MONTHYEARML22335A2802022-11-0404 November 2022 11-4-2022 Email Transmitting Draft Questions Pertaining to Pilgrim ISFSI Exemption Request ML22270A0422022-09-26026 September 2022 Acknowledgement Email for Holtecs Request for Reporting Exemption with Regards to the Pilgrim ISFSI Annual Radioactive Effluent Release Report (Docket No. 05000293) ML22154A1622022-05-26026 May 2022 Letter and Email from Save Our Bay/Diane Turco Regarding Irradiated Water Release from Pilgrim ML22007A2602021-12-0606 December 2021 E-mail from P. Obrien, Holtec, to A. Snyder, NRC, on Pilgrim Effluent Discharge ML21287A6192021-10-14014 October 2021 E-mail from S. Phillips, MEMA, to A. Snyder, NRC, Pilgrim Nuclear Power Station, Commonwealth of Massachusetts Consultation Response to Amendment Review for Emergency Preparedness ML21266A2512021-09-23023 September 2021 Consultation with Commonwealth of Massachusetts Regarding Proposed Amendment Application for Emergency Plan and Emergency Action Levels ML21266A2772021-09-23023 September 2021 HDI Clarification of Exemption Requested from 10 CFR 20, Appendix G, Section Iii.E ML21267A0012021-09-23023 September 2021 E-mail from A. Snyder, NRC, to A. Sterdis, Holtec, - Pilgrim Nuclear Power Station - Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E Acceptance Review ML21257A3832021-09-15015 September 2021 E-mail from A. Snyder, NRC, to A. Sterdis, Holtec, - Pilgrim Nuclear Power Station - Follow-on Request Re Request for Additional Information 2 Pilgrim - License Amendment Request Independent Spent Fuel Storage Installation Only Emergency Pl ML21211A5912021-07-22022 July 2021 Consultation Response from Commonwealth of Massachusetts Regarding Proposed Pilgrim ISFSI Only Technical Specifications ML21211A5162021-07-22022 July 2021 Consultation Response from Commonwealth of Massachusetts Regarding Proposed Pilgrim ISFSI Only Physical Security Plan ML21200A2352021-07-13013 July 2021 Consultation Request to Commonwealth of Massachusetts Regarding Proposed Pilgrim ISFSI Only Technical Specifications ML21200A1522021-07-13013 July 2021 Consultation Request to Commonwealth of Massachusetts Regarding Proposed Pilgrim Isfi Only Physical Security Plan ML21176A1842021-06-25025 June 2021 Email from HDI Regarding Pilgrim Nuclear Power Station Training ML21180A0582021-06-17017 June 2021 Email from Region I Regarding Pilgrim Nuclear Power Station Inspection - EA-13-132 ML21097A0402021-04-0606 April 2021 E-Mail Consult with Commonwealth of Mass Re - Amendment Application - Physical Security Plan for the Pilgrim Nuclear Power Station L-20-092, Email Pilgrim Nuclear Power Station-Exemption from Annual Force-On-Force Exercise Requirements of 10 CFR Part 73, Appendix B,2020-12-10010 December 2020 Email Pilgrim Nuclear Power Station-Exemption from Annual Force-On-Force Exercise Requirements of 10 CFR Part 73, Appendix B, L-20-096, Supplemental Information to Support Physical Security Plan Revision and License Amendment Request to Incorporate Alternate Measures - Holtec Email Dated December 10, 20102020-12-10010 December 2020 Supplemental Information to Support Physical Security Plan Revision and License Amendment Request to Incorporate Alternate Measures - Holtec Email Dated December 10, 2010 ML20328A2982020-11-16016 November 2020 Response from Commonwealth of Massachusetts on No Significant Hazard for Pilgrim ISFSI Amendment to Address ISFSI II Dated November 16, 2020 ML20297A2372020-10-22022 October 2020 Request for Additional Information - HDI Fleet Decommissioning Quality Assurance Program ML20266G4032020-09-22022 September 2020 Acceptance Review Email - Request for Approval of HDI Fleet Decommissioning Quality Assurance Program, Revision 0 ML20163A6802020-06-11011 June 2020 Confirmation of the Scope of the Requested Regulatory Relief for Pilgrim Security Qualifications ML20280A1912020-04-17017 April 2020 Request for Additional Information- Clarifying Information for Pilgrim ISFSI Physical Security Amendment Application ML20269A3542020-03-0505 March 2020 CFR 26.717 Reports 2019 Transmittal Email ML19336A0302019-11-27027 November 2019 OEDO-15-00479 - Re 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding ML19336A0332019-11-26026 November 2019 OEDO-15-00479 - E-mail to Petitioner - 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding (CAC No. MF6460; EPID L-2015-CRS-0002)- Issuance of Final Director'S Decision ML19331A1952019-11-21021 November 2019 NRR E-mail Capture - (External_Sender) Pilgrim Nuclear Power Station - Commonwealth Consultation Response - Amendment Regarding Site Emergency Plan and Emergency Action Level Scheme ML19331A1732019-11-12012 November 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station -Consult with Commonwealth - Amendment Regarding Cyber Security Plan ML19331A1642019-11-0505 November 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station -Consult with Commonwealth - Amendment Regarding Site Emergency Plan and Emergency Action Level Scheme ML19331A1792019-11-0505 November 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - EA and Fonsi for Pilgrim Emergency Planning Exemption CY-19-007, LTR-19-0441 Henrietta Cosentino, E-mail SECY-19-0078 Request by Entergy Nuclear Operations Inc. for Exemptions from Certain Emergency Planning Requirements for the Pilgrim Nuclear Power Station2019-11-0404 November 2019 LTR-19-0441 Henrietta Cosentino, E-mail SECY-19-0078 Request by Entergy Nuclear Operations Inc. for Exemptions from Certain Emergency Planning Requirements for the Pilgrim Nuclear Power Station ML19275H1962019-09-24024 September 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Consult with Commonwealth - Amendment Regarding Permanently Defueled Technical Specifications (PDTS) ML19239A0372019-08-26026 August 2019 E-mail from Entergy Dated August 26, 2019, Notification of Pilgrim License Transfer ML19239A0262019-08-23023 August 2019 LTR-19-0330 Janet Azarovitz, E-mail a Plea for More Time and Reasonable Discussion Including the Citizens of the Commonwealth in the Sale of the Pilgrim Nuclear Power Station ML19234A2072019-08-20020 August 2019 LTR-19-0328 Lawrence Delafield, President, Six Ponds Improv Assoc., Plymouth, Ma, Ltr Requests NRC to Postpone Consideration of Transferring the Licenses for the Pilgrim Nuclear Power Until the NRC Has Answered Concerns by Pilgrim Watch, Se ML19232A4032019-08-20020 August 2019 LTR-19-0322 Diane Turco, Director, Cape Downwinders, Massachusetts, Letter/E-mail Requests Suspension of the Pilgrim License Transfer from Entergy to Holtec Until the Adjudicatory Hearing Is Held and Raised Contentions Are Resolved ML19308A9942019-08-19019 August 2019 Entergy Nuclear Operations, Inc. Confirmatory Order Rescission Supplemental Information ML19226A3912019-08-14014 August 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - EA and Fonsi for Pilgrim Decommissioning Trust Fund Exemption (Holtec) ML19226A3962019-08-14014 August 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station -Consult with Commonwealth - Conforming Amendment in Support of Pilgrim License Transfer Application ML19226A1212019-08-13013 August 2019 OEDO-15-00479-2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding - Status (CAC No. MF6460; EPID L-2015-CRS-0002) ML19227A1032019-08-0707 August 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Draft Wording for Potential Condition of License Transfer Order ML19207B3662019-07-26026 July 2019 NRR E-mail Capture - Pilgrim - RAI Direct and Indirect Transfer of Lic.; Conforming Lic. Amend.; Req. for Exemption 10 CFR 50.82(A)(8)(I)(A) for Holtec Decom. International, Llc ML19176A3452019-06-25025 June 2019 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding - Information (OEDO-15-00479) (CAC No. MF6460; EPID L-2015-CRS-0002) ML19154A0652019-06-0303 June 2019 NRR E-mail Capture - Pilgrim - Permanent Cessation of Power Operations ML19154A5242019-06-0303 June 2019 NRR E-mail Capture - RAI - Pilgrim Post-Decommissioning Technical Specifications (PDTS) License Amendment Request (LAR) ML19161A2122019-05-20020 May 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Acceptance of License Amendment Request to Remove Cyber Security Plan Requirements ML19123A0332019-05-0101 May 2019 NRR E-mail Capture - Logbook Entry: 05/01/2019 Endangered Species Report Regarding a Confirmed Sighting of North Atlantic Right Whale(S) (Balaena Glacialis) ML19122A4912019-04-29029 April 2019 NRR E-mail Capture - Logbook Entry: 04/29/2019 Regarding the Confirmed Sighting of Ten North Atlantic Right Whales (Balaena Glacialis) ML19108A2372019-04-18018 April 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Acceptance of Requested Licensing Action, Proposed Exemptions from 10 CFR 50.54(w)(1) - On-Site Property Damage Insurance ML19108A2362019-04-18018 April 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Acceptance of Requested Licensing Action, Proposed Exemptions from 10 CFR 140.11(a)(4) - Primary and Secondary Liability Insurance 2022-09-26
[Table view] |
Text
From: Mary Lampert [1]
Sent: Sunday, January 22, 2017 4:26 PM To: Venkataraman, Booma <Booma.Venkataraman@nrc.gov>; Koenick, Stephen
<Stephen.Koenick@nrc.gov>; Dean, Bill <Bill.Dean@nrc.gov>; daniel.dorman@nrc.gov; Burritt, Arthur
<Arthur.Burritt@nrc.gov>; Cline, Leonard <Leonard.Cline@nrc.gov>
Cc: Michal Freedhoff <michal_freedhoff@markey.senate.gov>; Dave Lochbaum
<dlochbaum@ucsusa.org>; Donna Gilmore <dgilmore@cox.net>
Subject:
[External_Sender] Pilgrim Watch response to Stephen Koenick January 7 reply to our October 27, 2016 email regarding liability and Holtec guarantees at Pilgrim Nuclear Power Station.
Pilgrim Watch response to Stephen Koenick January 7 reply to our October 27, 2016 email regarding liability and Holtec guarantees at Pilgrim Nuclear Power Station.
We respectfully ask NRC to answer our original questions.
Thank you
Booma Venkataraman Stephen S. Koenick William Dean Daniel Dorman Arthur Burritt Leonard Cline Via Email January 22, 2017 Hello:
On January 7, 2017, Stephen Koenick responded to our October 27, 2016 email to William Dean, Daniel Dorman and Arthur Burritt regarding liability and Holtec guarantees at Pilgrim Nuclear Power Station. The January 7 reply talked a lot about NRCs safety mission but failed to respond to our specific questions. The original email is attached, along with your response. For convenience, the key questions are listed below; and, we will appreciate specific answers to these questions. The liability questions pertain to both onsite and offsite damage.
Again, we appreciate that the agreements between Entergy and Holtec could be proprietary but NRC would be privy to the substance of those agreements for NRC to satisfy its mission to protect public safety, property values and the environment if something goes wrong. If NRC does not have authority to be privy to the substance of those agreements or to the agreements themselves, please provide citations to regulation. Also, please explain how absent NRCs understanding of those agreements how NRC can satisfy its mission to protect public safety, property values and the environment if something goes wrong.
Questions-Liability1
- 1. If something goes wrong with any Holtec component, such as a leak, what company will be liable and responsible for any resulting damage, particularly but not exclusively offsite - Holtec or an Entergy company such as Entergy Nuclear Operations?
- 2. What do agreements between Entergy and Holtec say about responsibility/liability. Are there limits? If so, what if the damage exceeds the limits?
- 3. If there is contamination either on or offsite, what (if anything) does Price Anderson insurance cover? We add that each cask contains about one-half the Cs-137 that was released during the Chernobyl accident. There will be about 60 casks onsite at Pilgrim when the spent fuel pool is emptied standing above ground, vertically on a pad..
If Holtec is liable:
- 4. Are different Holtec companies/divisions responsible for each of the three primary components-MPC-68, HI-TRAC 100 D, and HI-STORM 100S; or is a single Holtec company/division responsible for any damage resulting from all three components?
- 5. What is the name, and location, of each specific Holtec company division that is responsible for any damage for each of the three components?
- a. MPC-68
- b. HI-TRAC 100 D, and
- c. HI-STORM 100S 1
http://www.holtecinternational.com/company/corporate-overview/corporate-organization-structure/
http://www.bloomberg.com/research/stocks/private/snapshot.asp?privcapId=4272763
- 6. If one Holtec company/division holds the responsibility/liability for all three, is that Holtec company/division a limited liability company? If so, is any other entity (Holtec or Entergy) secondarily responsible?
- 7. If separate Holtec companies hold the responsibility/liability, are they limited liability companies? If so, is any other entity (Holtec or Entergy) secondarily responsible?
- a. MPC-68
- b. HI-TRAC 100 D, and
- c. HI-STORM 100S If Entergy - Same questions as 4-7 Questions Guarantees How long does Holtec guarantee the following?
- a. MPC-68
- b. HI-TRAC 100 D
- c. HI-STORM 100S Once the guarantee expires who is responsible until DOE takes title- once the casks leave the site?
Thank you and we look forward to your response.
Respectfully, Mary Lampert Pilgrim Watch, director 148 Washington Street, Duxbury, MA 02332 Tel. 781.934.0389 2
ATTACHMENTS Pilgrim Watch to NRC- October 27, 2016 William Dean Daniel Dorman Arthur Burritt NRC Via Email October 27, 2016 RE: Liability & Holtec Guarantees We understand that Entergy is using Holtec Hi-Storm 100, Version B, MPC-68 casks for long-term storage of its spent nuclear fuel. There are now three (3) casks in Pilgrims on-site Independent Spent Fuel Storage Facility. There likely will be eight (8) after Pilgrims Spring 2017 refueling.
Eventually there will be nearly sixty (60)
Each cask has three primary components:
MPC a metal canister that has a storage capacity of 68 BWR spent fuel assemblies, HI-TRAC 100 D - The HI-TRAC (transfer cask) is a metal transfer cask that provides a means to lift and handle the canister as well as providing radiological shielding of the spent fuel assemblies.
HI-STORM 100-S (Version B storage overpack) - a steel-encased concrete cylinder that slides over the transfer cask and provides physical protection and radiological shielding for spent fuel assemblies in the metal canister.
We have questions regarding liability if something goes wrong with any Holtec component, such as a leak, what company will be liable and responsible for any resulting damage, particularly offsite - Holtec or an Entergy company such as Entergy Nuclear Operations. We also appreciate that the agreements between Entergy and Holtec would be proprietary but certainly NRC would be privy to the substance of those agreements for NRC to satisfy its mission to protect public safety, property and the environment if something goes wrong Questions-Liability2
- 8. If something goes wrong with any Holtec component, such as a leak, what company will be liable and responsible for any resulting damage, particularly offsite - Holtec or an Entergy company such as Entergy Nuclear Operations?
- 9. What do agreements between Entergy and Holtec say about responsibility/liability. Are there limits? If so, what if the damage exceeds the limits?
2 http://www.holtecinternational.com/company/corporate-overview/corporate-organization-structure/
http://www.bloomberg.com/research/stocks/private/snapshot.asp?privcapId=4272763 3
- 10. If there is contamination either on or offsite, what (if anything) does Price Anderson insurance cover?
If Holtec is liable:
- 11. Are different Holtec companies/divisions responsible for each of the three primary components-MPC-68, HI-TRAC 100 D, and HI-STORM 100S; or is a single Holtec company/division responsible for any damage resulting from all three components?
- 12. What is the name, and location, of each specific Holtec company division that is responsible for any damage for each of the three components?
- d. MPC-68
- e. HI-TRAC 100 D, and
- f. HI-STORM 100S
- 13. If one Holtec company/division holds the responsibility/liability for all three, is that Holtec company/division a limited liability company? If so, is any other entity (Holtec or Entergy) secondarily responsible?
- 14. If separate Holtec companies/divisons hold the responsibility/liability, are they limited liability companies? If so, is any other entity (Holtec or Entergy) secondarily responsible?
- d. MPC-68
- e. HI-TRAC 100 D, and
- f. HI-STORM 100S If Entergy - Same questions as 4-7 Questions Guarantees How long does Holtec guarantee the following?
- d. MPC-68
- e. HI-TRAC 100 D
- f. HI-STORM 100S Once the guarantee expires who is responsible until DOE takes title- once the casks leave the site?
Thank you and we look forward to your response.
Respectfully, Mary Lampert Pilgrim Watch, director 148 Washington Street, Duxbury, MA 02332 Tel. 781.934.0389 4
NRC Response-January 17, 2016 5
6