ML16054A429

From kanterella
Jump to navigation Jump to search
Revision 33 to the Updated Final Safety Analysis Report, Section 15, USAR Drawings, Table of Contents Through Drawing NH-36046, Rev. 80. Sheet 1 of 2
ML16054A429
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 01/26/2016
From:
Northern States Power Co, Xcel Energy
To:
Office of Nuclear Reactor Regulation
Shared Package
ML16054A376 List:
References
L-MT-16-004
Download: ML16054A429 (24)


Text

MONTICELLO UPDATED SAFETY ANALYSIS REPORT USAR-15.TOC SECTION 15Revision 3 3 Page 1 of 4 TABLE OF CONTENTS The plant drawings included in this section are presented as a compliment to the textual descriptions in other sections of the USAR. As such, they are intended to enhance the The plant drawings in the USAR reflect the drawing revisions current at the time the USAR was published and may have been superceded. Note that all site work activities must be conducted using controlled drawings. The reader is directed to the MNGP controlled drawing system for the most recent revisions of plant drawings. The enclosed P&IDs are tailed plant design drawings. As such, they depict more detail than is required to understand the text of the USAR. the enclosed P&IDs usually reflect the normal position during full power plant operation. (Solenoid valves are drawn showing the de-energized or shelf state.) However, plant operating procedures, not P&IDs, are used to control plant equipment. Consequently, the indicated positions of valves, dampers, etc. are not intended to depict any design or operating requirement and may differ from the actual position. Drawing Number Drawing Title NX-7834-2-2 ..........................I.E.D.Reactor Protection System NX-7865-7-1 ..........................Plant Protection Block Diagram RX Protection System NX-7865-7-2 ..........................Plant Protection Block Diagram RX Protection System NX-7993-1-1 ..........................Process Radiation Monitoring System NH-36032 ..............................P&ID - Legend ......................................................... M-100 NH-36034 ..............................Turbine & Extraction Steam P&ID, Sheet 1 of 2

...... M-103 NH-36035 ..............................Turbine & Extraction Steam P&ID, Sheet 2 of 2

...... M-104 NH-36035-2 ...........................P&ID Steam Jet Air Ejectors .................................... M-104-1 NH-36036 ..............................P&ID Condensate and Feedwater

........................... M-105 NH-36037 ..............................P&ID Condensate and Feedwater

........................... M-106 NH-36038 ..............................P&ID Condensate Demineralization System Sheet 1 of 2 ............................................................ M-107 NH-36038-2 ...........................P&ID Condensate Demineralizer System Sheet 2 of 2 ............................................................. M-107 NH-36041 ..............................P&ID Service Water System .................................... M-110 NH-36041-2 ...........................Service Water System P&ID, Sheet 2 of 2

............... M-110-2 NH-36042 ..............................P&ID Reactor Bldg Cooling Water System

.............. M-111 NH-36042-2 ...........................P&ID Reactor Bldg Cooling Water System

.............. M-111-1 NH-36043 ..............................P&ID-Open (Dirty) Radwaste Sump System

........... M-137 NH-36044 ..............................P&ID-Closed (Clean) Radwaste Sump System

....... M-138 MONTICELLO UPDATED SAFETY ANALYSIS REPORT USAR-15.TOC Revision 3 3 Page 2 of 4 M/arb Drawing Number Drawing Title NH-36045 ..............................P&ID-Clean Radwaste System

................................ M-139 NH-36046 ..............................P&ID-Dirty Radwaste System, Sheet 1 of 2

............. M-140 NH-36046-2 ...........................Dirty Radwaste System, Sheet 2 of 2

...................... M-140 NH-36047-1 ...........................Radwaste Solids Handling System P&ID

................. M-141 NH-36047-2 ...........................P&ID-Radwaste Solids Handling System

................ M-141-2 NH-36049-1 ...........................P&ID-Compressed Air System

................................. M-131 NH-36049-2 ...........................P&ID-Instrument Air System .................................... M-131 NH-36049-3 ...........................P&ID-Instrument Air - Turbine Building

................... M-131 NH-36049-4 ...........................P&ID-Service Air System

......................................... M-131 NH-36049-11 .........................P&ID-Instrument Air - Turbine Building

.................... M-131 NH-36049-12 .........................P&ID-Instrument Air - Reactor Building & Drywell

... M-131 NH-36049-14 .........................P&ID Instrument Air - Reactor Building

.................... M-131 NH-36049-15 .........................P&ID Air Supply to Outboard MSIVs

........................ M-131 NF-36054 ...............................Equipment Location - Reactor Bldg - Plan at El 896 ft-3 in., 923 ft-0 in.

............................................. M-1 NF-36055 ...............................Equipment Location-Reactor Bldg Plan at El. 935 ft-0 in. & Office Bldg Plan at El. 939 ft-0 in. . M-2 NF-36055-1 ...........................Equipment Locations - Office Bldg Plan at El. 928 ft-0 in.

NF-36056 ...............................Equipment Location-Reactor Bldg Plan at El. 962 ft-6 in. & Office Bldg Plan at El. 965 ft-0 in. .......................................................... M-3 NF-36056-1 ...........................Equipment Location - Office Bldg Plan at El. 951 ft-0 in.

NF-36057 ...............................Equipment Location - Reactor Bldg Plan at El. 986 ft-6 in., and 1001 ft-2 in.

.................. M-4 NF-36058 ...............................Equipment Location - Reactor Bldg Plan at El. 1027 ft-8 in.

............................................ M-5 NF-36059 ...............................Equipment Location - Turbine Bldg Plan at El. 908 ft-0 in. & 911 ft-0 in.

......................... M-6 NF-36060 ...............................Equipment Location - Turbine Bldg Plan at El. 931 ft-0 in. .............................................. M-7 NF-36061 ...............................Equipment Location - Turbine Bldg Operating Floor Plan at El. 951 ft-0 in.

.................... M-8 NF-36062 ...............................Equipment Location - Reactor, Turb and RW Bldgs, Section A-A

............................ M-9 NF-36063 ...............................Equipment Location - Reactor Bldg, Section B-B ............................................................. M-10 NH-36159 ..............................P&ID-Offgas System ................................................ M-142 NH-36159-2 ...........................Off-Gas Stack ......................................................... M-142 NF-36175 ...............................Single Line Diagram - Station Connections

............. E-1 MONTICELLO UPDATED SAFETY ANALYSIS REPORT USAR-15.TOC Revision 3 3 Page 3 of 4 M/arb Drawing Number Drawing Title NH-36241 ..............................Nuclear Boiler System - Steam Supply, P&ID

......... M-115 NH-36242 ..............................

P&ID-Vessel Instrumentation - Nuclear Boiler System .................................................................... M-116 NH-36242-1 ...........................P&ID Jet Pump Instrumentation - Nuclear Boiler System .................................................................... M-116-1 NH-36242-2 ...........................P&ID Reference Leg Backfill System - Nuclear Boiler System .......................................................... M-116-2 NH-36243 ..............................P&ID-Recirculation Loops - Nuclear Boiler System . M-117 NH-36243-1 ...........................P&ID-Recirc. Loops, Pumps and Motors - Nuclear Boiler System

............................................. M-117 NH-36244 ..............................Control Rod Hydraulic System P&ID

....................... M-118 NH-36245 ..............................P&ID-Control Rod Hydraulic System

....................... M-119 NH-36246 ..............................P&ID-Residual Heat Removal System

..................... M-120 NH-36247 ..............................P&ID-Residual Heat Removal System

..................... M-121 NH-36248 ..............................P&ID-Core Spray System

........................................ M-122 NH-36249 ..............................P&ID-(Steam Side) High Pressure Coolant Injection Sys ............................................................ M-123 NH-36250 ..............................P&ID-(Water Side) High Pressure Coolant Injection System ................................................................... M-124 NH-36251 ..............................P&ID-RCIC (Steam Side)

........................................ M-125 NH-36252 ..............................P&ID-RCIC (Water Side)

......................................... M-126 NH-36253 ..............................P&ID-Standby Liquid Control System

...................... M-127 NH-36254 ..............................P&ID-Reactor Water Cleanup System

..................... M-128 NH-36255 ..............................Unit 1 Reactor Water Clean Up Filter/Demineralizer System P&ID ........................................................... M-129 NH-36256 ..............................P&ID Fuel Pool Cooling and Cleanup System

......... M-135 NH-36257 ..............................

Fuel Pool Filter/Demin System P&ID

....................... M-136 NH-36258 ..............................P&ID Primary Containment & Atmospheric Control System

........................................................ M-143 NH-36263 ..............................Air Flow Diagram - Turbine Building

........................ M-151 NH-36266 ..............................Air Flow Diagram - Radwaste Area

.......................... M-154 NH-36489 ..............................P&ID Circulating Water System

............................... M-800 NH-36489-2 ...........................Circulating Water System P&ID

............................... M-800-1 NH-36516 ..............................Fire Protection System Yard Areas

.......................... M-810 NE-36640-2 ...........................125V DC Distribution Electrical Scheme

.................. E-110-2 NE-36640-3 ...........................Schematic Diagrams-125, 250 & 24 Volt DC Systems ................................................................... E-110-3 NE-36640-4 ...........................250V DC Distribution and Panel Schedule D31, D33 ................................................................. E-110-4 MONTICELLO UPDATED SAFETY ANALYSIS REPORT USAR-15.TOC Revision 3 3 Page 4 of 4 M/arb Drawing Number Drawing Title NE-36640-4-2

........................125/250V DC Distribution Cabinet D31 Scheme No. D3 ....................................................... E-110-4B NE-36640-6 ...........................24 VDC Distribution, Scheme D15, D25

.................. E-110-6 NH-36664 ..............................P&ID-RHR Service Water & Emergency Service Water Systems ................................................................... M-112 NH-36665 ..............................P&ID Service Water System and Make-Up Intake Structure ....................................................... M-811 NH-36666 ..............................P&ID-Screen Wash, Fire & Chlorination System Intake Structure ...................................................... M-812 NE-36771-4 ...........................Reactor Protection Power System Distribution Panel Y40 & Y50 ..................................................... E-111-4 NH-36881 ..............................Standby Gas Treatment Flow Diagram

.................... M-145 NH-46162 ..............................P&ID-Primary Containment Nitrogen Control System

........................................................ M-130 NH-54817-4 ...........................P&ID Off- Flow Diagram-Recombiner Building NH-54822-2 ...........................P&ID-Off-Gas Modification Engineering Flow Diagram Off-Gas Storage Area NH-54823-2 ...........................P&ID-Off-Gas Modification Engineering Flow Diagram Compressor Bldg NH-54823-3 ...........................P&ID-Off-Gas Modification Engineering Flow Diagram Compressor Bldg NH-54823-4 ...........................P&ID-Off-Gas Modification Engineering Flow Diagram-Compressor Bldg NH-91197 ..............................P&ID Containment Atmosphere Monitoring System NE-93523-3 ...........................Schematic Metering & Relaying Diagram 125/250 V DC Dist. Channel 2 .................................................. E-201-3 NE-93523-4 ...........................Schematic Metering & Relaying Diagram 125/250 V DC Dist. Channel 2 .................................................. E-201-4 NH-94896 ..............................P&ID Combustible Gas Control System Div. I (East)

NH-94897 ..............................P&ID Combustible Gas Control System Div. II (West)

ND-95208 ..............................Monticello Property Map ND-95209 ..............................Monticello Main Plant Structures NH-119062 ............................

RDS-1000 P&ID NH-178635 ............................Substation 1 - Line Diagram

A 8 c D E H J K L MANUAL TRIP ACT\.IATOR.

A3 TRIPPEO MANUAL 'TRIP ACTUATOR S3 AWC CR VOL 1-HVH WATER, LEVEL Tl<IP CR *.:

(.oint:>>

T (AIJTO) c c """" """" """'" '"' c * . ' ' .... l REF. 12 c TEST S'IIUctl I (Cf£N TO n$1) -**""-]

.... """liD \Aux ocv

\ Wt-.!EN eNeRGozeo I Cl> I I PEFlt.'<SSMi

.. u. ................ .a .... .a ........ ._ ..............

a. ..

1 AUXOCV CR 7 f PSRMIS,.,VE

\ 'NI-IEN ) \Aux OCV CR I PERMISSIVE

\ L .. _. .... _. .... ._._ ...... -..-..

.......... ENEFtGI '250 CR I MAIN )CONOEN5ER LOW V>t.. Tl!IP CR REACTOR VESSEL I*IIGH PRESS. TRIP C.R CR A MAIN ST. LINE' ISO\.Al'ION VAlVE CLO!IVRE Ti?itJP t..J.J'X """' CR A NEUTRON MONITOR114C 5Y5 TRIP A A ONl'AINMENr PR£SS.. TJ?IP *PPROACH Allo!ll.l LOCAl. Cl? A. TRIP N:TUA'!OR 81 OR B2 TRIPPEO CR TUR61NE. $TOP VA.l.-VC Ci.Oa}RE, 'TR.\P 6'.wlcE! cR CR 1'\JRSINe

'O'!CP VA.L\IE. '-'AL\1'6" ,.: CR ""' "' ! *----.J ......

v I

'.N\o\E.N R.*5ET 5WI'TC.M RE$E.T SWITC.H. \W.. Rt.!.ET 'N I'OS*l"OTO\

POS (NOT< 3) I CR RM" I CR + t 10 t.ECONOS \ 10 SECO"tlS \ T\Mt TIM! OtLfi-.'Y A.f'rER AfTtR &.R"-H I tS ll\ltTIA.T£0 I H SEAL '"' --.., H f-----,

I >mEe i A2 TRIP SAMSAC, AI TRtP ACTUA"!OR SCRAM COMTACTOR I I ,, T I I II II t 1 I I I I .. j I I I I I 1 f I I I I J

... ll....,....__.

I I I I I I I I

  • I I I I 1\C. TUII.TOR I I I I I I I I I 1 1 I 1 I 1 I I I I I 1 I t I J I I I I I I I I I I I I I I I I I I I I I I : I t t : ! : I I : : ' ' L 1/3 TRIP l.06K.-S(RAM PlLOT VALVES -r I I o I j, ;I ;

1 A-GROVP Gl SEE >o<;. 4 1/3 TRIP LOGIC-SC.RAM PILOT A -GROUP G2 '&. (. G.. 4 i : * : : 1/o 'TRIP LOGIC:

  • S(RA"' PILOT \iALVE.S A-(,ROUP :Oo '<X£. Fl<?, 4 I t I : ; I ' ' ' 1/3 TRIP LOGIC*SCII"M

?\LOT yALVES A-GROUP 64 St;:E: c 1/3 Cl.OSE

  • BACI<.-I)P SCRAM VALVE -A """'I J RD'. 12 "' l AS TRIP ACTI.IA'TOR SI'ME AS AI TRJP X:TUA'TOR I I I I I I II I I I I I I I I I I I 1 I I I I (514 1) I l t I I 1 I I I I ! I 1 I (SI< ;) ! I I ' : : (SH 1) I ' i I SEMUAL@ ttttlRIC 2 91'. 145 3 I.E.D. REACTOR PROTE.CTION -D.C SUPPL loS BtJILT RE\'!SEO TO REflECT TilE ELIMINATION Of M.S. HIGH RAO SClWd MOD PER J\ OWNo RHH 4-22 .. 93 CHK: PEB 8-26-93 MOO: 920315 fl J K L RD

NX-7865-7-2

,-I A ) ROD POSITION INFORMATION SYSTEM MALFUNCTION A )_ APRM " UPSCALE qf INOP OR LOW LPRM COUNT OR \FLOW UPSCALE ,/ ' EITHER ROD BLOCK MONITOR UPSCALE OR INOP ROD MOVEMENT TIMER SWITCH MALFUNCTION ROD SELECT POWER SW. IN "OFF" POSITION DURING WITHDRAW ROD WORTH MINIMIZER IN LIMITING CONDITION

!34 ANY APRM DOWNSCALE EITHER ROD BLOCK MONITOR DOWNSCALE REACTOR MODE SWITCH IN RUN POSITION DISCHARGE VOLUME HIGH WATER LEVEL 35 DISCHARGE VOLUME HIGH WATER LEVEL SCRAM TRIP BY-PASSED

! REACTOR SW. lt:J r 11 SHUTDOWN' POSITION REFUEL MODE ONE ROD PERMISSIVE INTERLOCK EAC. MODE IN OR REFUEL POSITION TROLLEY MOUNTED HOIST FUEL LOADED REFUEL PLATFORM NEAR REAC. CORE REACTOR MO,P.E SWITCH. IN START-UP POSITION 36 FRAME MOUNTED HOIST FUEL LOADED 36 REFUEL PLATFORM NEAR REAC. CORE ANY GRAPPLE DET FUEL RETR PERM & LOADED OR DETECTOR NOT FULLY NOT FULL UP INSERTED OR SRM DOWNSCALE 37 SERVICE ANY IRM PLATFORM RANGE SW. IN HOIST FUEL EITHER OF TWO LOADED LOWEST RANGES 36 I REAC." MODE

  • Jt.!

OR START -UP' \ POSITION ANY SRM ANY IRM UPSCALE OR UPSCALE OR INOP OR INOP J + ANY IRM DOWNSCALE IN ANY RANGE BUT LOWEST

  • REVISIONS 76 EC10856 DWN: JLL 7-27-10 CHK: DDW 8-2-10 APPR: AJD 8-2-10 ...--------------------------------------

..... I

  • I
  • I MANUAL VACUUM TRIP NO. 2 -7 IN. Hg SERVICE PLATFORM FUEL LOADED 36 BACKUP OVER SPEED TRIP (112%) MANUAL VACUUM TRIP NO. 1 REFUEL PLATFORM NEAR REAC. CORE REACTOR t(ODE SW. IN START -UP" POSITION TURBINE LOCKOUT RELAY TRIPPED EMERGENCY GOVERNOR ( 110-111 %) EMERGENCY TRIP VALVE ALL CONTROL RODS NOT FULL IN GRAPPLE FUEL LOADED OR NOT FULL UP MAIN CONDENSER LOW VACUUM MANUAL SPEED LOfD CHANGER REFUEL PLATFORM NEAR REAC. CORE FRAME MOUNTED HOIST FUEL LOADED VACUUM TRIP NO. 1 TROLLEY MOUNTED HOIST FUEL LOADED -19 IN. Hg VACUUM TRIP NO. 1 STOP VALVE TRIP -19 IN. Hg SPEED GOVERNOR ACTUATED MOIST SEP TANK LEVEL -I I MANUAL EMERGENCY TRIP VALVE MAIN rPJi9 HIGH ...,. _____________________________________

_ MANUAL l MANUAL THRUST BEARING WEAR REACTOR HIGH WATER LEVEL l MAIN RANSFORMER PHASE OVER CURR. VACUUM TRIP NO. 2 BEARING HI-VIBRATION EXHAUST GENERATOR HOOD LOCKOUT HIGH RELAY TEMPERATURE TRIPPED GENERATOR OVERHEATING PROTECTIVE RELAYS \. f46 & 240

  • 286 E -T-MANUAL MANUAL GENERATOR LOCK OUT RELAY TRIPPED 7 IN. Hg BYPASS ARMATURE LOSS OF COOLING ARMATURE WATER DISCH. COOUNG WATER HIGH TEMP. PUMP PRESS. OVER CURRENT\ OVER CURRENT\ RELAY SET AT) NO WATER FLOW RELAY SET AT ) 80% FULL LOAD CAPABILITY I CAPABILITY I ' I \ TIME ) ( TIME } DELAY DELAY 3.5 MIN 2 MIN I I I ' J \ AE RESPONSIBLE FOR THIS PORTION I I I GENERATOR GENERATOR GENERATOR 345 KV. BKR. NEUTRAL OVER CURRENT OVER DIFFERENTIAL WITH VOLTAGE PROTECTIVE I VOLTAGE CURRENT RESTRAINT RELAYS I 259N 281 251V I MAIN UNIT AUX TRANSFORMER TRANSFORMER

& GENERATOR SUDDEN TRANSFORMER DIFFERENTIAL MANUAL PRESSURE LOCKOUT CURRENT ! !*186 !387 l I ST I .286

  • G y I 5£H£Ul@HFCTRIC This map/document is to assist employees in the performance of their jobs. 729 E 1 Q 1 Your personal safety is provided for by using safety practices, procedures and equipment as described in safety training programs, manuals and SPAR's. '"'M...,...o=-N,...,T=I---=c....,.A-=o---=o..,...,w.,...,G:--T"""'A:""'"T"!

PLANT PROTECTION BLOCK DIAGRAM RX PROTECTION SYSTEM SCALE: NONE REV 76 MONTICELLO NUCLEAR GENERATING PLANT '(l Xce/ [nergym NORTHERN STATES POWER COMPANY NX-7865-7-2 c I H Jl K L M Ofi"-Co\5 SAI.IPI.E

""" "' I e ...

YF-CAS s.-.uru: srs. I I '" l¢ Off-GAS ffl.: UP STREM! or H<AOOP A .. '" 2 1<7 1 r* ' 115 V/l; 60CY lOCO. """' 2 ' ..........

,. 1309 ----1--.J

'" I l I I I I ! I I ; I I I I I i I I 115\o."\:

raeM mr svs""'""'""'

  • A*aus -*-_ Off-GAS RADIATION MONITORS & SAMPLERS 3 4 v REACTOR BUII.OjNG YENTIIA1!0N MONJIQBS 5 6 LOG RAENA110N t.IONITOR u IV I I 'L.. MAIN STEAM LINE RADIATION MONITORS N 7 f 8 9 10 11 12 ,..., ftf 215X626(t.IOmlOO.lO)-I1 P.t. tS$1.![1)

' ' REVISIONS A

D<LETED STACK GAS RADIATION MONITORS PER ORR: M0-82*104 OWN: BAS 9*29-82 CHK: MRG 10*4-62 PROJ:80Z061 RLUED: 1-11-BJ AS BUILT: REVISED TO REFLECT AS FOUND CONDffiON IN ACCORDANCE SRI 92-025 PER ORR:

OWN: RHH 8*20*96 CHK: DRN 9-3-96 MOD:rli--RLMED: 9-11-96 C AS-BUILT:

REVISED TO REFLECT THE ML S!E'AM DILUTION RECOMBiNER SYSTEM PER ORR: "OWN: JJG 8*15*02 CHK* RJf 8-23-02 MOO: 99Q160 RLU:O: 9*10*02 A B AS-BUILT:

C REIY.<AViN TO ASSURE L£GSUTY or USAA ORAMIICS ENHANCEMENTS NOT SHO\YN FOR CLARITY PER ORR M0-02-0245 H0-03 CHK: ""' 'MI*l MOD:....,._. .t SYSTEM .N STATES POWER COMPANY SCAlE: NONE I R<V D MINNEAPOUS NX-7993-"i-1 13 14 D H J K L M

D -c B -A '--v---' TO CONDENSER E-18 CONN 5 <iEiQD NH-36035 (0 , 8) I PS9-2"-EO 8 I 7 I 6 I 5 4 I 3 I 2 NO STill N0/2 TO

';' llr= [oo=-=3=-1=1-= [oo=-=.=_=j]:-r--::OG:-::2,--"'6",...-"'Eo;-----.----

--<:J-----.------::OG3-:::-:-::1o""*-"""m;---

  • ---

I A/R 01012217 OWN: .liP 3-29-06 CHK: BIJ.. 3-30-06 APPR: JSO 3-30-06 RRJ0-3/4" H8 r 7

"-J..

(8,1) --RS1-3"-G8--

Vi "6"':... 6 NOZZL£ J.

tt "' : PS 205 g 12-ill1""""1Jff!A


¢; 11n8 o .

iSfSiiBt .... -.:.-, L 1\ OG ,_-; . liiiDiilil I ll'iiS=26=]_ t-_

A/R 01121715 OWN: .liP 3-HlB CHK: BJR 3-11-08 APPR: RUG 3-12-08 ----,--....1 F.O. IIjl I :,. ,I I TX I' 1 "' I i 737o II C205 C07 A t----+.....r:IDLJ C2F%.--, l:ffiiD "' 12* 12" l.l '?f.

ll tE Ill lQ I 7991-9 ST STAG OG-25-1 I NO:ZZ .' 3/4"' 002-1"'-EO X: /3(f. L 1-----__ t_L---l '-' 00_26_1 r VENT I (C,8) I A

' (iii\ "t-HI RAD I 1:QE!1§J * \!_OSSA 9 I < HD I F.C. '!: I I 1/2" L-LOW 200 STI.GE 5100 P!lBSiff-j Rhl II 001 8-16" -HC 7 I -JLj..!!§...

I TO CONDENSER E-18 CONN 29 <iBID 1----.....1 NH-36035 (0,6) 6 .AlB EJECTOR £=28 fill F.W. j' NH-36036 (,\,5) I 5 INTER-CONDENSER REFERENCE QRAWINGS: F.W. (iBID NH-36036 (,1,5) 1. NUCLEAR BOILER STEMI SUPPLY ..............

<iETID 2. lEO PROCESS RADIATION SYSTW ......... .NX-7993-1-1, 2 &

  • 3. lED ISOLATION

..................... .NX-7823-*-17 , -*-* & -*-5 t 4 I FILITR F7 3 OJ I 0 I C-80 (,1,5)(8,6)

OS I M98 I OPEN ][IEC15325 OWN: .liP 3-15-10 CHK: PEB 3-15-10 APPR: JPC 3-17-10 OWN: .liP 10-20-10 CHK: BIJ.. 10-21-10 APPR: BJR 1Q-2HO OWN: .liP 3-7-11 CHK: BIJ.. 3-7-11 APPR: IIEO 3-8-11 OWN: .liP 3-9-11 CHK: BIJ.. 3-IQ-11 APPR: Ill 3-10-11 OWN: .liP 4-18-11 CHK: BIJ.. HB-11 APPR: DZ 4-25-11 { t::lt-----t 1 L ,104 I OS VM-10"-HC M99 T I I This is to assist in the of th e ir jobs.! l j 1 04 1 Your ptrsonol safety is providM for by using safety proclices, procedures and I M--equipment os dt:scn"bed in safety training programs, manuals and SPAR's. MONTI CAD DWG c P&ID STEAM JET AIR EJECTORS MONTICELLO NUCLEAR GENERATING PLANT SCALE: NONE REV 82 2 I D t--c B A

8 NH-36042-2 D c 8 A <Ell> NH-36042 (0,5) 7 6 --iTR-1720 (C,3) SEE RHR PUMP VENT .t DRAIN DETAIL ('TYP) <EID NH-36247 (E,2) TO RHR PUMP P-202A (1o-3') TO RHR pUMp P-202C (1o-JC) TO RHR PUMP P-2028 (1o-3B) TO RHR puMp P-2020 (10-JD) OH38) NH-36044 (E.3) 5 PR't'WELL EQUIP DRAIN SUMp HEAT [)(CHANGER TR-1720 (C,3) _ _]'L__ @OL ,.....-'=-----'T"""

4 PRnMO+

.'i::l:C::i 7 6 4 3 3 2 MONTICELLO NUCLEAR GENERATING PLANT UNIT 1 1 REVISIONS 76 EC11951 "A/R 01121715 DWN: ..UP 3-4-re CHK: llll 3-11--al APPR: RWG 3-12--al ... .

... .

... c -CIUMJIY GAIU' D -!io'RIY IElA1ED IIDWIDt. -SAFElY RElATED D.ECIRICAL MONTICELLO NUCLEAR GENERATING PLANT P&ID REACTOR BUILDING COOLING WATER SYSTEM NORTHERN STATES POWER COMPANY SCALE: NONE REV 76 MINNEAPOUS NH-36042-2 2 1 D c 8

MONTICELLO UPDATED SAFETY ANALYSIS REPORT USAR-15.TOC SECTION 15Revision 3 3 Page 1 of 4 TABLE OF CONTENTS The plant drawings included in this section are presented as a compliment to the textual descriptions in other sections of the USAR. As such, they are intended to enhance the The plant drawings in the USAR reflect the drawing revisions current at the time the USAR was published and may have been superceded. Note that all site work activities must be conducted using controlled drawings. The reader is directed to the MNGP controlled drawing system for the most recent revisions of plant drawings. The enclosed P&IDs are tailed plant design drawings. As such, they depict more detail than is required to understand the text of the USAR. the enclosed P&IDs usually reflect the normal position during full power plant operation. (Solenoid valves are drawn showing the de-energized or shelf state.) However, plant operating procedures, not P&IDs, are used to control plant equipment. Consequently, the indicated positions of valves, dampers, etc. are not intended to depict any design or operating requirement and may differ from the actual position. Drawing Number Drawing Title NX-7834-2-2 ..........................I.E.D.Reactor Protection System NX-7865-7-1 ..........................Plant Protection Block Diagram RX Protection System NX-7865-7-2 ..........................Plant Protection Block Diagram RX Protection System NX-7993-1-1 ..........................Process Radiation Monitoring System NH-36032 ..............................P&ID - Legend ......................................................... M-100 NH-36034 ..............................Turbine & Extraction Steam P&ID, Sheet 1 of 2

...... M-103 NH-36035 ..............................Turbine & Extraction Steam P&ID, Sheet 2 of 2

...... M-104 NH-36035-2 ...........................P&ID Steam Jet Air Ejectors .................................... M-104-1 NH-36036 ..............................P&ID Condensate and Feedwater

........................... M-105 NH-36037 ..............................P&ID Condensate and Feedwater

........................... M-106 NH-36038 ..............................P&ID Condensate Demineralization System Sheet 1 of 2 ............................................................ M-107 NH-36038-2 ...........................P&ID Condensate Demineralizer System Sheet 2 of 2 ............................................................. M-107 NH-36041 ..............................P&ID Service Water System .................................... M-110 NH-36041-2 ...........................Service Water System P&ID, Sheet 2 of 2

............... M-110-2 NH-36042 ..............................P&ID Reactor Bldg Cooling Water System

.............. M-111 NH-36042-2 ...........................P&ID Reactor Bldg Cooling Water System

.............. M-111-1 NH-36043 ..............................P&ID-Open (Dirty) Radwaste Sump System

........... M-137 NH-36044 ..............................P&ID-Closed (Clean) Radwaste Sump System

....... M-138 MONTICELLO UPDATED SAFETY ANALYSIS REPORT USAR-15.TOC Revision 3 3 Page 2 of 4 M/arb Drawing Number Drawing Title NH-36045 ..............................P&ID-Clean Radwaste System

................................ M-139 NH-36046 ..............................P&ID-Dirty Radwaste System, Sheet 1 of 2

............. M-140 NH-36046-2 ...........................Dirty Radwaste System, Sheet 2 of 2

...................... M-140 NH-36047-1 ...........................Radwaste Solids Handling System P&ID

................. M-141 NH-36047-2 ...........................P&ID-Radwaste Solids Handling System

................ M-141-2 NH-36049-1 ...........................P&ID-Compressed Air System

................................. M-131 NH-36049-2 ...........................P&ID-Instrument Air System .................................... M-131 NH-36049-3 ...........................P&ID-Instrument Air - Turbine Building

................... M-131 NH-36049-4 ...........................P&ID-Service Air System

......................................... M-131 NH-36049-11 .........................P&ID-Instrument Air - Turbine Building

.................... M-131 NH-36049-12 .........................P&ID-Instrument Air - Reactor Building & Drywell

... M-131 NH-36049-14 .........................P&ID Instrument Air - Reactor Building

.................... M-131 NH-36049-15 .........................P&ID Air Supply to Outboard MSIVs

........................ M-131 NF-36054 ...............................Equipment Location - Reactor Bldg - Plan at El 896 ft-3 in., 923 ft-0 in.

............................................. M-1 NF-36055 ...............................Equipment Location-Reactor Bldg Plan at El. 935 ft-0 in. & Office Bldg Plan at El. 939 ft-0 in. . M-2 NF-36055-1 ...........................Equipment Locations - Office Bldg Plan at El. 928 ft-0 in.

NF-36056 ...............................Equipment Location-Reactor Bldg Plan at El. 962 ft-6 in. & Office Bldg Plan at El. 965 ft-0 in. .......................................................... M-3 NF-36056-1 ...........................Equipment Location - Office Bldg Plan at El. 951 ft-0 in.

NF-36057 ...............................Equipment Location - Reactor Bldg Plan at El. 986 ft-6 in., and 1001 ft-2 in.

.................. M-4 NF-36058 ...............................Equipment Location - Reactor Bldg Plan at El. 1027 ft-8 in.

............................................ M-5 NF-36059 ...............................Equipment Location - Turbine Bldg Plan at El. 908 ft-0 in. & 911 ft-0 in.

......................... M-6 NF-36060 ...............................Equipment Location - Turbine Bldg Plan at El. 931 ft-0 in. .............................................. M-7 NF-36061 ...............................Equipment Location - Turbine Bldg Operating Floor Plan at El. 951 ft-0 in.

.................... M-8 NF-36062 ...............................Equipment Location - Reactor, Turb and RW Bldgs, Section A-A

............................ M-9 NF-36063 ...............................Equipment Location - Reactor Bldg, Section B-B ............................................................. M-10 NH-36159 ..............................P&ID-Offgas System ................................................ M-142 NH-36159-2 ...........................Off-Gas Stack ......................................................... M-142 NF-36175 ...............................Single Line Diagram - Station Connections

............. E-1 MONTICELLO UPDATED SAFETY ANALYSIS REPORT USAR-15.TOC Revision 3 3 Page 3 of 4 M/arb Drawing Number Drawing Title NH-36241 ..............................Nuclear Boiler System - Steam Supply, P&ID

......... M-115 NH-36242 ..............................

P&ID-Vessel Instrumentation - Nuclear Boiler System .................................................................... M-116 NH-36242-1 ...........................P&ID Jet Pump Instrumentation - Nuclear Boiler System .................................................................... M-116-1 NH-36242-2 ...........................P&ID Reference Leg Backfill System - Nuclear Boiler System .......................................................... M-116-2 NH-36243 ..............................P&ID-Recirculation Loops - Nuclear Boiler System . M-117 NH-36243-1 ...........................P&ID-Recirc. Loops, Pumps and Motors - Nuclear Boiler System

............................................. M-117 NH-36244 ..............................Control Rod Hydraulic System P&ID

....................... M-118 NH-36245 ..............................P&ID-Control Rod Hydraulic System

....................... M-119 NH-36246 ..............................P&ID-Residual Heat Removal System

..................... M-120 NH-36247 ..............................P&ID-Residual Heat Removal System

..................... M-121 NH-36248 ..............................P&ID-Core Spray System

........................................ M-122 NH-36249 ..............................P&ID-(Steam Side) High Pressure Coolant Injection Sys ............................................................ M-123 NH-36250 ..............................P&ID-(Water Side) High Pressure Coolant Injection System ................................................................... M-124 NH-36251 ..............................P&ID-RCIC (Steam Side)

........................................ M-125 NH-36252 ..............................P&ID-RCIC (Water Side)

......................................... M-126 NH-36253 ..............................P&ID-Standby Liquid Control System

...................... M-127 NH-36254 ..............................P&ID-Reactor Water Cleanup System

..................... M-128 NH-36255 ..............................Unit 1 Reactor Water Clean Up Filter/Demineralizer System P&ID ........................................................... M-129 NH-36256 ..............................P&ID Fuel Pool Cooling and Cleanup System

......... M-135 NH-36257 ..............................

Fuel Pool Filter/Demin System P&ID

....................... M-136 NH-36258 ..............................P&ID Primary Containment & Atmospheric Control System

........................................................ M-143 NH-36263 ..............................Air Flow Diagram - Turbine Building

........................ M-151 NH-36266 ..............................Air Flow Diagram - Radwaste Area

.......................... M-154 NH-36489 ..............................P&ID Circulating Water System

............................... M-800 NH-36489-2 ...........................Circulating Water System P&ID

............................... M-800-1 NH-36516 ..............................Fire Protection System Yard Areas

.......................... M-810 NE-36640-2 ...........................125V DC Distribution Electrical Scheme

.................. E-110-2 NE-36640-3 ...........................Schematic Diagrams-125, 250 & 24 Volt DC Systems ................................................................... E-110-3 NE-36640-4 ...........................250V DC Distribution and Panel Schedule D31, D33 ................................................................. E-110-4 MONTICELLO UPDATED SAFETY ANALYSIS REPORT USAR-15.TOC Revision 3 3 Page 4 of 4 M/arb Drawing Number Drawing Title NE-36640-4-2

........................125/250V DC Distribution Cabinet D31 Scheme No. D3 ....................................................... E-110-4B NE-36640-6 ...........................24 VDC Distribution, Scheme D15, D25

.................. E-110-6 NH-36664 ..............................P&ID-RHR Service Water & Emergency Service Water Systems ................................................................... M-112 NH-36665 ..............................P&ID Service Water System and Make-Up Intake Structure ....................................................... M-811 NH-36666 ..............................P&ID-Screen Wash, Fire & Chlorination System Intake Structure ...................................................... M-812 NE-36771-4 ...........................Reactor Protection Power System Distribution Panel Y40 & Y50 ..................................................... E-111-4 NH-36881 ..............................Standby Gas Treatment Flow Diagram

.................... M-145 NH-46162 ..............................P&ID-Primary Containment Nitrogen Control System

........................................................ M-130 NH-54817-4 ...........................P&ID Off- Flow Diagram-Recombiner Building NH-54822-2 ...........................P&ID-Off-Gas Modification Engineering Flow Diagram Off-Gas Storage Area NH-54823-2 ...........................P&ID-Off-Gas Modification Engineering Flow Diagram Compressor Bldg NH-54823-3 ...........................P&ID-Off-Gas Modification Engineering Flow Diagram Compressor Bldg NH-54823-4 ...........................P&ID-Off-Gas Modification Engineering Flow Diagram-Compressor Bldg NH-91197 ..............................P&ID Containment Atmosphere Monitoring System NE-93523-3 ...........................Schematic Metering & Relaying Diagram 125/250 V DC Dist. Channel 2 .................................................. E-201-3 NE-93523-4 ...........................Schematic Metering & Relaying Diagram 125/250 V DC Dist. Channel 2 .................................................. E-201-4 NH-94896 ..............................P&ID Combustible Gas Control System Div. I (East)

NH-94897 ..............................P&ID Combustible Gas Control System Div. II (West)

ND-95208 ..............................Monticello Property Map ND-95209 ..............................Monticello Main Plant Structures NH-119062 ............................

RDS-1000 P&ID NH-178635 ............................Substation 1 - Line Diagram

A 8 c D E H J K L MANUAL TRIP ACT\.IATOR.

A3 TRIPPEO MANUAL 'TRIP ACTUATOR S3 AWC CR VOL 1-HVH WATER, LEVEL Tl<IP CR *.:

(.oint:>>

T (AIJTO) c c """" """" """'" '"' c * . ' ' .... l REF. 12 c TEST S'IIUctl I (Cf£N TO n$1) -**""-]

.... """liD \Aux ocv

\ Wt-.!EN eNeRGozeo I Cl> I I PEFlt.'<SSMi

.. u. ................ .a .... .a ........ ._ ..............

a. ..

1 AUXOCV CR 7 f PSRMIS,.,VE

\ 'NI-IEN ) \Aux OCV CR I PERMISSIVE

\ L .. _. .... _. .... ._._ ...... -..-..

.......... ENEFtGI '250 CR I MAIN )CONOEN5ER LOW V>t.. Tl!IP CR REACTOR VESSEL I*IIGH PRESS. TRIP C.R CR A MAIN ST. LINE' ISO\.Al'ION VAlVE CLO!IVRE Ti?itJP t..J.J'X """' CR A NEUTRON MONITOR114C 5Y5 TRIP A A ONl'AINMENr PR£SS.. TJ?IP *PPROACH Allo!ll.l LOCAl. Cl? A. TRIP N:TUA'!OR 81 OR B2 TRIPPEO CR TUR61NE. $TOP VA.l.-VC Ci.Oa}RE, 'TR.\P 6'.wlcE! cR CR 1'\JRSINe

'O'!CP VA.L\IE. '-'AL\1'6" ,.: CR ""' "' ! *----.J ......

v I

'.N\o\E.N R.*5ET 5WI'TC.M RE$E.T SWITC.H. \W.. Rt.!.ET 'N I'OS*l"OTO\

POS (NOT< 3) I CR RM" I CR + t 10 t.ECONOS \ 10 SECO"tlS \ T\Mt TIM! OtLfi-.'Y A.f'rER AfTtR &.R"-H I tS ll\ltTIA.T£0 I H SEAL '"' --.., H f-----,

I >mEe i A2 TRIP SAMSAC, AI TRtP ACTUA"!OR SCRAM COMTACTOR I I ,, T I I II II t 1 I I I I .. j I I I I I 1 f I I I I J

... ll....,....__.

I I I I I I I I

  • I I I I 1\C. TUII.TOR I I I I I I I I I 1 1 I 1 I 1 I I I I I 1 I t I J I I I I I I I I I I I I I I I I I I I I I I : I t t : ! : I I : : ' ' L 1/3 TRIP l.06K.-S(RAM PlLOT VALVES -r I I o I j, ;I ;

1 A-GROVP Gl SEE >o<;. 4 1/3 TRIP LOGIC-SC.RAM PILOT A -GROUP G2 '&. (. G.. 4 i : * : : 1/o 'TRIP LOGIC:

  • S(RA"' PILOT \iALVE.S A-(,ROUP :Oo '<X£. Fl<?, 4 I t I : ; I ' ' ' 1/3 TRIP LOGIC*SCII"M

?\LOT yALVES A-GROUP 64 St;:E: c 1/3 Cl.OSE

  • BACI<.-I)P SCRAM VALVE -A """'I J RD'. 12 "' l AS TRIP ACTI.IA'TOR SI'ME AS AI TRJP X:TUA'TOR I I I I I I II I I I I I I I I I I I 1 I I I I (514 1) I l t I I 1 I I I I ! I 1 I (SI< ;) ! I I ' : : (SH 1) I ' i I SEMUAL@ ttttlRIC 2 91'. 145 3 I.E.D. REACTOR PROTE.CTION -D.C SUPPL loS BtJILT RE\'!SEO TO REflECT TilE ELIMINATION Of M.S. HIGH RAO SClWd MOD PER J\ OWNo RHH 4-22 .. 93 CHK: PEB 8-26-93 MOO: 920315 fl J K L RD

NX-7865-7-2

,-I A ) ROD POSITION INFORMATION SYSTEM MALFUNCTION A )_ APRM " UPSCALE qf INOP OR LOW LPRM COUNT OR \FLOW UPSCALE ,/ ' EITHER ROD BLOCK MONITOR UPSCALE OR INOP ROD MOVEMENT TIMER SWITCH MALFUNCTION ROD SELECT POWER SW. IN "OFF" POSITION DURING WITHDRAW ROD WORTH MINIMIZER IN LIMITING CONDITION

!34 ANY APRM DOWNSCALE EITHER ROD BLOCK MONITOR DOWNSCALE REACTOR MODE SWITCH IN RUN POSITION DISCHARGE VOLUME HIGH WATER LEVEL 35 DISCHARGE VOLUME HIGH WATER LEVEL SCRAM TRIP BY-PASSED

! REACTOR SW. lt:J r 11 SHUTDOWN' POSITION REFUEL MODE ONE ROD PERMISSIVE INTERLOCK EAC. MODE IN OR REFUEL POSITION TROLLEY MOUNTED HOIST FUEL LOADED REFUEL PLATFORM NEAR REAC. CORE REACTOR MO,P.E SWITCH. IN START-UP POSITION 36 FRAME MOUNTED HOIST FUEL LOADED 36 REFUEL PLATFORM NEAR REAC. CORE ANY GRAPPLE DET FUEL RETR PERM & LOADED OR DETECTOR NOT FULLY NOT FULL UP INSERTED OR SRM DOWNSCALE 37 SERVICE ANY IRM PLATFORM RANGE SW. IN HOIST FUEL EITHER OF TWO LOADED LOWEST RANGES 36 I REAC." MODE

  • Jt.!

OR START -UP' \ POSITION ANY SRM ANY IRM UPSCALE OR UPSCALE OR INOP OR INOP J + ANY IRM DOWNSCALE IN ANY RANGE BUT LOWEST

  • REVISIONS 76 EC10856 DWN: JLL 7-27-10 CHK: DDW 8-2-10 APPR: AJD 8-2-10 ...--------------------------------------

..... I

  • I
  • I MANUAL VACUUM TRIP NO. 2 -7 IN. Hg SERVICE PLATFORM FUEL LOADED 36 BACKUP OVER SPEED TRIP (112%) MANUAL VACUUM TRIP NO. 1 REFUEL PLATFORM NEAR REAC. CORE REACTOR t(ODE SW. IN START -UP" POSITION TURBINE LOCKOUT RELAY TRIPPED EMERGENCY GOVERNOR ( 110-111 %) EMERGENCY TRIP VALVE ALL CONTROL RODS NOT FULL IN GRAPPLE FUEL LOADED OR NOT FULL UP MAIN CONDENSER LOW VACUUM MANUAL SPEED LOfD CHANGER REFUEL PLATFORM NEAR REAC. CORE FRAME MOUNTED HOIST FUEL LOADED VACUUM TRIP NO. 1 TROLLEY MOUNTED HOIST FUEL LOADED -19 IN. Hg VACUUM TRIP NO. 1 STOP VALVE TRIP -19 IN. Hg SPEED GOVERNOR ACTUATED MOIST SEP TANK LEVEL -I I MANUAL EMERGENCY TRIP VALVE MAIN rPJi9 HIGH ...,. _____________________________________

_ MANUAL l MANUAL THRUST BEARING WEAR REACTOR HIGH WATER LEVEL l MAIN RANSFORMER PHASE OVER CURR. VACUUM TRIP NO. 2 BEARING HI-VIBRATION EXHAUST GENERATOR HOOD LOCKOUT HIGH RELAY TEMPERATURE TRIPPED GENERATOR OVERHEATING PROTECTIVE RELAYS \. f46 & 240

  • 286 E -T-MANUAL MANUAL GENERATOR LOCK OUT RELAY TRIPPED 7 IN. Hg BYPASS ARMATURE LOSS OF COOLING ARMATURE WATER DISCH. COOUNG WATER HIGH TEMP. PUMP PRESS. OVER CURRENT\ OVER CURRENT\ RELAY SET AT) NO WATER FLOW RELAY SET AT ) 80% FULL LOAD CAPABILITY I CAPABILITY I ' I \ TIME ) ( TIME } DELAY DELAY 3.5 MIN 2 MIN I I I ' J \ AE RESPONSIBLE FOR THIS PORTION I I I GENERATOR GENERATOR GENERATOR 345 KV. BKR. NEUTRAL OVER CURRENT OVER DIFFERENTIAL WITH VOLTAGE PROTECTIVE I VOLTAGE CURRENT RESTRAINT RELAYS I 259N 281 251V I MAIN UNIT AUX TRANSFORMER TRANSFORMER

& GENERATOR SUDDEN TRANSFORMER DIFFERENTIAL MANUAL PRESSURE LOCKOUT CURRENT ! !*186 !387 l I ST I .286

  • G y I 5£H£Ul@HFCTRIC This map/document is to assist employees in the performance of their jobs. 729 E 1 Q 1 Your personal safety is provided for by using safety practices, procedures and equipment as described in safety training programs, manuals and SPAR's. '"'M...,...o=-N,...,T=I---=c....,.A-=o---=o..,...,w.,...,G:--T"""'A:""'"T"!

PLANT PROTECTION BLOCK DIAGRAM RX PROTECTION SYSTEM SCALE: NONE REV 76 MONTICELLO NUCLEAR GENERATING PLANT '(l Xce/ [nergym NORTHERN STATES POWER COMPANY NX-7865-7-2 c I H Jl K L M Ofi"-Co\5 SAI.IPI.E

""" "' I e ...

YF-CAS s.-.uru: srs. I I '" l¢ Off-GAS ffl.: UP STREM! or H<AOOP A .. '" 2 1<7 1 r* ' 115 V/l; 60CY lOCO. """' 2 ' ..........

,. 1309 ----1--.J

'" I l I I I I ! I I ; I I I I I i I I 115\o."\:

raeM mr svs""'""'""'

  • A*aus -*-_ Off-GAS RADIATION MONITORS & SAMPLERS 3 4 v REACTOR BUII.OjNG YENTIIA1!0N MONJIQBS 5 6 LOG RAENA110N t.IONITOR u IV I I 'L.. MAIN STEAM LINE RADIATION MONITORS N 7 f 8 9 10 11 12 ,..., ftf 215X626(t.IOmlOO.lO)-I1 P.t. tS$1.![1)

' ' REVISIONS A

D<LETED STACK GAS RADIATION MONITORS PER ORR: M0-82*104 OWN: BAS 9*29-82 CHK: MRG 10*4-62 PROJ:80Z061 RLUED: 1-11-BJ AS BUILT: REVISED TO REFLECT AS FOUND CONDffiON IN ACCORDANCE SRI 92-025 PER ORR:

OWN: RHH 8*20*96 CHK: DRN 9-3-96 MOD:rli--RLMED: 9-11-96 C AS-BUILT:

REVISED TO REFLECT THE ML S!E'AM DILUTION RECOMBiNER SYSTEM PER ORR: "OWN: JJG 8*15*02 CHK* RJf 8-23-02 MOO: 99Q160 RLU:O: 9*10*02 A B AS-BUILT:

C REIY.<AViN TO ASSURE L£GSUTY or USAA ORAMIICS ENHANCEMENTS NOT SHO\YN FOR CLARITY PER ORR M0-02-0245 H0-03 CHK: ""' 'MI*l MOD:....,._. .t SYSTEM .N STATES POWER COMPANY SCAlE: NONE I R<V D MINNEAPOUS NX-7993-"i-1 13 14 D H J K L M

D -c B -A '--v---' TO CONDENSER E-18 CONN 5 <iEiQD NH-36035 (0 , 8) I PS9-2"-EO 8 I 7 I 6 I 5 4 I 3 I 2 NO STill N0/2 TO

';' llr= [oo=-=3=-1=1-= [oo=-=.=_=j]:-r--::OG:-::2,--"'6",...-"'Eo;-----.----

--<:J-----.------::OG3-:::-:-::1o""*-"""m;---

  • ---

I A/R 01012217 OWN: .liP 3-29-06 CHK: BIJ.. 3-30-06 APPR: JSO 3-30-06 RRJ0-3/4" H8 r 7

"-J..

(8,1) --RS1-3"-G8--

Vi "6"':... 6 NOZZL£ J.

tt "' : PS 205 g 12-ill1""""1Jff!A


¢; 11n8 o .

iSfSiiBt .... -.:.-, L 1\ OG ,_-; . liiiDiilil I ll'iiS=26=]_ t-_

A/R 01121715 OWN: .liP 3-HlB CHK: BJR 3-11-08 APPR: RUG 3-12-08 ----,--....1 F.O. IIjl I :,. ,I I TX I' 1 "' I i 737o II C205 C07 A t----+.....r:IDLJ C2F%.--, l:ffiiD "' 12* 12" l.l '?f.

ll tE Ill lQ I 7991-9 ST STAG OG-25-1 I NO:ZZ .' 3/4"' 002-1"'-EO X: /3(f. L 1-----__ t_L---l '-' 00_26_1 r VENT I (C,8) I A

' (iii\ "t-HI RAD I 1:QE!1§J * \!_OSSA 9 I < HD I F.C. '!: I I 1/2" L-LOW 200 STI.GE 5100 P!lBSiff-j Rhl II 001 8-16" -HC 7 I -JLj..!!§...

I TO CONDENSER E-18 CONN 29 <iBID 1----.....1 NH-36035 (0,6) 6 .AlB EJECTOR £=28 fill F.W. j' NH-36036 (,\,5) I 5 INTER-CONDENSER REFERENCE QRAWINGS: F.W. (iBID NH-36036 (,1,5) 1. NUCLEAR BOILER STEMI SUPPLY ..............

<iETID 2. lEO PROCESS RADIATION SYSTW ......... .NX-7993-1-1, 2 &

  • 3. lED ISOLATION

..................... .NX-7823-*-17 , -*-* & -*-5 t 4 I FILITR F7 3 OJ I 0 I C-80 (,1,5)(8,6)

OS I M98 I OPEN ][IEC15325 OWN: .liP 3-15-10 CHK: PEB 3-15-10 APPR: JPC 3-17-10 OWN: .liP 10-20-10 CHK: BIJ.. 10-21-10 APPR: BJR 1Q-2HO OWN: .liP 3-7-11 CHK: BIJ.. 3-7-11 APPR: IIEO 3-8-11 OWN: .liP 3-9-11 CHK: BIJ.. 3-IQ-11 APPR: Ill 3-10-11 OWN: .liP 4-18-11 CHK: BIJ.. HB-11 APPR: DZ 4-25-11 { t::lt-----t 1 L ,104 I OS VM-10"-HC M99 T I I This is to assist in the of th e ir jobs.! l j 1 04 1 Your ptrsonol safety is providM for by using safety proclices, procedures and I M--equipment os dt:scn"bed in safety training programs, manuals and SPAR's. MONTI CAD DWG c P&ID STEAM JET AIR EJECTORS MONTICELLO NUCLEAR GENERATING PLANT SCALE: NONE REV 82 2 I D t--c B A

8 NH-36042-2 D c 8 A <Ell> NH-36042 (0,5) 7 6 --iTR-1720 (C,3) SEE RHR PUMP VENT .t DRAIN DETAIL ('TYP) <EID NH-36247 (E,2) TO RHR PUMP P-202A (1o-3') TO RHR pUMp P-202C (1o-JC) TO RHR PUMP P-2028 (1o-3B) TO RHR puMp P-2020 (10-JD) OH38) NH-36044 (E.3) 5 PR't'WELL EQUIP DRAIN SUMp HEAT [)(CHANGER TR-1720 (C,3) _ _]'L__ @OL ,.....-'=-----'T"""

4 PRnMO+

.'i::l:C::i 7 6 4 3 3 2 MONTICELLO NUCLEAR GENERATING PLANT UNIT 1 1 REVISIONS 76 EC11951 "A/R 01121715 DWN: ..UP 3-4-re CHK: llll 3-11--al APPR: RWG 3-12--al ... .

... .

... c -CIUMJIY GAIU' D -!io'RIY IElA1ED IIDWIDt. -SAFElY RElATED D.ECIRICAL MONTICELLO NUCLEAR GENERATING PLANT P&ID REACTOR BUILDING COOLING WATER SYSTEM NORTHERN STATES POWER COMPANY SCALE: NONE REV 76 MINNEAPOUS NH-36042-2 2 1 D c 8