Category:Letter type:L
MONTHYEARL-MT-23-054, Subsequent License Renewal Application Supplement 82024-01-11011 January 2024 Subsequent License Renewal Application Supplement 8 L-MT-23-047, License Amendment Request: Revision to the MNGP Pressure Temperature Limits Report to Change the Neutron Fluence Methodology and Incorporate New Surveillance Capsule Data2023-12-29029 December 2023 License Amendment Request: Revision to the MNGP Pressure Temperature Limits Report to Change the Neutron Fluence Methodology and Incorporate New Surveillance Capsule Data L-MT-23-056, Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information - Set 1 Part 22023-12-18018 December 2023 Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information - Set 1 Part 2 L-MT-23-042, 2023 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.462023-12-11011 December 2023 2023 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.46 L-MT-23-052, Subsequent License Renewal Application Supplement 72023-11-30030 November 2023 Subsequent License Renewal Application Supplement 7 L-MT-23-051, Update to the Technical Specification Bases2023-11-28028 November 2023 Update to the Technical Specification Bases L-MT-23-049, Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information - Set 12023-11-21021 November 2023 Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information - Set 1 L-MT-23-043, 10 CFR 50.55a(z)(1) Request Regarding OMN-17, Revision 1. VR-092023-11-13013 November 2023 10 CFR 50.55a(z)(1) Request Regarding OMN-17, Revision 1. VR-09 L-MT-23-038, License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.62023-11-10010 November 2023 License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.6 L-MT-23-046, Subsequent License Renewal Application Response to Request for Additional Information Round 2 - Set 12023-11-0909 November 2023 Subsequent License Renewal Application Response to Request for Additional Information Round 2 - Set 1 L-MT-23-041, Subsequent License Renewal Application Response to Request for Confirmation of Information Set 22023-10-0303 October 2023 Subsequent License Renewal Application Response to Request for Confirmation of Information Set 2 L-MT-23-037, Subsequent License Renewal Application Response to Request for Additional Information Set 32023-09-22022 September 2023 Subsequent License Renewal Application Response to Request for Additional Information Set 3 L-MT-23-036, Subsequent License Renewal Application Response to Request for Additional Information Set 2 and Supplement 62023-09-0505 September 2023 Subsequent License Renewal Application Response to Request for Additional Information Set 2 and Supplement 6 L-MT-23-035, Subsequent License Renewal Application Supplement 52023-08-28028 August 2023 Subsequent License Renewal Application Supplement 5 L-MT-23-034, Subsequent License Renewal Application Response to Request for Additional Information Set 12023-08-15015 August 2023 Subsequent License Renewal Application Response to Request for Additional Information Set 1 L-MT-23-028, 2023 Refueling Outage 90-Day Inservice Inspection (ISI) Summary Report2023-07-31031 July 2023 2023 Refueling Outage 90-Day Inservice Inspection (ISI) Summary Report L-MT-23-032, 10 CFR 50.55a(z)(2) Request Regarding MO-2397, VR-112023-07-31031 July 2023 10 CFR 50.55a(z)(2) Request Regarding MO-2397, VR-11 L-MT-23-031, Subsequent License Renewal Application Supplement 4 and Responses to Request for Confirmation of Information - Set 12023-07-18018 July 2023 Subsequent License Renewal Application Supplement 4 and Responses to Request for Confirmation of Information - Set 1 L-MT-23-030, Subsequent License Renewal Application Supplement 32023-07-0404 July 2023 Subsequent License Renewal Application Supplement 3 L-MT-23-025, Subsequent License Renewal Application Supplement 22023-06-26026 June 2023 Subsequent License Renewal Application Supplement 2 L-MT-23-019, Submittal of 2022 Annual Radiological Environmental Operating Report2023-05-10010 May 2023 Submittal of 2022 Annual Radiological Environmental Operating Report L-MT-23-020, Submittal of 2022 Annual Radioactive Effluent Release Report2023-05-10010 May 2023 Submittal of 2022 Annual Radioactive Effluent Release Report L-MT-23-021, Core Operating Limits Report (COLR) for the Monticello Nuclear Generating Plant for Cycle 322023-05-0202 May 2023 Core Operating Limits Report (COLR) for the Monticello Nuclear Generating Plant for Cycle 32 L-MT-23-017, 2022 Annual Report of Individual Monitoring for the Monticello Nuclear Generating Plant (MNGP)2023-04-18018 April 2023 2022 Annual Report of Individual Monitoring for the Monticello Nuclear Generating Plant (MNGP) L-MT-23-010, Subsequent License Renewal Application Supplement 12023-04-0303 April 2023 Subsequent License Renewal Application Supplement 1 L-MT-23-013, Core Operating Limits Report (COLR) for Cycle 31, Revision 32023-03-28028 March 2023 Core Operating Limits Report (COLR) for Cycle 31, Revision 3 L-MT-23-012, Core Operating Limits Report (COLR) for Monticello Nuclear Generating Plant Cycle 31, Revision 22023-03-17017 March 2023 Core Operating Limits Report (COLR) for Monticello Nuclear Generating Plant Cycle 31, Revision 2 L-MT-23-008, 10CFR50.55a Request to Use Later Edition of ASME Section XI for ISI Code of Record (RR-003)2023-02-0707 February 2023 10CFR50.55a Request to Use Later Edition of ASME Section XI for ISI Code of Record (RR-003) L-MT-23-004, CFR 50.55a Request RR-001, Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI for the Monticello Third Interval Containment Inservice Inspection Program2023-01-23023 January 2023 CFR 50.55a Request RR-001, Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI for the Monticello Third Interval Containment Inservice Inspection Program L-MT-23-005, Response to the NRC Request for Additional Information Regarding the 50.55a Request Pr 08, HPCI Pump Quarterly Testing (EPID Number L-2022-LLR-0088)2023-01-0606 January 2023 Response to the NRC Request for Additional Information Regarding the 50.55a Request Pr 08, HPCI Pump Quarterly Testing (EPID Number L-2022-LLR-0088) L-MT-22-049, Industry Groundwater Protection Initiative Special Report2022-12-15015 December 2022 Industry Groundwater Protection Initiative Special Report L-MT-22-052, L-MT-22-052 Monticello Nuclear Generating Plant 10 CFR 50.55a Request No. Pr 08, Request for HPCI Pump Quarterly Alternative2022-12-15015 December 2022 L-MT-22-052 Monticello Nuclear Generating Plant 10 CFR 50.55a Request No. Pr 08, Request for HPCI Pump Quarterly Alternative L-MT-22-046, 2022 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.462022-12-13013 December 2022 2022 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.46 L-MT-22-048, Update to the Monticello Technical Specification Bases2022-11-28028 November 2022 Update to the Monticello Technical Specification Bases L-MT-22-047, Withdrawal of Request for Relief from ASME OM Code for the Sixth Inservice Testing Interval2022-11-10010 November 2022 Withdrawal of Request for Relief from ASME OM Code for the Sixth Inservice Testing Interval L-MT-22-045, Letter Submitting Post-Exam Package2022-11-0404 November 2022 Letter Submitting Post-Exam Package L-MT-22-030, Sixth Interval Inservice Testing (1ST) Plan2022-09-0606 September 2022 Sixth Interval Inservice Testing (1ST) Plan L-MT-22-037, Supplement to 10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval, Alternative VR-10, Excess Flow Check Valve Testing Frequency2022-08-29029 August 2022 Supplement to 10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval, Alternative VR-10, Excess Flow Check Valve Testing Frequency L-MT-22-007, Response to Request for Additional Information for the Monticello Nuclear Generating Plant Alternative Request VR-08 (EPID: L-MT-22-007)2022-07-22022 July 2022 Response to Request for Additional Information for the Monticello Nuclear Generating Plant Alternative Request VR-08 (EPID: L-MT-22-007) L-MT-22-026, Changes to the Emergency Plan2022-07-19019 July 2022 Changes to the Emergency Plan L-MT-22-024, Response to a Request for Additional Information for the Monticello Nuclear Generating Plant Related to the Amendment to Adopt Advanced Framatome Methodologies2022-06-0606 June 2022 Response to a Request for Additional Information for the Monticello Nuclear Generating Plant Related to the Amendment to Adopt Advanced Framatome Methodologies L-MT-22-022, Response to a Request for Additional Information: Monticello Alternative VR-10, Excess Flow Check Valve Testing Frequency2022-05-25025 May 2022 Response to a Request for Additional Information: Monticello Alternative VR-10, Excess Flow Check Valve Testing Frequency L-MT-22-017, 2021 Annual Radiological Environmental Operating Report2022-05-11011 May 2022 2021 Annual Radiological Environmental Operating Report L-MT-22-018, 2021 Annual Radioactive Effluent Release Report2022-05-11011 May 2022 2021 Annual Radioactive Effluent Release Report L-MT-22-016, 2021 Annual Report of Individual Monitoring2022-04-28028 April 2022 2021 Annual Report of Individual Monitoring L-MT-22-019, Withdrawal of Requests for Relief from ASME OM Code for the Sixth Inservice Testing Interval2022-04-18018 April 2022 Withdrawal of Requests for Relief from ASME OM Code for the Sixth Inservice Testing Interval L-MT-22-010, License Amendment Request to Revise Technical Specification 3.6.1.8 Residual Heat Removal (RHR) Drywell Spray Header and Nozzle Surveillance Frequency2022-03-18018 March 2022 License Amendment Request to Revise Technical Specification 3.6.1.8 Residual Heat Removal (RHR) Drywell Spray Header and Nozzle Surveillance Frequency L-MT-22-012, Special Report for the Bypass of the Offgas Treatment Storage System2022-03-15015 March 2022 Special Report for the Bypass of the Offgas Treatment Storage System L-MT-22-008, 10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval Alternative Related to Excess Flow Check Valve Testing Frequency (L-MT-22-008)2022-03-0707 March 2022 10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval Alternative Related to Excess Flow Check Valve Testing Frequency (L-MT-22-008) L-MT-22-006, 10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval OMN-26 (L-MT-22-006)2022-02-18018 February 2022 10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval OMN-26 (L-MT-22-006) 2024-01-11
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARL-MT-23-054, Subsequent License Renewal Application Supplement 82024-01-11011 January 2024 Subsequent License Renewal Application Supplement 8 L-MT-23-047, License Amendment Request: Revision to the MNGP Pressure Temperature Limits Report to Change the Neutron Fluence Methodology and Incorporate New Surveillance Capsule Data2023-12-29029 December 2023 License Amendment Request: Revision to the MNGP Pressure Temperature Limits Report to Change the Neutron Fluence Methodology and Incorporate New Surveillance Capsule Data L-MT-23-038, License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.62023-11-10010 November 2023 License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.6 L-MT-23-035, Subsequent License Renewal Application Supplement 52023-08-28028 August 2023 Subsequent License Renewal Application Supplement 5 L-MT-23-031, Subsequent License Renewal Application Supplement 4 and Responses to Request for Confirmation of Information - Set 12023-07-18018 July 2023 Subsequent License Renewal Application Supplement 4 and Responses to Request for Confirmation of Information - Set 1 L-MT-23-025, Subsequent License Renewal Application Supplement 22023-06-26026 June 2023 Subsequent License Renewal Application Supplement 2 L-MT-23-010, Subsequent License Renewal Application Supplement 12023-04-0303 April 2023 Subsequent License Renewal Application Supplement 1 ML23009A3542023-01-0909 January 2023 Subsequent License Renewal Application Sections 1 - 4 and Appendices a - D L-MT-22-010, License Amendment Request to Revise Technical Specification 3.6.1.8 Residual Heat Removal (RHR) Drywell Spray Header and Nozzle Surveillance Frequency2022-03-18018 March 2022 License Amendment Request to Revise Technical Specification 3.6.1.8 Residual Heat Removal (RHR) Drywell Spray Header and Nozzle Surveillance Frequency L-MT-21-072, License Amendment Request: Revise MNGP Technical Specifications to Support a Ten-Year Inspection of the Diesel Generator Fuel Oil Storage Tank2021-12-13013 December 2021 License Amendment Request: Revise MNGP Technical Specifications to Support a Ten-Year Inspection of the Diesel Generator Fuel Oil Storage Tank L-MT-21-067, Update to the Monticello Technical Specification Bases2021-11-29029 November 2021 Update to the Monticello Technical Specification Bases ML21320A2262021-11-15015 November 2021 License Amendment Request: Standard Emergency Plan and Consolidated Emergency Operations Facility for the Monticello Nuclear Generating Plant and the Prairie Island Nuclear Generating Plant L-MT-21-043, Supplement to License Amendment Request: Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2021-06-30030 June 2021 Supplement to License Amendment Request: Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b L-MT-20-023, License Amendment Request: Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR2020-11-0303 November 2020 License Amendment Request: Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR L-MT-20-018, License Amendment Request: Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements2020-09-22022 September 2020 License Amendment Request: Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements L-MT-20-003, License Amendment Request: Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times-RITSTF Initiative 4b2020-03-30030 March 2020 License Amendment Request: Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times-RITSTF Initiative 4b ML20058F9432020-02-27027 February 2020 and Prairie Island Nuclear Generating Plant, Units 1 and 2 - License Amendment Request: Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules Revision 4 L-MT-18-073, Supplement to License Amendment Request: Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee...2018-11-20020 November 2018 Supplement to License Amendment Request: Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee... L-MT-18-009, License Amendment Request: Revise Limiting Condition for Operation (LCO) of Specification 3.5.1, Emergency Core Cooling System - Operating, to Remove the LCO Note2018-11-12012 November 2018 License Amendment Request: Revise Limiting Condition for Operation (LCO) of Specification 3.5.1, Emergency Core Cooling System - Operating, to Remove the LCO Note L-MT-18-060, License Amendment Request: Revise the Safety Limit Minimum Critical Power Ratio in Reactor Core Safety Limit 2.1.12018-11-12012 November 2018 License Amendment Request: Revise the Safety Limit Minimum Critical Power Ratio in Reactor Core Safety Limit 2.1.1 L-MT-18-051, Supplement to License Amendment Request to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control,2018-09-11011 September 2018 Supplement to License Amendment Request to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, L-MT-18-006, Application to Revise Technical Specifications to Adopt TSTF-551, Revision 3, Revise Secondary Containment Surveillance Requirements2018-07-0303 July 2018 Application to Revise Technical Specifications to Adopt TSTF-551, Revision 3, Revise Secondary Containment Surveillance Requirements L-MT-18-020, Supplement to License Amendment Request: Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Control2018-04-24024 April 2018 Supplement to License Amendment Request: Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Control L-MT-18-010, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2018-03-28028 March 2018 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-MT-17-083, License Amendment Request: Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program2017-12-19019 December 2017 License Amendment Request: Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program L-MT-17-058, Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control2017-10-20020 October 2017 Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control ML17095A1142017-03-31031 March 2017 License Amendment Request to Revise Emergency Action Level Scheme: Attachment 4, Supporting Calculations for EAL Thresholds, Part 2 of 5 ML17095A1202017-03-31031 March 2017 License Amendment Request to Revise Emergency Action Level Scheme: Attachment 4, Supporting Calculations for EAL Thresholds, Part 5 of 5 ML17090A2012017-03-31031 March 2017 License Amendment Request to Revise Technical Specification for Plant/Unit Staff Qualifications Education and Experience Eligibility Requirements for Licensed Operators ML17095A1152017-03-31031 March 2017 License Amendment Request to Revise Emergency Action Level Scheme: Attachment 4, Supporting Calculations for EAL Thresholds, Part 3 of 5 ML17095A1132017-03-31031 March 2017 License Amendment Request to Revise Emergency Action Level Scheme: Attachment 4, Supporting Calculations for EAL Thresholds, Part 1 of 5 ML17095A1182017-03-31031 March 2017 License Amendment Request to Revise Emergency Action Level Scheme: Attachment 4, Supporting Calculations for EAL Thresholds, Part 4 of 5 ML17095A1122017-03-31031 March 2017 License Amendment Request to Revise Emergency Action Level Scheme: Attach. 1, EAL Comparison Matrix Document (Deviations & Differences) and Attachments 2 & 3, Red-Line & Clean Versions of EAL Technical Bases Document L-MT-16-031, Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing, and to Request an Alternative to the ASME Code2016-07-28028 July 2016 Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing, and to Request an Alternative to the ASME Code L-MT-16-014, License Amendment Request: Revise Battery Charger Surveillance Requirement 3.8.4.22016-04-0404 April 2016 License Amendment Request: Revise Battery Charger Surveillance Requirement 3.8.4.2 ML16047A2722016-02-10010 February 2016 License Amendment Request: Revise Technical Specification 5.5.11 to Provide a Permanent Extension of the Integrated Leakage Rate (Type a) Test Frequency from Ten to Fifteen Years L-MT-15-032, License Amendment Request to Revise Technical Specification Surveillance Requirement 3.5.1.3.b to Correct the Alternate Nitrogen System Pressure2015-09-0202 September 2015 License Amendment Request to Revise Technical Specification Surveillance Requirement 3.5.1.3.b to Correct the Alternate Nitrogen System Pressure L-MT-15-048, License Amendment Request: Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process2015-07-15015 July 2015 License Amendment Request: Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process L-MT-14-043, License Amendment Request for Fuel Storage Changes Supplement to Proposed Spent Fuel Pool Boral Monitoring Program Technical Specification2014-05-30030 May 2014 License Amendment Request for Fuel Storage Changes Supplement to Proposed Spent Fuel Pool Boral Monitoring Program Technical Specification ML14126A7272014-05-0505 May 2014 Supplement to License Amendment Request (LAR) for Cyber Security Plan Implementation Date Extension L-MT-14-009, License Amendment Request: Revision to Required Actions for Technical Specification 3.5.1, Emergency Core Cooling System (ECCS)2014-04-0404 April 2014 License Amendment Request: Revision to Required Actions for Technical Specification 3.5.1, Emergency Core Cooling System (ECCS) ML14072A3902014-03-13013 March 2014 License Amendment Request for Fuel Storage Changes, Supplement to Propose a Spent Fuel Pool Boral Monitoring Program Technical Specification ML13333B6742013-11-27027 November 2013 License Amendment Request (LAR) for Northern States Power Company, Minnesota (NSPM) Cyber Security Plan Implementation Date Extension L-MT-13-081, Maximum Extended Load Line Limit Analysis Plus License Amendment Request - Request for Additional Information Responses2013-08-14014 August 2013 Maximum Extended Load Line Limit Analysis Plus License Amendment Request - Request for Additional Information Responses L-MT-13-055, License Amendment Request for Transition to Areva Atrium 10XM Fuel and Areva Safety Analysis Methodology2013-07-15015 July 2013 License Amendment Request for Transition to Areva Atrium 10XM Fuel and Areva Safety Analysis Methodology L-MT-13-046, License Amendment Request for Fuel Storage Changes, Supplement to Respond to NRC Staff Requests for Additional Information2013-05-16016 May 2013 License Amendment Request for Fuel Storage Changes, Supplement to Respond to NRC Staff Requests for Additional Information L-MT-13-030, License Amendment Request: Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-535, Revision 0, Revise Shutdown Margin Definition to Address Advanced Fuel Designs2013-04-19019 April 2013 License Amendment Request: Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-535, Revision 0, Revise Shutdown Margin Definition to Address Advanced Fuel Designs L-MT-13-010, License Amendment Request: Reduce the Reactor Steam Dome Pressure Specified in the Reactor Core Safety Limits2013-03-11011 March 2013 License Amendment Request: Reduce the Reactor Steam Dome Pressure Specified in the Reactor Core Safety Limits L-MT-12-102, License Amendment Request: Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month.2013-01-0404 January 2013 License Amendment Request: Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month. L-MT-12-078, License Amendment Request: Modification to the MNGP Emergency Plan Concerning a Revision to the Emergency Action Level Setpoint for the Turbine Building Normal Waste Sump Monitor2012-12-21021 December 2012 License Amendment Request: Modification to the MNGP Emergency Plan Concerning a Revision to the Emergency Action Level Setpoint for the Turbine Building Normal Waste Sump Monitor 2024-01-11
[Table view] Category:Technical Specifications
MONTHYEARML22357A1002023-03-31031 March 2023 and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Issuance of Amendments Standard Emergency Plan and Consolidated Emergency Operations Facility ML22318A2152022-12-27027 December 2022 Issuance of Amendment No. 209 Ten-Year Inspection of the Diesel Generator Fuel Oil Storage Tank ML21148A2742021-07-12012 July 2021 Issuance of Amendment No. 206 TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML20352A3492021-01-0808 January 2021 Issuance of Amendment No. 205, Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-582, RPV WIC Enhancements, and TSTF-583-T, TSTF-582 Diesel Generator Variation ML20210M0142020-09-0808 September 2020 and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Issuance of Amendment Nos. 204, 231, and 219 TSTF-529 Clarify Use and Application Rules ML19176A4212019-08-29029 August 2019 Issuance of Amendment No. 203 Adoption of 10 CFR 50.69 ML19162A0932019-07-30030 July 2019 Issuance of Amendment No, 202 Regarding Deletion of the Note Associated with Technical Specification 3.5.1., Erccs - Operating ML18291B2142018-11-26026 November 2018 Issuance of Amendment Adoption of TSTF-551 Revise Secondary Containment Surveillance Requirements L-MT-18-060, License Amendment Request: Revise the Safety Limit Minimum Critical Power Ratio in Reactor Core Safety Limit 2.1.12018-11-12012 November 2018 License Amendment Request: Revise the Safety Limit Minimum Critical Power Ratio in Reactor Core Safety Limit 2.1.1 L-MT-18-006, Application to Revise Technical Specifications to Adopt TSTF-551, Revision 3, Revise Secondary Containment Surveillance Requirements2018-07-0303 July 2018 Application to Revise Technical Specifications to Adopt TSTF-551, Revision 3, Revise Secondary Containment Surveillance Requirements ML17346A0852017-12-12012 December 2017 Final Pre-App TS Markups ML17250A8702017-09-0707 September 2017 MNGP TSTF-542 Draft Variations ML17250A8712017-09-0707 September 2017 MNGP TSTF-542 TS Draft Markups ML17172A4312017-06-23023 June 2017 Correction of Amendment No. 194, Issuance of Amendment to Adopt F Tstf 545, Revision 3, Ts Inservice Testing Program Removal & Clarify Sr Usage Rule Application to Section 5.5 Testing ML17123A3212017-06-16016 June 2017 Issuance of Amendment Adoption of TSTF-545, Revision 3, TS Inservice Testing Program Removal and Clarify SR Usage Rule Application to Section 5.5 Testing ML15335A4932015-11-20020 November 2015 Technical Requirements Manual, Revision 17 L-MT-15-032, License Amendment Request to Revise Technical Specification Surveillance Requirement 3.5.1.3.b to Correct the Alternate Nitrogen System Pressure2015-09-0202 September 2015 License Amendment Request to Revise Technical Specification Surveillance Requirement 3.5.1.3.b to Correct the Alternate Nitrogen System Pressure ML15072A1412015-06-0505 June 2015 Issuance of Amendment No. 188 Regarding Transition to Areva Atrium 10XM Fuel and Areva Safety Analysis Methods L-MT-15-043, Withdrawal of License Amendment Request to Revise Technical Specification Surveillance Requirement 3.5.1.3.b to Correct the Alternate Nitrogen System Pressure2015-05-29029 May 2015 Withdrawal of License Amendment Request to Revise Technical Specification Surveillance Requirement 3.5.1.3.b to Correct the Alternate Nitrogen System Pressure ML15110A2802015-04-15015 April 2015 Operating License and Technical Specifications ML14323A0332015-01-0808 January 2015 Issuance of Amendment No. 187 Regarding Revision to TS 5.5.11 for Drywell Personnel Airlock Leakage Rate Testing ML14281A3182014-11-25025 November 2014 Issuance of Amendment Regarding Reduction in Steam Dome Pressure Safety Limit L-MT-14-088, Areva Atrium 10XM Fuel Transition License Amendment Request Supplement2014-11-11011 November 2014 Areva Atrium 10XM Fuel Transition License Amendment Request Supplement ML14246A4492014-11-0303 November 2014 Issuance of Amendment to Revise TS 3.5.1, ECCS - Operating L-MT-14-043, License Amendment Request for Fuel Storage Changes Supplement to Proposed Spent Fuel Pool Boral Monitoring Program Technical Specification2014-05-30030 May 2014 License Amendment Request for Fuel Storage Changes Supplement to Proposed Spent Fuel Pool Boral Monitoring Program Technical Specification ML14035A2482014-03-28028 March 2014 Issuance of Amendment No. 180 to Implement Maximum Extended Load Line Limit Analysis Plus (Mellla+) Operating Domain ML14072A3902014-03-13013 March 2014 License Amendment Request for Fuel Storage Changes, Supplement to Propose a Spent Fuel Pool Boral Monitoring Program Technical Specification ML13218A0612014-01-28028 January 2014 Issuance of Amendment No. 178 to Adopt TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML13316B2982013-12-0909 December 2013 Issuance of Amendment No. 176 to Renewed Facility Operating License Regarding Extended Power Uprate ML13168A3732013-08-28028 August 2013 Issuance of Amendment No. 175 to Make Minor Corrections and Editorial Changes, Clarify Fuel Storage Capacity, and Remove Obsolete Information ML13168A2192013-08-0909 August 2013 Issuance of Amendment No. 174 to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-484, Revision 0, Use of TS 3.10.1 for Scram Time Testing Activities L-MT-13-055, License Amendment Request for Transition to Areva Atrium 10XM Fuel and Areva Safety Analysis Methodology2013-07-15015 July 2013 License Amendment Request for Transition to Areva Atrium 10XM Fuel and Areva Safety Analysis Methodology ML13189A1942013-06-27027 June 2013 Operating License and Technical Specifications Updating Instructions L-MT-13-030, License Amendment Request: Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-535, Revision 0, Revise Shutdown Margin Definition to Address Advanced Fuel Designs2013-04-19019 April 2013 License Amendment Request: Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-535, Revision 0, Revise Shutdown Margin Definition to Address Advanced Fuel Designs L-MT-12-076, License Amendment Request for Fuel Storage Changes2012-10-30030 October 2012 License Amendment Request for Fuel Storage Changes L-MT-12-071, License Amendment Request: Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control.2012-09-18018 September 2012 License Amendment Request: Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control. L-MT-12-055, License Amendment Request: Revise Renewed Facility Operating License & Technical Specifications to Clarify Fuel Storage Capacity, Remove Obsolete Information and Make Minor Corrections and Miscellaneous Editorial Changes2012-08-21021 August 2012 License Amendment Request: Revise Renewed Facility Operating License & Technical Specifications to Clarify Fuel Storage Capacity, Remove Obsolete Information and Make Minor Corrections and Miscellaneous Editorial Changes L-MT-12-051, License Amendment Request: Remove Degraded Voltage Transfer to the 1AR Transformer2012-05-25025 May 2012 License Amendment Request: Remove Degraded Voltage Transfer to the 1AR Transformer L-MT-12-028, License Amendment Request: Revise Allowable Value for the Automatic Depressurization System Bypass Timer2012-04-0505 April 2012 License Amendment Request: Revise Allowable Value for the Automatic Depressurization System Bypass Timer ML12083A2522012-03-22022 March 2012 Enclosure 2 - Monticello Nuclear Generating Plant Technical Requirements Manual Revision 10 L-MT-11-022, 002 Monticello - Technical Requirements Manual, Revision 72011-04-27027 April 2011 002 Monticello - Technical Requirements Manual, Revision 7 L-MT-09-047, Supplement to Extended Power Uprate License Amendment Request: Revision to Proposed Technical Specification Changes in Response to Staff Comments2009-08-31031 August 2009 Supplement to Extended Power Uprate License Amendment Request: Revision to Proposed Technical Specification Changes in Response to Staff Comments L-MT-09-020, License Amendment Request: Revise the Modes of Applicability for Reactor Water Cleanup System Isolation on a Standby Liquid Control System Initiation2009-05-29029 May 2009 License Amendment Request: Revise the Modes of Applicability for Reactor Water Cleanup System Isolation on a Standby Liquid Control System Initiation L-MT-09-041, Supplement to License Amendment Request: Revision to the Allowable Value and Channel Calibration Surveillance Interval for the Recirculation Riser Differential Pressure - High Function2009-04-0202 April 2009 Supplement to License Amendment Request: Revision to the Allowable Value and Channel Calibration Surveillance Interval for the Recirculation Riser Differential Pressure - High Function ML0834406812009-01-30030 January 2009 (Mngp), License Amendment No. 159 Regarding the Power Range Neutron Monitoring System L-MT-08-012, License Amendment Request: Application for Technical Specification Change Regarding Revision of Control Rod Notch Surveillance Test Frequency and a Clarification of a Frequency Example Using the Consolidated Line Item Improvement Process2008-04-22022 April 2008 License Amendment Request: Application for Technical Specification Change Regarding Revision of Control Rod Notch Surveillance Test Frequency and a Clarification of a Frequency Example Using the Consolidated Line Item Improvement Process L-MT-08-013, License Amendment Request: Application for Technical Specification Change TSTF-427, Add Limiting Condition for Operation 3.0.9 Regarding the Unavailability of Barriers Using the Consolidated Line Item Improvement Process2008-04-0404 April 2008 License Amendment Request: Application for Technical Specification Change TSTF-427, Add Limiting Condition for Operation 3.0.9 Regarding the Unavailability of Barriers Using the Consolidated Line Item Improvement Process ML0810101932008-03-31031 March 2008 Monticello, License Amendment Request: Extended Power Uprate ML0802806012008-01-30030 January 2008 Technical Specifications ML0802400852008-01-23023 January 2008 Tech Specs - Issuance of Amendment Two Inoperable Control Room Ventilation Subsystems Per TSTF-447 2023-03-31
[Table view] |
Text
(l Xcel Energy* Monticello Nuclear Generating Plant 2807 W County Road 75 Monticello, MN 55362 September 2, 2015 L-MT-15-032 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Monticello Nuclear Generating Plant Docket 50-263 Renewed Facility Operating License No. DPR-22 License Amendment Request to Revise Technical Specification Surveillance Requirement 3.5.1.3.b to Correct the Alternate Nitrogen System Pressure Pursuant to 10 CFR 50.90, Northern States Power Company, a Minnesota corporation (NSPM), doing business as Xcel Energy, hereby requests an amendment to the Technical Specifications (TS) for the Monticello Nuclear Generating Plant (MNGP)
Renewed Operating License DPR-22. The proposed change would revise MNGP TS Surveillance Requirement 3.5.1.3.b to state that the MNGP Alternate Nitrogen System required pressure for operability is ~ 1060 psig rather than the ~ 410 psig currently stated in the TS Surveillance Requirement.
NSPM has determined that the current MNGP TS value for the Alternate Nitrogen System is non-conservative and that the guidance of Nuclear Regulatory Commission (NRC) Administrative Letter, 98-10, "Dis positioning of Technical Specifications That Are Insufficient to Assure Plant Safety," applies. Based on this, NSPM has implemented administrative controls to maintain the Alternate Nitrogen System pressure at
~ 1060 psig, and is submitting this License Amendment Request (LAR) to address the nonconformance. provides NSPM's evaluation of the proposed change. Attachment 1 to provides Figure 1, which is a sketch of the basic Alternate Nitrogen System configuration, for information. Attachment 2 to Enclosure 1 provides the marked-up MNGP TS page. Attachment 3 to Enclosure 1 provides the marked-up MNGP TS Bases page, which is being provided for information only.
Document Control Desk L-MT-15-032 Page 2 of 2 NSPM evaluated the proposed change in accordance with 10 CFR 50.92 and concluded the change involves no significant hazard consideration. Additionally, NSPM has determined the proposed change does not authorize a significant change in the types or totals amounts of effluent release or result in any significant increase in individual or cumulative occupational radiation exposure. Therefore, the proposed amendment meets the categorical exclusion requirements of 10 CFR 51.22(c)(9) and an environmental impact assessment need not be prepared. In accordance with 10 CFR 50.91(b)(1), a copy of this application, with enclosure, is being provided to the designated Minnesota Official. The MNGP Plant Operations Review Committee has reviewed this application.
NSPM requests approval of the proposed amendment by September 5, 2016. Once approved, the amendment will be implemented within 90 days.
Please contact Mr. Richard Loeffler at (763) 295-1247 if there are any questions regarding this letter.
Summary of Commitments This letter proposes no new commitments and does not revise any existing commitments.
I declare under penalty of perjury that the foregoing is true and correct.
Peter A. G Site Vice Pr
- ent Monticello Nuclear Generating Plant Northern States Power Company- Minnesota Enclosures cc: Administrator, Region Ill, USNRC Project Manager, Monticello Nuclear Generating Plant, USNRC Resident Inspector, Monticello Nuclear Generating Plant, USNRC Minnesota Department of Commerce
ENCLOSURE1 MONTICELLO NUCLEAR GENERATING PLANT Evaluation of the Proposed Change License Amendment Request to Revise Technical Specification Surveillance Requirement 3.5.1.3.b to Correct the Alternate Nitrogen System Pressure 1.0
SUMMARY
DESCRIPTION 2.0 DETAILED DESCRIPTION 2.1 Proposed Changes 2.2 Reason for the Proposed Changes
3.0 TECHNICAL EVALUATION
3.1 Alternate Nitrogen System Background 3.2 Current Alternate Nitrogen System Description Summary 3,3 Current Licensing Basis/Current Licensing Basis Acceptance Criteria 3.4 Alternate Nitrogen System Bottle Pressure Calculation Summary 3.5 Conclusions
4.0 REGULATORY ANALYSIS
4.1 Applicable Regulatory Requirements/Criteria 4.2 Precedent 4.3 No Significant Hazards Consideration Determination
5.0 ENVIRONMENTAL CONSIDERATION
6.0 REFERENCES
ATTACHMENTS:
- 1. Figure 1 -Alternate Nitrogen System (Provided for Information Only)
- 2. Marked-Up Technical Specification Page
- 3. Marked-Up Technical Specification Bases Page (Provided for Information Only)
L-MT-15-032 Page 2 of 9 License Amendment Request to Revise Technical Specification Surveillance Requirement 3.5.1.3.b to Correct the Alternate Nitrogen System Pressure 1.0
SUMMARY
DESCRIPTION Northern States Power Company, a Minnesota corporation, doing business as Xcel Energy (hereafter "NSPM"), proposes an amendment to the Technical Specifications (TS) for the Monticello Nuclear Generating Plant (MNGP) Renewed Operating License DPR-22. A revision is proposed to the MNGP TS Surveillance Requirement (SR) 3.5.1.3.b to state that the MNGP Alternate Nitrogen System required pressure for operability is ~ 1060 psig rather than the ~ 410 psig currently stated in the TS Surveillance Requirement.
2.0 DETAILED DESCRIPTION 2.1 Proposed Changes NSPM proposes a revision to a SR of TS 3.5.1, "ECCS (Emergency Core Cooling System)- Operating," to correct the requirements for the Alternate Nitrogen System pressure. TS SR 3.5.1.3 requires verification of limits for Automatic Depressurization System (ADS) pneumatic pressure for both of the required ADS pneumatic supplies.
This proposed change would specifically revise the MNGP TS SR 3.5.1.3.b pressure limit for determining operability of the Alternate Nitrogen System from~ 410 psig to the corrected value of~ 1060 psig.
2.2 Reason for Proposed Changes NSPM has determined that the current MNGP TS value for the Alternate Nitrogen System is non-conservative. This non-conservatism exists based on non-conservative errors and deficiencies identified in the calculation that supports the Alternate Nitrogen System operability. The non-conservatisms and deficiencies were captured and entered into the site Corrective Action Program (CAP). A revision of the calculation that supports the Alternate Nitrogen System Operability Leakage Criteria has been completed and supports changing the pressure limit for determining operability from ~ 410 psig to
~ 1060 psig. Additionally, NSPM determined that the guidance of Nuclear Regulatory Commission (NRC) Administrative Letter, 98-10, "Dispositioning of Technical Specifications that are Insufficient to Assure Plant Safety," applies to the nonconformance. NSPM has implemented administrative controls to maintain the Alternate Nitrogen System pressure ~ 1060 psig. NSPM is submitting this License Amendment Request (LAR) to address the nonconformance.
L-MT-15-032 Page 3 of 9
3.0 TECHNICAL EVALUATION
3.1 Alternate Nitrogen System Background In response to NUREG-0737 Item II.K.3.28 that required a long term (100 day) post-accident depressurization capability to assure long term shutdown cooling operability, NSPM created a tie-in with nitrogen bottles to the existing air supply to two Safety Relief Valves (SRV) to meet the requirements. Later modifications to the system provided two separate and independent safety-related nitrogen supply trains to the primary containment purge and vent valves and to the reactor building to torus vacuum breaker valves (to maintain containment integrity). The modification included a supply to the hard pipe vent system. Additional modifications revised the Alternate Nitrogen System to provide a safety related backup pneumatic supply for six of the eight SRVs and all of the inboard Main Steam Isolation Valves (MSIV). Finally, check valves were added at strategic locations within each Alternate Nitrogen System bottle manifold to increase the nitrogen volume available during temporary system configurations during bottle change outs.
3.2 Current Alternate Nitrogen System Description Summary A safety-related Alternate Nitrogen System provides an alternate pressure source to equipment required during or following an accident. The Alternate Nitrogen System was designed as a long-term, safety-related backup to the normal non-safety related pneumatic supplies (i.e., the Instrument Air and Instrument Nitrogen Systems). The plant instrument air and nitrogen systems are described in Updated Safety Analysis Report (USAR) Section 10.3.4 (Reference 1). The Alternate Nitrogen System consists of two separate safety-related trains supplied from separate nitrogen bottle racks located in the Turbine Building. The location of the bottle racks permits replacement of nitrogen bottles to maintain the nitrogen pressure during normal operation and following an accident.
The Alternate Nitrogen System supplies the following major components:
- The T-ring seals of the Primary Containment and Atmospheric Control System purge and vent valves and the T-ring seals and actuators of the Reactor Building to Torus vacuum breakers.
- The Hard Pipe Vent System isolation valves and rupture disc.
Train A of the Alternate Nitrogen System provides backup pneumatic supply to the T-ring seals of the inboard Primary Containment and Atmospheric Control System purge and vent valves, the T-ring seals and actuators of the Reactor Building SC to Torus vacuum breakers and SRVs A, B, and E. Train B of the Alternate Nitrogen
L-MT-15-032 Page 4 of 9 System provides backup pneumatic supply to the T-ring seals of the outboard Primary Containment and Atmospheric Control System purge and vent valves, the actuators of the inboard MSIVs, and SRVs C, F, and H. Train B also provides the sole pneumatic supply to the Primary Containment Hard Pipe Vent System isolation valves and rupture disc. In each Alternate Nitrogen System train, one SRV is assigned to perform the ADS function, a different SRV performs the low-low set (LLS) function, and another SRV is available to perform alternate shutdown and manual depressurization functions. One ADS SRV and one LLS SRV have an associated accumulator bank that provides pneumatic pressure for valve actuation. Figure 1 in Attachment 1 shows the basic Alternate Nitrogen System configuration.
The bottled nitrogen supply racks used for the Alternate Nitrogen System are manually checked for adequate supply and pressure during plant operation at a frequency to assure minimum design capacity requirements of the system will be met, assuming worst case leakage rates.
3.3 Current Licensing Basis/Current Licensing Basis Acceptance Criteria Current TS SR 3.5.1.3.b requires verification every 31 days that each Alternate Nitrogen System supply pressure is ?: 410 psig. This LAR proposes changing the required supply pressure in TS SR 3.5.1.3.b from ?: 410 psig to ?: 1060 psig. The SR ensures there is adequate supply pressure for reliable ADS operation. The design pneumatic supply pressure requirements for the Alternate Nitrogen System trains are such that following a failure of the normal pneumatic supply to the ADS SRVs supplied by the Alternate Nitrogen System, at least five valve actuations can occur in a 10 hour1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> period. Each Alternate Nitrogen System train supplies one ADS valve. An accumulator bank supplies the remaining ADS valve, of which the supply pressure is verified by TS SR 3.5.1.3.a.
All three ADS valves are required to cycle in response to a Loss of Coolant Accident (LOCA).
3.4 Alternate Nitrogen System Bottle Pressure Calculation Summary The calculation for the Alternate Nitrogen System supply pressure was revised to correct non-conservative errors and deficiencies that were identified and entered into the site CAP. The required pressure in the bottles in the Alternate Nitrogen System bottle racks was calculated using the Ideal Gas Law. A compressibility factor was used to modify the Ideal Gas Law for high pressures.
To determine the required nitrogen bottle pressure, the volume of gas required to operate the equipment served (i.e., the Alternate Nitrogen System loads) was added to the volume of unavailable nitrogen remaining in the bottle at bottle isolation. As stated in Section 3.2 above, the Alternate Nitrogen System is composed of an A and B Train. The calculation determines the volume of nitrogen required to actuate all Alternate Nitrogen System Train B required loads. The calculation does not determine the Alternate
L-MT-15-032 Page 5 of 9 Nitrogen System Train A loads as the Train B loads are bounding. Train B loads consist of one ADS SRV, one LLS SRV, one manually operated SRV, four inboard MSIVs, three T-ring seals on the Containment Purge and Vent Valves, and the hard piped vent system. The load for the one manually operated SRV and the Hard Pipe Vent are not considered in the calculation to determine the TS SR value as they are not actuated to satisfy the TS Requirement. The Alternate Nitrogen System supply to the hard pipe vent is specifically not considered in the calculation as those components are normally manually isolated and would only be unisolated under beyond design basis conditions.
Therefore, operation of the hard pipe vent system is not required to be assumed coincident with other accident or transient events and the load is excluded. Lastly, maximum system leakage in the Alternate Nitrogen System train over a 10 hour1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> period was considered in the calculation.
In order to calculate the volumes of different loads, an isentropic expansion of the nitrogen as it exits the bottles was assumed. This is an appropriate assumption as the valves actuate rapidly allowing minimal time for heat transfer from the pressure boundary to the nitrogen. This is conservative to an isothermal expansion as it results in the lowest pressures in the affected portions of the Alternate Nitrogen (AN2) Systems.
The lower the pressure in the AN2 system during operation of the equipment, the more mass that will initially flow from the AN2 tanks into the AN2 system. Therefore, the Ideal Gas equation for isentropic expansion of a gas was used to determine the minimum nitrogen temperature possible following the valve actuations.
The required Alternate Nitrogen System load volume is then added to the volume remaining in the nitrogen bottles at the time that the low pressure isolation occurs. Low pressure isolation occurs when system pressure decreases to 330 psig. The calculation assumes system isolation occurs at a conservative system pressure of 500 psig, which allows additional margin for instrument error. The unavailable volume of nitrogen remaining when the bottles are isolated at 500 psig was determined to be 259.5 standard cubic feet (scf).
The calculated required nitrogen gas volumes to actuate equipment for the limiting train of the Alternate Nitrogen System are:
- Volume required to cycle one ADS SRV and 1.8 scf one LLS SRV five times (1 0 cycles total)
- Volume required to seal T-ring seals after the purge and 47.9 scf vent valves cycle once AND the volume required to close and seal the four inboard MSIVs
- Volume of leakage out of the Alternate Nitrogen System 150 scf over a 10 hour1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> period
L-MT-15-032 Page 6 of 9
- Volume remaining when bottles are isolated at 500 psig 259.5 scf To convert this volume to the minimum required bottle pressure with use of the Ideal Gas Law, an iterative approach was taken to select the compressibility factor. A high and low pressure around the final value was selected to be applied to show that even though the pressure ratio varies, the compressibility factor remains the same. This ultimately determined that in order to satisfy the TS SR 3.5.1.3.b, the minimum Alternate Nitrogen System supply pressure must be greater than or equal to 1060 psig.
3.5 Conclusions Each Alternate Nitrogen System subsystem provides sufficient capacity at the minimum bottle pressure of 1060 psig to supply subsystem loads to meet design and safety functions for the various equipment served. This includes actuating the ADS SRVs during a LOCA to depressurize the reactor vessel to permit low pressure ECCS injection. Each Alternate Nitrogen System provides sufficient volume to cycle the one ADS SRV five times while supplying the other loads on the system, without nitrogen bottle replacement.
4.0 REGULATORY ANALYSIS
4.1 Applicable Regulatory Requirements/Criteria Title 10 Code of Federal Regulations 50.36(c)(3). Surveillance Requirements:
Surveillance requirements are requirements relating to test, calibration, or inspection to assure that the necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the limiting conditions for operation will be met.
Conclusion The proposed change revises the system operability criteria for the Alternate Nitrogen System from ;:: 41 0 psig to ;:: 1060 psig. This is a correction to the value for the operability criteria. The TS SR will continue to be in place and will be under administrative controls until this LAR is approved and implemented. Therefore, the TS SR will continue to assure that the pressure requirement for operability will be met.
L-MT-15-032 Page 7 of 9 4.2 Precedent Nuclear Management Company (NMC), the predecessor to NSPM, submitted a request for revision of TS 3.5.1.3.b by letter dated January 30, 2007 (Reference 2). The request was to revise a non-conservative TS value for the Alternate Nitrogen System. The request for amendment was approved by NRC on February 21, 2008 (Reference 3).
4.3 No Significant Hazards Consideration Determination In accordance with the requirements of 10 CFR 50.90, Northern States Power Company, a Minnesota corporation (NSPM), doing business as Xcel Energy, requests an amendment to the Technical Specifications (TS) for the Monticello Nuclear Generating Plant (MNGP) Renewed Operating License DPR-22. The proposed amendment would revise the MNGP TS Surveillance Requirement 3.5.1.3.b for the Alternate Nitrogen System required pressure for operability. NPSM has determined that the current MNGP TS value for the Alternate Nitrogen System is non-conservative and that the guidance of Nuclear Regulatory Commission (NRC) Administrative Letter 98-10, "Dis positioning of Technical Specifications that are Insufficient to Assure Plant Safety," applies. NSPM has implemented administrative controls to maintain Alternate Nitrogen System pressure and is submitting this License Amendment Request to address this nonconformance.
NSPM has evaluated the proposed amendment against the standards in 10 CFR 50.92 and has determined that the operation of the MNGP in accordance with the proposed amendment presents no significant hazards. NSPM's evaluation against each of the criteria in 10 CFR 50.92 follows.
- 1. Does the proposed change involve a significant increase in the probability or consequences of an accident previously evaluated?
Response: No.
The proposed change revises the TS SR for the purpose of restoring a value to be consistent with the licensing basis. The proposed TS change does not introduce new equipment or new equipment operating modes, nor does the proposed change alter existing system relationships. The proposed change does not affect plant operation Further, the proposed change does not increase the likelihood of the malfunction of any sse or impact any analyzed accident.
Consequently, the probability of an accident previously evaluated is not affected and there is no significant increase in the consequences of any accident previously evaluated.
L-MT-15-032 Page 8 of 9 Therefore, the proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated.
- 2. Does the proposed change create the possibility of a new or different kind of accident from any accident previously evaluated?
Response: No.
The proposed change revises the TS SR for the purpose of restoring a value to be consistent with the licensing basis. The change does not involve a physical alteration of the plant (i.e., no new or different type of equipment will be installed) or a change in the methods governing normal plant operations. The proposed change does not alter assumptions made in the safety analysis for the components supplied by the Alternate Nitrogen System. Further, the proposed change does not introduce new accident initiators.
Therefore, the proposed change does not create the possibility of a new or different kind of accident from any accident previously evaluated.
- 3. Does the proposed change involve a significant reduction in a margin of safety?
Response: No.
The proposed change revises the TS SR for the purpose of restoring a value to be consistent with the licensing basis. The proposed change does not alter the manner in which safety limits, limiting safety system settings, or limiting conditions for operation are determined. The safety analysis assumptions and acceptance criteria are not affected by this change.
Therefore, the proposed change does not involve a significant reduction in a margin of safety.
Based on the above evaluation, the NSPM has determined that operation of the facility in accordance with the proposed change does not involve a significant hazards consideration as defined in 10 CFR 50.92(c), in that it does not: (1) involve a significant increase in the probability or consequences of an accident previously evaluated; (2) create the possibility of a new or different kind of accident from any accident previously evaluated; or (3) involve a significant reduction in a margin of safety.
L-MT-15-032 Page 9 of 9
5.0 ENVIRONMENTAL CONSIDERATION
NSPM has determined that the proposed change would revise a requirement with respect to installation or use of a facility or component located within the restricted area, as defined in 10 CFR 20, or would change an inspection or surveillance requirement.
However, the proposed amendment does not involve (i) a significant hazards consideration, or (ii) authorize a significant change in the types or a significant increase in the amounts of any effluent that may be released offsite, or (iii) result in a significant increase in individual or cumulative occupational radiation exposure. Accordingly, the proposed amendment meets the eligibility criterion for a categorical exclusion set forth in 10 CFR 51.22(c)(9). Therefore, NSPM concludes that pursuant to 10 CFR 51.22(b),
no environmental impact statement or environmental assessment needs to be prepared in connection with the proposed amendment.
6.0 REFERENCES
- 1. USAR Section 10.3, Plant Auxiliary Systems.
- 2. Letter from NMC to NRC, "License Amendment Request to Revise Technical Specification Surveillance Requirement 3.5.1.3 to Correct the Alternate Nitrogen System Pressure," dated January 30, 2007 (ADAMS Accession No. ML040310516).
- 3. Letter from NRC to NMC, "Monticello Nuclear Generating Plant- Issuance of Amendment Re: Request to Revise Technical Specification Surveillance Requirement 3.5.1.3 to Correct the Alternate Nitrogen System Pressure (TAC No. MD4292," dated February 21, 2008 (ADAMS Accession No. ML080380638).
ATTACHMENT 1 MONTICELLO NUCLEAR GENERATING PLANT, UNIT 1 License Amendment Request to Revise Technical Specification Surveillance Requirement 3.5.1.3.b to Correct the Alternate Nitrogen System Pressure Figure 1 - Alternate Nitrogen System (Provided for Information Only)
(1 page follows)
~
. _/ RV-Z-71 A(I>DS)
~IN-2-718
\ RY-2-71 E(I.Ls)
SRV RV-!l-710 ~)
!NSJRUt,tENT--1><1--f-...HA.I--...,.------"1 AIR CV-7478 VAR!Oil~ I OAnS
\
~~R\I-2-71C L~--- ------ ~ (ADS) ~
RV-:2-710 {US)
RV-2.-?lF RV-2-71H (US) am ill! MNt.r .8R)
MONTICEUO NUCLEAR GENERATING PLANT F1GU~ 1 ALTERNATE NITROGEN SYSTEM
ATTACHMENT 2 MONTICELLO NUCLEAR GENERATING PLANT, UNIT 1 License Amendment Request to Revise Technical Specification Surveillance Requirement 3.5.1.3.b to Correct the Alternate Nitrogen System Pressure MARKED-UP TECHNICAL SPECIFICATION PAGE (1 page follows)
ECCS - Operating 3.5.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.5.1.1 Verify, for each low pressure ECCS injection/spray 31 days subsystem, the piping is filled with water from the pump discharge valve to the injection valve.
SR 3.5.1.2 Verify each ECCS injection/spray subsystem 31 days manual, power operated, and automatic valve in the flow path, that is not locked, sealed, or otherwise secured in position, is in the correct position.
SR 3.5.1.3 Verify ADS pneumatic pressure is as follows for 31 days each required ADS pneumatic supply:
- a. S/RV Accumulator Bank header pressure
~ 88.3 psig; and
- b. Alternate Nitrogen System pressure is 1060 ~ ~ 4-W psig.
I I SR 3.5.1.4 -------------------------------N0 T E------------------------------
Only required to be met in MODE 1.
Verify the RHR System intertie return line isolation 31 days valves are closed.
SR 3.5.1.5 Verify correct breaker alignment to the LPCI swing 31 days bus.
SR 3.5.1.6 Verify each recirculation pump discharge valve In accordance cycles through one complete cycle of full travel or is with the lnservice de-energized in the closed position. Testing Program Monticello 3.5.1-5 Amendment No. 146, 155, 162, _
ATTACHMENT 3 MONTICELLO NUCLEAR GENERATING PLANT, UNIT 1 License Amendment Request to Revise Technical Specification Surveillance Requirement 3.5.1.3.b to Correct the Alternate Nitrogen System Pressure MARKED-UP TECHNICAL SPECIFICATION BASES PAGE (Provided for Information Only)
(3 pages follow)
ECCS - Operating 3.5.1 BASES SURVEILLANCE SR 3.5.1.1 REQUIREMENTS The flow path piping has the potential to develop voids and pockets of entrained air. Maintaining the pump discharge lines of the CS System and LPCI subsystems full of water ensures that the ECCS will perform properly, injecting its full capacity into the RCS upon demand. This will also prevent a water hammer following an ECCS initiation signal. One acceptable method of ensuring that the lines are full is to vent at the high points. While the potential for developing voids in the HPCI System exists, the effects of a void have been analyzed and shown to be acceptable. The 31 day Frequency is based on the gradual nature of void buildup in the ECCS piping, the procedural controls governing system operation, and operating experience.
SR 3.5.1.2 Verifying the correct alignment for manual, power operated, and automatic valves in the ECCS flow paths provides assurance that the proper flow paths will exist for ECCS operation. This SR does not apply to valves that are locked, sealed, or otherwise secured in position since these were verified to be in the correct position prior to locking, sealing, or securing. A valve that receives an initiation signal is allowed to be in a nonaccident position provided the valve will automatically reposition in the proper stroke time. This SR does not require any testing or valve manipulation; rather, it involves verification that those valves capable of potentially being mispositioned are in the correct position. This SR does not apply to valves that cannot be inadvertently misaligned, such as check valves. For the HPCI System, this SR also includes the steam flow path for the turbine and the flow controller position.
The 31 day Frequency of this SR was derived from the lnservice Testing Program requirements for performing valve testing at least once every 92 days. The Frequency of 31 days is further justified because the valves are operated under procedural control and because improper valve position would only affect a single subsystem. This Frequency has been shown to be acceptable through operating experience.
SR 3.5.1.3 Verification every 31 days that each ADS pneumatic pressure is within the analysis limits (S/RV Ace mulator Bank header pressure;:::: 88.3 psig ernate Nitrogen Syst m supply (ALT N2 TRAIN A (or B) SUPPLY) pressure;:::: 44G psig (Ref. 4-J)) ensures adequate pressure for reliable ADS operation. The supply associated with each ADS valve provides pneumatic pressure for valve actuation. The design pneumatic supply pressure requirements for the S/RV accumulator bank and Alternate Monticello B 3.5.1-12 Revision No.
ECCS - Operating 3.5.1 BASES REFERENCES 1. USAR, Section 6.2.2.
- 2. USAR, Section 6.2.3.
- 3. USAR, Section 6.2.4.
- 4. USAR, Section 6.2.5.
- 5. USAR, Section 14.7.2.
- 6. USAR, Section 14.7.3.
- 7. 10 CFR 50, Appendix K.
- 8. USAR, Section 6.2.1.1.
- 9. 10 CFR 50.46.
- 10. USAR, Section 14.7.2.3.2.
- 11. Memorandum from R.L. Baer (NRC) to V. Stello, Jr. (NRC),
"Recommended Interim Revisions to LCOs for ECCS Components,"
December 1, 1975.
- 12. USAR, Section 14.7.2.3.1.5.
- 13. (Not Used)
- 14. Amendment No. 162, "Issuance of Amendment Regarding Completion Time to Restore a Low-Pressure Emergency Core Cooling Subsystem to Operable Status," dated July 10, 2009.
(ADAMS Accession No. ML091480782)
- 15. Amendment No. 168, "Issuance of Amendment Re: Testing of Main Steam Safety/Relief Valves," dated July 27, 2012. (ADAMS Accession No. ML12185A216)
- 16. ASME Operation and Maintenance (OM) Code.
- 17. Amendment No. 176, "Monticello Nuclear Generating Plant-Issuance of Amendment No. 176 to Renewed Facility Operating License Regarding Extended Power Uprate," (ADAMS Accession No. ML13316C459)
Monticello B 3.5.1-19 Revision No.
ECCS - Operating 3.5.1 BASES REFERENCES (continued)
- 18. Amendment No. 184, "Monticello Nuclear Generating Plant-Issuance of Amendment to Revise Technical Specification 3.5.1, "ECCS [Emergency Core Cooling System]- Operating," dated November 3, 2014. (ADAMS Accession No. ML14246A449)
[Condition F previously allowed two Core Spray subsystems to be inoperable for 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.]
- 19. Amendment No. XXX, "Issuance of Amendment Re: Request to Revise Technical Specification Surveillance Requirement 3.5.1.3 to Correct the Alternate Nitrogen System Pressure," [as stated in amendment issued] dated August XX, 2015.
Monticello B 3.5.1 Last Revision No.