MONTHYEARNMP1L3570, Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-02-0101 February 2024 Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation IR 05000220/20230042024-02-0101 February 2024 Integrated Inspection Report 05000220/2023004 and 05000410/2023004 NMP1L3569, CFR 50.46 Annual Report2024-01-26026 January 2024 CFR 50.46 Annual Report ML24004A2122024-01-0808 January 2024 Senior Reactor and Reactor Operator Initial License Examinations ML23354A0012024-01-0404 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0059 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23278A1292023-12-14014 December 2023 Units 1 & 2; Limerick, Units 1 & 2; Nine Mile Point, Units 1 & 2; and Peach Bottom, Units 2 & 3 -Revision to Approved Alternatives to Use Boiling Water Reactor Vessel and Internals Project Guidelines NMP1L3566, Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station2023-12-14014 December 2023 Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station IR 05000410/20243012023-12-14014 December 2023 Initial Operator Licensing Examination Report 05000410/2024301 ML23305A1402023-12-13013 December 2023 Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 NMP1L3564, Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements2023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements ML23291A4642023-12-0707 December 2023 Issuance of Amendment No. 251 Regarding the Adoption of Title 10 the Code of Federal Regulations Section 50.69, Risk-Informed Categorization and Treatment of SSC for Nuclear Power Plants ML23289A0122023-12-0606 December 2023 Issuance of Amendment No. 250 Regarding the Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b NMP1L3563, Submittal of Relief Request I5R-12, Revision 0, Concerning the Installation of a Full Structural Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208)2023-12-0404 December 2023 Submittal of Relief Request I5R-12, Revision 0, Concerning the Installation of a Full Structural Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) IR 05000220/20234022023-11-28028 November 2023 Security Baseline Inspection Report 05000220/2023402 and 05000410/2023402 NMP1L3557, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-22022 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000220/20234202023-11-0101 November 2023 Security Baseline Inspection Report 05000220/2023420 and 05000410/2023420 ML23305A0052023-11-0101 November 2023 Operator Licensing Examination Approval IR 05000220/20230032023-10-25025 October 2023 Integrated Inspection Report 05000220/2023003 and 05000410/2023003 IR 05000220/20235012023-10-17017 October 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000220/2023501 and 05000410/2023501 IR 05000220/20230112023-10-16016 October 2023 Comprehensive Engineering Team Inspection Report 05000220/2023011 and 05000410/2023011 RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans NMP1L3554, Submittal of Revision 28 to the Final Safety Analysis Report (Updated), Fire Protection Design Criteria Document, 10CFR50.59 Evaluation Summary Report, 10CFR54.37(b) Aging Management Review, and Technical Specifications with Revised Bases2023-10-0606 October 2023 Submittal of Revision 28 to the Final Safety Analysis Report (Updated), Fire Protection Design Criteria Document, 10CFR50.59 Evaluation Summary Report, 10CFR54.37(b) Aging Management Review, and Technical Specifications with Revised Bases C IR 05000220/20233032023-09-20020 September 2023 Retake Operator Licensing Examination Report 05000220/2023303 ML23250A0822023-09-19019 September 2023 Regulatory Audit Summary Regarding LARs to Adopt TSTF-505, Rev. 2, and 10 CFR 50.69 ML23257A1732023-09-14014 September 2023 Requalification Program Inspection IR 05000220/20230052023-08-31031 August 2023 Updated Inspection Plan for Nine Mile Point Nuclear Station, Units 1 and 2 (Report 05000220/2023005 and 05000410/2023005) RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2023-08-30030 August 2023 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs NMP2L2851, Relief Request Associated with Successive Inspections for Generic Letter 88-01 / BWRVIP-75-A Augmented Examinations2023-08-25025 August 2023 Relief Request Associated with Successive Inspections for Generic Letter 88-01 / BWRVIP-75-A Augmented Examinations ML23151A3472023-08-21021 August 2023 Issuance of Amendments to Adopt TSTF-295-A, Modify Note 2 to Actions of PAM Table to Allow Separate Condition Entry for Each Penetration NMP1L3534, License Amendment Request - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2023-08-18018 August 2023 License Amendment Request - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation ML23220A0262023-08-0808 August 2023 Licensed Operator Positive Fitness-for-Duty Test IR 05000220/20234012023-08-0808 August 2023 Cyber Security Inspection Report 05000220/2023401 and 05000410/2023401 (Cover Letter Only) NMP1L3545, Supplemental Information Letter to Adopt TSTF-505, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 and 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems .2023-08-0404 August 2023 Supplemental Information Letter to Adopt TSTF-505, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 and 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems . RS-23-087, Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor2023-08-0404 August 2023 Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor IR 05000220/20230022023-08-0101 August 2023 Integrated Inspection Report 05000220/2023002 and 05000410/2023002 ML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 NMP1L3544, Fifth Inservice Inspection Interval, First Inservice Inspection Period 2023 Owner'S Activity Report for RFO-27 Inservice Examinations2023-07-14014 July 2023 Fifth Inservice Inspection Interval, First Inservice Inspection Period 2023 Owner'S Activity Report for RFO-27 Inservice Examinations ML23186A1642023-07-0606 July 2023 Operator Licensing Retake Examination Approval NMP2L2846, Nine Mire Point Nuclear Station, Units 1 and 2, General License 30-day Cask Registration Notifications2023-07-0505 July 2023 Nine Mire Point Nuclear Station, Units 1 and 2, General License 30-day Cask Registration Notifications ML23192A0622023-06-30030 June 2023 Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance, Report No. 10CFR21-0136, Rev. 0 IR 05000220/20230102023-06-29029 June 2023 Biennial Problem Identification and Resolution Inspection Report 05000220/2023010 and 05000410/2023010 ML23131A4242023-06-23023 June 2023 Issuance of Amendment No. 249 Regarding the Revision to Technical Specification 3.3.1 to Adopt Technical Specifications Task Force Traveler TSTF-568 RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations NMP1L3539, Day Commitment Response - Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208)2023-06-0909 June 2023 Day Commitment Response - Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) ML23159A0052023-06-0505 June 2023 56557-EN 56557 - Paragon - Redlined RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling IR 05000410/20233022023-05-15015 May 2023 Initial Operator Licensing Examination Report 05000410/2023302 2024-02-01
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML23264A7992023-09-21021 September 2023 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC Fleet Request License Amendment Request to Adopt TSTF-580, Revision 1 ML23205A2432023-07-19019 July 2023 NRC Staff Follow-up Question on Audit Question 18 TSTF-505 and 50.69 Regulatory Audit (E-mail Dated 7/19/2023) (EPIDs L-2022-LLA-0185 and L-2022-LLA-0186) ML23087A2912023-03-28028 March 2023 Request for Additional Information (3/28/2023 E-mail) - Proposed Emergent I5R-11 Alternative Associated with a Weld Overlay on RPV Recirculation Nozzle N2E DM Weld ML23061A0522023-03-0202 March 2023 Request for Additional Information (3/2/2023 E-mail) - Proposed Alternative Associated with a Weld Overlay Repair to the Torus ML23012A2002023-01-13013 January 2023 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000220/2023401 and 05000410/2023401 ML22207A2162022-07-26026 July 2022 Information Request to Support Triennial Baseline Design-Basis Capability of Power-Operated Valves Inspection; Inspection Report 05000220/2022010 and 05000410/2022010 ML22194A9412022-07-13013 July 2022 Request for Additional Information Relief Request CS-PR-02 (7/13/2022 e-mail) ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 ML22020A0642022-01-13013 January 2022 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative for Repair of Water Level Instrumentation Partial Penetration Nozzles ML21320A3472021-11-16016 November 2021 Request for Additional Information LAR to Revise TSs to Adopt TSTF-582, Revision 0 ML21306A3312021-11-0202 November 2021 Request for Additional Information Alternative Request GV-RR-10 (11/2/2021 e-mail) ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21144A2132021-05-24024 May 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21117A0342021-05-0505 May 2021 Request for Additional Information Regarding Proposed Alternative to Use ASME Code Case N-893 ML21125A1282021-05-0404 May 2021 OPC Document Request - Feb 2021 ML21110A5112021-04-20020 April 2021 Request for Additional Information Review of License Amendment Request to Revise Technical Specifications to Adopt TSTF-582 ML21088A2682021-03-30030 March 2021 Notification of Conduct of a Fire Protection Team Inspection ML21062A0652021-03-0101 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21049A2572021-02-18018 February 2021 Request for Additional Information Byron/Dresden Proposed Changes to Site Emergency Plans to Support Post-Shutdown and Permanently Defueled Conditions (EPID-2020-LLA-0240 & EPID-2020-LLA-0237) ML20365A0092020-12-30030 December 2020 Request for Additional Information Concerning Review of License Amendment Request and Relief Request to Change Excess Flow Check Valve Testing Frequency (EPIDs L-2020-LLA-0188 and L-2020-LLR-0114) ML20358A2602020-12-28028 December 2020 Changes to Draft Request for Additional Information Regarding License Amendment Request and Relief Request to Change Excess Flow Check Valve Testing Frequency ML20272A2802020-09-28028 September 2020 Withdrawal and Replacement of Request for Additional Information to Support Review of License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times ML20248H5192020-09-28028 September 2020 Changes to Draft Request for Additional Information Regarding Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times ML20246G6362020-09-0202 September 2020 Request for Additonal Information to Support Review of License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times NMP2L2739, Request for Additional Information for Nine Mile Point Nuclear Station, Unit 2, to Adopt TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, Revision 22020-08-28028 August 2020 Request for Additional Information for Nine Mile Point Nuclear Station, Unit 2, to Adopt TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 ML20239A7982020-08-25025 August 2020 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet License Amendment Request to Adopt TSTF-568, Revision 2 ML20212L8702020-07-30030 July 2020 Request for Additonal Information Review of License Amendment Requests Regarding Riskinformed Categorization and Treatment of Structures, Systems and Components (L-2019-LLA-0290) ML20213A9352020-07-30030 July 2020 Request for Additional Information Review of License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times ML20153A7042020-06-0101 June 2020 NRR E-mail Capture - Preliminary RAI for Fleet Request to Use Alternative OMN-26 ML20135H1972020-05-14014 May 2020 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Request to Extend Safety Relief Valve Test Interval ML20045E3582020-02-14014 February 2020 Draft Request for Additional Information Regarding License Amendment Request to Increase Allowable MSIV Leakage Rates ML19296A1862019-10-23023 October 2019 Request for Additional Information Regarding License Amendment Request to Increase Allowable MSIV Leakage Rates (L-2019-LLA-0115) ML19275H1362019-10-0202 October 2019 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Request to Use ASME Code Case N-879 ML19179A0612019-07-19019 July 2019 Three Mile Point 1 - Supplemental Information Needed to Proposed Alternative to Use ASME Code Case N-879 ML19151A8132019-05-31031 May 2019 Licensed Operator Positive Fitness-For-Duty Test ML19025A1572019-01-25025 January 2019 Request for Additional Information Regarding Primary Containment Oxygen Concentration License Amendment Request ML19025A1202019-01-24024 January 2019 NRR E-mail Capture - Calvert Cliffs, Fitzpatrick, and Nine Mile Point - Request for Additional Information Regarding License Amendment Request to Revise Emergency Response Organization Staffing ML18341A2212018-12-0707 December 2018 Request for Additional Information Regarding Emergency Tech Spec Change Re HPCS Completion Time (EPID -L-2018-LLA-0491) ML18228A6932018-08-15015 August 2018 Request for Additional Information Regarding Reactor Pressure Vessel Water Inventory Control License Amendment Request (L-2017-LLA-0426) ML18205A3922018-07-24024 July 2018 Request for Additional Information Regarding Reactor Pressure Vessel Water Inventory Control License Amendment Request (L-2017-LLA-0426) ML18184A2882018-07-0303 July 2018 Request for Additional Information Regarding Removal of Boraflex Credit from Spent Fuel Pool License Amendment Request(L-2018-LLA-0039) ML18102A2372018-04-12012 April 2018 NRR E-mail Capture - Calvert Cliffs, Ginna, and Nine Mile Point - Request for Additional Information Regarding License Amendment Request to Revise Emergency Action Level Schemes (EPID-L-2017-LLA-0237) ML17331B1342017-12-12012 December 2017 2, and R.E. Ginna Nuclear Power Plant - Request for Additional Information - Regarding ML17285B1962017-10-27027 October 2017 Request for Additional Information Regarding Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools. ML17272A0112017-10-10010 October 2017 Request for Additional Information Regarding License Amendment Concerning Reactor Pressure Vessel Water Inventory Control ML17234A3592017-08-30030 August 2017 Request for Additional Information Regarding Relief Request NMP-RR-001 to Utilize Code Case N-702 ML17241A2752017-08-29029 August 2017 Request for Additional Information Response MSA (MF7946,7) and FE (MG0087,8) E-mail Attachment ML17240A3102017-08-15015 August 2017 NRR E-mail Capture - Nine Mile Point MSA and FE RAI ML17172A0842017-06-27027 June 2017 Request for Additional Information Regarding Relief Request to Utilize ASME Code Case N-702 ML17065A1622017-03-14014 March 2017 Request for Additional Information Regarding Proposed Alternative to Perform Pressure Isolation Valve Leakage Testing at Frequencies Consistent with 10 CFR Part 50, Appendix J 2023-09-21
[Table view] |
Text
DIST TION'RC PIP LSlegers Local PDR SVarga Docket APR 1 ",
j975 ORBI3 Rdg KRGoller TJCarter GLear Docke t No. 50-220 CJDeBevec SATeets OELD OltrE (3)
Niagara Hohawk Power Corporation ACRS (14),
ATTN: Hr. Gerald K. Rhode, " Gray file Vice President Engineering extra cps (5) 300 Erie Boulevard Pest JKnight, Syracuse, New York 13202 RCudlin, LShao Gentlemen: SChan GLainas Pursuant to 550.54(f) of 10 CFR Part 50, the Nuclear Regulatory Commission
,(NRC) staff requires that certain information related to the design of the containment for your facility be submitted promptly to NRC for its review.
This requirement results from recent developments associated with the large-scale BMR Hark III testing being conducted by the General Electric Company. These tests indicate that suppression pool hydrodynamic loads during a loss-of-coolant accident (LOCA) should be considered in the detailed design of components and structure of the Hark III containment.
En addition, there appears to be a potential for the occurrence of similar dynamic loads on plants with a Mark type of containment. I Therefore, we require that you provide the information specified in Enclosure 1 concerning the potential magnitude of these hydrodynamic loads, and the effects of these loads, in combination with other design loads, on the design of your containment structures. r Enclosure 1 specifies, the information required to complete our review of the effect of pool dynamic loads on the design of your containment structures. Enclosure 2 contains background information on the status of efforts directed at determining pool dynamic loads. For general information, we have also provided in Enclosure 3 a description of the various phenomena during a postulated LOCA which result in possible hydrodynamic loads. Please note that certain key phrases in Enclosure 3 have been underlined. These phrases (1) identify those specific hydrodynamic loads which, as a minimum, should be considered in your review of containment design, and (2) establish the standard nomenclature by which phenomena should be discussed or referenced in your documentation.
Your response to the request should be filed within sixty days of the date of receipt of this letter. If you cannot meet this schedule, please advise us within fifteen days. The scheduling of work on this matter should parallel related efforts on other containment design/
operational control aspects, i.e., relief valve vent clearing and steam quenching vibration phenomena.
OFFICE 1IN
~GI!3 ORRIS HRRRX FOR CONCURRE CE OF THIS L TTER SURIIAME W DQEQYM '3QQ GLI=ar SEE MEM0 0 F ADs AND ORB s DATED DATE ~ 4/ /7S 4l l2 JZS V32l23.
Form AEC-318 (Rev. 9-53) AECM 0240
- V 5 COVCRNMENT I RINTINC ORRICC'I 074 555 886
F F, ~
~
f'
~
~
)
h hat F ~
1.
Nr. Cerald K. Rhode Please contact us if you desire additional discussion or clarification of the information requested.
Sincerely, George Lear, Chief Operating Reactors Branch 03 Division of Reactor Licensing
Enclosures:
1 ~ Required Information
- 2. Background
- 3. Description of Potential Pool,,Dynamic Phenomena This request for Generic Information vas approved by GAO under a blanket Clearance Ho. B-180225 (R0072); this clearance expires July 31, 1977.
cc: v/enclosures Arvin E. Upton, Esquire LeBoeuf, Lamb, Leiby 8 ffacRae 1757 N Street, N. P.
Pashington, D. C. 20036 Anthony Z. Roisman, Esquire Berlin, Roisman & Kessler 1712 5 Street, N. M.
washington, D. C. 20036 Osvego City Library 1'20 E. Second Nev York Street'swego, 13126 OFFICE%
SURNAMEt>
DATEf2 Form AEC-318 (Rev. 9-53) AECM 0240 Q U.R OOVCRNNCNl'RINTINO OFPICCI 1$ 1$ 4$ $ 2$ $
E
~
7 r
'1
ENCLOSURE l RE UIRED INFOIQNTION Provide large size plan and section drawings of the suppression chamber which illustrate the structures, equipment, and piping in and above the suppression pool. These drawings should be in sufficient detail to describe all equipment and structural surfaces which could be subjected to suppression pool hydrodynamic loadings.
(2) . Provide a chronology of all potential pool dynamic loads during a LOCA which identifies the source of the load (see enclosure 3),
the time interval over which the load is active, and the structures which are affected. (For an example, see GESSAR, Response 3.82.)
(3) For each structure or group of structures identified in paragraph (2) above, provide the anticipated load as a function of time due to each of the pool dynamic loads which could be imparted to the structure.
(4) For each structure or group of structures identified in paragraph (2) above, provide the total load as a function of time due to the sum of anticipated pool dynamic loads.
Describe the manner in which the pool dynamic load characteristic shown in (4) above is integrated into the structural design of each structure.
Specify the relative magnitude of the pool dynamic load compared to other design basis loads for the structure.
(6) Describe the manner by which potential asymmetric'loads were considered in the containment design. Characterize the type and magnitude of possible asymmetric loads and the capabilities of'he affected structures to withstand such a loading profile. Include of seismically induced pool motion which 'could lead 'onsideration to locally deeper submergences for certain horizontal vent stacks.
Provide justification for each of the load histories given in (3)
'above by the use of appropriate experimental data and/or analyses.
References to test data should indicate the specific test runs and data'points and the manner by which they were converted to loads.
As an interim measure, use of available experimental data may be acceptable; however, if it appears necessary, additional tests directly applicable to the LOCA pool dynamic load phenomenon and its analyses will be required.
(8) Provide a description of the structural analysis methods, and a summary of the results of your structural design evaluation which either demonstrate that the containment design can withstand the pool dynamic loads imposed upon the structure within adequate margins, or the design modifications required to meet allowable design limits.
,I ~
~~a t L') P~ A . chal
ENCLOSURE 2 BAC!(GROUND Pool D amies The need to consider suppression pool hydrodynamic loads in the design of certain parts of the Mark III containment developed during the early phases of the large-scale Mark III test program being conducted by the General Electric Company. A series of air tests were performed in March 1974 to scope the range and magnitude of pool dynamic loads. It was recognized that more definitive tests were required and therefore comprehensive tests in 1/3 scale were initiated in the summer of 1974 and are currently still in progress. Parallel efforts to develop analytical models for the various pool dynamic phenomena have been implemented by the General Electric Company, several architect/engineers, and by NRC consultants.
The NRC staff has maintained contact with GE regarding the planning and progress of the pool dynamics testing and associated analyses. Due to the commonality of the water pressure suppression feature in Mark I, II, and III type containments it was apparent that pool dynamic loads could also be a consideration for Mark I and II plants. GE, in fact, is in the process of planning a series of tests for ASEA/Atom of Sweden.
The purpose of these tests would be to determine pool dynamic loads for a structure located immediately above the suppression pool for a containment with vertical vent pipes. The basis for applying this data to specific Mark I and II designs has not yet been established.
I" W
W e n lip If/ I /1 V
ENCLOSURE 3 DESCRIPTION OF POTENTIAL POOL DYNAMIC PHENOMENA e
Following a .design basis loss-of-coolant accident in the drywell, the dry-well atmosphere will be rapidly compressed due to blowdown mass and energy addition to the drywell volume. This compression would be transmitted in the form of a com ressive wave and propogate through the vent system into the suppression pool. The pool response to this effect could include a load on the suppression chamber walls.
With pressurization of the drywell, the water in the downcomers will be depressed and forced out through the vent system into the suppression pool. This movement of pool water can result in a water et im in ement load on the suppression chamber.
Following clearing of the vents an air/steam/water mixture will flow from the drywell through the vents and be injected into the suppression pool below the surface. Depending on the characteristics of the suppression system (i.e., the vent area compared to the drywell volume and break flow area) drywell overexpansions could occur. Overexpansion of the drywell results when the initial vent flow, following vent clearing, evacuates the drywell more rapidly than the volume is replenished by blowdown mass and energy input. If the drywell volume is relatively small compared to the area of the vents, then there is insufficient capacity to absorb the transition in venting rates and loads due to o r a sion o cillat ons can occur on the suppression chamber and vent system.
During vent flow the steam component of the flow mixture will condense in the pool while the air, being noncondensible, will be released to the pool as high pressure air bubbles. Initial air bubble loads would be experienced by all pool retaining structures and could be of an oscillator mode due to overexpansion and recompression of the bubbles.
The continued addition and expansion of air within the pool causes the pool volume to swell and therefore an acceleration of the surface vertically upward. This response of the pool is referred to as bulk pool swell since the air is confined beneath the pool and is driving a solid ligament of water. Bulk ool swell air bubble and flow dra loads are imparted to the suppression chamber walls and to structures, components, etc,, which may be Due to the effect of buoyancy, air bubbles will rise faster than the pool water mass and will eventually break through the swollen surface and relieve the driving force beneath the pool. This breakup of the water ligament leads to the upward expulsion of a 2-phase mixture of air and water and is referred to as pool swell in the froth mode. Structures which are located at higher elevations above the initial pool surface could experience a pool swell froth im in ement load due to impact of 2-phase flow.
I V T1. fg
$ l
2 Froth flow will continue until the fluid kinetic energy has been expended, followed by fallback of the water to the initial suppression pool level.
Structures located above the pool could be subject to water fallback loads.
Following the initial pool swell event the suppression system will settle into a generally coherent phase during which significant vent flow rates are maintained from the drywell to the pool. A resultant effect is the occurrence of hi h vent flow steam condensation loads, which can be of an on pool retaining structures. As the reactor coolant system inventory of mass and energy is depleted, near the end of blowdown, venting rates to the suppression pool diminish allowing water to reenter the downcomers. During phases of low vent mass flux the suppression system behaves in an oscillatory manner, referred to as chugging, whereby periodic clearing and subsequent recovery of vents occurs since the vent flow cannot sustain bulk steam condensation at the vent exit. The resultant local fluctuations in pressure and water levels generate fichu~in
, predominantly on the vent system.
It should be further noted that the magnitude and range of any of the hydro-of the suppression system, either in the circumferential or radial direction.
One possible initiator of such response would be seismicall induced ool motion which could lead to locally deeper submergences for certain downcomers and therfore larger pool swell loads. Full account of this potentiality should be made in establishing hydrodynamic load capabilities for the suppression chamber structures design.
~
g h