|
---|
Category:License-Operator
MONTHYEARML24262A2142024-09-18018 September 2024 Form 5.1-1 Post Examination Check Sheet (PI 2024) IR 05000282/20243012024-09-13013 September 2024 NRC Initial License Examination Report 05000282/2024301 and 05000306/2024301 ML24262A2132024-09-0606 September 2024 Form 2.1-1 Examination Preparation Checklist (PI 2024) ML24262A2122024-08-23023 August 2024 Form 1.3-1 Exam Security Agreement L-PI-24-040, Post-Submittal Package Letter2024-08-23023 August 2024 Post-Submittal Package Letter ML24213A1592024-07-31031 July 2024 Operator Licensing Examination Approval - Prairie Island Nuclear Generating Plant ML24262A1532024-07-24024 July 2024 Form 3.4-1 Scenario Events & Evolutions Checklist ML24262A1522024-07-24024 July 2024 Form 2.3-1 Examination Outline Quality Checklist ML24262A2012024-07-24024 July 2024 Form 2.3-4 Written Examination Quality Checklist ML24262A2002024-07-24024 July 2024 Form 2.3-2 Operating Test Quality Checklist ML24262A1992024-05-29029 May 2024 L-PI-24-018 PINGP 75 Day Letter ML24262A1512024-03-15015 March 2024 L-PI-24-011 150 Day Letter 2024 PINGP ILT NRC Exam ML24017A0182024-01-19019 January 2024 Confirmation of Initial License Examination ML22270A2372022-09-26026 September 2022 Form 5.1-1 Post Exam Checklist IR 05000282/20223012022-08-31031 August 2022 NRC Initial License Examination Report 05000282/2022301; 05000306/2022301 ML22270A2252022-08-26026 August 2022 Ile Security Agreement - Final ML22249A0062022-08-26026 August 2022 2.1-1 Examination Preparation Checklist for Prairie Island 08092022 ML22249A0072022-08-19019 August 2022 Ile 2022 Post Exam Comments Letter ML22237A3022022-08-0808 August 2022 Ile 2.3-2 ML22213A1852022-08-0808 August 2022 Plan, Operator Licensing Examination Approval ML22237A3032022-08-0808 August 2022 Ile 2.3-4 ML22166A3892022-07-28028 July 2022 Issuance of Amendments 239 and 227 24-Month Operating Cycle ML22174A3902022-06-27027 June 2022 Licensed Operator Positive Fitness-For-Duty Test ML22237A3012022-05-27027 May 2022 Ile Licensee Letter Transmitting Proposed Exam and Test ML22242A3072022-03-24024 March 2022 3.4-1 Scenario Events & Evolutions Checklist RO & SRO ML22242A3032022-03-24024 March 2022 2.3-1 Exam Outline Quality Checklist ML22027A8012022-01-27027 January 2022 Confirmation of Initial License Examination ML21121A0002021-04-27027 April 2021 Preparation and Scheduling of Operator Licensing Examinations ML21110A5922021-04-19019 April 2021 GFE Results, March 2021 ML21082A4892021-03-23023 March 2021 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information IR 05000282/20203012020-09-22022 September 2020 NRC Initial License Examination Report 05000282/2020301 and 05000306/2020301 ML20265A1722020-09-21021 September 2020 ES-201-1 L-PI-20-048, Post Exam Comments2020-09-21021 September 2020 Post Exam Comments ML20265A1802020-09-21021 September 2020 ES-403-1 L-PI-20-053, ES-201-32020-09-18018 September 2020 ES-201-3 ML20246G7462020-08-27027 August 2020 Ile As-Administered RO Admin JPMs ML20246G7322020-08-27027 August 2020 Ile As-Administered Simulator JPMs ML20245E5452020-08-27027 August 2020 ES-301-1 and ES-301-2, Administrative Topics Outline ML20245E5482020-08-27027 August 2020 ES-D-1, Scenario Outline ML20245E5632020-08-27027 August 2020 ES-301-7 ML20245E5822020-08-27027 August 2020 ES-201-2, Examination Outline Quality Checklist ML20245E5802020-08-27027 August 2020 75 Day Letter ML20245E5812020-08-27027 August 2020 ES-301-5, Transient and Event Checklist ML20245E5792020-08-27027 August 2020 ES-301-6 ML20252A2542020-08-27027 August 2020 Proposed facility-developed RO-SRO Written Examination ML20245E5742020-08-27027 August 2020 ES-301-3 ML20246G7542020-08-27027 August 2020 Ile As-Administered Scenarios ML20245E5762020-08-27027 August 2020 ES-301-4 ML20252A2482020-08-27027 August 2020 Proposed Operating Test - Walkthrough Portion JPMs ML20252A2512020-08-27027 August 2020 Proposed Operating Test - Dynamic Simulator Scenarios 2024-09-06
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24262A2142024-09-18018 September 2024 Form 5.1-1 Post Examination Check Sheet (PI 2024) IR 05000282/20243012024-09-13013 September 2024 NRC Initial License Examination Report 05000282/2024301 and 05000306/2024301 ML24262A2132024-09-0606 September 2024 Form 2.1-1 Examination Preparation Checklist (PI 2024) L-PI-24-040, Post-Submittal Package Letter2024-08-23023 August 2024 Post-Submittal Package Letter ML24262A2122024-08-23023 August 2024 Form 1.3-1 Exam Security Agreement ML24213A1592024-07-31031 July 2024 Operator Licensing Examination Approval - Prairie Island Nuclear Generating Plant ML24262A2012024-07-24024 July 2024 Form 2.3-4 Written Examination Quality Checklist ML24262A1522024-07-24024 July 2024 Form 2.3-1 Examination Outline Quality Checklist ML24262A1532024-07-24024 July 2024 Form 3.4-1 Scenario Events & Evolutions Checklist ML24262A2002024-07-24024 July 2024 Form 2.3-2 Operating Test Quality Checklist ML24262A1992024-05-29029 May 2024 L-PI-24-018 PINGP 75 Day Letter ML24262A1512024-03-15015 March 2024 L-PI-24-011 150 Day Letter 2024 PINGP ILT NRC Exam ML24017A0182024-01-19019 January 2024 Confirmation of Initial License Examination ML22270A2372022-09-26026 September 2022 Form 5.1-1 Post Exam Checklist IR 05000282/20223012022-08-31031 August 2022 NRC Initial License Examination Report 05000282/2022301; 05000306/2022301 ML22270A2252022-08-26026 August 2022 Ile Security Agreement - Final ML22249A0062022-08-26026 August 2022 2.1-1 Examination Preparation Checklist for Prairie Island 08092022 ML22249A0072022-08-19019 August 2022 Ile 2022 Post Exam Comments Letter ML22237A3022022-08-0808 August 2022 Ile 2.3-2 ML22213A1852022-08-0808 August 2022 Plan, Operator Licensing Examination Approval ML22237A3032022-08-0808 August 2022 Ile 2.3-4 ML22237A3012022-05-27027 May 2022 Ile Licensee Letter Transmitting Proposed Exam and Test ML22242A3032022-03-24024 March 2022 2.3-1 Exam Outline Quality Checklist ML22242A3072022-03-24024 March 2022 3.4-1 Scenario Events & Evolutions Checklist RO & SRO ML22027A8012022-01-27027 January 2022 Confirmation of Initial License Examination ML21121A0002021-04-27027 April 2021 Preparation and Scheduling of Operator Licensing Examinations ML21082A4892021-03-23023 March 2021 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information IR 05000282/20203012020-09-22022 September 2020 NRC Initial License Examination Report 05000282/2020301 and 05000306/2020301 L-PI-20-048, Post Exam Comments2020-09-21021 September 2020 Post Exam Comments ML20265A1802020-09-21021 September 2020 ES-403-1 ML20265A1722020-09-21021 September 2020 ES-201-1 L-PI-20-053, ES-201-32020-09-18018 September 2020 ES-201-3 ML20246G7402020-08-27027 August 2020 Ile As-Administered Written Exam ML20246G7432020-08-27027 August 2020 Ile As-Administered In-Plant JPMs ML20252A2482020-08-27027 August 2020 Proposed Operating Test - Walkthrough Portion JPMs ML20246G7462020-08-27027 August 2020 Ile As-Administered RO Admin JPMs ML20245E5822020-08-27027 August 2020 ES-201-2, Examination Outline Quality Checklist ML20245E5452020-08-27027 August 2020 ES-301-1 and ES-301-2, Administrative Topics Outline ML20245E5742020-08-27027 August 2020 ES-301-3 ML20246G7542020-08-27027 August 2020 Ile As-Administered Scenarios ML20258A0162020-08-27027 August 2020 ES-401-6 ML20246G7342020-08-27027 August 2020 Ile As-Administered SRO Admin JPMs ML20245E5762020-08-27027 August 2020 ES-301-4 ML20245E5662020-08-27027 August 2020 ES-401-6 ML20245E5792020-08-27027 August 2020 ES-301-6 ML20245E5802020-08-27027 August 2020 75 Day Letter ML20245E5812020-08-27027 August 2020 ES-301-5, Transient and Event Checklist ML20245E5482020-08-27027 August 2020 ES-D-1, Scenario Outline ML20245E5632020-08-27027 August 2020 ES-301-7 ML20245E5582020-08-27027 August 2020 ES-401-2, 3, 4, PWR Examination Outline 2024-09-06
[Table view] |
Text
Appendix D Scenario Outline Form ES-D-1 Facility: PRAIRIE ISLAND Scenario No.: 1 Op-Test No.: PI-ILT-NRC-14 Examiners: ______________________ Operators: __________________________
Initial Conditions:
-8 Reactor Power at 1 x 10 amps, Boron Concentration at 1369 ppm, RCS temperature at 547°F, RCS pressure at 2235 psig, Xenon at equilibrium, Bank D rods at 144 steps, Generator Power at 0 MW.
No equipment is out of service.
Turnover:
Raise reactor power to the point of adding heat.
Event Malf. Event Type* Event No. No. Description R (ATC) 1 RAISE POWER TO THE POAH N (SRO)
I (ATC, SRO) PRZR PRESSURE CHANNEL FAILS LOW 2
TS (SRO) (CONTROLLING CHANNEL)
C (ATC, SRO) 3 22 GPM RCS LEAK INTO CONTAINMENT TS (SRO) 4 M (ALL) SMALL BREAK LOCA 5 C (BOP) 11 & 12 SI PUMPS FAIL TO AUTO START 6 C (BOP) 11 & 12 CC PUMPS FAIL TO AUTO START
- (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor
Appendix D Scenario Outline Form ES-D-1 Facility: PRAIRIE ISLAND Scenario No.: 2 Op-Test No.: PI-ILT-NRC-14 Examiners: ______________________ Operators: __________________________
Initial Conditions:
Reactor Power at 100%, Boron Concentration at 1299 ppm, RCS temperature at 560°F, RCS pressure at 2235 psig, Xenon at equilibrium, Bank D rods at 218 steps, Generator Power at 581 MW.
12 RHR Pump is out of service. T.S. LCO 3.5.2 Condition A was entered with 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> remaining. D1, 11 TD AFW Pump, 11 RHR Pump, 11 SI Pump, 11 CC Pump, and 12 CLW Pump are PROTECTED. BKR 16-10 is out of service.
Turnover:
nd Place a 2 Letdown Orifice in service in preparation of SP 1047, Control Rod Quarterly Exercise.
Event Malf. Event Type* Event No. No. Description ND 1 N (BOP) PLACE 2 LETDOWN ORIFICE IN SERVICE 2 TS (SRO) CONTAINMENT PRESSURE CHANNEL FAILS HIGH I (ATC, SRO) 3 PRESSURIZER LEVEL FAILS HIGH TS (SRO) 4 C (BOP, SRO) TURBINE MALFUNCTION (10 MW LOAD CYCLING)
R (ATC) 5 RAPID DOWNPOWER (100% TO 95%)
N (SRO) 6 M (ALL) LARGE BREAK LOCA 7 C (BOP) MAIN TURBINE FAILS TO AUTO TRIP 8 C (ATC) BOTH SAFEGUARD TRAINS FAIL TO AUTO ACTUATE 9 C (BOP, SRO) 11 & 12 AFW PUMPS FAIL TO AUTO START
- (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor
Appendix D Scenario Outline Form ES-D-1 Facility: PRAIRIE ISLAND Scenario No.: 3 Op-Test No.: PI-ILT-NRC-14 Examiners: ______________________ Operators: __________________________
Initial Conditions:
Reactor Power at 50%, Boron Concentration at 1482 ppm, RCS temperature at 556°F, RCS pressure at 2235 psig, Xenon at equilibrium, Bank D rods at 181 steps, Generator Power at 272 MW.
PT-485, Turbine First Stage Pressure, is failed HIGH. Rod Control is in MANUAL. T.S. LCO 3.3.1 Condition A and R entered. P7 was verified to be in required state for existing unit conditions. TRM 3.3.4 Condition A was entered. A Work Request was initiated to repair PT-485. 123 Air Compressor is out of service. 13 Charging Pump Suction Stabilizer PM is complete are ready to be re-started.
Turnover:
Restore RCS Average Coolant Temperature to program temperature.
Swap charging pumps to 11 and 13 running and 12 is secured per 1C12.1.
Event Malf. Event Type* Event No. No. Description R (ATC) 1 RESTORE TAVE TO TREF N (SRO) 2 N (BOP) SWAP CHARGING PUMPS 3 TS (SRO) 11 SI PUMP PLACED IN LOCAL I (BOP, SRO) 4 N43 PR NUCLEAR INSTRUMENT FAILS HIGH TS (SRO) 5 C (ATC) PRESSURIZER SPRAY VALVE DRIFTS OPEN LOOP A RCS LOSS OF FLOW & REACTOR FAILS TO 6 C (ATC, SRO)
AUTOMATICALLY TRIP 7 M (ALL) FAULT IN 12 SG
- (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor
Appendix D Scenario Outline Form ES-D-1 Facility: PRAIRIE ISLAND Scenario No.: 4 Op-Test No.: PI-ILT-NRC-14 Examiners: ______________________ Operators: __________________________
Initial Conditions:
Reactor Power at 50%, Boron Concentration at 1480 ppm, RCS temperature at 553°F, RCS pressure at 2235 psig, Xenon at equilibrium, Bank D rods at 175 steps, Generator Power at 265 MW.
13 Charging Pump is out of service. Two 40 GPM letdown orifices are in service. Pressurizer heaters are on. 11 and 12 Condensate Pumps are running. 11 and 12 Main Feed Pumps are running. 11 MFP recirculation valve is still open. 11 and 12 HDT Pumps are running.
Turnover:
Alternate CFCUs and discharge dampers such that 11 and 13 CFCUs are running in slow to the dome and 12 and 14 CFCUs are running in fast to support/gap.
When directed by the Shift Manager, perform a load increase from 50% to 60%.
Event Malf. Event Type* Event No. No. Description ALTERNATE CONTAINMENT FAN COIL UNITS AND 1 N (BOP)
DISCHARGE DAMPERS I (BOP, SRO) 11 SG PRESS CHANNEL FAILS HIGH 2
TS (SRO) CAUSING 11 SG PORV TO OPEN R (ATC) 3 UNIT 1 LOAD INCREASE FROM 50% TO 60%
N (SRO)
DROPPED ROD (B-8) AND REACTOR FAILS TO 4 C (ATC, SRO)
AUTOMATICALLY TRIP 5 C (BOP) TURBINE FAILS TO AUTOMATICALLY TRIP 6 M (ALL) LOSS OF ALL AC (OCCURS 10 SECS AFTER TURB TRIP) 7 C (ATC, SRO) 11 TD AFW PUMP FAILS TO AUTO START
- (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor
Appendix D Scenario Outline Form ES-D-1 Facility: PRAIRIE ISLAND Scenario No.: 5 Op-Test No.: PI-ILT-NRC-14 Examiners: ______________________ Operators: __________________________
Initial Conditions:
Reactor Power at 100%, Boron Concentration at 853 ppm, RCS temperature at 560°F, RCS pressure at 2235 psig, Xenon at equilibrium, Bank D rods at 218 steps, Generator Power at 581 MW.
11 SI Pump is out of service. T.S. LCO 3.5.2 Condition A was entered with 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> remaining. D2, 12 MD AFW Pump, 12 RHR Pump, 12 SI Pump, 12 CC Pump, and 22 CLW Pump are PROTECTED. PT-485, Turbine First Stage Pressure, is failed LOW. Rod Control is in MANUAL. T.S. LCO 3.3.1 Condition A and R entered. P7 was verified to be in required state for existing unit conditions. TRM 3.3.4 Condition A was entered. A Work Request was initiated to repair PT-485. B/S 1PC-485A is tripped. Bus 15 and 16 are powered from CT11.
A dedicated operator is monitoring phase currents at the G-Panel.
Turnover:
Transfer power on Bus 15 to 1RY after turnover is complete.
Event Malf. Event Type* Event No. No. Description 1 N (BOP) TRANSFER POWER ON BUS 15 FROM CT11 TO 1RY I (ATC, SRO) 2 ROD E-3 POSITION INDICATION FAILS LOW TS (SRO)
I (ATC, SRO) 3 RCS THOT CHANNEL FAILS HIGH TS (SRO) 4 C (BOP, SRO) LOSS OF BUS DUCT COOLING R (ATC) 5 RAPID DOWNPOWER (100% to 50%)
N (SRO) 6 M (ALL) 12 SG TUBE RUPTURE 7 C (BOP) SI TO CHILLED WATER SIGNAL FAILURE
- (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor