GO2-94-107, Application for Amend to License NPF-21,requesting Mod of Three Equipment Piece Numbers Included in Table 3.6.3-1, Primary Containment Isolation Valves

From kanterella
(Redirected from ML17290B155)
Jump to navigation Jump to search
Application for Amend to License NPF-21,requesting Mod of Three Equipment Piece Numbers Included in Table 3.6.3-1, Primary Containment Isolation Valves
ML17290B155
Person / Time
Site: Columbia 
Issue date: 05/05/1994
From: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17290B156 List:
References
GO2-94-107, NUDOCS 9405120207
Download: ML17290B155 (8)


Text

, ACCELERATED DI<

BUTION DEMONST TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9405120207 DOC.DATE: 94/05/05 NOTARIZED: NO FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe AUTH.NAME AUTHOR AFFILIATION PARRISH.J.V.

Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Application for amend to license NPF-21,requesting mod of three equipment piece numbers included in Table 3.6.3-1, "Primary Containment Isolation Valves."

DISTRIBUTION CODE:

AOOID COPIES RECEIVED:LTR I

ENCL /

SIZE:

TITLE: OR Submittal:

General Distribution NOTES:

DOCKET g

05000397 D

RECIPIENT ID CODE/NAME PDIV-3 LA CLIFFORD,J INTERNAL ACRS NRR/DORS/OTSB NRR/DRPW NRR/DSSA/SRXB OC LF.CB RE 01 EXTERNAL: NRC PDR COPIES LTTR ENCL 1

1 2

2 6

6 1

1 1

1 1

1 1

0 1

1 1

1 RECIPIENT ID CODE/NAME PDIV-3 PD NRR/DE/EELB NRR/DRCH/HICB NRR/DSSA/SPLB NUDOCS-ABSTRACT OGC/HDS1 NSIC COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 1

0 1

1 D

D D

D NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 22 ENCL 20 S

~

~

4 il

WASHINGTONPUBLIC POWER SUPPLY SYSTEM PO. Box 968

~ 3000 George Washirrgton Way

~ Richland, Washington 99352-0968

~ (509) 372-5000 May 5, 1994 G02-94-107 Docket No. 50-397 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station PI-37 Washington, D.C.

Gentlemen:

Subject:

WNP-2, OPERATING LICENSE NPF-21 REQUEST FOR AMENDMENT TO TECHNICAL SPECIFICATION 3/4.6.3, PRIMARY CONTAINMENTISOLATIONVALVES

Reference:

1.

2.

Letter, GO2-93-256, JV Parrish (SS) to NRC, "Request for Amendment to Technical Specifications to Relocate Component Lists in Accordance with Generic Letter 91-08...", dated October 21, 1993.

Letter, G02-94-099, JV Parrish (SS) to NRC, "NRC Inspection Report, 94-02 Reply to a Notice of Violation," dated April29, 1994.

f'n accordance with the Code ofFederal Regulations, Title 10, Parts 50.90 and 2.101, the Supply System hereby submits a request for amendment to the WNP-2 Technical Specifications.

Specifically, the Supply System is requesting modification of three equipment piece numbers (EPNs) included in Table 3.6.3-1, "Primary Containment Isolation Valves."

The following changes are requested:

EXISTING EPN PR P

ED EPN REA N FOR HAN E PI-EFC-X29d PI-EFCX-72f PI-EFC-X29b PI-V-X72f/1 Conformity to existing EPN assignment.

This is an administrative change only.

Reflect design change to be implemented during R-9 refueling outage.

PI-EFCX-73e PI-V-X73e/1 Reflect design change to be implemented during R-9 refueling outage.

9405g20207 940505 "PDR,'

ADQCQ. 05000397'.

.PDR

6+&p f5f

,g + Q.P

~

~

REQUEST FOR AMENDMENTTO TECHNICALSPECIFICATION 3/4.6.3, PRIMARY CONTAINMENTISOLATIONVALVES Reference 1 previously requested relocation of Table 3.6.3-1 to a plant procedure which would be controlled pursuant to the requirements of 10CFR50.59 and Technical Specification 6.8.1.

Renaming PI-EFC-X29d is an administrative change.

Excess flow check valves PI-EFCX-72f and PI-EFCX-73e willbe replaced with swing check valves to conform the plant to the analyzed design basis.

This replacement requires that the check valves be renamed.

Replacing the existing excess flow check valves with swing check valves represents a reduced risk to public health and safety.

Granting this request involves no adverse safety impact. Attachment 1 to this letter provides the requested change. provides additional information.

Approval of this amendment is required to support startup following the R-9 refueling outage; therefore, staff approval is requested by June 15, 1994.

Should you have any questions or desire additional information, please contact me or H.E. Kook at (509) 377-4278.

Sincerely,

. Parrish (Mail Drop 1023)

Assistant Managing Director, Operations JVP/LCF/bk Attachments CC:

LJ Callan - NRC RIV KE Perkins, Jr. - NRC RIV, Walnut Creek Field Office NS Reynolds - Winston Ec Strawn JW Clifford - NRC DL Williams - BPA/399 NRC Sr. Resident Inspector - 927N

t

STATE OF WASHINGTON)

)

COUNTY OF BENTON

)

Subject:

Request forAmendment to TS 3/4.6.3, Primary Containment I.

1 tion Valv I, J. V. PARRISH, being duly sworn, subscribe to and say that I am the Assistant Managing Director, Operations for the WASHINGTON PUBLIC POWER SUPPLY SYSTEM, the applicant herein; that I have the full authority to execute this oath; that I have reviewed the foregoing; and that to the best of my knowledge, information, and belief the statements made in it are true.

DATE Pl 5

, 1993 J

. Parrish, Assistant Managing Director Operations On this date personally appeared before me J. V. PARRISH, to me known to be the individual who executed the foregoing instrument, and acknowledged that he signed the same as his free act and deed for the uses and purposes herein mentioned.

GIVEN under my hand and seal this ~day of 1993.

Notary Public in and for the STATE OF WASHINGTON Residing at Kennewick Washin ton MyC i i Epi ~A!