Summary of Open House with Members of the Public Regarding River Bend Station Performance
ML16119A308
Person / Time
Site: River Bend Entergy icon.png
Issue date: 04/27/2016
From: Greg Warnick
NRC/RGN-IV/DRP/RPB-C
To: Maguire W
Entergy Operations
Warnick G
References
IR 2015006
Download: ML16119A308 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E LAMAR BLVD ARLINGTON, TX 76011-4511 April 27, 2016 Mr. William F. Maguire Site Vice President, Entergy Operations, Inc.

River Bend Station 5485 U.S. Highway 61N St. Francisville, LA 70775

SUBJECT:

SUMMARY

OF OPEN HOUSE WITH MEMBERS OF THE PUBLIC REGARDING RIVER BEND STATION PERFORMANCE

Dear Mr. Maguire:

On April 19, 2016, members of the U.S. Nuclear Regulatory Commission (NRC) staff met with members of the public to share the results of the most recent performance assessment of River Bend Station as documented in NRC Inspection Report 05000458/2015006, issued on March 2, 2016 (ML16061A414). The focus of the meeting was to provide members of the public an opportunity to ask questions about the NRCs purpose and responsibilities, and to discuss any regulatory issues. The discussion covered the Reactor Oversight Process (ROP), the role of the NRC resident inspector, River Bend Stations position in the ROP Action Matrix, and the appropriate level of NRC regulatory response based on River Bend Stations position in the ROP Action Matrix.

This Category 3 public meeting was attended by one member of the public, one representative for Senator Vitter, one representative for Senator Cassidy, two people from the Louisiana Department of Environmental Quality, one person from the Governors Office of Homeland Security, and eight people from Entergy. A copy of the NRCs slides are enclosed.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRCs ADAMS. ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room).

Sincerely,

/RA/

Gregory G. Warnick, Branch Chief Project Branch C Division of Reactor Projects Docket No.: 50-458 License No.: NPF-47

Letter to Mr. William F. Maguire from Gregory G. Warnick dated April 27, 2016 April 27, 2016 Mr. William F. Maguire Site Vice President, Entergy Operations, Inc.

River Bend Station 5485 U.S. Highway 61N St. Francisville, LA 70775

SUBJECT:

SUMMARY

OF OPEN HOUSE WITH MEMBERS OF THE PUBLIC REGARDING RIVER BEND STATION PERFORMANCE

Dear Mr. Maguire:

On April 19, 2016, members of the U.S. Nuclear Regulatory Commission (NRC) staff met with members of the public to share the results of the most recent performance assessment of River Bend Station as documented in NRC Inspection Report 05000458/2015006, issued on March 2, 2016 (ML16061A414). The focus of the meeting was to provide members of the public an opportunity to ask questions about the NRCs purpose and responsibilities, and to discuss any regulatory issues. The discussion covered the Reactor Oversight Process (ROP), the role of the NRC resident inspector, River Bend Stations position in the ROP Action Matrix, and the appropriate level of NRC regulatory response based on River Bend Stations position in the ROP Action Matrix.

This Category 3 public meeting was attended by one member of the public, one representative for Senator Vitter, one representative for Senator Cassidy, two people from the Louisiana Department of Environmental Quality, one person from the Governors Office of Homeland Security, and eight people from Entergy. A copy of the NRCs slides are enclosed.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRCs ADAMS. ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room).

Sincerely,

/RA/

Gregory G. Warnick, Branch Chief Project Branch C Division of Reactor Projects Docket No.: 50-458 License No.: NPF-47 ADAMS Accession Number: ML16119A308 SUNSI Rev Complete: GW Yes No ADAMS Yes No Keyword: NRC-002 Publicly Avail. Yes No Sensitive Yes No SPE:DRP/C BC:DRP/C LBrandt GWarnick

/RA/ /RA/

4/27/16 4/28/16 OFFICIAL RECORD COPY

Letter to Mr. William F. Maguire from Gregory G. Warnick dated April 27, 2016

SUBJECT:

SUMMARY

OF OPEN HOUSE WITH MEMBERS OF THE PUBLIC REGARDING RIVER BEND STATION PERFORMANCE DISTRIBUTION:

Regional Administrator (Marc.Dapas@nrc.gov)

Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)

DRP Director (Troy.Pruett@nrc.gov)

DRP Deputy Director (Ryan.Lantz@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Jeffrey.Sowa@nrc.gov)

Acting Resident Inspector (Brian.Parks@nrc.gov)

Branch Chief, DRP/C (Greg.Warnick@nrc.gov)

Senior Project Engineer, DRP/C (Cale.Young@nrc.gov)

Project Engineer, DRP/C (Lindsay.Brandt@nrc.gov)

Project Engineer, DRP/C (Michael.Stafford@nrc.gov)

RBS Administrative Assistant (Lisa.Day@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Acting Project Manager (Andrea.George@nrc.gov)

Branch Chief, DRS/IPAT (Thomas.Hipschman@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)

Electronic Distribution for River Bend Station

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E LAMAR BLVD ARLINGTON, TX 76011-4511 April 27, 2016 Mr. William F. Maguire Site Vice President, Entergy Operations, Inc.

River Bend Station 5485 U.S. Highway 61N St. Francisville, LA 70775

SUBJECT:

SUMMARY

OF OPEN HOUSE WITH MEMBERS OF THE PUBLIC REGARDING RIVER BEND STATION PERFORMANCE

Dear Mr. Maguire:

On April 19, 2016, members of the U.S. Nuclear Regulatory Commission (NRC) staff met with members of the public to share the results of the most recent performance assessment of River Bend Station as documented in NRC Inspection Report 05000458/2015006, issued on March 2, 2016 (ML16061A414). The focus of the meeting was to provide members of the public an opportunity to ask questions about the NRCs purpose and responsibilities, and to discuss any regulatory issues. The discussion covered the Reactor Oversight Process (ROP), the role of the NRC resident inspector, River Bend Stations position in the ROP Action Matrix, and the appropriate level of NRC regulatory response based on River Bend Stations position in the ROP Action Matrix.

This Category 3 public meeting was attended by one member of the public, one representative for Senator Vitter, one representative for Senator Cassidy, two people from the Louisiana Department of Environmental Quality, one person from the Governors Office of Homeland Security, and eight people from Entergy. A copy of the NRCs slides are enclosed.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRCs ADAMS. ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room).

Sincerely,

/RA/

Gregory G. Warnick, Branch Chief Project Branch C Division of Reactor Projects Docket No.: 50-458 License No.: NPF-47

Letter to Mr. William F. Maguire from Gregory G. Warnick dated April 27, 2016 April 27, 2016 Mr. William F. Maguire Site Vice President, Entergy Operations, Inc.

River Bend Station 5485 U.S. Highway 61N St. Francisville, LA 70775

SUBJECT:

SUMMARY

OF OPEN HOUSE WITH MEMBERS OF THE PUBLIC REGARDING RIVER BEND STATION PERFORMANCE

Dear Mr. Maguire:

On April 19, 2016, members of the U.S. Nuclear Regulatory Commission (NRC) staff met with members of the public to share the results of the most recent performance assessment of River Bend Station as documented in NRC Inspection Report 05000458/2015006, issued on March 2, 2016 (ML16061A414). The focus of the meeting was to provide members of the public an opportunity to ask questions about the NRCs purpose and responsibilities, and to discuss any regulatory issues. The discussion covered the Reactor Oversight Process (ROP), the role of the NRC resident inspector, River Bend Stations position in the ROP Action Matrix, and the appropriate level of NRC regulatory response based on River Bend Stations position in the ROP Action Matrix.

This Category 3 public meeting was attended by one member of the public, one representative for Senator Vitter, one representative for Senator Cassidy, two people from the Louisiana Department of Environmental Quality, one person from the Governors Office of Homeland Security, and eight people from Entergy. A copy of the NRCs slides are enclosed.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRCs ADAMS. ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room).

Sincerely,

/RA/

Gregory G. Warnick, Branch Chief Project Branch C Division of Reactor Projects Docket No.: 50-458 License No.: NPF-47 ADAMS Accession Number: ML16119A308 SUNSI Rev Complete: GW Yes No ADAMS Yes No Keyword: NRC-002 Publicly Avail. Yes No Sensitive Yes No SPE:DRP/C BC:DRP/C LBrandt GWarnick

/RA/ /RA/

4/27/16 4/28/16 OFFICIAL RECORD COPY

Letter to Mr. William F. Maguire from Gregory G. Warnick dated April 27, 2016

SUBJECT:

SUMMARY

OF OPEN HOUSE WITH MEMBERS OF THE PUBLIC REGARDING RIVER BEND STATION PERFORMANCE DISTRIBUTION:

Regional Administrator (Marc.Dapas@nrc.gov)

Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)

DRP Director (Troy.Pruett@nrc.gov)

DRP Deputy Director (Ryan.Lantz@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Jeffrey.Sowa@nrc.gov)

Acting Resident Inspector (Brian.Parks@nrc.gov)

Branch Chief, DRP/C (Greg.Warnick@nrc.gov)

Senior Project Engineer, DRP/C (Cale.Young@nrc.gov)

Project Engineer, DRP/C (Lindsay.Brandt@nrc.gov)

Project Engineer, DRP/C (Michael.Stafford@nrc.gov)

RBS Administrative Assistant (Lisa.Day@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Acting Project Manager (Andrea.George@nrc.gov)

Branch Chief, DRS/IPAT (Thomas.Hipschman@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)

Electronic Distribution for River Bend Station