Forwards Rev 25 to QA Program for Station Operation IAW 10CFR50.54(A)(3).Rev 25 Incorporates Organization Related Changes Associated W/Restructuring of Supply Chain Organization within Nuclear Operations Group
ML17265A260
Person / Time
Site: Ginna Constellation icon.png
Issue date: 05/05/1998
From: Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To: Vissing G
NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17265A261 List:
References
NUDOCS 9805130093
Download: ML17265A260 (4)


Text

CATEGORY

  • REGULA RY INFORMATION DISTRIBUTI SYSTEM (RIDS)

ACCESSION NBR:9805130093 DOC.DATE: 98/05/05 NOTARIZED: NO DOCKET FACIL:5t)-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH. NAME , AUTHOR AFFILIATION MECREDY,R.C. Rochester Gas 8 Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION VISSING,G.S.

SUBJECT:

Forwards rev 25 to QA program for station operation IAW 10CFR50.54(A)(3).Rev 25 incorporates organization related C changes associated w/restructuring of Supply Chain organization within Nuclear Operations Group. A DISTRIBUTION CODE: Q004D COPIES RECEIVED:LTR t ENCL J SIZE:(Q +

(Docket/Utili TITLE: QA Topical Report, Change, Amendment, or Correspondence E

NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72). 05000244 G

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL VISSING,G. 1 1 INTERNAL: DRS/RGN.+ 1 1 ILE CENTER Ol 1 1 NRR/DISP/PIMB 1 1 NRR/DRCH/HQMB 1 1 NUDOCS-ABSTRACT 1 1 OC/LFDCB 1 1 RGN1 FILE 1 1 EXTERNAL: DMB/OSS 1 1 IHS 1 1 NRC PDR 1 1 D

0 U

E N

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 11 ENCL 11

NAY-85-1998 14: 11 716 771 3987 P.81/87 Post-lt'ax Note 7671 ac'y Vrsxi~w C0JDopL Phone o Phono N Fax o

'3dl Vl l U. S. Nuclear Regulatory Commission Document Control Desk ATTN: Mr. Guy S. Vissing Project Directorate I-1 Washington, DC 20555

SUBJECT:

Revised Submittal of Quality Assurance Program for Station Operation R. E. Ginna Nuclear Power Plant Docket Number 50-244

REFERENCES:

a. Letter from R.C. Mecredy, RG&E, to G.S. Vissing, NRC,

Subject:

"Revised Submittal of Quality Assurance Program for Station Operation," dated December 17, 1997.

b. Letter from G.S. Vissing, NRC, to R.C. Mecredy, RGB,

Subject:

"Request for Additional Information Concerning Revision 24 of the Quality Assurance Plan for the R.E. Ginna Nuclear Power Plant (TAC No. MA0391)," dated April 6, 1998.

Dear Mr. Vissing:

In accordance with 10 CFR 50 '4(a)(3), enclosed is Revision 25 to the Quality Assurance Program for Station Operation. Revision 25 incorporates the following changes:

Organization related changes associated with the restructuring of the. Supply Chain organization within the Nuclear Operations Group.

The above changes do not impact commitments in the Quality Assurance Program description previously approved by the Nuclear Regulatory Commission (NRC) and therefore do not require NRC prior approval. These Quality Assurance Program changes will be considered effective 6/1/98.

Additionally, in Revision 24 of QA Program for Station Operations (Reference a), RGEE requested the following change:

~ Establish that a grace period of +25% (not to exceed 90 days) may be applied to frequencies for performance of periodic activities described, by this document and the Regulatory Guides and Standards listed in Table 17.1.7-1.

This grace period. will not be applied to 10CFR requirements listed in Table 17.1.7-1.

9805i30093 'F80505 PDR ADOCK 05000244 P PDR

NAY-8S-1998 14: 11 RGRE GINNA PROCURENENT 716 771 3987 P.82i87 On April 6, 1998, the NRC requested additional information concerning this change in Refexence b. RG&E is modifying the change requested in Reference a and is providing the additional information requested by the NRC in this submittal of 25'. Revision'll of the changes are described in the attached Synopsis of Changes (Attachment 1) and in the enclosed program revision.

Attachment 1 also provides the basis for concluding that the revised program continues to satisfy the 10CFR50 Appendix B criteria. Changes made to Revision 24 of the Quality Assurance Pxogram fox Station Operation are denoted by a single revision bar in the left margin. Attachment 2 is a copy of the enclosure with changes highlighted or struck out.

Very truly yours, Robert C. Mecredy RCM~cjk~qap sub.R25 Attachments 1 and 2.

Enclosure:

QA Program for Station Operation Revision 25 xc U.S. Nuclear Regulatory Commission Mr. Guy S. Vissing (Mail Stop 14B2)

Project Directorate I-1 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 Ginna Senior Resident Xnspector