|
---|
Category:ANNUAL OPERATING REPORT
MONTHYEARML17241A3581998-12-0909 December 1998 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period of 970526-981209. ML17229A7911998-01-0707 January 1998 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period of 960727-980107. ML17229A6331997-12-31031 December 1997 Annual Operating Rept. W/980221 Ltr ML17229A6971997-12-31031 December 1997 Annual Environ Radiological Operating Rept for 1997. ML17229A5371997-05-25025 May 1997 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period of 960106-970525. ML17229A2071996-07-27027 July 1996 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period of 941202-960727. ML17228B5501996-01-0505 January 1996 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period 940423-960105. ML17228B0431994-12-31031 December 1994 1994 Annual Operating Rept. ML17309A7881994-12-0101 December 1994 Rept of Changes Made to Facility Under Provisions of 10CFR50.59 for Period 930618-941201. W/950531 Ltr ML20078B9161994-04-22022 April 1994 Rept of Changes Made to Facility Under Provisions of 10CFR50.59 for Period 930326-940422 ML17228A4541993-12-31031 December 1993 Annual Operating Rept for St Lucie Units 1 & 2 for 1993. W/940224 Ltr ML17309A7181993-06-18018 June 1993 Rept of 10CFR50.59 Plant Changes for Period 920123-930618. W/931213 Ltr ML17309A7121993-03-25025 March 1993 Rept of Changes Made to Facility Under Provisions of 10CFR50.59 for Period 911007-930325. W/930922 Ltr ML17227A7471992-12-31031 December 1992 1992 Annual Operating Rept for St Lucie Units 1 & 2. ML17309A6821992-01-22022 January 1992 Rept of 10CFR50.59 Plant Changes for 910123-920122. W/ 920710 Ltr ML17227A3161991-12-31031 December 1991 Annual 10CFR50.59 Rept for 1991 ML17309A6741991-10-0606 October 1991 Rept of Changes Made to Facility Under Provisions of 10CFR50.59 for Period 901007 to 911006. W/920406 Ltr ML17223B1191990-12-31031 December 1990 1990 Annual Operating Rept. ML17308A4991990-01-22022 January 1990 Rept of 10CFR50.59 Plant Changes, Covering 890123-900122. W/900713 Ltr ML17308A4861989-12-31031 December 1989 1989 Annual Operating Rept for St Lucie Units 1 & 2 & Steam Generator Inservice Insp Rept. W/900227 Ltr ML17308A4791989-01-22022 January 1989 Rept of Changes Made Under Provision of 10CFR50.59 for Period Ending 890122. W/890720 Ltr ML17308A4581988-12-31031 December 1988 1988 Annual Operating Rept for St Lucie Units 1 & 2. W/ 890301 Ltr ML17223A2031988-12-31031 December 1988 Suppl to 1988 Annual Operating Rept ML17308A4681988-10-0606 October 1988 Rept of Changes Made Under Provisions of 10CFR50.59 for Period Ending 881006. W/890406 Ltr ML20147E1751987-12-31031 December 1987 Annual Operating Rept,St Lucie Units 1 & 2 ML17221A7171987-10-0606 October 1987 Annual Rept Re Plant Changes/Mods Made Between 861006 & 871006 L-87-106, Annual Operating Rept,St Lucie Units 1 & 2, for 1986.W/1986-12-31031 December 1986 Annual Operating Rept,St Lucie Units 1 & 2, for 1986.W/ ML17209A8611981-02-27027 February 1981 Annual Operating Rept for 1980. ML17208A4201980-02-29029 February 1980 1979 Annual Operating Rept. ML17206A6791979-02-28028 February 1979 Annual Rept 1978. 1998-12-09
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML17241A4891999-10-0707 October 1999 LER 99-004-00:on 990912,noted That MSSV Surveillance Was Outside of TS Requirements.Caused by Setpoint Drift.Subject MSSVs Are Being Refurbished & Retested Prior to Unit Startup from SL1-16 Refueling Outage.With 991007 Ltr ML17241A4951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for St Lucie,Units 1 & 2.With 991014 Ltr ML17241A4741999-08-31031 August 1999 Rev 1 to PCM 99016, St Lucie Unit 1,Cycle 16 Colr. ML17241A4591999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With 990913 Ltr ML17241A4301999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With 990805 Ltr ML17241A4111999-07-16016 July 1999 LER 99-007-00:on 990610,unplanned Cooldown Transient Occurred Due to Personnel Error.Trained & Briefed Personnel & Revised Procedures.With 990716 Ltr ML17241A4031999-07-0606 July 1999 LER 99-006-00:on 990605,sub-critical Reactor Trip Occurred Due to Inadvertent MSIV Opening.Caused by Personnel Error. Provided Operation Supervision Instruction to Operating Crews,Stand Down Meetings & Operator Aids.With 990706 Ltr ML17241A4041999-07-0606 July 1999 LER 99-005-00:on 990604,CEA Drop Resulted in Manual Reactor Trip.Caused by Procedural Inadequacies.Procedure Changes Are Planned to Correct Lack of Procedural Guidance for CEA Subgroup Power Switch Replacement.With 990706 Ltr ML17241A4091999-06-30030 June 1999 Monthly Operating Repts for June 1999 for St Lucie,Units 1 & 2.With 990712 Ltr ML17241A3941999-06-30030 June 1999 LER 99-004-01:on 990415,as Found Cycle 10 Psv Setpoints Were Outside TS Limits.Caused by Manufacturing Process Defect. All Three Psvs Were Replaced with pre-tested Valves During Cycle 11 Refueling Outage.With 990630 Ltr ML17355A3681999-06-30030 June 1999 Revised Update to Topical QA Rept, Dtd June 1999 ML17241A3551999-06-0404 June 1999 LER 99-002-00:on 990505,both Trains of Safety Injection Actuation Were Blocked During Surveillance.Caused by Procedure Error.Procedure Revised.With 990604 Ltr ML17241A3631999-05-31031 May 1999 Monthly Operating Repts for May 1999 for St Lucie Units 1 & 2.With 990610 Ltr ML17241A3321999-05-17017 May 1999 LER 99-004-00:on 990415,determined That as Found Cycle 10 Psv Setpoints Outside TS Limits.Root Cause Under Investigation.Psvs Replaced with pe-tested Valves During Cycle 11 ML17241A3271999-05-0606 May 1999 LER 99-003-00:on 990406,ECCS Suction Header Leak Resulted in Both ECCS Trains Being Inoperable & Entry Into TS 3.0.3. Caused by Chloride Induced OD Stress Corrosion Cracking of Piping.Made Code Repairs & Coated Piping.With 990506 Ltr ML17241A3331999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for St Lucie,Units 1 & 2.With 990517 Ltr ML17229B0801999-04-0707 April 1999 LER 99-002-00:on 990311,SG ECT Error Caused Operation with Condition Prohibited by Ts.Caused by Deficiencies in Data Analysis Guideline Instructions.Licensee Will Change Data Analysis Guidelines for Lead Analysts.With 990407 Ltr ML17229B0841999-04-0707 April 1999 Rev 2 to PSL-ENG-SEMS-98-102, Engineering Evaluation of ECCS Suction Lines. ML17229B0791999-04-0707 April 1999 LER 99-001-00:on 990309,discovered Inadequate Design & IST SRs for Iodine Removal Sys (Irs).Caused by Original Design Inadequacies & Personnel Error.Naoh Tank Vent Valve V07233 Was Tagged Open.With 990407 Ltr ML17229B0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With 990408 Ltr ML17229B0541999-03-10010 March 1999 LER 99-001-00:on 990211,inadequate TS SRs for SIT & SDC Isolation Valves Were Noted.Caused by Failure to Correctly Implement TS Srs.Submitted LAR to Align Required TS SR with Design Bases Requirements Being Verified.With 990310 Ltr ML17229B0461999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for St Lucie,Units 1 & 2.With 990310 Ltr ML17229B0051999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for St Lucie,Units 1 & 2.With 990211 Ltr ML17229A9901999-01-20020 January 1999 LER 98-009-00:on 981223,noted That Facility Operated Outside of Design Basis.Caused by non-conservative MSLB Analysis Inputs.Will Review SR Component Differences Between Units & Will re-baseline LTOP Analysis.With 990120 Ltr ML17229A9961999-01-14014 January 1999 SG Tube Inservice Insp Special Rept. ML17229A9821999-01-0404 January 1999 LER 98-010-00:on 981207,RCS Boron Sample Frequency Required by Ts,Was Exceeded by Twelve Minutes.Caused by Personnel Error.Equipment Clearance Order Was Lifted to Draw Required Sample & Operations Procedure Was Changed.With 990104 Ltr ML17229A9831998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for St Lucie,Units 1 & 2.With 990111 Ltr ML17229A9611998-12-22022 December 1998 LER 97-002-01:on 981204,containment Sump Debris Screen Was Not IAW Design.Caused by Inadequate C/As for Sump Screen Anamolies.All Identified Sump Screen Deficiencies Were Dispositioned &/Or Repaired.With 981222 Ltr ML17229A9561998-12-15015 December 1998 LER 98-008-00:on 981118,missed TS SG U Tube Insp.Caused by Encoding Errors While Using Remote Positioning Fixtures.All SG Tube Surveyed.With 981215 Ltr ML17241A3581998-12-0909 December 1998 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period of 970526-981209. ML17229A9421998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for St Lucie,Units 1 & 2.With 981215 Ltr ML17229A9301998-11-25025 November 1998 LER 98-005-01:on 980807,discovered That New MOV Methodology Caused Past PORV Block Valve Operability Problem.Caused by Inadequacies in Original Vendor MOV Methodology.Planned Valve Mods Will Be Implemented During Cycle 11 1998 Outage ML17229A9021998-11-0404 November 1998 LER 98-008-00:on 981008,inadequate Reactor Protection Sys Trip Bypass TS Was Noted.Caused by Poorly Worded Ts. Submitted LAR to Clarify Power Requirements for High Rate of Power Trips.With 981104 Ltr ML17241A4931998-11-0101 November 1998 Statement of Account for Period of 981101-990930 for Suntrust Bank,As Trustee for Florida Municipal Power Agency Nuclear Decommissioning Trust (St Lucie Project). ML17229A9051998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for St Lucie,Units 1 & 2.With 981110 Ltr ML17229A8871998-10-19019 October 1998 Part 21 Rept Re Potential Defect in Swagelok Stainless Steel Front Ferrule,Part Number SS-503-1 Which Was Machined with Improper Length.C/A Includes Insp Equipment That Will 100% Identify Short Length ML17229A8781998-10-19019 October 1998 Part 21 Rept Re Potential Defect in Swagelok Stainless Steel Front Ferrule,Part Number SS-503-1,which Was Machined with Improper Length.Insp Equipment That Will 100% Identify Short Length ML17229A8771998-10-14014 October 1998 LER 98-006-00:on 980918,inadvertent Afas Actuation Was Noted.Caused by Degradation of Multiple Afas Power Supplies. Replaced Afas Power Supplies & Revised Procedures.With 981014 Ltr ML17229A8761998-10-14014 October 1998 LER 98-007-00:on 980918,identified Discrepancies Between Fire Protection Design Requirements & Field Conditions. Caused by Inadequate Translation & Implementation of Fire Protection Requirements.Procedures Revised.With 981014 Ltr ML17229A8721998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for St Lucie Units 1 & 2.With 981009 Ltr ML17229A8511998-09-0202 September 1998 LER 98-005-00:on 980807,discovered That PORV Margins Were Insufficient to Accommodate Addl Conservatism.Caused by Inadequacies in Original Vendor MOV Methodology.Will Implement Planned Valve Actuator mods.W/980902 Ltr ML17229A8611998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for St Lucie,Units 1 & 2.With 980911 Ltr ML18066A2771998-08-13013 August 1998 Part 21 Rept Re Deficiency in CE Current Screening Methodology for Determining Limiting Fuel Assembly for Detailed PWR thermal-hydraulic Sa.Evaluations Were Performed for Affected Plants to Determine Effect of Deficiency ML17229A8481998-08-0707 August 1998 Rev 1 to PSL-ENG-SEFJ-98-013, St Lucie Unit 2,Cycle 10 Colr. ML17229A9461998-08-0707 August 1998 Rev 0 to PCM 98016, St Lucie Unit 2,Cycle 11 Colr. ML17229A8301998-07-31031 July 1998 Monthly Operating Repts for July 1998 for St Lucie,Units 1 & 2.W/980814 Ltr ML17229A8201998-07-29029 July 1998 LER 98-007-00:on 980630,inadequate Procedure May Have Resulted in SBO Recovery Complications.Caused by Inadequate Procedures.Attached Caution Tags to Appropriate Control switches.W/980729 Ltr ML17229A7981998-06-30030 June 1998 Monthly Operating Repts for June 1998 for St Lucie,Units 1 & 2.W/980713 Ltr ML17229A7701998-05-31031 May 1998 Monthly Operating Repts for May 1998 for St Lucie,Units 1 & 2.W/980612 Ltr ML17229A7411998-05-28028 May 1998 LER 98-004-00:on 980430,discovered Waste Gas Decay Tank Operation W/O Available Oxygen Analyzers,Which Is Prohibited by Ts.Caused by Inadequate Licensee Review of License Amend. Oxygen Analyzer recalibrated.W/980528 Ltr 1999-09-30
[Table view] |
Text
~ CATEGORY 10 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RXDS)
ACCESSION NBf<.c;803030003 DOC DATE. 97/12/31 NOTARIZED- NO DOCKET FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power & Light Co. 05000335 50-389 St. Lucie Plant, Unit 2, Florida Power S Light Co. 05000389 AUTH. NAME AUTHOR AFFILIATION STALL,J.A. Florida Power 6 Light Co.
RECIP . NAME RECXPIENT AFFILIATION
SUBJECT:
"St Lucie Units 1 &2 1997 Annual Operating Rept." W/980221 ltr.
DISTRIBUTION CODE: XE47D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: 50.59 Annual Report of Changes, Tests or Experiments Made W out Approve NOTES: E RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID'ODE/NAME LTTR ENCL PD2-3 PD 1 0 GLEAVES,W 1 1 INTERNAL: ACRS 1 1 FILE CENTE 1 1 RGN2 FILE 01 1 1 EXTERNAL: NOAC 1 1 NRC PDR 1 1 D
N NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 7 ENCL 6
~
~
Florida Power 5 Light Company,6351 S. Ocean Orive, Jensen Beach, FL34S57 7
L-98-049 FPL February 21, 1998 10 CFR 50 '6 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Gentlemen:
Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 1997 Annual 0 eratin Re ort Pursuant to Technical Specification 6.9.1.4, this letter transmits the 1997 Annual Operating Report for St. Lucie Units 1 and 2. The report covers activities on a calendar year basis for both units.
I Section 1 Man-REM Report required by 'echnical Specification 6.9.1.5.
Section 2 Primary Chemistry information required by Technical Specification 6.9.1.5.
Should there be any questions on this information, please contact us ~
Very truly yours, J. A. Stall Vice President St. Lucie Plant JAS/ptq cc:, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant Enclosure
'r'VV 9803030003 97i23i PDR ADOCK 05000335 R PDR an FPL Group company
St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 1997 Annual 0 eratin Re ort SECTION 1 TECHNICS SPECIFICATION 6. 9. 1 . 5 ST. LUCIE UNITS 1 AND 2 1997 MAN-REM REPORT
St. Lucie Plant - 1997 Standard Format For Reporting Number Of Personnel & Man-Rem For Work And Job Functions Number of Personnel ) 100 mrem Total Man Rem Work And Job Function Station Utility Contract Station Utility Contract Reactor Operations and Surv Engineering 000.143 000.071 000.000 Health Physics 000.235 000.000 000.032 Maintenance 000.252 000.000 000.736 Operations 001.973 000.062 000.015 Supervision 000.000 000.000 000.000 Routine Maintenance Engineering 3 1 5 001.111 001.429 001.988 Health Physics 38 0 38 011.485 000.007 022.740 Maintenance 239 11 301 121.875 003.056 133.666 Operations 53 11 78 019.115 005.155 034.846 Supervision 0 0 0 000.090 000.000 000.000 Inservice Inspection Engineering 0 000.000 000.002 000.000 Health Physics 0 000.013 000.000 000.000 Maintenance 0 000.106 000.000 000.017 Operations 0 000.003 000.007 000.001 Supervision :0 000.003 000.000 000.000 Special Maintenance Engineering 0 0 0 000.036 000.036 000.052 Health Physics 1 .0 11 000.710 000.000 003.638 Maintenance 21 2 635 011.389 000.470 279.104 Operations 4 1 12 001.961 000.510 007.416 Supervision 0 0 0 000.000 000.000 000.000
. Waste Processing Engineering 000.000 . 000.000 000.000 Health Physics 000.393 000.000 007.651 Maintenance 000.322 000.000 003.508 Operations 000.052 000.006 001.004 Supervision 000.000 000.000 000.000 Refueling Engineering 000.022 000.000 000.000 Health Physics 000.093 000.000 000.048 Maintenance 000.129 000.127 000.136 Operations 000.333 000.002 000.000 Supervision 000.000 000.000 000.000 Totals Engineering 3 1 5 001.312 001.538 002.040 Health Physics 40 0 55 012.929 000.007 034.109 Maintenance 260 13 943 134.073 003.653 417.167 Operations 59 12 92 023.437 005.742 043.282 Supervision 0 0 0 000.093 000.000 000.000 Grand Totals 362 26 1095 171.844 011.174 496.598
St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 1997 Annual 0 eratin Re ort SECTION 2 TECHNICAL& SPECIFICATION 6. 9. 1. 5 AND 3. 4. 8 CHEMISTRY RESULTS In accordance with Technical Specification 6.9.1.5, the primary coolant specific activity did not exceed the limits of Technical Specification 3.4.8.