ML16294A239

From kanterella
Jump to navigation Jump to search
Radiological Survey and Dose Assessment Report for the Western New York Nuclear Service Center and Off-Site Areas in Follow Up to Aerial Gamma Radiation Survey Conducted in 2014, Rev. 0, Appendix H, Part 5 of 41
ML16294A239
Person / Time
Site: West Valley Demonstration Project, P00M-032
Issue date: 08/22/2016
From:
MJW Technical Services
To:
Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation, State of NY, Energy Research & Development Authority
Shared Package
ML16293A155 List: ... further results
References
Download: ML16294A239 (9)


Text

Appendix HS -

RESRAD-Offsite 3.11 nput Param differ from defaults

- Area 3

Attachment HS: RESRAD-Offsite 3.1 Inputs Parameters for Area 3 that differ from defaults Parameter ,,

RESRAD-Offsite Default Area 3:1 Area 3.2 Basis Preliminary Inputs Yearly dose estimates Exposure Duration 30 1 1 calculated.

Site Layout X dimension of Primary 100 254 32 Contamination Y dimension of Primary 100 254 32 Contamination Non-Leafy Plot X: 34.375 I 65.625 X: 0I1 X: -502 I -501 Google Maps used to (Smaller I Larger) Y: 234 I 266 Y: 0I1 Y: 17.5 I 18.5 estimate distances using Leafy Plot X: 34.375 I 65.625 X: 0I1 X: -502 I -501 satellite images.

(Smaller I Larger) Y: 234 I 266 Y: 0I1 Y: 17.5I18.5 Pasture X: 0I100 X: 484 I 599 X: -18 I 97 (Smaller I Larger) .v: 450 I 550 Y: 81I149 Y: 98.5 I 166.5

  • Grain X: 0 I 100 X: 0 I 254 X: -502 I -248 (Smaller I Larger) Y: 300 I 400 Y: 0 I 254 Y: 17.5 I 271.5 Dwelling X: 34.375 I 65.625 X: 548 I 595 X: 46 I 93 (Smaller I Larger) Y: 134I166 Y:-46/47 Y: -28.5 I 64.5 Surface-water Body X: -100 I 200 X: 310 I 360 X: -192 I -142 (Smaller/ Larger) Y: 550 I 850 Y: 0 I 254 Y: 17.5 I 271.5 Distribution Coefficients 1740 1740 Ac-227 20 Sediment: 4000 Sediment: 4000 Am-241 20 All others: 1900 All others: 1900 Sediment: 480 Sediment: 480 Cs-137 4600 All others: 280 All others: 280 Sediment: 3 Sediment: 3 Np-237 257 All others: 2.3 All others: 2.3 Phase 1 Decommissioning Pa-231 50 2040 *2040 Plan for the West Valley Sediment: 3000 Sediment: 3000 Demonstration Project Rev Pu-239 2000 All others: 2600 All others: 2600 2 Attachment C.

Sediment: 15 Sediment: 15 Sr-90 30 All others: 5 All others: 5 Th-229 60000 5890 5890 Sediment: 10 Sediment: 10 U-233 50 All others: 35 All others: 35 Sediment: 10 Sediment: 10 u-2*;15 50 All others: 35 All others: 35 Pathways External, Inhalation, Plant Ingestion, Meat Ingestion, External, Inhalation, Meat External, Inhalation, Meat No consumption of fish Include Milk Ingestion, Aquatic Ingestion, Drinking Water, Ingestion, Drinking Water, based on land use surveys.

Foods, Drinking Water, Soil Ingestion Soil Ingestion No dairy cattle.

Soil Ingestion Physical and Hydrological Phase 1 Decommissioning Plan for the West Valley Precipitation 1 1.16 1.16 Demonstration Project Rev 2 Attachment c.

Phase 1 Decommissioning Plan foe the West Valley Demonstration Project Rev Wind Speed 0.89 (calculated) Wind Rose *Wind Rose 2 Table 3-10: Wind Speed and Direction Frequency Distributions at 10 Meters.

Page 1of8

Attachment HS: RESRAD-Offsite 3.1 Inputs Parameters for Area 3 that differ from defaults Parameter RESR.tib-Offsi'te Default Area 3.1 Area 3.,2 . Basis Primary Contamination Phase 1 Decommissioning Plan for the West Valley Demonstration Project Rev 2 Attachment C; Selected Length of contamination 100 165 165 to achieve site specific parallel to aquifer flow groundwater dilution factor of 0.2, based on DEIS groundwater model correlation.

Irrigation only assumed for Irrigation 0.2 0.47 0 feed grain. No other crops produced.

Based on the Phase 1 Decommissioning Pla*n for the West Valley Demonstration P'roject Rev 2 Attachment C; Evapotranspiration coefficient 0.5 0.78 0.62 Evapotranspiration and runoff coefficients selected to achieve infiltration rate of 0.26 m/y.

Phase 1 Decommissioning Plan for the West Valley Demonstration Project Rev 2 Attachment C; Runoff 0.2 0.41 0.41 Evapotranspiration and runoff coefficients selected to achieve infiltration rate of0.26 m/y.

Phase 1 Decommissioning Plan for the West Valley

. Thickness 2 1 1 Demonstration Project Rev 2 Attachment C.

Phase 1 Decommissioning Plan for the West Valley Total Porosity 0.5 0.36 0.36 Demonstration Project Rev 2 Attachment C.

. Phase 1 Decommissioning Plan for the West Valley Dry bulk density 1.5 1.7 1.7 Demonstration Project Rev 2 Attachment C.

Phase 1 Decommissioning Plan for the West Valley Soil erodibility factor 0.4 0 0 Demonstration Project Rev 2 Attachment C.

Phase 1 Decommissioning Plan for the West Valley Field Capacity 0.3 0.2 0.2 Demonstration Project Rev 2 Attachment C.

Phase 1 Decommissioning Plan for the West Valley B parameter 5.3 1.4 1.4 Demonstration Project Rev 2 Attachment C.

Phase 1 Decommissioning Plan for the West Valley Hydraulic conductivity 10 140 140 Demonstration Project Rev 2 Attachment C.

Phase 1 Decommissioning Plan for the West Valley Effective Porosity 0.4 0.25 0.25 Demonstration Project Rev 2 Attachment C:

Page 2 of 8

(

Attachment HS: RESRAD-Offsite 3.1 Inputs Parameters for Area 3 that differ from defaults Parameter << RESRAD:offsite Default Area 3.l Area 3.2 . *. Basis Agricultural Areas Non-Leafy: 0.2 Non-Leafy: O Non-Leafy: 0 Leafy: 0.2 Leafy: O Leafy: O Phase 1 Decommissioning Plan for the West Valley Irrigation Pasture: 0.2 Pasture: 0 Pasture: O Demonstration Project Rev Grain: 0.2 Grain: 0.47 Grain: 0.47 2 Attachment C.

Dwelling: 0.2 Dwelling: O Dwelling: O Non-Leafy: 0.62 Non-Leafy: 0.62 Phase 1 Decommissioning Non-Leafy: 0.5 Plan for the West Valley Leafy: 0.5 Leafy: 0.62 Leafy: 0.62 Demonstration Project Rev 2 Attachment C.

Evapotranspiration coefficient Pasture: 0.5 Pasture: 0.62 Pasture: 0.62 Evapotranspiration and runoff coefficients Grain: 0.5 Grain: 0.78 Grain: 0.78 selected to achieve infiltration rate of 0.26 Dwelling: 0.5 Dwelling: 0.62 Dwelling: 0.62 m/y.

Non-Leafy: 0.41 Non-Leafy: 0.41 Phase 1 Decommissioning Non-Leafy: 0.2 Plan for the West Valley Leafy: 0.2 Leafy: 0.41 Leafy: 0.41 Demonstration Project Rev 2 Attachment C.

Runoff Pasture: 0.2 Pasture: 0.41 Pasture: 0.41 Evapotranspiration and runoff coefficients Grain: 0.2 Grain: 0.41 Grain: 0.41 selected to achieve infiltration rate of0.26 Dwelling: 0.2 Dwelling: 0.41 Dwelling: 0.41 m/y.

Non-Leafy: 1.5 Non-Leafy: 1.7 Non-Leafy: 1.7 Leafy: 1.5 Leafy: 1.7 Leafy: 1.7 Phase 1 Decommissioning Plan for the West Valley Dry bulk density Pasture: 1.5 Pasture: 1. 7 Pasture: 1.7 Demonstration Project Rev Grain: 1.5 Grain: 1.7 Grain: 1.7 2 Attachment C.

Dwelling: 1.5 Dwelling: 1.7 Dwelling: 1.7 Non-Leafy: 0.4 Non-Leafy: O Non-Leafy: 0 Leafy: 0.4 Leafy: O Leafy: O Phase 1 Decommissioning Plan for the West Valley Soil erodibility factor Pasture: 0.4 Pasture: O Pasture: O Demonstration Project Rev 2 Attachment C.

Grain: 0.4 Grain: O Grain: O Dwelling: 0 Dwelling: O Dwelling: O Atmospheric Transport Phase 1 Decommissioning Plan for the West Valley Joint Metrological Data (Wind Demonstration Project Rev Speed/ Stability class n/a Wind Rose Wind Rose 2 Table 3-10: Wind Speed frequency) and Direction Frequency Distributions at 10 Meters Unsaturated Zone Hydrology Phase 1 Decommissioning Plan for the West Valley Thickness 4 2 2 Demonstration Project Rev 2 Attachment C.

Phase 1 Decommissioning Plan for the West Valley Dry bulk density 1.5 1.7 1.7 Demonstration Project Rev 2 Attachment c.

Phase 1 Decommissioning Plan for the West Valley Total Porosity 0.4 0.36 0.36 Demonstration Project Rev 2 Attachment C.

Page 3 of 8

Attachment HS: RESRAD-Offsite 3.1 Inputs Parameters for Area 3 that differ from defaults Parameter . RESRAD-Offsite Defa.ult Area 3.1 Area 3.2 Basis Phase 1 Decommissioning Plan for the West Valley Effective Porosity 0.2 0.25 0.25 Demonstration Project Rev 2 Attachment c.

Phase 1 Decommissioning Plan for the West Valley Field Capacity 0.3 0.2 0.2 Demonstration Project Rev 2 Attachment C.

Phase 1 Decommissioning Plan for the West Valley Hydraulic conductivity 10 140 140 Demonstration Project Rev 2 Attachment C.

Phase 1 Decommissioning Plan for the West Valley B parameter 5.3 1.4 1.4 Demonstration Project Rev 2 Attachment C.

Saturated Zone Hydrology Phase 1 Decommissioning Plan for the West Valley D_ry bulk density 1.5 1.7 1.7 Demonstration Project Rev 2 Attachment C.

Phase 1 Decommissioning Plan for the West Valley Tota I Porosity 0.4 0.36 0.36 Demonstration Project Rev 2 Attachment C.

Phase 1 Decommissioning Plan for the West Valley Effective Porosity 0.2 0.25 0.25 Demonstration Project Rev 2 Attachment C.

Phase 1 Decommissioning Plan for the West Valley Hydraulic conductivity 100 1400 1400 Demonstration Project Rev 2 Attachment c.

Phase 1 Decommissioning Plan for the West Valley Hydraulic Gradient 0.02 0.03 0.03 Demonstration Project Rev 2 Attachment C.

Pha_se 1 Decommissioning Plan for the West Valley Depth of aquife'r contributing 10 5 s Demonstration Project Rev 2 Attachment C.

Water Usage Phase 1 Decommissioning Plan for the West Valley Consumption SlO 730 730 Demonstration Project Rev 2 Attachment C.

Phase 1 Decommissioning Plan for the West Valley Number of H_umans 4 4 4 Demonstration Project Rev 2 Attachment C.

Phase 1 Decommissioi;iing Plan for the West Valley Dwelling 22S 22S 22S Demonstration Project Rev 2 Attachment C.

Phase 1 Decommissioning Plan for the West Valley Beef Cattle so so so Demonstration Project Rev 2 Attachment C.

Page 4 of 8

Attachment HS: RESRAD-Offsite 3.1 Inputs Parameters for Area 3 that differ from defaults P~rameter RESRAD:offsit~ Default Area*3.l Area 3.2 Basis Phase 1 Decommissioning Plan for the West VaUey Demonstration Project Rev Number of Beef Cattle 2 10 10 2 Attachment C. No dairy cattle. All cattle are maintained for consumption of beef.

Phase 1 Decommissioning Plan for the West Valley Surface/Well 0/1 0/1 0/1 Demonstration Project Rev 2 Attachment C.

Phase 1 Decommissioning Plan for the West Valley Dairy Cattle 160 0 0 Demonstration Project Rev 2 Attachment C. No dairy cattle.

Phase 1 Decommissioning Plan for the West Valley Number of Dairy Cattle 2 0 0 Demonstration Project Rev 2 Attachment C. No dairy cattle.

Irrigation only assumed for Irrigation Non-Leafy 0.2 0 0 crop field.

Irrigation only assumed for Irrigation Leafy 0.2 0 0 crop field.

Irrigation only assumed for Irrigation Pasture 0.2 0 0 crop field.

Irrigation only assumed for Irrigation Grain 0.2 0.47 0.47 crop field.

Irrigation only assumed for Irrigation Dwelling 0.2 0 0 crop field.

3 31899 m /y=730 L/d x 4 humans+ 225 L/d x 4 Well Pump Rate 5100 31899 31899 humans+ 50 L/d x 10 Beef Cattle+ 0.47 m/y x 64516 mi Surface Water Body Based on Surface-water Body layout and an Volume 150000 15000 15000 average water depth of 1 meter.

Ingestion Rates Phase 1 Decommissioning Drinking Water Consum'ption Plan for the West Valley 510/1 730/1 730/1 Rate/Fraction Affected Demonstration Project Rev 2 Attachment c.

Fish Consumption No consumption offish 5.4/0.9 0/1 0/1 Rate/Fraction Affected based on land use surveys.

Phase 1 Decommissioning Crustacea Consumption Plan for the West Valley 0.9/0.5 0/1 0/1 Rate/Fraction Affected Demonstration Project Rev 2 Attachment C.

Non-Leafy Consumption No non-leafy vegetation 160/0.5 0/1 0/1 Rate/Fraction Affected grown.

Leafy Consumption No leafy vegetation 14/0.S 0/1 0/1 Rate/Fraction Affected grown.

Phase 1 Decommissioning Meat Consumption Plan for the West Valley 63/1 65/1 65/1 Rate/Fraction Affected Demonstration Project Rev 2 Attachment c.

Page 5 of 8

Attachment HS: RESRAD-Offsite 3.1 Inputs Parameters for Area 3 that differ from defaults RESRAD,Offsite Default< Area 3.1 Area 3.2 Basis**

Param!lter". "

Phase 1 Decommissioning Plan for the West Valley Milk Consumption 92/1 0/1 0/1 Demonstration Project Rev Rate/Fraction Affected 2 Attachment C. No dairy cattle.

Phase 1 Decommissioning Plan for the West Valley Soil Consumption Rate 36.5 18.3 18.3 Demonstration Project Rev 2 Attachment C.

Livestock Intakes Phase 1 Decommissioning Beef: SO Beef: SO Beef: SO Plan for the West Valley Water Demonstration Project Rev Dairy: 160 Dairy: 0 Dairy: O 2 Attachment C. No dairy cattle.

Phase 1 Decommis~ioning Plan for the West Valley Demonstration Project Rev Beef: 14 Beef: S.6 Beef: S.6 2 Attachment C. The total livestock fodder intake (27.3) provided in the Pasture Decommissioning Plan was split based on the default ratios in RESRAD.

Dairy: 44 Dairy: 0 Dairy: 0 -.

Beef:

S.6=(14/(14+S4))x27 .3 Dairy: No dairy cattle.

Phase 1 Decommissioning Plan for the West Valley Demonstration Project Rev Beef: S4 Beef: 21.7 Beef: 21.7 2 Attachment C. The total livestock fodder intake

' (27.3) provided in the Grain Decommissioning Plan was split based on the default ratios in RESRAD.

Dairy: 11 Dairy: O Dairy: 0 Beef:

21. 7=(S4/(14+S4))x27 .3 Dairy: No dairy cattle.

Beef: 0.1 Beef: 0.1 Phase 1 Decommissioning Beef: 0.1 Plan for the West Valley Soil from Pasture Demonstration Project Rev 2 Attachment C. No dairy Dairy: 0.4 Dairy: 0 Dairy: 0 cattle.

Beef: 0.4 Beef: 0.4 Phase 1 Decommissioning Beef: 0.4 Plan for the West Valley Soil from Grain Demonstration Project Rev 2 Attachment C. No dairy Dairy: 0.1 Dairy: 0 Dairy: 0 cattle.

Livestock Feed Factors Pasture: 1.1 Pasture: 1.1 Pasture: 1.1 Phase 1 Decommissioning Grain: 0.7 Grain: 0.7 Grain: 0.7 Plan for the West Valley Wet weight crop yield Non-leafy: 0.1 Non-leafy: 1. 75 Non-leafy: 1.75 Demonstration Project Rev Leafy: 1.5 Leafy: 1.5 Leafy: 1.S 2 Attachment C.

Pasture: 20 Pasture: 1R Pasture: 18 Phase 1 Decommissioning Grain: 20 Grain: 18 Grain: 18 Plan for the West Valley Weathering removal constant Non-leafy: 20 Non-leafy: 18 Non-leafy: 18 Demonstration Project Rev Leafy: 20 Leafy: 18 Leafy: 18 2 Attachment c.

Page6of8

C.*-*

Attachment HS: RESRAD-Offsite 3.1 Inputs Parameters for Area 3 that differ from defaults

,RESR~tf
bffsite'o"efault
  • Parameter , *'/::~* . * ' Area 3.1 Area3'.2 " ~~;is ,*

Pasture: 0.25 Pasture: 0.25 Pasture: 0.25 Phase 1 Decommissioning Foliar interception factor for Grain: 0.25 Grain: 0.25 Grain: 0.25 Plan for the West Valley irrigation Non-leafy: 0.25 Non-leafy: 0.25 Non-leafy: 0.25 Demonstration Project Rev Leafy: 0.25 Leafy: 0.57 Leafy: 0.57 2 Attachment C.

Pasture: 0.9 Pasture: 0.9 Pasture: 0.9 Phase 1 Decommissioning Grain: 1.2 Grain: 0.9 Grain: 0.9 Plan for the West Valley Root depth Non-leafy: 1.2 Non-leafy: 0.9 Non-leafy: 0.9 Demonstration Project Rev Leafy: 0.9 Leafy: 0.9 Leafy: 0.9 2 Attachment C.

Inhalation and External Gamma Phase 1 Decommissioning Plan for the West Valley Mass loading 0.0001 0.0000148 0.0000148 Demonstration Project Rev 2 Attachment C.

Phase 1 Decommissioning Plan for the West Valley Indoor to outdoor 0.4 1 1 Demonstration Project Rev 2 Attachment C.

Phase 1 Decommissioning External gamma penetrating Plan for the West Valley 0.7 0.273 0.273 factor Demonstration Project Rev 2 Attachment C.

Occupancy Outdoor occupancy in the primary contamination area accounted for in the livestock grain fields. Area 3.2 is a section of overgrowth that generally would not be occupied for a real amount of time.

Primary contamination indoor 0 0 0.0114 However, an occupancy assumption of 100 hour0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br />s/year, consistent with the Recreational Hiker to be able to assess any dose from the 2015 WVDP Aerial Radiological Survey data.

Outdoor occupancy in the Primary contamination primary contamination 0 0 0.0114 outdoor area accounted for in the livestock grain fields.

Phase 1 Decommissioning Plan for the West Valley Offsite dwelling indoor 0.5 0.55. 0.55 Demonstration Project Rev 2 Attachment C.

Remainder of time for residential farmer Offsite dwelling outdoor 0.1 0.1115 0.1002 assumed to be associated with time outside their dwelling.

Non-leafy vegetable fields 0.1 0 0 No non-leafy crops.

Leafy vegetable fields 0.1 0 0 No leafy crops.

Residential farmer is assumed to spend 2000 hour0.0231 days <br />0.556 hours <br />0.00331 weeks <br />7.61e-4 months <br />s/year associated Pasture and silage fields 0.1 0.1142 0.1142 farming activities. Half is associated with crops and half with livestock.

Page 7 of 8

Attachment HS: RESRAD-Offsite 3.1 Inputs Parameters for Area 3 that differ from defaults Par'a~et'k*r oef~uit '

. '"' ~ \

' .,' *: ~a;is *.2

' REsRAo,omite Area 3'.1 Area 3:2 '

Residential farmer is assumed to spend 2000 0.1142 0.1142 hours/year associated Livestock grain fields 0.1 farming activities. Half is associated with crops and half with livestock.

Page 8 of 8