Radiological Survey and Dose Assessment Report for the Western New York Nuclear Service Center & Off-Site Areas in Follow Up to Aerial Gamma Radiation Survey Conducted in 2014, Rev. 0, Appendix E - Part 22 of 24
ML16293A849
Person / Time
Site: West Valley Demonstration Project, P00M-032
Issue date: 08/22/2016
From:
MJW Technical Services
To:
Office of Nuclear Material Safety and Safeguards, State of NY, Energy Research & Development Authority, Office of Nuclear Reactor Regulation
Shared Package
ML16293A155 List: ... further results
References
Download: ML16293A849 (5)


Text

Appendix E -

Project Data Quality Parameter Crosswalk

Appendix E - Project Data Quality Parameter Crosswalk Field Data Quality Parameters Data Quality Field Activity- Equipment Calibration

  • Operability Acceptance Criteri.a *
  • Criteria Criteria Met.

Indicator Check Check Identified Y/N (PARCC Parameter)

Precision Soil Samples Duplicate Sample Not Not 10% Relative Quality y applicable applicable Difference (RPD) Assurance between duplicates, Project Plan -

1/10 samples and 2 A.6.1, B.5.2.1 duplicates per sub-area Precision No Soil Sample Equipment Not Not Less than Minimum Quality y Cross- Rinsate Blanks applicable applicable Detectable Assurance Contamination Concentration Project Plan -

(MDC) on equipment A.6.1, B.4.1, rinsate blanks B.5.2.2 Precision No Sample Deionized Water Not Not Less than Detection Quality y Equipment Blank applicable applicable Limits in DI water Assurance Cross- blanks Project Plan -

Contamination A.6.1, B.4.1, B.5.2.2 Accuracy Course Grid Ludlum 2241-2 Annual Daily {3 Within annual Quality y Walkover Scaler/Ratemeter calibration. times/day) calibration, +/-20% Assurance coupled with Daily source source gross cpm Project Plan -

2"X2" Nal checks. A.6.1, B.6.1, Gamma Detector B.7.1 and GPS Instrument Accuracy Location Specific Bicron Microrem Annual Daily {3 Within annual Quality y Static Survey Meter calibration. times/day) calibration,+/- 20% Assurance Daily source source uRem/hr Project Plan -

checks. A.6.1, B.6.1, B.7.1

Appendix E - Project Data Quality Parameter Crosswalk Accuracy Location Specific Ludlum 2241-2 Annual Daily (3 Within annual Quality y Static Survey Scaler/Ratemeter calibration. times/day) calibration, +/-20% Assurance coupled with Daily source source Gross cpm Project Plan -

2"X2" Nal checks. A.6.1, B.6.1, Gamma Detector B.7.1 Representativeness Walkover Area Global Not Daily. At designated Quality y Location Positioning . applicable. walkover location. Assurance System (GPS) Commercial Verified with Project Plan -

GPS. multiple GPS' and A.6.1 landmarks.

Representativeness Sample Area GPS Not Daily. At designated Quality y Location applicable. sample location. Assurance Commercial Verified with Project Plan -

GPS. multiple GPS' and A.6.1 landmarks.

Representativeness Soil Depth Standard Tape Not Not Samples collected at Quality y Determination Measure/Ruler applicable. applicable. designated depths, Assurance Standard verified by second Project Plan -

measuring technician. A.6.1 device.

Completeness Sampling Not applicable Not Not 95% of samples Quality y applicable *applicable targeted for Assurance Collection Project Plan -

A.6.1 Completeness Data Usability Not applicable Not Not 90% data usability Quality y applicable applicable Assurance Project Plan -

A.6.1

, r Appendix E,.... Project Data Quality Parameter Crosswalk Laboratory Data Quality Parameters Data Quality Indicator Parameter Acceptance Criteria Criteria Identified Criteria Met Y/N (PARCC Parameter)

Precision Relative Percent Difference 10% Quality Assurance Project y (RPO) Plan A.6.1, B.4, B.5.3, analytical methods, GEL Quality Assurance Plan, es/er/ms-5 Precision Relative Error Ratio (RER) < 1.96 Quality Assurance Project y Plan A.6.1, B.4, B.5.3, analytical methods, GEL Quality Assurance Plan, es/er/ms-5 Precision Background Data Initial startup calibration Quality Assurance Project y Plan A.6.1, B.4, B.5.3, analytical methods, GEL Quality Assurance Plan, es/er/ms-5 Precision Count Time Per GEL analytical method Quality Assurance Project y Plan A.6.1, B.4, B.5.3, analytical methods, GEL Quality Assurance Plan, es/er/ms-5 Accuracy Matrix Spike {MS) or GEL QAP Quality Assurance Project y MS/Matrix Spike Duplicate Plan A.6.1, B.4, B.5.3,

{MSD) analytical methods, GEL Quality Assurance Plan, es/er/ms-5 Accuracy Tracer Percent Recovery (R) GEL QAP Quality Assurance Project y Plan A.6.1, B.4, B.5.3, analytical methods, GEL Quality Assurance Plan, es/er/ms-5 Accuracy Sample & Standards prep 10% Quality Asswance Project y

Appendix E - Project Data Quality Parameter Crosswalk Batch Calculations Plan A.6.1, B.4, B.5.3, analytical methods, GEL Quality Assurance Plan, es/er/ms-5 Accuracy/Precision Instrument Calibration (Initial 1 per 24 hrs (ICV) 1 per 12 Quality Assurance Project y

& Continuing) hrs (CCV) Plan A.6.1, B.4, B.5.3, analytical methods, GEL Quality Assurance Plan, es/er/ms-5 Accuracy/Precision Frequency of Calibration 1 per 24 hrs (ICV) 1 per 12 Quality Assurance Project hrs (CCV) Plan A.6.1, B.4, B.5.3, analytical methods, GEL Quality Assurance Plan, es/er/ms-5 Accuracy/Completeness 10% Sample and Standards NIST traceable standards Quality Assurance Project y Traceability Plan A.6.1, B.4, B.5.3, analytical methods, GEL Quality Assurance Plan, es/er/ms-5 Representativeness Field and Method Blanks < MDC and 2s counting Quality Assurance Project y uncertainty Plan A.6.1, B.4, B.5.3, analytical methods, GEL Quality Assurance Plan, es/er/ms-5 Completeness Chain-of-Custody (COC) Review Completeness Quality Assurance Project y

  • Plan A.6.1, B.4, B.5.3, analytical methods, GEL Quality Assurance Plan, es/er/ms-5