ML17226A120
Jump to navigation
Jump to search
| ML17226A120 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 07/28/2017 |
| From: | Entergy Operations |
| To: | Office of Nuclear Reactor Regulation, Office of Nuclear Material Safety and Safeguards |
| Shared Package | |
| ML17226A087 | List:
|
| References | |
| RBG-47776, RBF1-17-0089 | |
| Download: ML17226A120 (2) | |
Text
RBS USAR CHAPTER 17 QUALITY ASSURANCE 17.1-1 August 1987 17.1 QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTION Does not apply.
RBS USAR Revision 12 17.2-1 December 1999 CHAPTER 17 QUALITY ASSURANCE
- 7 17.2 QUALITY ASSURANCE DURING THE OPERATIONS PHASE
- 10 *12 The Quality Assurance program description is provided separately in Quality Assurance Program Manual.
7* 10* 12*