ML16294A239

From kanterella
Jump to navigation Jump to search
Radiological Survey and Dose Assessment Report for the Western New York Nuclear Service Center and Off-Site Areas in Follow Up to Aerial Gamma Radiation Survey Conducted in 2014, Rev. 0, Appendix H, Part 5 of 41
ML16294A239
Person / Time
Site: West Valley Demonstration Project, P00M-032
Issue date: 08/22/2016
From:
MJW Technical Services
To:
Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation, State of NY, Energy Research & Development Authority
Shared Package
ML16293A155 List: ... further results
References
Download: ML16294A239 (9)


Text

Appendix HS -

RESRAD-Offsite 3.11 nput Param differ from defaults

- Area 3

Attachment HS: RESRAD-Offsite 3.1 Inputs Parameters for Area 3 that differ from defaults Parameter RESRAD-Offsite Default Area 3:1 Area 3.2 Basis Preliminary Inputs Exposure Duration 30 1

1 Yearly dose estimates calculated.

Site Layout X dimension of Primary 100 254 32 Contamination Y dimension of Primary 100 254 32 Contamination Non-Leafy Plot X: 34.375 I 65.625 X: 0I1 X: -502 I -501 Google Maps used to (Smaller I Larger)

Y: 234 I 266 Y: 0I1 Y: 17.5 I 18.5 estimate distances using Leafy Plot X: 34.375 I 65.625 X: 0I1 X: -502 I -501 satellite images.

(Smaller I Larger)

Y: 234 I 266 Y: 0I1 Y: 17.5I18.5 Pasture X: 0I100 X: 484 I 599 X: -18 I 97 (Smaller I Larger)

.v: 450 I 550 Y: 81I149 Y: 98.5 I 166.5

  • Grain X: 0 I 100 X: 0 I 254 X: -502 I -248 (Smaller I Larger)

Y: 300 I 400 Y: 0 I 254 Y: 17.5 I 271.5 Dwelling X: 34.375 I 65.625 X: 548 I 595 X: 46 I 93 (Smaller I Larger)

Y: 134I166 Y:-46/47 Y: -28.5 I 64.5 Surface-water Body X: -100 I 200 X: 310 I 360 X: -192 I -142 (Smaller/ Larger)

Y: 550 I 850 Y: 0 I 254 Y: 17.5 I 271.5 Distribution Coefficients 1740 1740 Ac-227 20 Sediment: 4000 Sediment: 4000 Am-241 20 All others: 1900 All others: 1900 Cs-137 4600 Sediment: 480 Sediment: 480 All others: 280 All others: 280 Sediment: 3 Sediment: 3 Np-237 257 All others: 2.3 All others: 2.3 Pa-231 50 2040

  • 2040 Phase 1 Decommissioning Plan for the West Valley Sediment: 3000 Sediment: 3000 Demonstration Project Rev Pu-239 2000 All others: 2600 All others: 2600 2 Attachment C.

Sediment: 15 Sediment: 15 Sr-90 30 All others: 5 All others: 5 Th-229 60000 5890 5890 Sediment: 10 Sediment: 10 U-233 50 All others: 35 All others: 35 Sediment: 10 Sediment: 10 u-2*;15 50 All others: 35 All others: 35 Pathways External, Inhalation, Plant Ingestion, Meat Ingestion, External, Inhalation, Meat External, Inhalation, Meat No consumption of fish Include Milk Ingestion, Aquatic Ingestion, Drinking Water, Ingestion, Drinking Water, based on land use surveys.

Foods, Drinking Water, Soil Ingestion Soil Ingestion No dairy cattle.

Soil Ingestion Physical and Hydrological Phase 1 Decommissioning Precipitation 1

1.16 1.16 Plan for the West Valley Demonstration Project Rev 2 Attachment c.

Phase 1 Decommissioning Plan foe the West Valley Wind Speed 0.89 (calculated)

Wind Rose

  • Wind Rose Demonstration Project Rev 2 Table 3-10: Wind Speed and Direction Frequency Distributions at 10 Meters.

Page 1of8

Attachment HS: RESRAD-Offsite 3.1 Inputs Parameters for Area 3 that differ from defaults Parameter RESR.tib-Offsi'te Default Area 3.1 Area 3.,2

. Basis Primary Contamination Phase 1 Decommissioning Plan for the West Valley Demonstration Project Rev Length of contamination 2 Attachment C; Selected 100 165 165 to achieve site specific parallel to aquifer flow groundwater dilution factor of 0.2, based on DEIS groundwater model correlation.

Irrigation only assumed for Irrigation 0.2 0.47 0

feed grain. No other crops produced.

Based on the Phase 1 Decommissioning Pla*n for the West Valley Demonstration P'roject Rev Evapotranspiration coefficient 0.5 0.78 0.62 2 Attachment C; Evapotranspiration and runoff coefficients selected to achieve infiltration rate of 0.26 m/y.

Phase 1 Decommissioning Plan for the West Valley Demonstration Project Rev 2 Attachment C; Runoff 0.2 0.41 0.41 Evapotranspiration and runoff coefficients selected to achieve infiltration rate of0.26 m/y.

Phase 1 Decommissioning

. Thickness 2

1 1

Plan for the West Valley Demonstration Project Rev 2 Attachment C.

Phase 1 Decommissioning Total Porosity 0.5 0.36 0.36 Plan for the West Valley Demonstration Project Rev 2 Attachment C.

. Phase 1 Decommissioning Dry bulk density 1.5 1.7 1.7 Plan for the West Valley Demonstration Project Rev 2 Attachment C.

Phase 1 Decommissioning Soil erodibility factor 0.4 0

0 Plan for the West Valley Demonstration Project Rev 2 Attachment C.

Phase 1 Decommissioning Field Capacity 0.3 0.2 0.2 Plan for the West Valley Demonstration Project Rev 2 Attachment C.

Phase 1 Decommissioning B parameter 5.3 1.4 1.4 Plan for the West Valley Demonstration Project Rev 2 Attachment C.

Phase 1 Decommissioning Hydraulic conductivity 10 140 140 Plan for the West Valley Demonstration Project Rev 2 Attachment C.

Phase 1 Decommissioning Effective Porosity 0.4 0.25 0.25 Plan for the West Valley Demonstration Project Rev 2 Attachment C:

Page 2 of 8

(

Attachment HS: RESRAD-Offsite 3.1 Inputs Parameters for Area 3 that differ from defaults Parameter RESRAD:offsite Default Area 3.l Area 3.2

. *. Basis Agricultural Areas Non-Leafy: 0.2 Non-Leafy: O Non-Leafy: 0 Leafy: 0.2 Leafy: O Leafy: O Phase 1 Decommissioning Irrigation Pasture: 0.2 Pasture: 0 Pasture: O Plan for the West Valley Grain: 0.2 Grain: 0.47 Grain: 0.47 Demonstration Project Rev 2 Attachment C.

Dwelling: 0.2 Dwelling: O Dwelling: O Non-Leafy: 0.5 Non-Leafy: 0.62 Non-Leafy: 0.62 Phase 1 Decommissioning Plan for the West Valley Leafy: 0.5 Leafy: 0.62 Leafy: 0.62 Demonstration Project Rev 2 Attachment C.

Evapotranspiration coefficient Pasture: 0.5 Pasture: 0.62 Pasture: 0.62 Evapotranspiration and runoff coefficients Grain: 0.5 Grain: 0.78 Grain: 0.78 selected to achieve Dwelling: 0.5 Dwelling: 0.62 Dwelling: 0.62 infiltration rate of 0.26 m/y.

Non-Leafy: 0.2 Non-Leafy: 0.41 Non-Leafy: 0.41 Phase 1 Decommissioning Plan for the West Valley Leafy: 0.2 Leafy: 0.41 Leafy: 0.41 Demonstration Project Rev 2 Attachment C.

Runoff Pasture: 0.2 Pasture: 0.41 Pasture: 0.41 Evapotranspiration and runoff coefficients Grain: 0.2 Grain: 0.41 Grain: 0.41 selected to achieve Dwelling: 0.41 Dwelling: 0.41 infiltration rate of0.26 Dwelling: 0.2 m/y.

Non-Leafy: 1.5 Non-Leafy: 1.7 Non-Leafy: 1.7 Leafy: 1.5 Leafy: 1.7 Leafy: 1.7 Phase 1 Decommissioning Dry bulk density Pasture: 1.5 Pasture: 1. 7 Pasture: 1.7 Plan for the West Valley Grain: 1.5 Grain: 1.7 Grain: 1.7 Demonstration Project Rev 2 Attachment C.

Dwelling: 1.5 Dwelling: 1.7 Dwelling: 1.7 Non-Leafy: 0.4 Non-Leafy: O Non-Leafy: 0 Leafy: 0.4 Leafy: O Leafy: O Phase 1 Decommissioning Soil erodibility factor Pasture: 0.4 Pasture: O Pasture: O Plan for the West Valley Demonstration Project Rev 2 Attachment C.

Grain: 0.4 Grain: O Grain: O Dwelling: 0 Dwelling: O Dwelling: O Atmospheric Transport Phase 1 Decommissioning Joint Metrological Data (Wind Plan for the West Valley Speed/ Stability class n/a Wind Rose Wind Rose Demonstration Project Rev frequency) 2 Table 3-10: Wind Speed and Direction Frequency Distributions at 10 Meters Unsaturated Zone Hydrology Phase 1 Decommissioning Thickness 4

2 2

Plan for the West Valley Demonstration Project Rev 2 Attachment C.

Phase 1 Decommissioning Dry bulk density 1.5 1.7 1.7 Plan for the West Valley Demonstration Project Rev 2 Attachment c.

Phase 1 Decommissioning Total Porosity 0.4 0.36 0.36 Plan for the West Valley Demonstration Project Rev 2 Attachment C.

Page 3 of 8

Attachment HS: RESRAD-Offsite 3.1 Inputs Parameters for Area 3 that differ from defaults Parameter

. RESRAD-Offsite Defa.ult Area 3.1 Area 3.2 Basis Phase 1 Decommissioning Effective Porosity 0.2 0.25 0.25 Plan for the West Valley Demonstration Project Rev 2 Attachment c.

Phase 1 Decommissioning Field Capacity 0.3 0.2 0.2 Plan for the West Valley Demonstration Project Rev 2 Attachment C.

Phase 1 Decommissioning Hydraulic conductivity 10 140 140 Plan for the West Valley Demonstration Project Rev 2 Attachment C.

Phase 1 Decommissioning B parameter 5.3 1.4 1.4 Plan for the West Valley Demonstration Project Rev 2 Attachment C.

Saturated Zone Hydrology Phase 1 Decommissioning D_ry bulk density 1.5 1.7 1.7 Plan for the West Valley Demonstration Project Rev 2 Attachment C.

Phase 1 Decommissioning Tota I Porosity 0.4 0.36 0.36 Plan for the West Valley Demonstration Project Rev 2 Attachment C.

Phase 1 Decommissioning Effective Porosity 0.2 0.25 0.25 Plan for the West Valley Demonstration Project Rev 2 Attachment C.

Phase 1 Decommissioning Hydraulic conductivity 100 1400 1400 Plan for the West Valley Demonstration Project Rev 2 Attachment c.

Phase 1 Decommissioning Hydraulic Gradient 0.02 0.03 0.03 Plan for the West Valley Demonstration Project Rev 2 Attachment C.

Pha_se 1 Decommissioning Depth of aquife'r contributing 10 5

s Plan for the West Valley Demonstration Project Rev 2 Attachment C.

Water Usage Phase 1 Decommissioning Consumption SlO 730 730 Plan for the West Valley Demonstration Project Rev 2 Attachment C.

Phase 1 Decommissioning Number of H_umans 4

4 4

Plan for the West Valley Demonstration Project Rev 2 Attachment C.

Phase 1 Decommissioi;iing Dwelling 22S 22S 22S Plan for the West Valley Demonstration Project Rev 2 Attachment C.

Phase 1 Decommissioning Beef Cattle so so so Plan for the West Valley Demonstration Project Rev 2 Attachment C.

Page 4 of 8

Attachment HS: RESRAD-Offsite 3.1 Inputs Parameters for Area 3 that differ from defaults RESRAD:offsit~ Default P~rameter Area*3.l Area 3.2 Basis Phase 1 Decommissioning Plan for the West VaUey Demonstration Project Rev Number of Beef Cattle 2

10 10 2 Attachment C. No dairy cattle. All cattle are maintained for consumption of beef.

Phase 1 Decommissioning Surface/Well 0/1 0/1 0/1 Plan for the West Valley Demonstration Project Rev 2 Attachment C.

Phase 1 Decommissioning Plan for the West Valley Dairy Cattle 160 0

0 Demonstration Project Rev 2 Attachment C. No dairy cattle.

Phase 1 Decommissioning Plan for the West Valley Number of Dairy Cattle 2

0 0

Demonstration Project Rev 2 Attachment C. No dairy cattle.

Irrigation Non-Leafy 0.2 0

0 Irrigation only assumed for crop field.

Irrigation Leafy 0.2 0

0 Irrigation only assumed for crop field.

Irrigation Pasture 0.2 0

0 Irrigation only assumed for crop field.

Irrigation Grain 0.2 0.47 0.47 Irrigation only assumed for crop field.

Irrigation Dwelling 0.2 0

0 Irrigation only assumed for crop field.

31899 m 3/y=730 L/d x 4 humans+ 225 L/d x 4 Well Pump Rate 5100 31899 31899 humans+ 50 L/d x 10 Beef Cattle+ 0.47 m/y x 64516 mi Surface Water Body Based on Surface-water Volume 150000 15000 15000 Body layout and an average water depth of 1 meter.

Ingestion Rates Phase 1 Decommissioning Drinking Water Consum'ption 510/1 730/1 730/1 Plan for the West Valley Rate/Fraction Affected Demonstration Project Rev 2 Attachment c.

Fish Consumption 5.4/0.9 0/1 0/1 No consumption offish Rate/Fraction Affected based on land use surveys.

Phase 1 Decommissioning Crustacea Consumption 0.9/0.5 0/1 0/1 Plan for the West Valley Rate/Fraction Affected Demonstration Project Rev 2 Attachment C.

Non-Leafy Consumption 160/0.5 0/1 0/1 No non-leafy vegetation Rate/Fraction Affected grown.

Leafy Consumption 14/0.S 0/1 0/1 No leafy vegetation Rate/Fraction Affected grown.

Phase 1 Decommissioning Meat Consumption 63/1 65/1 65/1 Plan for the West Valley Rate/Fraction Affected Demonstration Project Rev 2 Attachment c.

Page 5 of 8

Attachment HS: RESRAD-Offsite 3.1 Inputs Parameters for Area 3 that differ from defaults Param!lter".

RESRAD,Offsite Default<

Area 3.1 Area 3.2 Basis**

Phase 1 Decommissioning Milk Consumption Plan for the West Valley Rate/Fraction Affected 92/1 0/1 0/1 Demonstration Project Rev 2 Attachment C. No dairy cattle.

Phase 1 Decommissioning Soil Consumption Rate 36.5 18.3 18.3 Plan for the West Valley Demonstration Project Rev 2 Attachment C.

Livestock Intakes Beef: SO Beef: SO Beef: SO Phase 1 Decommissioning Plan for the West Valley Water Demonstration Project Rev Dairy: 160 Dairy: 0 Dairy: O 2 Attachment C. No dairy cattle.

Phase 1 Decommis~ioning Plan for the West Valley Beef: 14 Beef: S.6 Beef: S.6 Demonstration Project Rev 2 Attachment C. The total livestock fodder intake (27.3) provided in the Pasture Decommissioning Plan was split based on the default ratios in RESRAD.

Dairy: 44 Dairy: 0 Dairy: 0 Beef:

S.6=(14/(14+S4))x27.3 Dairy: No dairy cattle.

Phase 1 Decommissioning Plan for the West Valley Beef: S4 Beef: 21.7 Beef: 21.7 Demonstration Project Rev 2 Attachment C. The total livestock fodder intake (27.3) provided in the Grain Decommissioning Plan was split based on the default ratios in RESRAD.

Dairy: 11 Dairy: O Dairy: 0 Beef:

21. 7=(S4/(14+S4))x27.3 Dairy: No dairy cattle.

Beef: 0.1 Beef: 0.1 Beef: 0.1 Phase 1 Decommissioning Plan for the West Valley Soil from Pasture Demonstration Project Rev Dairy: 0.4 Dairy: 0 Dairy: 0 2 Attachment C. No dairy cattle.

Beef: 0.4 Beef: 0.4 Beef: 0.4 Phase 1 Decommissioning Plan for the West Valley Soil from Grain Demonstration Project Rev Dairy: 0.1 Dairy: 0 Dairy: 0 2 Attachment C. No dairy cattle.

Livestock Feed Factors Pasture: 1.1 Pasture: 1.1 Pasture: 1.1 Phase 1 Decommissioning Grain: 0.7 Grain: 0.7 Grain: 0.7 Plan for the West Valley Wet weight crop yield Non-leafy: 0.1 Non-leafy: 1. 75 Non-leafy: 1.75 Demonstration Project Rev Leafy: 1.5 Leafy: 1.5 Leafy: 1.S 2 Attachment C.

Pasture: 20 Pasture: 1R Pasture: 18 Phase 1 Decommissioning Grain: 20 Grain: 18 Grain: 18 Plan for the West Valley Weathering removal constant Non-leafy: 20 Non-leafy: 18 Non-leafy: 18 Demonstration Project Rev Leafy: 20 Leafy: 18 Leafy: 18 2 Attachment c.

Page6of8

C.*-*

Attachment HS: RESRAD-Offsite 3.1 Inputs Parameters for Area 3 that differ from defaults

  • Parameter, *'/::~*

. ;,RESR~tf:bffsite'o"efault * '

Area 3.1 Area3'.2

~~;is Pasture: 0.25 Pasture: 0.25 Pasture: 0.25 Phase 1 Decommissioning Foliar interception factor for Grain: 0.25 Grain: 0.25 Grain: 0.25 Plan for the West Valley irrigation Non-leafy: 0.25 Non-leafy: 0.25 Non-leafy: 0.25 Demonstration Project Rev Leafy: 0.25 Leafy: 0.57 Leafy: 0.57 2 Attachment C.

Pasture: 0.9 Pasture: 0.9 Pasture: 0.9 Phase 1 Decommissioning Grain: 1.2 Grain: 0.9 Grain: 0.9 Plan for the West Valley Root depth Non-leafy: 1.2 Non-leafy: 0.9 Non-leafy: 0.9 Demonstration Project Rev Leafy: 0.9 Leafy: 0.9 Leafy: 0.9 2 Attachment C.

Inhalation and External Gamma Phase 1 Decommissioning Mass loading 0.0001 0.0000148 0.0000148 Plan for the West Valley Demonstration Project Rev 2 Attachment C.

Phase 1 Decommissioning Indoor to outdoor 0.4 1

1 Plan for the West Valley Demonstration Project Rev 2 Attachment C.

Phase 1 Decommissioning External gamma penetrating factor 0.7 0.273 0.273 Plan for the West Valley Demonstration Project Rev 2 Attachment C.

Occupancy Outdoor occupancy in the primary contamination area accounted for in the livestock grain fields. Area 3.2 is a section of overgrowth that generally would not be occupied for Primary contamination indoor 0

0 0.0114 a real amount of time.

However, an occupancy assumption of 100 hour0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br />s/year, consistent with the Recreational Hiker to be able to assess any dose from the 2015 WVDP Aerial Radiological Survey data.

Outdoor occupancy in the Primary contamination 0

0 0.0114 primary contamination outdoor area accounted for in the livestock grain fields.

Phase 1 Decommissioning Offsite dwelling indoor 0.5 0.55.

0.55 Plan for the West Valley Demonstration Project Rev 2 Attachment C.

Remainder of time for residential farmer Offsite dwelling outdoor 0.1 0.1115 0.1002 assumed to be associated with time outside their dwelling.

Non-leafy vegetable fields 0.1 0

0 No non-leafy crops.

Leafy vegetable fields 0.1 0

0 No leafy crops.

Residential farmer is assumed to spend 2000 Pasture and silage fields 0.1 0.1142 0.1142 hour0.0132 days <br />0.317 hours <br />0.00189 weeks <br />4.34531e-4 months <br />s/year associated farming activities. Half is associated with crops and half with livestock.

Page 7 of 8

Attachment HS: RESRAD-Offsite 3.1 Inputs Parameters for Area 3 that differ from defaults Par'a~et'k*r REsRAo,omite oef~uit '

~ \\

~a;is

  • .2 Area 3'.1 Area 3:2 Residential farmer is assumed to spend 2000 Livestock grain fields 0.1 0.1142 0.1142 hour0.0132 days <br />0.317 hours <br />0.00189 weeks <br />4.34531e-4 months <br />s/year associated farming activities. Half is associated with crops and half with livestock.

Page 8 of 8