Information Request for NRC Triennial Evaluations of Changes, Tests, and Experiments (50.59) Baseline Inspection 05000282/2017008; 05000306/2017008 (Iak)
ML17123A358
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 05/03/2017
From: Khan I
Engineering Branch 3
To: Northard S
Northern States Power Company, Minnesota
References
IR 2017008
Download: ML17123A358 (6)


See also: IR 05000282/2017008

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION III

2443 WARRENVILLE RD. SUITE 210

LISLE, IL 60532-4352

May 3, 2017

Mr. Scott D. Northard

Site Vice President

Prairie Island Nuclear Generating Plant

Northern States Power Company, Minnesota

1717 Wakonade Drive East

Welch, MN 55089-9642

SUBJECT: PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNIT 1 AND 2

INFORMATION REQUEST FOR NRC TRIENNIAL EVALUATIONS OF

CHANGES, TESTS, AND EXPERIMENTS (50.59) BASELINE INSPECTION

05000282/2017008; 05000306/2017008

Dear Mr. Fessler:

On August 7 2017, the U.S. Nuclear Regulatory Commission (NRC) will begin a 50.59 Baseline

Inspection at the Prairie Island Nuclear Generating Plant, Units 1 and 2. This inspection will be

performed in accordance with the NRC Baseline Inspection Procedure 71111.17T. The onsite

portion of the inspection will take place on August 7 - 11, 2017.

Experience has shown that these baseline inspections are extremely resource intensive, both

for the NRC inspectors and the licensee staff. In order to minimize the inspection impact on

the site and to ensure a productive inspection for both parties, we have enclosed a request for

documents needed for the inspection. These documents have been divided into three groups.

The first group of information is necessary to ensure that the inspection team is

adequately prepared for the inspection. This information should be made available

via compact disc and delivered to the regional office no later than June 2, 2017. The

inspection team will review this information and, by June 16, 2017, will request specific

items that should be provided for review in the regional office by July 14, 2017.

The second group of requested documents contains additional items that the team will

review, or need access to, during the inspection. Certain documents contained within

Group II (i.e. Item (1)), will be requested for review in the regional office prior to the

inspection by July 14, 2017, as identified above. The remaining documents should be

available by the first day of the onsite inspection, August 7, 2017.

The third group lists information necessary to aid the inspection team in tracking issues

identified as a result of the inspection. It is requested that this information be provided to

the lead inspector as the information is generated during the inspection. It is important

that all of these documents are up to date and complete in order to minimize the number

of additional documents requested during the preparation and/or the onsite portions of

the inspection.

P. Fessler -2-

The lead inspector for this inspection is Mr. Irfan Khan. We understand that our regulatory

contact for this inspection is Mr. Frank Sienczak of your organization. If there are any

questions about the inspection or the material requested, please contact the lead inspector

at 630-829-9732 or via e-mail at Irfan.Khan@nrc.gov.

This letter does not contain new or amended information collection requirements subject to

the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, Control Number

3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to,

a request for information or an information collection requirement unless the requesting

document displays a currently valid Office of Management and Budget Control Number.

This letter and its enclosure will be made available for public inspection and copying at

http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in

accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Irfan A. Khan, Reactor Inspector

Engineering Branch 3

Division of Reactor Safety

Docket Nos. 50-282, 50-306

License Nos. DPR-42, DPR-60

Enclosure:

Modification and 50.59 Inspection Document Request

cc: Distribution via LISTSERV

P. Fessler -3-

Letter to Paul Fessler from Irfan Khan dated May 3, 2017

SUBJECT: PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNIT 1 AND 2

INFORMATION REQUEST FOR NRC TRIENNIAL EVALUATIONS OF

CHANGES, TESTS, AND EXPERIMENTS (50.59) BASELINE INSPECTION

05000282/2017008; 05000306/2017008

DISTRIBUTION:

Jeremy Bowen

RidsNrrPMPrairieIsland Resource

RidsNrrDorlLpl3

RidsNrrDirsIrib Resource

Cynthia Pederson

Darrell Roberts

Richard Skokowski

Allan Barker

Carole Ariano

Linda Linn

DRPIII

DRSIII

ADAMS Accession Number ML17123A358

OFFICE RIII RIII RIII RIII

NAME IKhan:cl

DATE 05/03/17

OFFICIAL RECORD COPY

MODIFICATION AND 50.59 INSPECTION DOCUMENT REQUEST

Inspection Report: 05000282/2017008; 05000306/2017008

Inspection Dates: August 7 - 11, 2017

Inspection Procedure: IP 71111.17T, Evaluations of Changes, Tests, and Experiments

Lead Inspector: Irfan A. Khan

630-829-9732

Irfan.Khan@nrc.gov

I. Information Requested for In-Office Preparation Week

The following information is requested by June 2, 2017, or sooner, to facilitate the

selection of specific items that will be reviewed during the onsite inspection week. The

inspection team will select specific items from the information requested below and

submit a list to your staff by June 16, 2017. We will request that certain items be made

available to the regional office prior to the inspection by July 14, 2017. We request that

the remaining items selected from the lists be available and ready for review on the first

day of inspection. All requested information should identify the associated system and

cover the time frame from the receipt of information for the last MOD/50.59 inspection to

the present.

The required information identified below should be provided on compact disc (CD).

Please provide three copies of each CD submitted (i.e., one for each inspector). The

preferred file format is a searchable pdf file. The CDs should be indexed and hyper-

linked to facilitate ease of use, if possible. If you have any questions regarding this

information, please call the inspection team leader as soon as possible.

1. List of all Title 10 of the Code of Federal Regulations (CFR), Part 50.59 completed

evaluations involving (a) calculations, (b) procedure revisions, (c) changes to the

facility (modifications), (d) non-routine operating configurations, or (e) departures in

methods of analyses. This list should include 50.59 evaluations for the following:

a. Changes that have been made under the provisions of 10 CFR 50.59 that have

been updated in accordance with 10 CFR 50.71(e)(4) since the last MOD/50.59

inspection;

b. Modifications that are field work complete; and

c. Changes to calculations (or initiation of new calculations) that have been issued.

The list should contain the number and title of each document, a brief description

of the change, and the corresponding number and type of the affected document

(i.e., the modification or procedure to which the evaluation applies). The list

should NOT include any evaluations in which prior U. S. Nuclear Regulatory

Commission approval was sought and obtained.

Enclosure

2. A list of all 10 CFR 50.59 changes that have been screened out as not requiring a full

evaluation involving: (a) calculations; (b) procedure revisions; (c) changes to the

facility (modifications); (d) non-routine operating configurations; or (e) departures in

methods of analyses.

The list should contain the number and title of each document, and the

corresponding number and type of the affected document (i.e., the modification or

procedure to which the evaluation applies).

3. A list of any modifications, procedure revisions, or Updated Final Safety Analysis

Report (UFSAR) changes where it was determined that 10 CFR 50.59 did not apply.

4. A list of calculation changes that have been issued for use.

5. A list of corrective action documents (open and closed) that address 10 CFR 50.59

issues, concerns, or processes. These documents should also include the corrective

action documents associated with the modification and the 50.59 change

implementation.

The list should contain the number, title and revision (or date) of each document, the

affected system and corresponding documentation (if applicable), and should be

sorted in order of significance.

6. Copies of procedures addressing the following: modifications, design changes, set

point changes, equivalency evaluations or suitability analyses, commercial grade

dedications, post-modification testing, 10 CFR 50.59 evaluations and screenings,

and UFSAR updates.

7. UFSAR updates submitted in accordance with 10 CFR 50.71(e)(4). Provide copies

of the complete submittal.

8. Copy of the UFSAR change log or a synopsis of the changes. This should include all

of the changes made to the UFSAR that were incorporated in the last

10 CFR 50.71(e)(4) submittal.

9. Electronic copy of the UFSAR and technical specifications, if available.

10. Name(s) and phone numbers for the regulatory and technical contacts.

11. Current management and engineering organizational chart.

II. Information Requested to be Available Prior to Inspection. Requests will be Made

for Specific Item (1) Documents by June 2, 2017 for Availability of Requested Item

(1) Documents in Regional Office by July 14, 2017, and Items (2), (3) and (4)

Documents on First Day of Inspection (August 7, 2017).

1. Copies of all selected items from Section I. This includes copies of

associated documents such as calculations, modification packages (including

description), 10 CFR 50.59 evaluations or screenings, and any corrective action

documents.

2

2. Copies of these documents do not need to be solely available to the inspection team

as long as the inspectors have easy and unrestrained access to them.

a. UFSAR, if not previously provided;

b. Original Final Safety Analysis Report Volumes;

c. Original Safety Evaluation Report and Supplements;

d. Final Safety Analysis Report Question and Answers;

e. Quality Assurance Plan;

f. Technical Specifications, if not previously provided;

g. Latest Individual Plant Examination/Probabilistic Risk Assessment Report;

h. Vendor Manuals; and

i. The latest 10 CFR 50.59 UFSAR Update Submittal.

3. Please ensure that other supporting documents for the selected items have been

located and are readily retrievable as the inspection team will likely be requesting

these documents during the inspection. Examples of supporting documents are:

a. Drawings supporting the modifications;

b. Procedures affected by the modifications; and

c. UFSAR change papers generated due to a 10 CFR 50.59 evaluation.

4. Assessment and Corrective Actions:

a. The most recent 50.59 Quality Assurance audit and/or self-assessment; and

b. Corrective action documents (e.g., condition reports, including status of

corrective actions) generated as a result of the most recent 50.59 Quality

Assurance audit and/or self-assessment.

III. Information Requested to be provided throughout the inspection

1. Copies of any corrective action documents generated as a result of the inspection

teams questions or queries during this inspection.

2. Copies of the list of questions submitted by the inspection team members and the

status/resolution of the information requested (provide daily during the inspection to

each inspection team member).

If you have any questions regarding the information requested, please contact the inspection

team leader.

3