Category:E-Mail
MONTHYEARML22335A2802022-11-0404 November 2022 11-4-2022 Email Transmitting Draft Questions Pertaining to Pilgrim ISFSI Exemption Request ML22270A0422022-09-26026 September 2022 Acknowledgement Email for Holtec'S Request for Reporting Exemption with Regards to the Pilgrim ISFSI Annual Radioactive Effluent Release Report (Docket No. 05000293) ML22154A1622022-05-26026 May 2022 Letter and Email from Save Our Bay/Diane Turco Regarding Irradiated Water Release from Pilgrim ML22007A2602021-12-0606 December 2021 E-mail from P. O'Brien, Holtec, to A. Snyder, NRC, on Pilgrim Effluent Discharge ML21287A6192021-10-14014 October 2021 E-mail from S. Phillips, MEMA, to A. Snyder, NRC, Pilgrim Nuclear Power Station, Commonwealth of Massachusetts Consultation Response to Amendment Review for Emergency Preparedness ML21266A2512021-09-23023 September 2021 Consultation with Commonwealth of Massachusetts Regarding Proposed Amendment Application for Emergency Plan and Emergency Action Levels ML21266A2772021-09-23023 September 2021 HDI Clarification of Exemption Requested from 10 CFR 20, Appendix G, Section Iii.E ML21267A0012021-09-23023 September 2021 E-mail from A. Snyder, NRC, to A. Sterdis, Holtec, - Pilgrim Nuclear Power Station - Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E Acceptance Review ML21257A3832021-09-15015 September 2021 E-mail from A. Snyder, NRC, to A. Sterdis, Holtec, - Pilgrim Nuclear Power Station - Follow-on Request Re Request for Additional Information 2 Pilgrim - License Amendment Request Independent Spent Fuel Storage Installation Only Emergency Pl ML21211A5912021-07-22022 July 2021 Consultation Response from Commonwealth of Massachusetts Regarding Proposed Pilgrim ISFSI Only Technical Specifications ML21211A5162021-07-22022 July 2021 Consultation Response from Commonwealth of Massachusetts Regarding Proposed Pilgrim ISFSI Only Physical Security Plan ML21200A2352021-07-13013 July 2021 Consultation Request to Commonwealth of Massachusetts Regarding Proposed Pilgrim ISFSI Only Technical Specifications ML21200A1522021-07-13013 July 2021 Consultation Request to Commonwealth of Massachusetts Regarding Proposed Pilgrim Isfi Only Physical Security Plan ML21176A1842021-06-25025 June 2021 Email from HDI Regarding Pilgrim Nuclear Power Station Training ML21180A0582021-06-17017 June 2021 Email from Region I Regarding Pilgrim Nuclear Power Station Inspection - EA-13-132 ML21097A0402021-04-0606 April 2021 E-Mail Consult with Commonwealth of Mass Re - Amendment Application - Physical Security Plan for the Pilgrim Nuclear Power Station L-20-092, Email Pilgrim Nuclear Power Station-Exemption from Annual Force-On-Force Exercise Requirements of 10 CFR Part 73, Appendix B,2020-12-10010 December 2020 Email Pilgrim Nuclear Power Station-Exemption from Annual Force-On-Force Exercise Requirements of 10 CFR Part 73, Appendix B, L-20-096, Supplemental Information to Support Physical Security Plan Revision and License Amendment Request to Incorporate Alternate Measures - Holtec Email Dated December 10, 20102020-12-10010 December 2020 Supplemental Information to Support Physical Security Plan Revision and License Amendment Request to Incorporate Alternate Measures - Holtec Email Dated December 10, 2010 ML20328A2982020-11-16016 November 2020 Response from Commonwealth of Massachusetts on No Significant Hazard for Pilgrim ISFSI Amendment to Address ISFSI II Dated November 16, 2020 ML20297A2372020-10-22022 October 2020 Request for Additional Information - HDI Fleet Decommissioning Quality Assurance Program ML20266G4032020-09-22022 September 2020 Acceptance Review Email - Request for Approval of HDI Fleet Decommissioning Quality Assurance Program, Revision 0 ML20163A6802020-06-11011 June 2020 Confirmation of the Scope of the Requested Regulatory Relief for Pilgrim Security Qualifications ML20280A1912020-04-17017 April 2020 Request for Additional Information- Clarifying Information for Pilgrim ISFSI Physical Security Amendment Application ML20269A3542020-03-0505 March 2020 CFR 26.717 Reports 2019 Transmittal Email ML19336A0302019-11-27027 November 2019 OEDO-15-00479 - Re 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding ML19336A0332019-11-26026 November 2019 OEDO-15-00479 - E-mail to Petitioner - 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding (CAC No. MF6460; EPID L-2015-CRS-0002)- Issuance of Final Director'S Decision ML19331A1952019-11-21021 November 2019 NRR E-mail Capture - (External_Sender) Pilgrim Nuclear Power Station - Commonwealth Consultation Response - Amendment Regarding Site Emergency Plan and Emergency Action Level Scheme ML19331A1732019-11-12012 November 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station -Consult with Commonwealth - Amendment Regarding Cyber Security Plan ML19331A1642019-11-0505 November 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station -Consult with Commonwealth - Amendment Regarding Site Emergency Plan and Emergency Action Level Scheme ML19331A1792019-11-0505 November 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - EA and Fonsi for Pilgrim Emergency Planning Exemption CY-19-007, LTR-19-0441 Henrietta Cosentino, E-mail SECY-19-0078 Request by Entergy Nuclear Operations Inc. for Exemptions from Certain Emergency Planning Requirements for the Pilgrim Nuclear Power Station2019-11-0404 November 2019 LTR-19-0441 Henrietta Cosentino, E-mail SECY-19-0078 Request by Entergy Nuclear Operations Inc. for Exemptions from Certain Emergency Planning Requirements for the Pilgrim Nuclear Power Station ML19275H1962019-09-24024 September 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Consult with Commonwealth - Amendment Regarding Permanently Defueled Technical Specifications (PDTS) ML19239A0372019-08-26026 August 2019 E-mail from Entergy Dated August 26, 2019, Notification of Pilgrim License Transfer ML19239A0262019-08-23023 August 2019 LTR-19-0330 Janet Azarovitz, E-mail a Plea for More Time and Reasonable Discussion Including the Citizens of the Commonwealth in the Sale of the Pilgrim Nuclear Power Station ML19234A2072019-08-20020 August 2019 LTR-19-0328 Lawrence Delafield, President, Six Ponds Improv Assoc., Plymouth, Ma, Ltr Requests NRC to Postpone Consideration of Transferring the Licenses for the Pilgrim Nuclear Power Until the NRC Has Answered Concerns by Pilgrim Watch, Se ML19232A4032019-08-20020 August 2019 LTR-19-0322 Diane Turco, Director, Cape Downwinders, Massachusetts, Letter/E-mail Requests Suspension of the Pilgrim License Transfer from Entergy to Holtec Until the Adjudicatory Hearing Is Held and Raised Contentions Are Resolved ML19308A9942019-08-19019 August 2019 Entergy Nuclear Operations, Inc. Confirmatory Order Rescission Supplemental Information ML19226A3912019-08-14014 August 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - EA and Fonsi for Pilgrim Decommissioning Trust Fund Exemption (Holtec) ML19226A3962019-08-14014 August 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station -Consult with Commonwealth - Conforming Amendment in Support of Pilgrim License Transfer Application ML19226A1212019-08-13013 August 2019 OEDO-15-00479-2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding - Status (CAC No. MF6460; EPID L-2015-CRS-0002) ML19227A1032019-08-0707 August 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Draft Wording for Potential Condition of License Transfer Order ML19207B3662019-07-26026 July 2019 NRR E-mail Capture - Pilgrim - RAI Direct and Indirect Transfer of Lic.; Conforming Lic. Amend.; Req. for Exemption 10 CFR 50.82(A)(8)(I)(A) for Holtec Decom. International, Llc ML19176A3452019-06-25025 June 2019 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding - Information (OEDO-15-00479) (CAC No. MF6460; EPID L-2015-CRS-0002) ML19154A0652019-06-0303 June 2019 NRR E-mail Capture - Pilgrim - Permanent Cessation of Power Operations ML19154A5242019-06-0303 June 2019 NRR E-mail Capture - RAI - Pilgrim Post-Decommissioning Technical Specifications (PDTS) License Amendment Request (LAR) ML19161A2122019-05-20020 May 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Acceptance of License Amendment Request to Remove Cyber Security Plan Requirements ML19123A0332019-05-0101 May 2019 NRR E-mail Capture - Logbook Entry: 05/01/2019 Endangered Species Report Regarding a Confirmed Sighting of North Atlantic Right Whale(S) (Balaena Glacialis) ML19122A4912019-04-29029 April 2019 NRR E-mail Capture - Logbook Entry: 04/29/2019 Regarding the Confirmed Sighting of Ten North Atlantic Right Whales (Balaena Glacialis) ML19108A2372019-04-18018 April 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Acceptance of Requested Licensing Action, Proposed Exemptions from 10 CFR 50.54(w)(1) - On-Site Property Damage Insurance ML19108A2362019-04-18018 April 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Acceptance of Requested Licensing Action, Proposed Exemptions from 10 CFR 140.11(a)(4) - Primary and Secondary Liability Insurance 2022-09-26
[Table view] |
Text
From: McKinley, Raymond Sent: Tuesday, February 24, 2015 12:58 PM To: mary.lampert@comcast.net
Subject:
RE: Comments and questions regarding Pilgrim's delay in restart - tube plugs falling out.
Attachments: 02.23.15 QUESTIONS NRC TUBE PLUGS DELAYING RESTART.pdf
- Mary, The Annual Assessment Meeting will most likely occur on March 18. A public meeting notice will be forthcoming soon. We also plan to discuss the results of the 95002 Supplemental Inspection during that meeting. The Special Inspection that was launched following winter storm Juno is still in progress. That report will be issued within 45 days from the exit meeting, so we will not be in a position to discuss the findings of that inspection at the March meeting.
We can answer some questions relative to the facts surrounding winter storms Juno and Neptune, but we will not be able to discuss any pre-decisional findings.
To your attached questions:
Were some tubes in the condenser plugged because they had failed and were leaking?
Yes, some tubes were previously plugged due to previously identified leaks.
- a. When did the tubes start to leak?
The previously plugged tubes began to leak again following the planned shutdown for winter storm Neptune.
- b. Why were they plugged and not replaced?
Tube plugging is the most common repair used in the industry. Condensers are constructed with more tubes than needed to allow any leaking tubes to be plugged. Eventually, condenser efficiency is impacted which results in lost generation revenue for the licensee.
At or near that point, licensees will either re-sleeve the tubes or replace the condenser water boxes.
- c. Did NRC approve that fix?
This is non-safety related equipment repair, and NRC approval is not required. However, as stated above, this is a normal repair used in industry.
- d. What is the industry history of outcomes of plugging tubes versus replacement?
Plugging is very effective. However, plugs can and do fall out or become loose. The decision to repair or replace is a licensee decision.
- 2. Why did the plugs come out- sounds like poor maintenance is that correct?
Thermal and hydraulic cycling associated with shutdowns and startups were most likely the cause. There is no reason to suspect poor maintenance.
- a. Is there a guidance or protocol calling for inspection of plugs prior to startup?
Licensees will typically inspect water boxes during a refueling outage but not for mid-cycle outages unless they perform water box work. They did not perform water box work during the Juno or Neptune outages, so there was no reason to perform a water box inspection.
- b. Were the tube plugs inspected before the recent plant started up?
No, see previous answer.
- c. What is the maintenance schedule and how does it match Entergys performance?
NRC does not regulate condenser maintenance activities. Licensees typically perform condenser maintenance during refueling outages or during online maintenance windows. It is in their own best interests to perform condenser maintenance to avoid unplanned down
powers / outages from an economic perspective as well as to protect their capital investment. In addition, NRC does have a Performance Indicator which tracks unplanned down powers, so such issues can draw regulatory scrutiny. Pilgrims unplanned down power Performance Indicator is solidly in the GREEN range, so it has not been a problem to this point.
- d. If there was an inspection, was it done right?
NRC does not inspect licensee condenser water box inspections.
- e. Supposedly there is a map of the tube sheet that shows what tubes are supposed to be plugged
- i. Was the map accurate?
ii. Did the maintenance crew read the map correctly?
As stated above, NRC does not inspect this activity. However, when leaks were identified following the winter storm Neptune startup, the licensee used their tube sheet maps to make sure plugs were still there and tight. They replaced missing plugs and tightened or replaced any loose plugs.
- 3. Did any salt get into the reactor?
The licensee monitors the condenser hotwell and condensate demineralizer discharge for conductivity and chlorides. They detected rising chlorides and conductivity in both locations during the startup which drove them to take corrective action.
- a. What tests were performed to assure that salt did not get into the reactor?
See previous answer.
- b. If any salt did get into the reactor, what protocol should, and will be, followed?
The licensee follows Electric Power Research Institute (EPRI) guidance, and their procedures drive them to take timely and appropriate action based on the severity of the chemistry conditions. In this case, the action was to hold at reduced power until the issue was corrected. Severe chloride or conductivity excursions can require an immediate shutdown, but the chemistry levels were manageable in this case. The problem was identified and corrected and chemistry levels returned to normal. The licensee will continue to monitor reactor water chemistry and take appropriate action in accordance with the EPRI guidance and plant procedures. Our inspectors will follow up to ensure that the licensee follows their reactor water chemistry procedures.
Sincerely, Ray McKinley Chief, Division of Reactor Projects Branch 5 U.S. NRC Region I From: Mary Lampert [1]
Sent: Monday, February 23, 2015 10:43 AM To: McKinley, Raymond Cc: michal freedhoff; Dave Lochbaum
Subject:
comments and questions regarding Pilgrim's delay in restart - tube plugs falling out.
Hello Ray:
Attached please find some comments and questions regarding Pilgrims delay in restart - tube plugs falling out.
Also do you have a date for NRCs March public meeting in Plymouth; and will the NRCs evaluation of its recent inspection be available before the meeting so that comments may be better informed?
Thanks and enjoy the day.
Mary