 Issue dateTitleTopic
ML22357A10031 March 2023and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Issuance of Amendments Standard Emergency Plan and Consolidated Emergency Operations FacilitySafe Shutdown
Health Physics Network
High winds
Minimum staff
Fire Protection Program
Siren
ML22318A21527 December 2022Issuance of Amendment No. 209 Ten-Year Inspection of the Diesel Generator Fuel Oil Storage TankAnticipated operational occurrence
Temporary Modification
Cyber Security
Qualified Offsite Circuit
Aging Management
Surveillance Frequency Control Program
ML21148A27412 July 2021Issuance of Amendment No. 206 TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4bSafe Shutdown
High winds
Reactor Vessel Water Level
High Radiation Area
Ultimate heat sink
Tornado Missile
Water Inventory Control
Internal Flooding
Probabilistic Risk Assessment
Squib
Qualified Offsite Circuit
Emergency Lighting
FLEX
Tornado-Generated Missile
Fukushima Dai-Ichi
Seismically rugged
Surveillance Frequency Control Program
Scram Discharge Volume
Large early release frequency
MELLLA
Flooding Focused Evaluation
Maintenance Rule Program
Offsite Circuit
ML20352A3498 January 2021Issuance of Amendment No. 205, Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-582, RPV WIC Enhancements, and TSTF-583-T, TSTF-582 Diesel Generator VariationHigh Radiation Area
Water Inventory Control
Surveillance Frequency Control Program
Fuel cladding
Offsite Circuit
ML20210M0148 September 2020and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Issuance of Amendment Nos. 204, 231, and 219 TSTF-529 Clarify Use and Application RulesTime of Discovery
ML19176A42129 August 2019Issuance of Amendment No. 203 Adoption of 10 CFR 50.69Safe Shutdown
High winds
Tornado Missile
Internal Flooding
Probabilistic Risk Assessment
FLEX
Large early release frequency
Earthquake
ML19162A09330 July 2019Issuance of Amendment No, 202 Regarding Deletion of the Note Associated with Technical Specification 3.5.1., Erccs - OperatingWater Inventory Control
ML18291B21426 November 2018Issuance of Amendment Adoption of TSTF-551 Revise Secondary Containment Surveillance Requirements
L-MT-18-060, License Amendment Request: Revise the Safety Limit Minimum Critical Power Ratio in Reactor Core Safety Limit 2.1.112 November 2018License Amendment Request: Revise the Safety Limit Minimum Critical Power Ratio in Reactor Core Safety Limit 2.1.1Reactor Vessel Water Level
Safety Limit Minimum Critical Power Ratio
Anticipated operational occurrence
MELLLA
Fuel cladding
L-MT-18-006, Application to Revise Technical Specifications to Adopt TSTF-551, Revision 3, Revise Secondary Containment Surveillance Requirements3 July 2018Application to Revise Technical Specifications to Adopt TSTF-551, Revision 3, Revise Secondary Containment Surveillance RequirementsRecently irradiated fuel
ML17346A08512 December 2017Final Pre-App TS Markups
ML17250A8707 September 2017MNGP TSTF-542 Draft VariationsReactor Vessel Water Level
Water Inventory Control
ML17250A8717 September 2017MNGP TSTF-542 TS Draft MarkupsShutdown Margin
Reactor Vessel Water Level
High Radiation Area
Ultimate heat sink
Water Inventory Control
Post Accident Monitoring
Hydrostatic
Squib
Scram Discharge Volume
Pressure Boundary Leakage
Recently irradiated fuel
Offsite Circuit
ML17172A43123 June 2017Correction of Amendment No. 194, Issuance of Amendment to Adopt F Tstf 545, Revision 3, Ts Inservice Testing Program Removal & Clarify Sr Usage Rule Application to Section 5.5 Testing
ML17123A32116 June 2017Issuance of Amendment Adoption of TSTF-545, Revision 3, TS Inservice Testing Program Removal and Clarify SR Usage Rule Application to Section 5.5 TestingIncorporated by reference
Missed surveillance
Pressure Boundary Leakage
ML15335A49320 November 2015Technical Requirements Manual, Revision 17
L-MT-15-032, License Amendment Request to Revise Technical Specification Surveillance Requirement 3.5.1.3.b to Correct the Alternate Nitrogen System Pressure2 September 2015License Amendment Request to Revise Technical Specification Surveillance Requirement 3.5.1.3.b to Correct the Alternate Nitrogen System PressureStroke time
Power Uprate
ML15072A1415 June 2015Issuance of Amendment No. 188 Regarding Transition to Areva Atrium 10XM Fuel and Areva Safety Analysis MethodsShutdown Margin
Reactor Vessel Water Level
Safety Limit Minimum Critical Power Ratio
Anticipated operational occurrence
Post Accident Monitoring
Hydrostatic
Pressure and Temperature Limits Report
Feedwater Controller Failure
MELLLA
Fuel cladding
Grace period
Power change
L-MT-15-043, Withdrawal of License Amendment Request to Revise Technical Specification Surveillance Requirement 3.5.1.3.b to Correct the Alternate Nitrogen System Pressure29 May 2015Withdrawal of License Amendment Request to Revise Technical Specification Surveillance Requirement 3.5.1.3.b to Correct the Alternate Nitrogen System Pressure
ML15110A28015 April 2015Operating License and Technical SpecificationsUnanalyzed Condition
Shutdown Margin
Reactor Vessel Water Level
Safety Limit Minimum Critical Power Ratio
Stroke time
Anticipated operational occurrence
Hydrostatic
Cyber Security
B.5.b
Missed surveillance
Scram Discharge Volume
Safeguards Contingency Plan
Fuel cladding
Power Uprate
ML14323A0338 January 2015Issuance of Amendment No. 187 Regarding Revision to TS 5.5.11 for Drywell Personnel Airlock Leakage Rate Testing
ML14281A31825 November 2014Issuance of Amendment Regarding Reduction in Steam Dome Pressure Safety LimitReactor Vessel Water Level
Anticipated operational occurrence
Fuel cladding
L-MT-14-088, Areva Atrium 10XM Fuel Transition License Amendment Request Supplement11 November 2014Areva Atrium 10XM Fuel Transition License Amendment Request SupplementReactor Vessel Water Level
Fuel cladding
ML14246A4493 November 2014Issuance of Amendment to Revise TS 3.5.1, ECCS - Operating
L-MT-14-043, License Amendment Request for Fuel Storage Changes Supplement to Proposed Spent Fuel Pool Boral Monitoring Program Technical Specification30 May 2014License Amendment Request for Fuel Storage Changes Supplement to Proposed Spent Fuel Pool Boral Monitoring Program Technical SpecificationAging Management
ML14035A24828 March 2014Issuance of Amendment No. 180 to Implement Maximum Extended Load Line Limit Analysis Plus (Mellla+) Operating DomainSafe Shutdown
Shutdown Margin
Reactor Vessel Water Level
Anticipated operational occurrence
Post Accident Monitoring
Hydrostatic
Probabilistic Risk Assessment
Pressure and Temperature Limits Report
Minimum Critical Power Ratio
Scram Discharge Volume
Feedwater Controller Failure
MELLLA
Time Critical Operator Action
Power change
Flow Induced Vibration
ML14072A39013 March 2014License Amendment Request for Fuel Storage Changes, Supplement to Propose a Spent Fuel Pool Boral Monitoring Program Technical SpecificationAging Management
ML13218A06128 January 2014Issuance of Amendment No. 178 to Adopt TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control
ML13316B2989 December 2013Issuance of Amendment No. 176 to Renewed Facility Operating License Regarding Extended Power Uprate
ML13168A37328 August 2013Issuance of Amendment No. 175 to Make Minor Corrections and Editorial Changes, Clarify Fuel Storage Capacity, and Remove Obsolete InformationSafe Shutdown
Shutdown Margin
Cyber Security
Pressure and Temperature Limits Report
Safeguards Contingency Plan
Recently irradiated fuel
Fire Protection Program
Power Uprate
ML13168A2199 August 2013Issuance of Amendment No. 174 to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-484, Revision 0, Use of TS 3.10.1 for Scram Time Testing ActivitiesAnticipated operational occurrence
Hydrostatic
Power change
L-MT-13-055, License Amendment Request for Transition to Areva Atrium 10XM Fuel and Areva Safety Analysis Methodology15 July 2013License Amendment Request for Transition to Areva Atrium 10XM Fuel and Areva Safety Analysis MethodologyShutdown Margin
Reactor Vessel Water Level
Anticipated operational occurrence
MELLLA
Fuel cladding
ML13189A19427 June 2013Operating License and Technical Specifications Updating Instructions
L-MT-13-030, License Amendment Request: Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-535, Revision 0, Revise Shutdown Margin Definition to Address Advanced Fuel Designs19 April 2013License Amendment Request: Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-535, Revision 0, Revise Shutdown Margin Definition to Address Advanced Fuel DesignsShutdown Margin
Anticipated operational occurrence
Power change
L-MT-12-076, License Amendment Request for Fuel Storage Changes30 October 2012License Amendment Request for Fuel Storage ChangesUnanalyzed Condition
Safe Shutdown Earthquake
Aging Management
Earthquake
L-MT-12-071, License Amendment Request: Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control.18 September 2012License Amendment Request: Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control.Safe Shutdown
Anticipated operational occurrence
L-MT-12-055, License Amendment Request: Revise Renewed Facility Operating License & Technical Specifications to Clarify Fuel Storage Capacity, Remove Obsolete Information and Make Minor Corrections and Miscellaneous Editorial Changes21 August 2012License Amendment Request: Revise Renewed Facility Operating License & Technical Specifications to Clarify Fuel Storage Capacity, Remove Obsolete Information and Make Minor Corrections and Miscellaneous Editorial ChangesSafe Shutdown
Anticipated operational occurrence
Cyber Security
Safeguards Contingency Plan
Fire Protection Program
Power Uprate
L-MT-12-051, License Amendment Request: Remove Degraded Voltage Transfer to the 1AR Transformer25 May 2012License Amendment Request: Remove Degraded Voltage Transfer to the 1AR TransformerAnticipated operational occurrence
Probabilistic Risk Assessment
L-MT-12-028, License Amendment Request: Revise Allowable Value for the Automatic Depressurization System Bypass Timer5 April 2012License Amendment Request: Revise Allowable Value for the Automatic Depressurization System Bypass TimerAnticipated operational occurrence
Power Uprate
ML12083A25222 March 2012Enclosure 2 - Monticello Nuclear Generating Plant Technical Requirements Manual Revision 10Unanalyzed Condition
Time of Discovery
Reactor Vessel Water Level
Safe Shutdown Earthquake
Post Accident Monitoring
Scram Discharge Volume
Earthquake
Recently irradiated fuel
Offsite Circuit
L-MT-11-022, 002 Monticello - Technical Requirements Manual, Revision 727 April 2011002 Monticello - Technical Requirements Manual, Revision 7Unanalyzed Condition
Time of Discovery
Reactor Vessel Water Level
Safe Shutdown Earthquake
Post Accident Monitoring
Scram Discharge Volume
Earthquake
Recently irradiated fuel
Offsite Circuit
L-MT-09-047, Supplement to Extended Power Uprate License Amendment Request: Revision to Proposed Technical Specification Changes in Response to Staff Comments31 August 2009Supplement to Extended Power Uprate License Amendment Request: Revision to Proposed Technical Specification Changes in Response to Staff CommentsUnanalyzed Condition
L-MT-09-020, License Amendment Request: Revise the Modes of Applicability for Reactor Water Cleanup System Isolation on a Standby Liquid Control System Initiation29 May 2009License Amendment Request: Revise the Modes of Applicability for Reactor Water Cleanup System Isolation on a Standby Liquid Control System Initiation
L-MT-09-041, Supplement to License Amendment Request: Revision to the Allowable Value and Channel Calibration Surveillance Interval for the Recirculation Riser Differential Pressure - High Function2 April 2009Supplement to License Amendment Request: Revision to the Allowable Value and Channel Calibration Surveillance Interval for the Recirculation Riser Differential Pressure - High Function
ML08344068130 January 2009(Mngp), License Amendment No. 159 Regarding the Power Range Neutron Monitoring SystemAnticipated operational occurrence
Post Accident Monitoring
Scram Discharge Volume
L-MT-08-012, License Amendment Request: Application for Technical Specification Change Regarding Revision of Control Rod Notch Surveillance Test Frequency and a Clarification of a Frequency Example Using the Consolidated Line Item Improvement Process22 April 2008License Amendment Request: Application for Technical Specification Change Regarding Revision of Control Rod Notch Surveillance Test Frequency and a Clarification of a Frequency Example Using the Consolidated Line Item Improvement ProcessIncorporated by reference
Scram Discharge Volume
Overtravel
L-MT-08-013, License Amendment Request: Application for Technical Specification Change TSTF-427, Add Limiting Condition for Operation 3.0.9 Regarding the Unavailability of Barriers Using the Consolidated Line Item Improvement Process4 April 2008License Amendment Request: Application for Technical Specification Change TSTF-427, Add Limiting Condition for Operation 3.0.9 Regarding the Unavailability of Barriers Using the Consolidated Line Item Improvement ProcessFire Barrier
Tornado Missile
Internal Flooding
Incorporated by reference
Turbine Missile
ML08101019331 March 2008Monticello, License Amendment Request: Extended Power UprateSafe Shutdown
Shutdown Margin
Reactor Vessel Water Level
Safety Limit Minimum Critical Power Ratio
Ultimate heat sink
Anticipated operational occurrence
Probabilistic Risk Assessment
Squib
Scram Discharge Volume
Feedwater Controller Failure
Flow Induced Vibration
ML08028060130 January 2008Technical Specifications
ML08024008523 January 2008Tech Specs - Issuance of Amendment Two Inoperable Control Room Ventilation Subsystems Per TSTF-447Recently irradiated fuel