Category:Technical Specifications
MONTHYEARML22357A1002023-03-31031 March 2023 and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Issuance of Amendments Standard Emergency Plan and Consolidated Emergency Operations Facility ML22318A2152022-12-27027 December 2022 Issuance of Amendment No. 209 Ten-Year Inspection of the Diesel Generator Fuel Oil Storage Tank ML21148A2742021-07-12012 July 2021 Issuance of Amendment No. 206 TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML20352A3492021-01-0808 January 2021 Issuance of Amendment No. 205, Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-582, RPV WIC Enhancements, and TSTF-583-T, TSTF-582 Diesel Generator Variation ML20210M0142020-09-0808 September 2020 and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Issuance of Amendment Nos. 204, 231, and 219 TSTF-529 Clarify Use and Application Rules ML19176A4212019-08-29029 August 2019 Issuance of Amendment No. 203 Adoption of 10 CFR 50.69 ML19162A0932019-07-30030 July 2019 Issuance of Amendment No, 202 Regarding Deletion of the Note Associated with Technical Specification 3.5.1., Erccs - Operating ML18291B2142018-11-26026 November 2018 Issuance of Amendment Adoption of TSTF-551 Revise Secondary Containment Surveillance Requirements L-MT-18-060, License Amendment Request: Revise the Safety Limit Minimum Critical Power Ratio in Reactor Core Safety Limit 2.1.12018-11-12012 November 2018 License Amendment Request: Revise the Safety Limit Minimum Critical Power Ratio in Reactor Core Safety Limit 2.1.1 L-MT-18-006, Application to Revise Technical Specifications to Adopt TSTF-551, Revision 3, Revise Secondary Containment Surveillance Requirements2018-07-0303 July 2018 Application to Revise Technical Specifications to Adopt TSTF-551, Revision 3, Revise Secondary Containment Surveillance Requirements ML17346A0852017-12-12012 December 2017 Final Pre-App TS Markups ML17250A8702017-09-0707 September 2017 MNGP TSTF-542 Draft Variations ML17250A8712017-09-0707 September 2017 MNGP TSTF-542 TS Draft Markups ML17172A4312017-06-23023 June 2017 Correction of Amendment No. 194, Issuance of Amendment to Adopt F Tstf 545, Revision 3, Ts Inservice Testing Program Removal & Clarify Sr Usage Rule Application to Section 5.5 Testing ML17123A3212017-06-16016 June 2017 Issuance of Amendment Adoption of TSTF-545, Revision 3, TS Inservice Testing Program Removal and Clarify SR Usage Rule Application to Section 5.5 Testing ML15335A4932015-11-20020 November 2015 Technical Requirements Manual, Revision 17 L-MT-15-032, License Amendment Request to Revise Technical Specification Surveillance Requirement 3.5.1.3.b to Correct the Alternate Nitrogen System Pressure2015-09-0202 September 2015 License Amendment Request to Revise Technical Specification Surveillance Requirement 3.5.1.3.b to Correct the Alternate Nitrogen System Pressure ML15072A1412015-06-0505 June 2015 Issuance of Amendment No. 188 Regarding Transition to Areva Atrium 10XM Fuel and Areva Safety Analysis Methods L-MT-15-043, Withdrawal of License Amendment Request to Revise Technical Specification Surveillance Requirement 3.5.1.3.b to Correct the Alternate Nitrogen System Pressure2015-05-29029 May 2015 Withdrawal of License Amendment Request to Revise Technical Specification Surveillance Requirement 3.5.1.3.b to Correct the Alternate Nitrogen System Pressure ML15110A2802015-04-15015 April 2015 Operating License and Technical Specifications ML14323A0332015-01-0808 January 2015 Issuance of Amendment No. 187 Regarding Revision to TS 5.5.11 for Drywell Personnel Airlock Leakage Rate Testing ML14281A3182014-11-25025 November 2014 Issuance of Amendment Regarding Reduction in Steam Dome Pressure Safety Limit L-MT-14-088, Areva Atrium 10XM Fuel Transition License Amendment Request Supplement2014-11-11011 November 2014 Areva Atrium 10XM Fuel Transition License Amendment Request Supplement ML14246A4492014-11-0303 November 2014 Issuance of Amendment to Revise TS 3.5.1, ECCS - Operating L-MT-14-043, License Amendment Request for Fuel Storage Changes Supplement to Proposed Spent Fuel Pool Boral Monitoring Program Technical Specification2014-05-30030 May 2014 License Amendment Request for Fuel Storage Changes Supplement to Proposed Spent Fuel Pool Boral Monitoring Program Technical Specification ML14035A2482014-03-28028 March 2014 Issuance of Amendment No. 180 to Implement Maximum Extended Load Line Limit Analysis Plus (Mellla+) Operating Domain ML14072A3902014-03-13013 March 2014 License Amendment Request for Fuel Storage Changes, Supplement to Propose a Spent Fuel Pool Boral Monitoring Program Technical Specification ML13218A0612014-01-28028 January 2014 Issuance of Amendment No. 178 to Adopt TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML13316B2982013-12-0909 December 2013 Issuance of Amendment No. 176 to Renewed Facility Operating License Regarding Extended Power Uprate ML13168A3732013-08-28028 August 2013 Issuance of Amendment No. 175 to Make Minor Corrections and Editorial Changes, Clarify Fuel Storage Capacity, and Remove Obsolete Information ML13168A2192013-08-0909 August 2013 Issuance of Amendment No. 174 to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-484, Revision 0, Use of TS 3.10.1 for Scram Time Testing Activities L-MT-13-055, License Amendment Request for Transition to Areva Atrium 10XM Fuel and Areva Safety Analysis Methodology2013-07-15015 July 2013 License Amendment Request for Transition to Areva Atrium 10XM Fuel and Areva Safety Analysis Methodology ML13189A1942013-06-27027 June 2013 Operating License and Technical Specifications Updating Instructions L-MT-13-030, License Amendment Request: Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-535, Revision 0, Revise Shutdown Margin Definition to Address Advanced Fuel Designs2013-04-19019 April 2013 License Amendment Request: Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-535, Revision 0, Revise Shutdown Margin Definition to Address Advanced Fuel Designs L-MT-12-076, License Amendment Request for Fuel Storage Changes2012-10-30030 October 2012 License Amendment Request for Fuel Storage Changes L-MT-12-071, License Amendment Request: Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control.2012-09-18018 September 2012 License Amendment Request: Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control. L-MT-12-055, License Amendment Request: Revise Renewed Facility Operating License & Technical Specifications to Clarify Fuel Storage Capacity, Remove Obsolete Information and Make Minor Corrections and Miscellaneous Editorial Changes2012-08-21021 August 2012 License Amendment Request: Revise Renewed Facility Operating License & Technical Specifications to Clarify Fuel Storage Capacity, Remove Obsolete Information and Make Minor Corrections and Miscellaneous Editorial Changes L-MT-12-051, License Amendment Request: Remove Degraded Voltage Transfer to the 1AR Transformer2012-05-25025 May 2012 License Amendment Request: Remove Degraded Voltage Transfer to the 1AR Transformer L-MT-12-028, License Amendment Request: Revise Allowable Value for the Automatic Depressurization System Bypass Timer2012-04-0505 April 2012 License Amendment Request: Revise Allowable Value for the Automatic Depressurization System Bypass Timer ML12083A2522012-03-22022 March 2012 Enclosure 2 - Monticello Nuclear Generating Plant Technical Requirements Manual Revision 10 L-MT-11-022, 002 Monticello - Technical Requirements Manual, Revision 72011-04-27027 April 2011 002 Monticello - Technical Requirements Manual, Revision 7 L-MT-09-047, Supplement to Extended Power Uprate License Amendment Request: Revision to Proposed Technical Specification Changes in Response to Staff Comments2009-08-31031 August 2009 Supplement to Extended Power Uprate License Amendment Request: Revision to Proposed Technical Specification Changes in Response to Staff Comments L-MT-09-020, License Amendment Request: Revise the Modes of Applicability for Reactor Water Cleanup System Isolation on a Standby Liquid Control System Initiation2009-05-29029 May 2009 License Amendment Request: Revise the Modes of Applicability for Reactor Water Cleanup System Isolation on a Standby Liquid Control System Initiation L-MT-09-041, Supplement to License Amendment Request: Revision to the Allowable Value and Channel Calibration Surveillance Interval for the Recirculation Riser Differential Pressure - High Function2009-04-0202 April 2009 Supplement to License Amendment Request: Revision to the Allowable Value and Channel Calibration Surveillance Interval for the Recirculation Riser Differential Pressure - High Function ML0834406812009-01-30030 January 2009 (Mngp), License Amendment No. 159 Regarding the Power Range Neutron Monitoring System L-MT-08-012, License Amendment Request: Application for Technical Specification Change Regarding Revision of Control Rod Notch Surveillance Test Frequency and a Clarification of a Frequency Example Using the Consolidated Line Item Improvement Process2008-04-22022 April 2008 License Amendment Request: Application for Technical Specification Change Regarding Revision of Control Rod Notch Surveillance Test Frequency and a Clarification of a Frequency Example Using the Consolidated Line Item Improvement Process L-MT-08-013, License Amendment Request: Application for Technical Specification Change TSTF-427, Add Limiting Condition for Operation 3.0.9 Regarding the Unavailability of Barriers Using the Consolidated Line Item Improvement Process2008-04-0404 April 2008 License Amendment Request: Application for Technical Specification Change TSTF-427, Add Limiting Condition for Operation 3.0.9 Regarding the Unavailability of Barriers Using the Consolidated Line Item Improvement Process ML0810101932008-03-31031 March 2008 Monticello, License Amendment Request: Extended Power Uprate ML0802806012008-01-30030 January 2008 Technical Specifications ML0802400852008-01-23023 January 2008 Tech Specs - Issuance of Amendment Two Inoperable Control Room Ventilation Subsystems Per TSTF-447 2023-03-31
[Table view] |
Text
TIP- PASSPORT DOCUMENT To NRC-BRANCH CHIEF COPY #169 Facility MT Department TRANSMITTAL Address DENAE SIEVERS - SAB2 TO BE MAILED TO REGION III Page: 1 From Address C-DOC CNTRL-MT 2807 W CO RD 75 Attention:
11 IIIIlIII 1lIII I City MONTICELLO State: MN Postal Code: 55362 Country UNITED STATES Email Contact Date/Time 06/27/2013 11:45 Transmittal Group Id: 0000024944 Trans No. 000220721
Title:
Total Items: 00001 Item Facility Type Sub Document Number Sheet Doc Status Revision Doc Date Copy # Media Cpys 0001 MT LIC TECH TECH-SPECS ISSUED 171 HOLE SS 01 Security : FY Destroy Documents Date:
Form of Destruction Signature of Destroyer Signature of Witness If a document was not received or is no longer required check the response below and return to sender.
Documents noted above not received (identify those not received).
I no longer require distribution of these documents (identify those no longer required).
Date: Signature:
Avot
OPERATING LICENSE AND TECHNICAL SPECIFICATIONS UPDATING INSTRUCTIONS TECHNICAL SPECIFICATIONS (Do not insert in TS binder, only an updating aid.)
Monticello Am 172
TABLE 1 (Page 1 of 3)
MONTICELLO NUCLEAR GENERATING PLANT OPERATING LICENSE AND TECHNICAL SPECIFICATIONS LIST OF EFFECTIVE PAGES Page Amend. Page Amend. Paae Amend. Page Amend.
No. No. No. No.
i --- (2) 3.1.4-2 146 3.3.5.1-1 146 3.4.5-2 146 ii --- (2) 3.1.4-3 158 3.3.5.1-2 146 3.4.6-1 148 iii --- (2) 3.1.5-1 146 3.3.5.1-3 146 3.4.6-2 148 1.1-1 146 3.1.5-2 146 3.3.5.1-4 146 3.4.7-1 146 1.1-2 148 3.1.5-3 146 3.3.5.1-5 151 3.4.7-2 146 1.1-3 146 3.1.6-1 146 3.3.5.1-6 170 3.4.8-1 146 1.1-4 172 3.1.6-2 146 3.3.5.1-7 146 3.4.8-2 146 1.1-4a 11)(44 1.1.5 146 3.1.7-1 148 3.3.5.1-8 17061) 3.4.9-1 172 1.1-6 146 3.1.7-2 146 3.3.5.1-9 161 3.4.9-2 172 1.2-1 146 3.1.7-3 146 3.3.5.1-10 146 3.4.9-3 172 1.2-2 146 3.1.7-4 146 3.3.5.2-11 146 1.3-1 146 3.1.7-5 146 3.3.5.2-1 146 1.3-2 146 3.1.7-6 146 3.3.5.2-2 146 1.3-3 146 3.1.8-1 146 3.3.5.2-3 146 1.3-4 146 3.1.8-2 146 3.3.5.2-4 146 3.4.10-1 146 1.3-5 146 3.2.1-1 146 3.3.6.1-1 146 3.5.1-1 146 1.3-6 146 3.2.2-1 146 3.3.6.1-2 146 3.5.1-2 162(5) 1.3-7 146 3.2.2-2 146 3.3.6.1-3 146 3.5.1-3 162 1.3-8 146 3.2.3-1 146 3.3.6.1-4 146 3.5.1-4 162 1.3-9 146 3.3.1.1-1 171 3.3.6.1-5 146 3.5.1-5 162 1.3-10 146 3.3.1.1-2 171 3.3.6.1-6 146 3.5.1-6 167 3.5.1-7 168 1.3-11 146 3.3.1.1-3 159 3.3.6.1-7 164 3.5.2-1 146 1.4-1 146 3.3.1.1-4 159 3.3.6.2-1 146 3.5.2-2 146 1.4-2 146 3.3.1.1-5 159 3.3.6.2-2 146 3.5.2-3 167 1.4-3 146 3.3.1.1-6 159 3.3.6.2-3 146 3.5.3-1 146 1.4-4 158 3.3.1.1-7 159 3.3.6.3-1 146 3.5.3-2 146 1.4-5 146 3.3.1.1-8 159 3.3.6.3-2 146 3.6.1.1-1 146 1.4-6 146 3.3.1.1-9 159 3.3.6.3-3 146 3.6.1.1-2 146 1.4-7 146 3.3.1.2-1 146 3.3.7.1-1 148 3.6.1.2-1 146 2.0-1 165 3.3.1.2-2 146 3.3.7.1-2 148 3.6.1.2-2 146 3.3.1.2-3 146 3.3.7.1-3 148 3.3.1.2-4 146 3.3.7.2-1 14813) 3.3.7.2-2 148(3) 3.0-1 157 3.3.1.2-5 146 3.3.8.1-1 146 3.6.1.2-3 146 3.0-2 146 3,3.2.1-1 146 3.3.8.1-2 146 3.6.1.2-4 146 3.0-3 157 3.3.2.1-2 146 3.3.8.1-3 147 3.6.1.3-1 148 3.0-4 146 3.3.2.1-3 159 3.3.8.2-1 146 3.6.1.3-2 146 3.0-5 146 3.3.2.1-4 159 3.3.8.2-2 146 3.6.1.3-3 148 3.1.1-1 146 3.3.2.1-5 159 3.3.8.2-3 146 3.6.1.3-4 146 3.1.1-2 146 3.3.2.2-1 146 3.4.1-1 159 3.6.1.3-5 148 3.1.1-3 146 3.3.2.2-2 146 3.4.1-2 159 3.6.1.3-6 148 3.1.2-1 146 3.3.3.1-1 146 3.6.1.3-7 146 3.1.2-2 146 3.3.3.1-2 146 3.4.2-1 146 3.6.1.3-8 148 3.1.3-1 146 3.3.3.1-3 146 3.4.3-1 146 3.6.1.4-1 146 3.1.3-2 3.1.3-3 158 158 3.3.3.2-1 3.3.4.1-1 146 146 3.4.3-2 3.4.4-1 168 146 f 3.6.1.5-1 3.6.1.5-2 146 1681 3.1.3-4 158 3.3.4.1-2 146 3.4.4-2 146 3.6.1.6-1 146' 3.1.4-1 146 3.3.4.1-3 146 3.4.5-1 146 3.6.1.6-2 146 Am. 172
TABLE 1 (Page 2 of 3)
MONTICELLO NUCLEAR GENERATING PLANT OPERATING LICENSE AND TECHNICAL SPECIFICATIONS LIST OF EFFECTIVE PAGES Paae Amend. Page Amend. Page Amend.
No. No. No.
3.6.1.7-1 146 3.8.2-2 148 3.10.6-1 146 3.6.1.7-2 146 3.8.2-3 146 3.10.6-2 146 3.6.1.8-1 146 3.8.3-1 146 3.10.7-1 146 3.6.1.8-2 146 3.8.3-2 146 3.10.7-2 146 3.6.2.1-1 146 3.8.3-3 146 3.10.8-1 146 3.6.2.1-2 146 3.8.4-1 146 3.10.8-2 146 3.6.2.1-3 146 3.8.4-2 153 3.10.8-3 146 3.6.2.2-1 146 3.8.4-3 146 4.0-1 146 3.6.2.3-1 146 3.8.5-1 148 4.0-2 150 3.6.2.3-2 146 3.8.5-2 146 5.1-1 146 3.6.3.1-1 146 3.8.6-1 146 5.2-1 146 3.6.4.1-1 146 3.8.6-2 146 5.2-2 146 3.6.4.1-2 146 3.8.6-3 146 5.3-1 146 3.6.4.2-1 146 3.8.6-4 146 5.4-1 146 3.6.4.2-2 146 3.8.7-1 146 5.5-1 146 3.6.4.2-3 146 3.8.7-2 146 5.5-2 163 3.6.4.3-1 146 3.8.8-1 148 5.5-3 146 3.6.4.3-2 146 3.8.8-2 146 5.5-4 146 3.7.1-1 146 3.9.1-1 146 5.5-5 146 3.7.1-2 146 3.9.1-2 146 5.5-6 146 3.7.2-1 146 3.9.2-1 146 5.5-7 146 3.7.2-2 146 3.9.3-1 146 5.5-8 146 3.7.3-1 146 3.9.4-1 146 5.5-9 146 3.7.4-1 146 3.9.4-2 146 5.5-10 148 3.7.4-2 146 3.9.5-1 146 5.5-11 148 3.7.4-3 146 3.9.6-1 146 5.6-1 146 3.7.5-1 154 3.9.7-1 146 5.6-2 159 5.6-3 172 3.7.5-2 154 3.9.7-2 146 5.7-1 146 3.7.6-1 146 3.9.8-1 146 5.7-2 146 3.7.6-2 146 3.9.8-2 146 5.7-3 146 3.7.7-1 146 3.10.1-1 146 5.7-4 146 3.7.8-1 146 3.10.1-2 146 3.8.1-1 146 3.10.1-3 146 Operating License 3.8.1-2 146 3.10.2-1 146 1 156 3.8.1-3 146 3.10.2-2 146 2 156 3.8.1-4 146 3.10.3-1 146 3 172 3.8.1-5 146 3.10.3-2 146 4 166 3.8.1-6 146 3.10.3-3 146 5 156 3.8.1-7 146 3.10.4-1 146 6 169 3.8.1-8 146 3.10.4-2 146 6A 169 3.8.1-9 146 3.10.4-3 146 7 160 3.8.1-10 146 3.10.5-1 146 3.8.2-1 148 3.10.5-2 146 Am. 172
TABLE 1 (Page 3 of 3)
MONTICELLO NUCLEAR GENERATING PLANT OPERATING LICENSE AND TECHNICAL SPECIFICATIONS LIST OF EFFECTIVE PAGES NOTES NOTE 1: Am. 146 corrected by letter dated 10/12/06.
NOTE 2: Am. 152 removed Table of Contents (TOC) from NRC issued Tech. Specs. TOC at Revision 0.
NOTE 3: Am. 148 corrected by letter dated 3/9/2009.
NOTE 4: Am. 172 inadvertently removed two definitions. Page 1.1-4a (not part of TS) inserted to provide definitions until an amendment can be processed and received.
NOTE 5: Condition F in Specification 3.5.1 (Completion Time of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> with both Core Spray subsystems inoperable) is annotated and is being treated as a non-conservative TS (see AR 01372600).
Am. 172
ECCS - Operating 3.5.1 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME C. One LPCI pump in both C.1 Restore one LPCI pump to 7 days LPCI subsystems OPERABLE status.
inoperable.
D. Two LPCI subsystems D.1 Restore one LPCI 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> inoperable for reasons subsystem to OPERABLE other than Condition C status.
or H.
E. One Core Spray E.1 Restore Core Spray 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> subsystem inoperable, subsystem to OPERABLE status.
AND OR One LPCI subsystem E.2 Restore LPCI subsystem to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> inoperable. OPERABLE status.
OR OR One or two LPCI E.3 Restore LPCI pump(s) to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> pump(s) inoperable. OPERABLE status.
F. Both Core Spray F.1 Restore one Core Spray 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Do Not subsystems inoperable. subsystem to OPERABLE Apply status. Condition F (see Ops. Memo.)
+
G. Required Action and G.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition A, B, AND C, D, E, or F not met.
G.2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> H. Two LPCI subsystems H.1 Isolate the RHR intertie 18 hours2.083333e-4 days <br />0.005 hours <br />2.97619e-5 weeks <br />6.849e-6 months <br /> inoperable due to open line.
RHR intertie return line isolation valve(s).
Monticello 3.5.1-2 Amendment No. 446, 162