Submits Recommendations for NRC Consideration,Per GL 89-01 & NUREG-1431 Re Conversion to Improved STS
ML17264A438
Person / Time
Site: Ginna Constellation icon.png
Issue date: 04/01/1996
From: Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To: Charemagne Grimes
NRC
References
RTR-NUREG-1431 GL-89-01, GL-89-1, NUDOCS 9604050453
Download: ML17264A438 (6)


Text

CATEGORY 1 REGULATOI INFORMATION DISTRIBUTIONOSTEM (RIDE)

ACCESS:6N NBR:9604050453 DOC.DATE: 96/04/01 NOTARIZED: NO FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G

AUTH. NAME AUTHOR AFFILIATION MECREDY,R.C.

Rochester Gas

& Electric Corp.

RECIP.VAME RECIPIENT AFFILIATION GRIMES,C.I.

NRC No Detailed AffiliationGiven DOCKET 05000244

SUBJECT:

Submits recommendations for NRC consideration,per GL, 89-01

&'UREG-1431 re conversion to improved STS.

DISTRIBUTION CODE:

A001D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: OR Submittal: General Distribution NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).

05000244 RECIPIENT ID CODE/NAME PDl-1 LA JOHNSON,A INTERNA E

CE RCH/HICB NRR/DSSA/SRXB OGC/HDS3 EXTERNAL: NOAC COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 1

0 1

1 RECIPIENT ID CODE/NAME PD1-1 PD NRR/DE/EMCB NRR/DSSA/SPLB NUDOCS-ABSTRACT

/i NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 D

.C N

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTEl CONTACT THE DOCUMENT CONTROL DESK ROOM OWFN SD-5(EXT. 415-2083)

TO ELIMINATE YOUR NAME FROM DISTRIBUTION LZSTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBEh OF COPIES REQUIRED:

LTTR 12 ENCL ll

AND ROCHESTER GASANDELECTRTC CORPORAVON ~ 89 FASTAVENUf,ROCHESTER N. Y 1d6d9-0001 ARFA CODE716 $46-2700 ROBERT C. MECREDY Vice President Nvcteor Operations April 1, 1996 U.S. Nuclear Regulatory Commission Mr. Chris I. Grimes Chief, Technical Specifications Branch Mail Stop 011E22 Washington, D.C. 20555

Subject:

Conversion to Improved Standard Technical Specifications Rochester Gas &Electric Corporation R.E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Grimes,

As you are aware, RG&E implemented the improved technical specifications (ITS) for Ginna Station on February 24, 1996.

Subsequent to this implementation, you contacted Mr. George Wrobel, Manager ofNuclear Safety and Licensing and asked ifRG&:E would be willingto provide recommendations for future technical specification conversion efforts. The purpose ofthis letter is to transmit several recommendations for your consideration (see attached).

We hope that these suggestions willbe beneficial.

RG&;E would also like to take this opportunity to thank you and your staff for their effort with respect to converting the Ginna Station "custom" technical specifications to the ITS. This was a very large undertaking by both RG&;E and the NRC and we very pleased with the final product.

RG&;E would like to expressly state our appreciation for Mr. Carl Schulten of your staff.

His thoroughness and attention to detail were commented upon by numerous members of the Ginna Station plant staff.,Mr. Schulten's willingness to learn and understand the design differences between Ginna Station and the plant used in the development ofNUREG-1431 was commendable.

Also, he was amenable to consideration ofso-called "generic" changes to NUREG-1431 which was evidence ofhis desire to ensure a technically correct and quality document for Ginna Station.

In those instances where Mr. Schulten requested that RG&E revise the licensing basis to more up-to-date standards (e.g., regulatory guides), it was made in a very professional manner with a rational basis such that at no time did he appear to be "forcing" RG&:E to accept the change.

In summary, RG&Efound Mr. Schulten to be an excellent reviewer who was very knowledgeable about a wide variety oftopics and issues.

O5t ~25 9604050453 960401 PDR ADQCK 05000244 P

PDR

.fg0i '

You also requested that RGkE provide a cost estimate of the conversion process.

While the numbers below include some estimates, they can be considered close to the real cost.

Consultant related manhours.(MFQ are also included; however, NRC review costs, are not provided since these have not yet been submitted to RGRE.

a.

Preparation oforiginal license amendment request (LAR)- 8,200 MH Support ofNRC review ofthe LARand preparation offinal submittal - 3,400 MH c.

Plant costs to implement (does not include future changes required to complete conversion-e.g., complete update procedure references to ITS) - 8,800 MH d.

Material and travel costs - $40,000 Finally, enclosed is a picture of Ginna Station as requested by Mr. Schulten for the TSB display of converted plants.

Thank you for the opportunity to provide the attached recommendations. Ifyou have any further

'uestions related to these matters, please do not hesitate to contact either Mr. Wrobel at (716) 724-8070 or Mr. Mark Flaherty at (716) 724-8512.

Very truly yours, Robert C. Mecredy MDF>820 Attachment

ecommendations for Fu ure n ersions The Ginna Station conversion effort was complicated by the fact that not only was a conversion to ITS being made, but several line item improvements and technical changes were rolled into the project. This included implementation ofWCAP-10271 (i.e., TOPS),

a change to pressurizer safety valve setpoints, reactor coolant specific activity limits and implementation of Generic Letter 89-01 (Radiological Effluents relocation). While these changes were in part driven by the vintage of the previous Ginna Station technical specifications, it complicated, and in some cases delayed, the conversion effort. As such, RGkE would suggest that other licensees be recommended to submit these "beyond conversion" changes separate from the conversion effort. As a minimum, the licensees could mark up their existing technical specifications with the necessary justifications in a separate license amendment request and ask that the requested changes be implemented as part ofITS ifthey do not need them immediately.

It is recognized that the generic process for changes to the ITS NUREGs was evolving during the time frame in which RGB converted the Ginna Station technical specifications.

And to some degree, this generic process willcontinue to evolve as more plants convert to ITS. The generic process requires significant resources on part ofboth the industry and the NRC in order to obtain consensus ofall parties involved. While RGB'oes not have any real recommendations for improving this process, we feel that NRC management should be made aware that the ITS NUREGs are really a living document that willcontinue to change as more plants convert and find problems or potential clarifications. Unfortunately, this requires resources which were typically assigned at the last moment during our conversion process resulting in delays and some uncertainty.

Licensees should also be strongly encouraged to participate in this generic process from the very beginning oftheir conversion efforts to help reduce these scheduling problems.

RGB provided electronic copies ofthe Ginna Station UFSAR, technical specifications, and conversion LARto our lead TSB reviewer at the beginning ofthe project. We believe that these were very useful to the NRC during the review process (based on the questions which arose from them) and would recommend that future conversion projects provide them if available.

RGB developed simple flow diagrams ofplant systems which contained information of what we believed was addressed by a proposed LCO for use during the review process.

These were eventually added to the Ginna Station bases "forillustration purposes" only but provided an easy starting point from which to have discussions with the NRC reviewer.

While every licensee may not want these figures in their bases due to controlled drawing issues, having them during the review process would be ofgreat benefit to both the licensees and the NRC.

~

~

0 I

I

e

~

~

~

~~

The criteria forwhat must be contained within technical specifications is defined in 10 CFR 50.36.

However, during the Ginna Station conversion process, it was evident that the criteria were not fullyunderstood by NRC branches outside the TSB, and to some degree by NRC consultants.

This was demonstrated both during the conversion process and subsequent to implementation with respect to NRC inspectors. It is recommended that this understanding be increased within the NRC.

The conversion of a licensee's technical specification to ITS requires much coordination between the Technical Specification Branch (TSB) and Projects.

Essentially, the TSB is responsible for ensuring the new ITS are technically correct while Projects is responsible for coordinating other NRC branches to provide necessary support, including taking the final product through management for formal NRC approval.

This coordination effort should be performed in parallel to the greatest degree possible to support scheduling needs and to ensure a quality document.

In addition, both the TSB and Projects are required for a conversion.

That is, a conversion to ITS requires a strong knowledge ofhow to use the ITS NUREGs and the history behind why the documents are written and formatted as they are.

This expertise can be provided by the TSB as was demonstrated during the Ginna Station conversion effortwhen RGB attempted to make several changes that were different from, the ITS. The TSB acknowledged that we were attempting to do the "rightthing," however, our proposed method was inconsistent with the document usage rules.

As such, RGB either accepted the NUEEG wording with a greater understanding of the ITS or a compromise was reached. RGB believes that one ofthe main reasons that our conversion was successful was the lead that the TSB took in reviewing the proposed ITS for Ginna Station.

Someone new to ITS may not be able to provide the ITS knowledge that is required as was shown by the NRC's use ofconsultants who were technically knowledgeable ofplant systems but did not have a strong ITS background.

In the same way, strong support from Projects is required to ensure that ifother NRC branches are required to be involved, they work with and support the TSB to the greatest degree possible.

Requiring the technical branch reviewing the ITS to also perform this activity could be very burdensome as was discovered during the Ginna Station conversion effort. As such, RGB'ould recommend that NRC management be made aware of the resource requirements from both the TSB and Projects necessary to support a conversion effort, especially since only a small minorityofthe plants have converted to date. Requiring periodic meetings (or conference calls) between the licensee, Projects, and the TSB would also be recommended during the NRC's review of the licensee's submittal.