Text
SENIOR VICE PRESIDENT RIVER BEND NUCLEAR GROUP SWEC
~--------------------------
GSU PROJECT MANAGER PLANT MANAGER SWEC GSU PROJECT MANAGER ---------------------------
SUPERINTENDENT PRELIMINARY TEST STARTUP AND TEST I
I I
I I
I GSU SUPERVISOR STARTUP & TEST CONTROL SWEC SITE SUPERINTENDENT GE GSU GSU LEAD TEST ADVISORY SUPERVISOR TEST AND SITE OPERATIONS ASSISTANT SUPERVISOR ENGINEER - CHOC MANAGER PLANNING TURNOVER MANAGER SUPERINTENDENT STARTUP TESTING GSU TURNOVER I
I I
I I
PUNCH LIST GSU GSU GSU GSU LEAD ENGINEER LEAD ENGINEER LEAD ENGINEER PGCC SUPERVISOR SUPERVISOR SUPERVISOR NSSS BOP PGCC SUPERVISOR PREOP TESTING PREOP TESTING PREOP TESTING NSSS BOP ELECTRICAL GSU I
I I
I I
I SCHEDULING-PLANNING PRELIMINARY PRELIMINARY PRELIMINARY PREOP ENGINEERS PREOP ENGINEERS PREOP ENGINEERS TEST ENGINEERS TEST ENGINEERS TEST ENGINEERS P--------------~~~~~~~-------*
I I
GENERAL ASSISTANT RADIOLOGICAL LEAD ENGINEER LEAD ENGINEER LEAD ENGINEER OPERATIONS PLANT MANAGER-CHEMISTRY PROGRAMS TEST TURNOVER HYDRO TEST MAINTENANCE &
SUPERVISOR SUPERVISOR SUPERVISOR MATERIALS I
I I
PRELIMINARY PRELIMINARY PRELIMINARY TEST ENGINEERS TEST ENGINEERS TEST ENGINEERS FIGURE 14.2-1 START -UP ORGANIZATION RIVER BEND STATION UPDATED SAFETY ANALYSIS REPORT
S&W AD OPS SITE ADVISORY MANAGER PERMANENT VOTING MEMBER OTHERS AS REQUIRED NON-PERMANENT NON-VOTING MEMBERS PLANT STAFF REPRESENTATIVE PERMANENT VOTING MEMBER GSU SUPERINTENDENT START-UP & TEST JTG CHAIRMAN SUPERVISOR PREOPERATIONAL TESTING PERMANENT VOTING MEMBER JTG SECRETARY PERMANENT NON-VOTING MEMBER G.E.
OPERATIONS MANAGER PERMANENT VOTING MEMBER FIGURE 14.2-2 JOINT TEST GROUP (JTG)
RIVER BEND STATION UPDATED SAFETY ANALYSIS REPORT
MONTHS 0
2 4
6 8
10 12 14 16 18 I
I I
I I
PRELIMINARY TEST PHASE
[]~--------------------[]
INITIAL ENERGIZATION PREFERRED STATION SERVICE TRANSFORMERS COLD FUEL POOL HYDRO VIBRATION FUNCTIONAL LOAD RPV HYDRO TESTING TESTING FUEL ILRT INTEGRATED SIT ECCS &
START-UP CHECKS PREOPERATIONAL TEST PHASE o~------------------Cl D
20 22 24 26 I
I I
I 50%
100%
POWER POWER TEST TESTING I
I I I I INITIAL 75%
COMMERICAL HEATUP POWER OPERATION
& 25%
TEST TEST INITIAL START-UP TEST PHASE D
FIGURE 14.2-3 PRELIMINARY, PREOPERATIONAL, AND INITIAL START -UP PHASE SCHEDULE RIVER BEND STATION UPDATED SAFETY ANALYSIS REPORT
a:
w 31:
0 a.
1-z w 0 a:
w
- a.
A. NATURAL CIRCULATION B. LOW RECIRC PUMP SPEED VALVE MINIMUM POSITION C. LOW RECIRC PUMP SPEED VALVE MAXIMUM POSITION D. RATED RECIRC PUMP SPEED VALVE MINIMUM POSITION E. ANALYTICAL LOWER LIMIT OF AUTOMATIC LOAD FOLLOWING REGION F. ANALYTICAL UPPER LIMIT OF AUTOMATIC LOAD FOLLOWING REGION MINIMUM FLOW CONTROL LINE FOR TRANSFER TO CAVITATION REGION 10 20 30 50 60 70 80 90 PERCENT CORE FLOW TEST CONDITION (TC) REGION DEFINITIONS TEST CONDITION (TC)
POWER FLOW MAP REGION AND NOTES
- 1.
FROM 5 TO 35 PERCENT THERMAL POWER AND OPERATING ON RECIRCULATION PUMP LOW FREQUENCY POWER SUPPLY.
- 2.
AFTER MAIN GENERATOR SYNCHRONIZATION FROM 45 PERCENT TO 75 PERCENT CONTROL ROD LINES. AT OR BELOW THE ANALYTICAL LOWER LIMIT OF MASTER FLOW CONTROL MODE.
- 3.
FROM 45 TO 75 PERCENT CONTROL ROD LINES ABOVE 80 PERCENT CORE FLOW, AND WITHIN MAXIMUM ALLOWED RECIRCULATION CONTROL VALVE POSITION.
- 4.
ON THE NATURAL CIRCULATION CORE FLOW LINE WITH +5 PERCENT OF THE INTERSECTION WITH THE 100 PERCENT POWER ROD LINE.
- 5.
FROM THE 100 PERCENT LOADLINE TO 5 PERCENT BELOW THE 100 PERCENT LOADLINE AND BETWEEN MAXIMUM FLOW AT RATED RECIRCULATION PUMP SPEED (MINIMUM VALVE POSITION) TO 5 PERCENT ABOVE THE ANALYTICAL LOWER LIMIT OF THE AUTOMATIC FLOW CONTROL RANGE.
- 6.
WITHIN 0 TO 5 PERCENT RATED 100 PERCENT THERMAL POWER, AND WITHIN 0 TO +5 PERCENT OF RATED 100 PERCENT CORE FLOW RATE.
FIGURE 14.2-4 100 110 START -UP & TEST CONDITION FLOW MAP RIVER BEND STATION UPDATED SAFETY ANALYSIS REPORT
TEST'21 TEST CONDITIONS NOTES:
OPEN HEAT (1) TEST CONDITIONS REFER TO NO.
TEST NAME VESSEL UP I
I I
I I
WARRANTY 1
2 3
4 5
6 CONDITIONS STATED ON 1
CHEMICAL AND RADIOCHEMICAL X
X X
X x<2*1 FIGURE 14.2-4 OF THE FSAR (2) TEST NUMBER INFERS THE 2
RADIATION MEASUREMENT X
X X
X X
SECTIONS NUMBERS OF SECTION 3
FUEL LOADING X
14.2.12.3. OF THE FSAR (3) PERFORM TEST 5, TIMING OF 4 4
FULL CORE SHUTDOWN MARGIN X
SLOWEST CONTROL RODS IN 5
CONTROL ROD DRIVE SYSTEM X
X X':s' xm CONJUNCTION WITH EXPECTED SCRAMS 6
SAM PERFORMANCE (4) TO BE COMPLETED BETWEEN TEST 10 lAM PERFORMANCE X
x'*'
CONDITIONS 1 AND 3 (5) AFTER RECIRC PUMP TRIPS 11 LPRM CALIBRATION X
X (6) DOWN SETPOINT ONLY 12 APRM CALIBRATION X
X X
X X
X (7) NU BYPASS VALVE RESPONSE (8) NO CONTROL VALVE RESPONSE 13 PROCESS COMPUTER X
X
X (9) BETWEEN 80% AND 90% POWER 14 RCIC SYSTEM X
X'::
X'2
(10) BETWEEN TEST CONDITIONS 1 AND
- 3. BETWEEN 70% AND 90% POWER 16A SELECTED PROCESS TEMPERATURES X
xm XIS I (11) AT MAXIMUM POWER THAT WILL 168 WATER LEVEL REF. LEG TEMPS X
X NOT CAUSE SCRAM (12) ON ASCENSION TO TEST CONDITIONS 17 SYSTEM EXPANSION X
X7' X'2
(13) BETWEEN 40% AND 55% POWER 18 TIP UNCERTAINTY X
X (14) BETWEEN 60% AND 85% POWER (15) BETWEEN TEST CONDITIONS 2 AND 19 CORE PERFORMANCE X
X X
X X
X 3
20 STEAM PRODUCTION X
(16) GREATER THAN 75% POWER, FULL ISOLATION 21 CORE POWER-VOID MODE RESPONSE X
X (17) TURBINE TRIP 22 PRESSURE REGULATOR X
X xm X
X X
WITHIN BYPASS SYSTEM CAPACITY 23A WATER LEVEL SETPOINT CHANGES X
X X
X 238 FEEDWATER SYS-LOSS OF FW HEATING X
(19) GENERATOR LOAD REJECT 23C FEEDWATER SYS-PUMP TRIP X
(20) AT STEADY STATE AND IN 23D FEEDWATER SYS-MAX RUNOUT CAPABILITY X:l' CONJUNCTION WITH NOTE 27 (21) DEMONSTRATON OF STEAM 24 TURBINE VALVE SURVEILLANCE Xo' xnn CONDENSING 25A MSIV X
Xi23)(1S)
(22) AFTER TRIP OR COOLDOWN FROM TEST CONDITION 6 258 MSIV FULL CLOSURE x'29J (23) SINGLE VALVE 25C MAIN STEAM LINE FLOW VENTURI CALIS X
X2' (24) MAY BE DEFERRED UNTIL WARRANTY 25D MAIN STEAM LINE ELBOW TAP CALIS.
X X2' (25) RESPONSE CHECK ONLY 26 RELIEF VALVES X
(26) REFERS TO RCIC COLD QUICK STARTS ONLY 27 TURBINE TRIP AND GENERATOR LOAD REJECTION X"7' X'2tl (27) INSPECTION AFTER 2ND AND SHUTDOWN FROM OUTSIDE CONTROL ROOM X
3RD THERMAL CYCLE (28) MAY BE DONE AT TEST RECIRCULATION FLOW CONTROL X
X
- xps, X
xllOf CONDITION 3 INSTEAD (29) SRV LOW-LOW SET LOGIC 308 RECIRCULATION SYSTEM-TWO PUMP TRIP X
VERIFICATION RECIRCULATION SYSTEM PERFORMANCE XSI XP2J 30E RECIRCULATION SYSTEM CAVITATION X
X 31 LOSS OF TURB. GENERATOR & OFFSITE PWR X
33 DRYWELL PIPING VIBRATION X
X X'2o1 x*2o1 35 RECIRCULATION SYSTEM FLOW CALIBRATION X
X 70 REACTOR WATER CLEANUP SYSTEM X
71 RESIDUAL HEAT REMOVAL SYSTEM X'221 103 DRYWELL ATMOSPHERE COOLING SYSTEM X
X 105 PENETRATION TEMPERATURE X
FIGURE 14.2-5 STARTUP TEST PROGRAM RIVER BEND STATION UPDATED SAFETY ANALYSIS REPORT
THIS FIGURE HAS BEEN DELETED FIGURE 14.2-6 MAXIMUM ACCEPTABLE DRIVE FLOW FOLLOWING PUMP TRIP RIVER BEND STATION UPDATED SAFETY ANALYSIS REPORT
0 w e
<(
...I w
c w
- E i=
SAFE UP TO LIMITED POWER UNSAFE o._------~--------~--------~------~~---
0 25 50 75 100 g
100 u.. z "
u; w
c 0
0 a:
1-z w 0 a:
w a..
50 PERCENT RATED POWER PERCENT RATED POWER FIGURE 14.2-7 RCIC ACCEPTANCE CRITERIA CURVES RIVER BEND STATION UPDATED SAFETY ANALYSIS REPORT