MONTHYEARL-MT-24-002, Submittal of Revision 41 to the Updated Safety Analysis Report2024-04-17017 April 2024 Submittal of Revision 41 to the Updated Safety Analysis Report ML24109A1002024-04-17017 April 2024 1 to the Updated Safety Analysis Report, Appendix C, Quality Assurance Program ML24109A0992024-04-17017 April 2024 1 to the Updated Safety Analysis Report, Appendix a, Seismic Design Criteria ML24109A1072024-04-17017 April 2024 1 to the Updated Safety Analysis Report, Appendix J, Fire Protection Program ML24109A1052024-04-17017 April 2024 1 to the Updated Safety Analysis Report, Appendix H, Reactor Pressure Vessel Design Summary Report ML24109A0892024-04-17017 April 2024 1 to the Updated Safety Analysis Report, Chapter 7, Plant Instrumentation and Control Systems ML24109A1012024-04-17017 April 2024 1 to the Updated Safety Analysis Report, Appendix D, Pre-Operational and Startup Tests ML24109A0982024-04-17017 April 2024 1 to the Updated Safety Analysis Report, Drawings ML24109A0872024-04-17017 April 2024 1 to the Updated Safety Analysis Report, Chapter 5, Containment System ML24109A0912024-04-17017 April 2024 1 to the Updated Safety Analysis Report, Chapter 9, Plant Radioactive Waste Control Systems ML24109A0922024-04-17017 April 2024 1 to the Updated Safety Analysis Report, Chapter 10, Plant Auxiliary Systems ML24109A0972024-04-17017 April 2024 1 to the Updated Safety Analysis Report, Chapter 15, USAR Drawings, Table of Contents ML24109A1042024-04-17017 April 2024 1 to the Updated Safety Analysis Report, Appendix G, Probable Maximum Flood Mississippi River at Monticello, Minnesota ML24109A1092024-04-17017 April 2024 1 to the Updated Safety Analysis Report - Redacted ML24109A1062024-04-17017 April 2024 1 to the Updated Safety Analysis Report, Appendix I, Evaluation of High Energy Line Breaks Outside Containment ML24109A1112024-04-17017 April 2024 1 to the Updated Safety Analysis Report, Table of Contents ML24109A0832024-04-17017 April 2024 1 to the Updated Safety Analysis Report, Chapter 1, Introduction and Summary ML24109A0842024-04-17017 April 2024 1 to the Updated Safety Analysis Report, Chapter 2, Site and Environs ML24109A0932024-04-17017 April 2024 1 to the Updated Safety Analysis Report, Chapter 11, Plant Power Conversion Systems ML24109A1032024-04-17017 April 2024 1 to the Updated Safety Analysis Report, Appendix F, Containment Vessel Design Summary Design ML24109A0862024-04-17017 April 2024 1 to the Updated Safety Analysis Report, Chapter 4, Reactor Coolant System ML24109A0902024-04-17017 April 2024 1 to the Updated Safety Analysis Report, Chapter 8, Plant Electrical Systems ML24109A1022024-04-17017 April 2024 1 to the Updated Safety Analysis Report, Appendix E, Plant Comparative Evaluation with the Proposed AEC 70 Design Criteria ML24109A1102024-04-17017 April 2024 1 to the Updated Safety Analysis Report, List of Effective Pages ML24109A0962024-04-17017 April 2024 1 to the Updated Safety Analysis Report, Chapter 14, Plant Safety Analysis ML24109A1082024-04-17017 April 2024 1 to the Updated Safety Analysis Report, Appendix K, Renewed Operating License - USAR Supplement ML24109A0852024-04-17017 April 2024 1 to the Updated Safety Analysis Report, Chapter 3, Reactor ML24109A0952024-04-17017 April 2024 1 to the Updated Safety Analysis Report, Chapter 13, Plant Operations ML24109A0942024-04-17017 April 2024 1 to the Updated Safety Analysis Report, Chapter 12, Plant Structures and Shielding ML24109A0882024-04-17017 April 2024 1 to the Updated Safety Analysis Report, Chapter 6, Plant Engineered Safeguards ML23006A1432022-12-19019 December 2022 0 to Updated Safety Analysis Report, Section 13, Plant Operations ML23006A1332022-12-19019 December 2022 Submittal of Revision 40 to Updated Safety Analysis Report ML23006A1342022-12-19019 December 2022 0 to Updated Safety Analysis Report, List of Effective Pages ML23006A1352022-12-19019 December 2022 0 to Updated Safety Analysis Report, Appendix a, Revision 29, Seismic Design Criteria ML23006A1362022-12-19019 December 2022 0 to Updated Safety Analysis Report, Appendix D, Revision 35, Pre-Operational and Startup Tests ML23006A1372022-12-19019 December 2022 0 to Updated Safety Analysis Report, Section 15-2 Drawing Set ML23006A1382022-12-19019 December 2022 0 to Updated Safety Analysis Report, Appendix J, Revision 40, Fire Protection Program ML23006A1392022-12-19019 December 2022 0 to Updated Safety Analysis Report, Section 2, Site and Environs ML23006A1442022-12-19019 December 2022 0 to Updated Safety Analysis Report, Section 5, Containment System ML23006A1462022-12-19019 December 2022 0 to Updated Safety Analysis Report, Section 12, Plant Structures and Shielding ML23006A1402022-12-19019 December 2022 0 to Updated Safety Analysis Report, Section 11, Plant Power Conversion System ML23006A1422022-12-19019 December 2022 0 to Updated Safety Analysis Report, Appendix G, Probable Maximum Flood at Mississippi at Monticello Minnesota May 26, 1969 ML23006A1412022-12-19019 December 2022 0 to Updated Safety Analysis Report, Section 9, Plant Radioactive Waste Control Systems ML23006A1282022-12-19019 December 2022 0 to Updated Safety Analysis Report, Appendix I, Revision 38, Evaluation of High Energy Line Breaks Outside Containment ML23006A1452022-12-19019 December 2022 0 to Updated Safety Analysis Report, Section 6, Plant Engineered Safeguards ML23006A1482022-12-19019 December 2022 0 to Updated Safety Analysis Report, Section 14, Plant Safety Analysis ML23006A1472022-12-19019 December 2022 0 to Updated Safety Analysis Report, Section 15, Table of Contents - USAR Drawings ML23006A1292022-12-19019 December 2022 0 to Updated Safety Analysis Report, Table of Contents ML23006A1512022-12-19019 December 2022 0 to Updated Safety Analysis Report, Appendix F, Containment Vessel Design ML23006A1562022-12-19019 December 2022 0 to Updated Safety Analysis Report, Appendix E, Revision 35, Plant Comparative Evaluation with the Proposed AEC 70 Design Criteria 2024-04-17
[Table view] |
Text
SECTION 12
Revision 26 USAR 12.1MONTICELLO UPDATED SAFETY ANALYSIS REPORT Page 1 of 1SECTION 12PLANT STRUCTURES AND SHIELDING I/kab12.1Summary Description The plant buildings and structures consist of the reactor building, turbine building,radwaste building, administration building, intake structure, off-gas stack, off-gas building, recombiner building, emergency filtration train building and other auxiliary
structures. The design requirements contained in this section apply to the plant
structures and equipment which are required to prevent the significant release of radioactivity, which are required for safe shutdown or which are required for power generation. Plant structures and equipment not discussed in this section are designed in accordance with building codes valid at the Monticello Site. The
arrangement of the main plant structures on the site is shown in Drawing ND-95209, Section 15.Drawings NF-36054 through NF-36063, Section 15, show the generalarrangement of the reactor building, turbine building, office and control building.01156713 SECTION 1212.212.2.1
12.2.2
12.2.3
12.2.412.2.5
SECTION 1212.312.3.1
12.3.2
12.3.3 SECTION 1212.412.4.1
12.4.212.4.3
SECTION 1212.5
Revision 22USAR 12.FIGURESMONTICELLO UPDATED SAFETY ANALYSIS REPORT Page 1 of 4SECTION 12PLANT STRUCTURES AND SHIELDING I/jmr FIGURESFOR ADMINISTRATIVE USE ONLYResp Supv:CNSTP Assoc Ref:
SR:2yrs N Freq: USAR-MANARMS:USAR-12.FIGURESDoc Type:Admin Initials:Date:
9703 Revision 22USAR 12.FIGURESMONTICELLO UPDATED SAFETY ANALYSIS REPORT Page 2 of 4 I/jmrFigure 12.2-9 Comparison of Actual Earth Quake Spectrum to Recommended Spectrum Revision 22USAR 12.FIGURESMONTICELLO UPDATED SAFETY ANALYSIS REPORT Page 3 of 4 I/jmrFigure 12.2-10 Drywell and Foundation Cross Section Revision 22USAR 12.FIGURESMONTICELLO UPDATED SAFETY ANALYSIS REPORT Page 4 of 4 I/jmrFigure 12.2-11 Main Steam Line Anchor Frame and RestraintsBOT. OF STEEL EL. 9371SECTION (OF NF46164)EL. 9360MK1 MK2 & MK3 MK2 MK1 BKT30 WF33 WF 33 WF MK3 SEE MECH. DWGs.
GRADE B PIPE 10 SCH 80 EL. 9440+BOT. OF STEEL 80 REF 26EL. 9426EL. 9406EL. 9310L U00002 usar12.21 C Section E-E (of NF-36852)
SECTION 12
Revision 26 USAR 12.1MONTICELLO UPDATED SAFETY ANALYSIS REPORT Page 1 of 1SECTION 12PLANT STRUCTURES AND SHIELDING I/kab12.1Summary Description The plant buildings and structures consist of the reactor building, turbine building,radwaste building, administration building, intake structure, off-gas stack, off-gas building, recombiner building, emergency filtration train building and other auxiliary
structures. The design requirements contained in this section apply to the plant
structures and equipment which are required to prevent the significant release of radioactivity, which are required for safe shutdown or which are required for power generation. Plant structures and equipment not discussed in this section are designed in accordance with building codes valid at the Monticello Site. The
arrangement of the main plant structures on the site is shown in Drawing ND-95209, Section 15.Drawings NF-36054 through NF-36063, Section 15, show the generalarrangement of the reactor building, turbine building, office and control building.01156713 SECTION 1212.212.2.1
12.2.2
12.2.3
12.2.412.2.5
SECTION 1212.312.3.1
12.3.2
12.3.3 SECTION 1212.412.4.1
12.4.212.4.3
SECTION 1212.5
Revision 22USAR 12.FIGURESMONTICELLO UPDATED SAFETY ANALYSIS REPORT Page 1 of 4SECTION 12PLANT STRUCTURES AND SHIELDING I/jmr FIGURESFOR ADMINISTRATIVE USE ONLYResp Supv:CNSTP Assoc Ref:
SR:2yrs N Freq: USAR-MANARMS:USAR-12.FIGURESDoc Type:Admin Initials:Date:
9703 Revision 22USAR 12.FIGURESMONTICELLO UPDATED SAFETY ANALYSIS REPORT Page 2 of 4 I/jmrFigure 12.2-9 Comparison of Actual Earth Quake Spectrum to Recommended Spectrum Revision 22USAR 12.FIGURESMONTICELLO UPDATED SAFETY ANALYSIS REPORT Page 3 of 4 I/jmrFigure 12.2-10 Drywell and Foundation Cross Section Revision 22USAR 12.FIGURESMONTICELLO UPDATED SAFETY ANALYSIS REPORT Page 4 of 4 I/jmrFigure 12.2-11 Main Steam Line Anchor Frame and RestraintsBOT. OF STEEL EL. 9371SECTION (OF NF46164)EL. 9360MK1 MK2 & MK3 MK2 MK1 BKT30 WF33 WF 33 WF MK3 SEE MECH. DWGs.
GRADE B PIPE 10 SCH 80 EL. 9440+BOT. OF STEEL 80 REF 26EL. 9426EL. 9406EL. 9310L U00002 usar12.21 C Section E-E (of NF-36852)