modifying Response Time Testing Surveillance Requirements for RPS Instrumentation,Primary Containment Isolation Actuation Instrumentation & ECCS Actuation Instrumentation ML17292A5491996-10-15015 October 1996 Application for Amend to License NPF-21 to Modify TS for Secondary Containment & Standby Gas Treatment Sys to Reflect Revised Secondary Containment Drawdown & post-accident Analyses Results.Affidavit,Encl ML17292A5381996-10-10010 October 1996 Application for Amend to License NPF-21,requesting Addition of Section 2B(6) Re Allowance of Storage of Byproduct, Source & Special Nuclear Materials ML17292A4081996-08-0909 August 1996 Requests Amend to License NPF-21,revising TS Section 6.3 Re Unit Staff Qualifications,By Changing Operations Manager Qualification Requirements Associated W/Operations Knowledge from Meeting Ansi/Ans N18.1-1971 GO2-96-089, Application for Amend to License NPF-21,modifying TS to Support Cycle 12,scheduled to Begin Subsequent to Spring 1996 Outage1996-04-24024 April 1996 Application for Amend to License NPF-21,modifying TS to Support Cycle 12,scheduled to Begin Subsequent to Spring 1996 Outage ML17291B2781996-03-19019 March 1996 Application for Amend to License NPF-21,revising Containment Leakage Testing ML17291B2071996-01-19019 January 1996 Application for Amend to License NPF-21 Re Primary Containment Leakage Testing GO2-95-265, Application for Amend to License NPF-21,revising TS to Be Consistent w/NUREG-1434, STS GE Plants,Bwr 6, Including Improved TS Submittal,Consisting of Application of Selection Criteria,Ts,Comparison Document & NSHC1995-12-0808 December 1995 Application for Amend to License NPF-21,revising TS to Be Consistent w/NUREG-1434, STS GE Plants,Bwr 6, Including Improved TS Submittal,Consisting of Application of Selection Criteria,Ts,Comparison Document & NSHC ML17291B0921995-10-26026 October 1995 Application for Amend to License NPF-21,revising TS to Reflect Replacement of Existing Reactor Recirculation Flow Control Sys W/Adjustable Speed Drive Sys ML17291A8421995-06-0606 June 1995 Application for Amend to License NPF-21,changing TS 6.0, Administrative Controls by Revising Assistant Managing Director,Operations & Plant Manager Position Titles ML17291A8381995-06-0606 June 1995 Application for Amend to License NPF-21,modifying Index of TS by Deleting Ref to Bases Pages.Future Changes to Bases Info Will Be Evaluated Per 10CFR50.59 ML17291A8321995-06-0606 June 1995 Application for Amend to License NPF-21,modifying TS 6.9.3.2 by Adding Re to Three TRs Describing Analytical Methods That May Be Used in Determining Reactor Core Operating Limits for Reload Licensing Applications,Consistent W/Gl 88-16 ML17291A7551995-04-25025 April 1995 Application for Amend to License NPF-21,adding RWCU Sys High Blowdown Containment Isolation Trip Function & Associated LCO & SRs to Tables 3.3.2-1,3.3.2-2 & 4.3.2.1-1 ML17291A4791994-10-31031 October 1994 Application for Amend to License NPF-21,revising TSs to Relocate Safety/Relief Valve Position Indication Instrumentation Requirements ML17291A4741994-10-31031 October 1994 Application for Amend to License NPF-21,revising TS 3/4.1.3.1, Reactivity Control Sys. ML17291A4201994-09-26026 September 1994 Suppl to 930709 Application for Amend to License NPF-21 Re Increase in Power Operation,Changing Power/Flow Maps in TS 3/4.2.6,3/4.2.7,3/4.2.8 & 3/4.4.1 & Bases to Reflect Use of Siemens Power Corp Staif Code for Stability Analysis ML17291A3941994-09-18018 September 1994 Application for Amend to License NPF-21,changing TS Table 3.6.3-1 Re Primary Containment Isolation Valve Requirements ML17291A3171994-08-0808 August 1994 Application for Amend to License NPF-21,amending TS 4.0.5, Surveillance Requirements for Inservice Insp & Testing Program. ML17291A2151994-07-12012 July 1994 Application for Amend to License NPF-21,requesting Amend to Ts,Relocating TS Table for Instrument Response Time Limits ML17291A2201994-07-0808 July 1994 Application for Amend to License NPF-21,revising TS W/Regard to Control Rod Scram Insertion Testing Under Emergency Circumstances ML17290B1711994-05-0606 May 1994 Application for Amend to License NPF-21,revising TSs 3/4.3.7.5,3/4.4.2 & 3/4.5.1 for Main Steam Relief Valve Position Indication ML17290B1551994-05-0505 May 1994 Application for Amend to License NPF-21,requesting Mod of Three Equipment Piece Numbers Included in Table 3.6.3-1, Primary Containment Isolation Valves. ML17290A9631994-02-17017 February 1994 Application for Amend to License NPF-21,revising TS to Support Hydrostatic Testing ML17290A9601994-02-17017 February 1994 Application for Amend to License NPF-21,revising TS Section 6.0, Administrative Controls, Including Changing Reporting Relationship for QA Functions in Section 6.2.1.e of TS from Managing Director to Assistant Managing Director,Operations ML17290A9551994-02-0808 February 1994 Application for Amend to License NPF-21,consisting of Changes to TS Table 3.6.3-1,for RCIC-V-8,increasing Stroke Time from 13 Seconds to 26 Seconds & Deleting Note (J) Reference from RCIC-V-8 & RCIC-V-63 ML17290A9031994-01-13013 January 1994 Application for Amend to License NPF-21,requesting Continued Plant Operation W/Eccs Functional,But Not in Strict Compliance W/Requirements for Demonstrating That Response Time within Limits of TS 3/4.3.3, ECCS Instrumentation. ML17290A8961994-01-0606 January 1994 Application for Amend to License NPF-21,requesting Changes to TS to Clarify Instrumentation Testing Requirements ML17290A8781994-01-0606 January 1994 Application for Amend to License NPF-21,requesting Rev to TS to Relocate Requirements for Seismic Monitoring Instrumentation to FSAR & Plant Procedures ML17290A8921994-01-0606 January 1994 Suppl to 930709 Application for Amend to License NPF-21, Increasing Licensed Power Level from 3,323 Mwt to 3,486 Mwt W/Extended Load Line Limit & Changing SRV Setpoint Tolerance to Include Changes to TS Paragraph 6.9.3.2 ML17290A8391993-12-20020 December 1993 Application for Amend to License NPF-21,revising TS 3/4.6.1.8, Drywell & Suppression Chamber Purge Sys. ML17290A8181993-12-0606 December 1993 Application for Amend to License NPF-21,requesting TS Surveillance Requirement 4.6.6.1.b.3 Be Revised to Provide Appropriate Acceptance Criteria for Demonstrating Operability of Primary Containment Hydrogen Recombiner Sys ML17290A8221993-12-0606 December 1993 Application for Amend to License NPF-21,adding Footnote to TS Table 4.3.7.5-1, Accident Monitoring Instrumentation Srs, Exempting Channel Calibr of Safety/Relief Valve Position Indicators from Spec 4.0.4 for 24 H 1999-07-29
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML17284A9101999-10-13013 October 1999 Application for Amend to License NPF-21,revising TS 3.3.6.1, Table 3.3.6.1-1, Primary Containment Isolation Instrumentation. Footnote (D) Is Removed Since Both Inboard & Outboard Trip Sys Are Now Functional in All Modes ML17284A8501999-07-29029 July 1999 Application for Amend to License NPF-21,revising TS 3.4.9, RHR Shutdown Cooling Sys - Hot Shutdown. ML17284A8471999-07-29029 July 1999 Application for Amend to License NPF-21,revising Tech Specs SR 3.5.2.2, Condensate Storage Tank Water Level. ML17284A8441999-07-29029 July 1999 Application for Amend to License NPF-21,revising TS Table 3.3.5.1-1, ECCS Instrumentation Items 1.a,2.a,4.a & 5.a. ML17284A8431999-07-29029 July 1999 Application for Amend to License NPF-21,removing License Condition 2.C.(16),Attachment 2,Item 3(b) Re post-accident Neutron Flux Monitoring ML17284A8401999-07-29029 July 1999 Application for Amend to License NPF-21,amending Tech Specs SR 3.8.4.6 of TS 3.8.5, DC Sources - Operating & SR 3.8.5.1 of TS 3.8.5, DC Sources - Shutdown. ML17292B6891999-06-0303 June 1999 Application for Amend to License NPF-21,reflecting Change in Name of Washington Public Power Supply Sys to Energy Northwest.Marked-up Copy of Affected Pages of OL for Plant, Encl ML17292B6441999-04-20020 April 1999 Application for Amend to License NPF-21,revising TS 3.4.11 to Replace Existing Reactor Pressure Temp Limit Curves by 000630 ML17292B6321999-04-0707 April 1999 Application for Amend to License NPF-21,requesting Mod to MCPR Safety Limits by 990930 to Allow Continued Power Operation at Plant Following Restart from R-14 RFO ML17292B4861998-12-17017 December 1998 Application for Amend to License NPF-21,revising TS SR 3.8.1.8 to Allow for Capability to Manually Transfer Between Preferred & Alternate Offsite Power Sources During Modes 1 & 2 by 990125 ML17284A8071998-11-0909 November 1998 Supplemental Application for Amend to License NPF-21, Requesting Minor Wording Changes to Clarify Intent of Proposed New License Section 2.B.(6).Addl Info That Describes Physical Storage of Matls,Encl ML17284A7161998-08-0505 August 1998 Application for Amend to License NPF-21,modifying TS SR 3.8.4.7 to Allow Performance Discharge Test to Be Performed in Lieu of Battery Svc Test for Div 1 & 3,125 Vdc Batteries E-B1-1 & HPCS-B1-DG3 & Div 1,250 Vdc Battery E-B2-1 ML17284A7051998-07-17017 July 1998 Application for Exigent Amend to License NPF-21,modifying TS SR 3.8.4.7 to Allow Performance Discharge Test to Be Performed in Lieu of Battery Svc Test for Div 2,125 Vdc, Battery E-B1-2 ML17292B3401998-04-16016 April 1998 Application for Amend to License NPF-21,modifying Requirement That cold-worked Austenitic Stainless Steel Used in Newly Designed ECCS Pump Suction Strainers Must Have Yield Strength Not Greater than 90,000 Psi ML17292B1301997-12-0404 December 1997 Application for Amend to License NPF-21,modifying Min Critical Power Ratio Safety Limits by 980515 to Allow Continued Power Operation at WNP-2 Following Restart from R-13 Refueling Outage ML17292B0261997-08-14014 August 1997 Application for Amend to License NPF-21,modifying Inservice Testing Requirements Specified in TS 5.5.6 for Inboard Primary Containment Isolation Valve on Transvering in-core Probe (TIP) Sys Nitrogen Purge Line ML17292A9401997-07-16016 July 1997 Application for Amend to License NPF-21,adding New Min Reactor Vessel Pressure Versus Reactor Vessel Metal Temp (P/T) Curves,Applicable Up to 12 Efpys.Changes Support Vessel Leak Testing ML17292A8631997-05-20020 May 1997 Application for Amend to License NPF-21,requesting Mod of Minimum Critical Power Ratio Safety Limits by 970615 ML17292A7561997-03-22022 March 1997 Application for Amend to License NPF-21,modifying Response Time Testing Surveillance Requirements for RPS Instrumentation,Primary Containment Isolation Actuation Instrumentation & ECCS Actuation Instrumentation ML17292A5491996-10-15015 October 1996 Application for Amend to License NPF-21 to Modify TS for Secondary Containment & Standby Gas Treatment Sys to Reflect Revised Secondary Containment Drawdown & post-accident Analyses Results.Affidavit,Encl ML17292A5381996-10-10010 October 1996 Application for Amend to License NPF-21,requesting Addition of Section 2B(6) Re Allowance of Storage of Byproduct, Source & Special Nuclear Materials ML17292A4081996-08-0909 August 1996 Requests Amend to License NPF-21,revising TS Section 6.3 Re Unit Staff Qualifications,By Changing Operations Manager Qualification Requirements Associated W/Operations Knowledge from Meeting Ansi/Ans N18.1-1971 GO2-96-089, Application for Amend to License NPF-21,modifying TS to Support Cycle 12,scheduled to Begin Subsequent to Spring 1996 Outage1996-04-24024 April 1996 Application for Amend to License NPF-21,modifying TS to Support Cycle 12,scheduled to Begin Subsequent to Spring 1996 Outage ML17291B2781996-03-19019 March 1996 Application for Amend to License NPF-21,revising Containment Leakage Testing ML17291B2071996-01-19019 January 1996 Application for Amend to License NPF-21 Re Primary Containment Leakage Testing GO2-95-265, Application for Amend to License NPF-21,revising TS to Be Consistent w/NUREG-1434, STS GE Plants,Bwr 6, Including Improved TS Submittal,Consisting of Application of Selection Criteria,Ts,Comparison Document & NSHC1995-12-0808 December 1995 Application for Amend to License NPF-21,revising TS to Be Consistent w/NUREG-1434, STS GE Plants,Bwr 6, Including Improved TS Submittal,Consisting of Application of Selection Criteria,Ts,Comparison Document & NSHC ML17291B0921995-10-26026 October 1995 Application for Amend to License NPF-21,revising TS to Reflect Replacement of Existing Reactor Recirculation Flow Control Sys W/Adjustable Speed Drive Sys ML17291A8421995-06-0606 June 1995 Application for Amend to License NPF-21,changing TS 6.0, Administrative Controls by Revising Assistant Managing Director,Operations & Plant Manager Position Titles ML17291A8381995-06-0606 June 1995 Application for Amend to License NPF-21,modifying Index of TS by Deleting Ref to Bases Pages.Future Changes to Bases Info Will Be Evaluated Per 10CFR50.59 ML17291A8321995-06-0606 June 1995 Application for Amend to License NPF-21,modifying TS 6.9.3.2 by Adding Re to Three TRs Describing Analytical Methods That May Be Used in Determining Reactor Core Operating Limits for Reload Licensing Applications,Consistent W/Gl 88-16 ML17291A7551995-04-25025 April 1995 Application for Amend to License NPF-21,adding RWCU Sys High Blowdown Containment Isolation Trip Function & Associated LCO & SRs to Tables 3.3.2-1,3.3.2-2 & 4.3.2.1-1 ML17291A4791994-10-31031 October 1994 Application for Amend to License NPF-21,revising TSs to Relocate Safety/Relief Valve Position Indication Instrumentation Requirements ML17291A4741994-10-31031 October 1994 Application for Amend to License NPF-21,revising TS 3/4.1.3.1, Reactivity Control Sys. ML17291A4201994-09-26026 September 1994 Suppl to 930709 Application for Amend to License NPF-21 Re Increase in Power Operation,Changing Power/Flow Maps in TS 3/4.2.6,3/4.2.7,3/4.2.8 & 3/4.4.1 & Bases to Reflect Use of Siemens Power Corp Staif Code for Stability Analysis ML17291A3941994-09-18018 September 1994 Application for Amend to License NPF-21,changing TS Table 3.6.3-1 Re Primary Containment Isolation Valve Requirements ML17291A3171994-08-0808 August 1994 Application for Amend to License NPF-21,amending TS 4.0.5, Surveillance Requirements for Inservice Insp & Testing Program. ML17291A2151994-07-12012 July 1994 Application for Amend to License NPF-21,requesting Amend to Ts,Relocating TS Table for Instrument Response Time Limits ML17291A2201994-07-0808 July 1994 Application for Amend to License NPF-21,revising TS W/Regard to Control Rod Scram Insertion Testing Under Emergency Circumstances ML17290B1711994-05-0606 May 1994 Application for Amend to License NPF-21,revising TSs 3/4.3.7.5,3/4.4.2 & 3/4.5.1 for Main Steam Relief Valve Position Indication ML17290B1551994-05-0505 May 1994 Application for Amend to License NPF-21,requesting Mod of Three Equipment Piece Numbers Included in Table 3.6.3-1, Primary Containment Isolation Valves. ML17290A9631994-02-17017 February 1994 Application for Amend to License NPF-21,revising TS to Support Hydrostatic Testing ML17290A9601994-02-17017 February 1994 Application for Amend to License NPF-21,revising TS Section 6.0, Administrative Controls, Including Changing Reporting Relationship for QA Functions in Section 6.2.1.e of TS from Managing Director to Assistant Managing Director,Operations ML17290A9551994-02-0808 February 1994 Application for Amend to License NPF-21,consisting of Changes to TS Table 3.6.3-1,for RCIC-V-8,increasing Stroke Time from 13 Seconds to 26 Seconds & Deleting Note (J) Reference from RCIC-V-8 & RCIC-V-63 ML17290A9031994-01-13013 January 1994 Application for Amend to License NPF-21,requesting Continued Plant Operation W/Eccs Functional,But Not in Strict Compliance W/Requirements for Demonstrating That Response Time within Limits of TS 3/4.3.3, ECCS Instrumentation. ML17290A8961994-01-0606 January 1994 Application for Amend to License NPF-21,requesting Changes to TS to Clarify Instrumentation Testing Requirements ML17290A8781994-01-0606 January 1994 Application for Amend to License NPF-21,requesting Rev to TS to Relocate Requirements for Seismic Monitoring Instrumentation to FSAR & Plant Procedures ML17290A8921994-01-0606 January 1994 Suppl to 930709 Application for Amend to License NPF-21, Increasing Licensed Power Level from 3,323 Mwt to 3,486 Mwt W/Extended Load Line Limit & Changing SRV Setpoint Tolerance to Include Changes to TS Paragraph 6.9.3.2 ML17290A8391993-12-20020 December 1993 Application for Amend to License NPF-21,revising TS 3/4.6.1.8, Drywell & Suppression Chamber Purge Sys. ML17290A8181993-12-0606 December 1993 Application for Amend to License NPF-21,requesting TS Surveillance Requirement 4.6.6.1.b.3 Be Revised to Provide Appropriate Acceptance Criteria for Demonstrating Operability of Primary Containment Hydrogen Recombiner Sys ML17290A8221993-12-0606 December 1993 Application for Amend to License NPF-21,adding Footnote to TS Table 4.3.7.5-1, Accident Monitoring Instrumentation Srs, Exempting Channel Calibr of Safety/Relief Valve Position Indicators from Spec 4.0.4 for 24 H 1999-07-29
[Table view] |
Text
~O 0 Y ga )
J REGULAT RY INFORMATION DXSTRIBUTIOh SYSTEM (RIDS)
ACCESSION NBR:9908060077 DOC.DATE: 99/07/29 NOTARIZED: YES DOCKET ¹ FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH l NAME AUTHOR AFFILIATION WEBRING,R.L. Washington Public Power Supply System RECXP.NAME RECIPIENT AFFILIATION Records Management Branch (Document Control Desk)
SUBJECT:
Application for amend to license NPF-21,amending Tech Specs SR 3.8.4.6 of TS 3.8.5 "DC Sources Operating" & to SR 3.8.5.1 of TS 3.8.5 "DC Sources - Shutdown."
A DISTRIBUTION CODE: A001D COPIES,RECEIVED:LTR ENCL SIZE:
TITLE: OR Submittal: General "Distribution T NOTES: E RECIPIENT COPIES RECIPIENT COPIES XD CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL LPD4-2 LA 1 1 CUSHING, J 1 1 SC 1 1 INTERNAL: ACRS 1 1 CENTER 0 1 NRR/DE/EEIB 1 1 NRR/DSSA/SPLB 1 1 NRR/DSSA/SRXB 1 1 NUDOCS-ABSTRACT 1 .1 OGC/RP 1 0 EXTERNAL: NOAC NRC PDR 1 1 D
'E EJIIQSK3$ N NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE.'TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 12 ENCL 11
~ ~
WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ Richland, Washington 99352-0968 July 29, 1999 GO2-99-146 Docket No. 50-397 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington D.C. 20555.
Gentlemen:
Subject:
WNP-2, OPERATING LICENSE NPF-21 REQUEST FOR AMENDMENT TECHNICALSPECIFICATIONS SR 3.8.4.6 AND 3.8.5.1
Reference:
NRC Administrative Letter 98-10, December 29, 1998, "Dispositioning of Technical Specifications That Are Insufficient To Assure Plant Safety" In accordance with the Code of Federal Regulations, Title 10, Parts 2.101, 50.59, and 50.90, the Washington Public Power Supply System hereby submits a request for amendment to the WNP-2 Operating License. Specifically, the Supply System is, requesting a revision to SR 3.8.4.6 of Technical Specification 3.8.4, "DC Sources Operating," and to SR 3.8.5.1 of Technical Specification 3.8.5 "DC Sources Shutdown." The proposed amendment to SR 3 8.4.6 would prohibit surveillance testing of Division 1, 2, and 3 125 and 250 volt DC,
~
battery charger capacity during Modes 1, 2, and 3. The proposed amendment to SR 3.8.5.1 would include SR 3.8.4.6 as one of the surveillance tests that are not required to be performed as part of the note to SR 3.8.5.1.
Technical Specification 3.8.4, as currently worded, would allow surveillance testing of battery charger capacity during Modes 1, 2, 3, 4, and 5. However, such surveillance testing requires the charger and related DC system to be declared inoperable. If this occurred during Mode 1, 2, or 3, the minimum functional capability of a Division 1, 2, or 3 DC electrical power system would no longer be available. Since these tests can be satisfactorily performed in Modes 4 and 5, performing the tests in Mode 1, 2, or 3 would be an unnecessary challenge to a DC power system during reactor operation. Therefore, the current wording of the Technical Specifications constitutes a degraded or nonconforming condition pursuant to the guidance of the Reference. This condition was identified recently and it was determined that administrative controls had been previously instituted to prohibit battery charger capacity surveillance testing during Modes 1, 2, and 3.
9908060077 990729 P
PDR'~lADOCK 05000397 PDR
REQUEST FOR AMENDMENT TECHNICALSPECIFICATIONS SR 3.8.4.6 and 3.8.5.1 Page 2 of 2 Similarly, SR 3.8.5.1 identifies several surveillance tests from Technical Specification 3.8.4 as being applicable to assure that DC electrical power subsystems are operable while Technical Specification 3.8.5 is governing. However, SR 3.8.5.1 identifies two of the enumerated surveillance tests as being not required if performance of the test would result in the inoperability of the affected DC system while it was required for service. The intent is that these SRs must still be capable of being met, but actual performance is not required. The proposed amendment to SR 3.8.5.1 would add SR 3.8.4.6 to the existing exceptions, since performing a battery charger capacity test requires declaring the affected systems inoperable.
Additional information has been attached to this letter to complete the amendment request. provides a detailed description and basis for acceptability of the proposed changes. Attachment 2 describes an evaluation of the proposed changes in accordance with 10CFR50.92, and concludes the changes do not result in a significant hazards consideration. provides the Environmental Assessment Applicability Review and notes that the proposed change meets the eligibility criteria for a categorical exclusion as set forth in 10CFR51.22(c)(9). Therefore, in accordance with 10CFR51.22, an environmental assessment of the change is not required. Attachment 4 summarizes the proposed change and provides a marked-up page of the Technical Specification. Attachment 5 submits the typed Technical Specification page as proposed by this request.
This request for an amendment has been approved by the WNP-2 Plant Operations Committee and reviewed by the Supply System Corporate Nuclear Safety Review Board. In accordance with 10CFR50.91, the State of Washington has been provided a copy of this letter.
Should you have any questions or desire additional information regarding this matter, please contact me or PJ Inserra at (509) 377-4147.
Respectfully, RL Webring Vice President, Operations Support/PIO Mail Drop PE08 Attachments CC: EW Merschoff - NRC RIV DJ Ross - EFSEC JS Cushing - NRC NRR PD Robinson -Winston &, Strawn NRC Resident Inspector - 927N Dl. Williams - BPA/1399
STATE OF WASHINGTON)
Subject:
eratin License NPF-21
) R uest for Amendment s ) Technical S ecifications SR 3..4 6 and SR 3.8.5.1 COUNTY OF BENTON )
I, RL Webring, being duly sworn, subscribe to and say that I am the Vice President, Operations Support/PIO, for the WASHINGTON PUBLIC POWER SUPPLY SYSTEM, the applicant herein; that I have the full authority to execute this oath; that I have reviewed the foregoing; and that to the best of my knowledge, information, and belief that the statements made in it are true.
DATE 1999 Webring Vice President, Operations Support On this date personally appeared before me RL Webring, to me known to be the individual who executed the foregoing instrument, and acknowledged that he signed the same as his free act and deed for the uses and purposes herein mentioned.
GIVEN under my hand and seal this ~Zday of 1999 Notary ublic in an r the STATE OF WASHINGTON Residing at My Commission expires + Z9 ~l
4 K
gyglhl I lll(g~
~o Qrqz IQ(it)i1~
Ol)p()p)p)l'Lh
REQUEST FOR AMENDMENT 0
TECHNICALSPECIFICATIONS SR 3.8.4.6 and 3.8.5.1 Attachment 1
~ Page 1 of 1 Description of Proposed Changes Summary Of Proposed Technical Specification Request The Washington Public Power Supply System is requesting a revision to Technical Specification 3.8.4, "DC Sources Operating," to add a note to SR 3.8,4.6 that would prohibit performing the Division 1, 2, and 3 battery charger capacity testing during Modes 1, 2, and 3, and allow taking credit for unplanned events that satisfy the surveillance.
Additionally, we are proposing to change the note included in SR 3.8.5.1 to add SR 3.8.4.6 to the surveillance tests identified as being not required if performance of the test would result in the affected DC system being declared inoperable while it is required for service. The proposed changes would bring the notes in SR 3.8.4.6 and SR 3.8.5.1 into conformance with NUREG-1434 Rev. 1.
Basis For The Proposed Technical Specification Request During transition to the WNP-2 Improved Technical Specifications, two deviations from NUREG-1434 were adopted on the basis of a misinterpretation of a statement in Section 8.3.2 of the WNP-2 FSAR. The first deviation omitted a note from SR 3.8.4.6 that prohibited performance of surveillance testing of battery charger capacity during Modes 1, 2, and 3, and allowed taking credit for unplanned events that satisfied the surveillance. The second deviation omitted SR 3.8.4.6 from a note in SR 3.8.5.1. Since the original basis for not including the NUREG-1434 note in SR 3.8.4.6, and for omitting SR 3.8.4.6 from the note in SR 3.8.5.1 has been determined to be incorrect, we are now proposing to a'mend the note in SR 3.8.4.6 and in SR 3.8.5.1 at this time.
Performance of the testing prescribed by SR 3.8.4.6 requires installation of test equipment, including an electrical load bank, to increase the battery charger output current to the specified test acceptance criteria. This alteration requires the affected DC source system to be declared inoperable. Since this testing can be completed in Modes 4 and 5 without entering an action statement, it would be an unnecessary challenge to a DC power system to initiate testing during Mode 1, 2, or 3. Similarly, Technical Specification 3.8.5.1 requires the DC source subsystems to be available to support required operability of the DC distribution systems during Modes 4 and 5, and during movement of irradiated fuel assemblies in secondary containment. Since performance of the SR 3.8.4.6 battery charger capacity test results in the affected DC system being declared inoperable, the proposed change to the note in SR 3.8.5.1 would include SR 3.8.4.6 as one of the SRs not required to be performed if it resulted in the affected DC system being declared inoperable while Technical Specification 3.8.5 is governing.
REQUEST FOR AMENDMENT TECHNICALSPECIFICATIONS SR 3.8.4.6 and 3.8.5.1 Attachment 2
~ Page 1 of 2 Evaluation of Significant Hazards Consideration Summary of Proposed Change The Washington Public Power Supply System is requesting a revision to Technical Specification 3.8.4, "DC Sources Operating," to add a note to SR 3.8.4.6 that would prohibit performing the Division 1, 2, and 3 battery charger capacity testing during Modes 1, 2, and 3, and allow taking credit for unplanned events that satisfy the surveillance.
Additionally, we are proposing to change the note included in SR 3.8.5.1 to add SR 3.8.4.6 to the surveillance tests identified as being not required if performance of the test would result in the affected DC system being declared inoperable while it .is required for service. The proposed changes would bring the notes in SR 3.8.4.6 and SR 3.8.5.1 consistent with NUREG-1434 Rev. j.
No Significant Hazards Consideration Determination The Washington Public Power Supply System has evaluated the proposed change to the Technical Specifications using the criteria established in 10 CFR 50.92(c), and has determined that it does not represent a significant hazards consideration as described below:
~ The operation of WNP-2 in accordance with the proposed amendment wiH not involve a significant increase in the probability or consequences of an accident previously evaluated.
The proposed change has no impact on previously analyzed accidents or transients, and has no effect on operation, capacity or surveillance test details of the DC system battery chargers. The change only imposes a mode restriction on performance of specified surveillance testing and allows taking credit for unplanned events that satisfy the surveillance. Therefore, operation of WNP-2 in accordance with the proposed amendment will not involve a significant increase in the probability or consequences of an accident previously evaluated.
~ The operation of WNP-2 in accordance with the proposed amendment will not create the possibility of a new or different kind of accident from any accident previously evaluated.
The proposed change has no effect on operation, capacity, or surveillance test details of the DC system battery chargers. The change only prohibits performing specified battery charger capacity surveillance testing from being implemented during Mode 1, 2, or 3 and allows taking credit for unplanned events that satisfy the surveillance. The proposed change to SR 3.8.4.6 of Technical Specification 3.8.4 and SR 3.8.5.1 of Technical Specification 3.8.'re consistent with the wording previously evaluated and approved by the NRC in NUREG-).434 Rev. 1.
~ pl\+ %' 't IA lg
REQUEST FOR AMENDMENT TECHNICALSPECIFICATIONS SR 3.8.4.6 and 3.8.5.1 Page 2 of 2 Therefore, operation of WNP-2 in accordance with the proposed amendment will not create the possibility of a new or different kind of accident previously evaluated.
~ The operation of WNP-2 in accordance with the proposed amendment will not involve a significant reduction in the margin of safety.
The proposed change only imposes a mode restriction, prohibiting battery charger capacity surveillance testing from being performed during Modes 1, 2, and 3, allowing credit to be taken for unplanned events that satisfy the surveillance, and allowing such testing to be omitted under certain conditions during Modes 4 and 5 and during movement of irradiated fuel in secondary containment. Performance of this testing would remove a DC electrical power subsystem from service and could present a safety risk were an event to occur if the testing was performed in Modes 1, 2, and 3, or while DC service is required in other operating conditions. Therefore, operation of WNP-2 in accordance with the proposed amendment will not involve a significant reduction in the margin of safety.
REQUEST FOR AMENDMENT TECHNICALSPECIFICATIONS SR 3.8.4.6 and 3.8.5.1 Page 1 of 1 Environmental Assessment ApplicabBity Review The Washington Public Power Supply System has evaluated the proposed amendment against the criteria for identification of licensing and regulatory actions requiring environmental assessment in accordance with 10CFR51.21.
The proposed change meets the criteria for categorical exclusion as provided under 10CFR51.22(c)(9) because the change does not pose a significant hazards consideration nor does it involve an in'.rease in the amounts, or a change in the types, of any effluent that may be released offsite.
Furthermore, this request does not involve an increase in individual or cumulative occupational exposure.
~ ~