ML17262A637

From kanterella
Jump to navigation Jump to search
Responds to Rev 1 to NUREG-1394, Emergency Response Data Sys Implementation. Preliminary Software Testing Expected to Be Completed by 921002.Sys Expected to Be Online by 930124
ML17262A637
Person / Time
Site: Ginna Constellation icon.png
Issue date: 10/28/1991
From: Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To: Andrea Johnson
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation
References
RTR-NUREG-1394 NUDOCS 9111060036
Download: ML17262A637 (7)


Text

'0 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9111060036 DOC.DATE: 91/10/28 NOTARIZED: NO DOCKET FACIL:50-244 Robert 'Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH. NAME AUTHOR AFFILIATION MECREDY,R.C. Rochester Gas 6 Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION JOHNSON,A.R. Project Directorate I-3

SUBJECT:

Responds to Rev 1 to NUREG-1394, "Emergency Response Data Sys Implementation." Preliminary software testing expected to be completed by 921002.Sys expected to be online by D TITLE: OR 930124.

DISTRIBUTION CODE: A045D COPIES RECEIVED:LTR / ENCL t SIZE:

Submittal: Emergency Preparedness Pla s, Implement'g Procedures, C S

NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72). 05000244 A l

RECIPIENT COPIES RECIPIENT COPIES D ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD1-3 PD 1 1 JOHNSON,A 1 1 D INTERNAL: AEOD/DOA/IRB 1 1 NRR/DREP/PEPB9D 1 1 NUDOCS-ABSTRACT 1 1 REG . -bE 1 1 EXTERNAL: NRC PDR 1 1 NSIC 1 1 D

D D

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACI'HE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 8 ENCL 8

j INIIIllllll II/IIIIIIIIII jigjgjgii IIIIIIIIII lgiijj/Ij i IIIIIIIIIIII ROCHESTER GAS AND ELECTRIC CORPORATION cs 3P.

EAST AVENUE, ROCHESTER N.Y. 14649-0001

'9 ROBERTC MECREDY TELEPHOkE Vice President AREA CODE 71B 546 2700 Cinna Nuclear Production October 28, 1991 J.S. Nuclear Regulatory Commission Document Control Desk Attn: Allen R. Johnson Project Directorate I-3 Washington, D.C. 20555

Subject:

Response to Emergency Response Data System (ERDS)

R.E. Ginna Nuclear Power Plant Docket No. 50-244 Ref: (a) NUREG-1394, Rev. 1, Emergency Response Data System Implementation,'une 1991

Dear Mr. Johnson:

Enclosed is Rochester Gas and Electric Corporation's (RG&E's) response to the Emergency Response Data System (ERDS) rule and requirements as outlined in reference (a) .

In accordance with reference (a), Appendix A requirements, the ERDS Transmission/Reception Plan will be implemented consistent with the attached. proposed schedule. RG&E will attempt to provide all critical safety function parameters noted in Appendix E of reference (a). However, points listed. in Appendix E but, not currently available will be identified via Data Point Library (DPL')

sheets. If not: currently available for transmission, retro-fitting of these data points is considered outside the scope of this implementation plan. Appendix F of reference (a) identifies an engineering units coding scheme. RG&E does not plan to alter existing plant: specific engineering units to correspond to these listed in Appendix F. However, conversion information will be provided on the DPL sheets and provided to the NRC in accordance with the attached schedule. This is consistent with the guidance in reference (a). Appendix I of reference (a) describes the methodology for computer point selection. RG&E will provide the selected data point information and any clarifying information with the DPL sheets.

'""9111060036 9'11026 PDR -AOOCK 05000244 F PDR

0 t

~1

,h

, ( ,~r

Section 3.6 of reference (a) describes the Administrative Implemen-tation Requirements. As identified in the attached schedule, RGGE will develop or revise Emergency Plan Implementing procedures in accordance with 10CFR50.54(q). These procedure(s) will incorporate the requirement that changes to the DPL will be submitted to the NRC using the DPL Reference File Form from Appendix C of reference (a) within thirty (30) days of the change.

Very truly yours, Robert C. Mecredy GAL/186 Attachment zc: Mr. Allen R. Johnson (Mail Stop 14D1)

Project Directorate I-3 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 Ginna Senior Resident Inspector

~ ~ Co ATTACHHENT 1 ERDS Project Time Line 1992 ID Name Duration Scheduled Start Scheduled Finish Resource Names Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr -'Qtr c~

1 Send letter of intent Od 10/28/91 10/28/91 2 Select EROS data points 157.38ed 9/20/91 2/24/92 Select PPCS data points 69.38ed 9/20/91 11/28/91 G irma Ops/EP Complete data point library 35.38ed 1/20/92 2/24/92 Engineering Complete plant attribute library 71.38ed 12/15/91 2/24/92 Computer Systems 6 Select Contractor 32.38ed 2/24/92 3/27/92 Computer Systems 7 HRC phone line installed 7d 11/15/91 11/25/91 NRC 0+

8 Ginna Refueling Outage 44.38ed 3/27/92 5/10/92 G irma ~i 9 Hardware installation 35d 5/10/92 6/26/92 Computer Systems ~Z+

10 Software installation 60d 5/10/92 7/31/92 Computer Systems ~z+

11 Preliminary software testing 45d 8/2/92 10/2/92 Computer Systems 12 Preliminary testing of link 45d 10/4/92 12/4/92 HRC/Computer Systems 13 ERDS On-line testing 20d 12/27/92 1/22/93 HRC/Computer Systems/EP 14 System acceptance Od 1/24/93 1/24/93 NRC/Computer Systems/EP 0+

15 Procedure development 131.38ed 8/30/92 1/8/93 16 Procedures written 60d 8/30/92 11/20/92 Computer Systems/EP 17 Procedure training 30d 11/29/92 1/8/93 Ginna Training 18 Ginna ERDS "On-Line" Od 1/24/93 1/24/93 0+

Project: EROS implementation Critical Suwery Date: 10/25/91 Noncritical

l V ~ fj r