Third Inservice Inspection Interval, Second Inservice Inspection Period 2014 Owner'S Activity Report for RFO14 Inservice Examinations
ML14203A008
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 07/16/2014
From: Swift P
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML14203A008 (12)


Text

APaul M. Swift Exe!.on GnManager - Engineering Services Exelon Generaton. Lycoming, NY 13093 (315) 349-5208 Paul. Swiff@exeloncorp.com July 16, 2014 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Nine Mile Point Nuclear Station, Unit 2 Renewed Facility Operating License No. NPF-69 Docket No. 50-410

Subject:

Third Inservice Inspection Interval, Second Inservice Inspection Period 2014 Owner's Activity Report for RFO14 Inservice Examinations Pursuant to 10 CFR 50.55a, Nine Mile Point Nuclear Station, LLC (NMPNS) hereby submits the attached Third Inservice Inspection Interval, Second Inservice Inspection Period, 2014 Owner's Activity Report for RFO14 Inservice Examinations, for Nine Mile Point Unit 2 (NMP2). The report summarizes the results of examinations performed during the last refueling outage (RFO-

14) of the Second Inservice Inspection Period of the Third Ten-Year Inspection Interval (April 5, 2011 through April 4, 2015).

This activity report meets the requirements of the American Society of Mechanical Engineers (ASME), Code Case N-532-4, "Alternative Requirements to Repair and Replacement Documentation Requirements and Inservice Summary Report Preparation and Submission as Required by IWA-4000 and IWA-6000, Section Xl, Division 1," as approved for use by Regulatory Guide 1.147, "Inservice Inspection Code Case Acceptability, ASME Section Xl, Division 1.."

There are no regulatory commitments contained in this letter.

Should you have any questions regarding the information in this submittal, please contact Everett (Chip) Perkins, Director - Licensing, at (315) 349-5219.

Sincerely, Paul M. Swift Manager - Engineering Services, Nine Mile Point Nuclear Station PMS/BTV

Attachment:

Third Inservice Inspection Interval, Second Inservice Inspection Period 2014 Owner's Activity Report for RFO14 Inservice Examinations

U. S. Nuclear Regulatory Commission July 16, 2014 Page 2 cc: Regional Administrator, Region I, USNRC Project Manager, USNRC Resident Inspector, USNRC

ATTACHMENT (1)

THIRD INSERVICE INSPECTION INTERVAL, SECOND INSERVICE INSPECTION PERIOD 2014 OWNER'S ACTIVITY REPORT FOR RFO14 INSERVICE EXAMINATIONS

Exeion .-

THIRD INSERVICE INSPECTION INTERVAL SECOND INSERVICE INSPECTION PERIOD 2014 OWNER'S ACTIVITY REPORT FOR RFO14 INSERVICE EXAMINATIONS Prepared For Nine Mile Point Nuclear Station Unit 2 P.O. Box 63, Lake Road Lycoming, New York 13093 Commercial Service Date: April 5, 1988 NRC Docket Number: 50-410 Document Number: CNG-NMP2-OAR-003-014 Revision Niumhbr I

nlnl Nfl*" M~u q 9fllA Prepared by:

Ronald P. Fabiny - NMPNS ISI Pfiir m Owner Reviewed by:

Todd L. Davis - NMPNS Site ISI & CISI Program Implementer Reviewed by: (l kc*( * ( -/// y Carlo McClay - NMPNS eý1pair & Replacement Program Owner Reviewed by.

Mike Brnggs 'ýpr-isro Engineering Programs Approved bY 4/l ,VL 5*- A-l /(

Mark McCorbie - G~ral Supervisor Site Engineering Programs

Nine Mile Point Nuclear Station Unit 2 CNG-NMP2-OAR-003-14

  • Exeton v,: J THIRD INSERVICE INSPECTION INTERVAL Rev. 00 2014 OWNER'S ACTIVITY REPORT FOR Date:

INSERVICE EXAMINATIONS Page 2 of 9 TABLE OF CONTENTS Ta b le of C o nte nts .................................................................................................................................................... 2 Re c o rd of Re v is ion ..................................................................................................................................................... 3 A b s tra c t ....................................................................................................................................................................... 4 Form OAR-1 Owner's Activity Report for ASME Section Xl Inspection & Testing Plans ..................................... 6 Table 1 Items with Flaws or Relevant Conditions that Required Evaluation for Continued Service ..................... 7 Table 2 Abstract of Repairs, Replacements, orCorrective Measures Required for Continued Service ............... 8

Nine Mile Point Nuclear Station Unit 2 CNG-NMP2-OAR-003-14

- ExeL.^on,* _*'.,*: THIRD INSERVICE INSPECTION INTERVAL Rev. 00 2014 OWNER'S ACTIVITY REPORT FOR Date:

INSERVICE EXAMINATIONS Page 3 of 9 RECORD OF REVISION REVISION DATE AFFECTED REASONFOR REVISION No. PAGES 00 Entire Initial issue of Owner's Activity Report for ASME Document Section XI Inservice Inspection, Containment Inservice Examinations, and Pressure Tests and Alternate Risk-Informed Inspection in accordance with the requirements of ASME Code Case N-532-4.

Nine Mile Point Nuclear Station Unit 2 CNG-NMP2-OAR-003-14 ExelonG mration. THIRD INSERVICE INSPECTION INTERVAL Rev. 00 2014 OWNER'S ACTIVITY REPORT FOR Date:

INSERVICE EXAMINATIONS Page 4 of 9 ABSTRACT ASME Section Xl Code Case N-532-4 requires submission of the Owner's Activity Report to the regulatory and enforcement authorities having jurisdiction at the plant site within 90 calendar days of the completion of each refueling outage.

This Owner's Activity Report summarizes the results of the Nine Mile Point Nuclear Station (NMPNS), Unit 2, American Society of Mechanical Engineers (ASME)Section XI In-service Inspection, Risk-Informed Inspection, Containment In-service Examinations, and Pressure Tests performed since the last report dated June 15, 2012 through Refueling Outage Fourteen (RFO14) ending April 29, 2014. RFO14 is the second of two outages scheduled during the Second In-service Inspection Period that started on April 5, 2011 and is scheduled to end on April 4, 2015.

The attached Table 1 and 2 include flaws and conditions (those meeting the requirements of Code Case N-532-

4) identified since the last Owner's Activity Report following Refueling Outage RFO-1 3.

As an alternate to the requirements of the ASME, Boiler and Pressure Vessel Code (B&PVC),Section XI, Article IWA-6000, NMPNS is implementing ASME Code Case N-532-4, Alternative Requirements to Repair and Replacement Documentation Requirements and In-service Summary Report Preparation and Submission as Required by IWA-4000 and IWA-6000,Section XI, Division 1". Regulatory Guide 1.147, Revision 15, approved ASME Code Case N-532-4 for use. This Report complies with the requirements of Code Case N-532-4 and the conditions identified in RG 1.147.

OWNER'S ACTIVITY REPORTS - FORM OAR-1 Owner Activity Report Form OAR-1 was prepared and certified upon completion of the Nine Mile Point Unit 2, 2014 refueling outage (RFO14) examination activity in accordance with the following NMPNS inspection plans and schedules:

CNG-NMP2-ISI-003, Third Ten-Year In-service Inspection Plan and Implementing Schedule, (includes the Alternate Risk-Informed Inspection Program)

CNG-NMP2-CISI-002, Second Containment In-service Inspection Plan and Implementing Schedule.

NMP2-PT-008, Inservice Pressure Testing Program Plan In addition to the Owner's Activity Report, Form OAR-i, the following Tables are also included:

a. Items with Flaws or Relevant Conditions that Require Evaluation for Continued Service, Table 1, provides a listing of item(s) with flaws or relevant conditions that required evaluation to determine acceptability for continued service, whether or not the flaw or relevant condition was discovered during a scheduled examination or test, and provides such information as Examination Category, Examination Item Number, Item Description, Flaw Characterization (as required by IWA-3300).

Nine Mile Point Nuclear Station Unit 2 CNG-NMP2-OAR-003-14

-- ExetonCl2-ýicin THIRD INSERVICE INSPECTION INTERVAL Rev. 00 2014 OWNER'S ACTIVITY REPORT FOR Date:

INSERVICE EXAMINATIONS Page 5 of 9

b. Abstract of Repairs, Replacements or Corrective Measures Required for Continued Service, Table 2, identifies those items containing flaws or relevant conditions that exceeded Division 1 acceptance criteria. This information is required even if the discovery of the flaw or relevant condition that necessitated the repair/replacement activity did not result from an examination or test required by Division 1. If the acceptance criterion for a particular item is not specified in Division 1, the provisions of IWA-3100(b) shall be used to determine which repair/replacement activities are required to be included in the abstract.

In accordance with ASME Section XI, IWB-2412(a), IWC-2412, IWD-2412 IWE-2412(a), and IWF-2410(b) and with the exception of the examinations that may be deferred until the end of the inspection interval as specified in Table IWB-2500-1, IWC-2500-1, IWD-2500-1, IWF-2500-1 and IWE-2500-1, including those examinations which NMPNS has requested and received approval in the form of proposed alternatives in accordance with 10CFR50.55a(a)(3), the required examinations in each examination category have been completed for the First In-service Inspection Period in accordance with Tables IWB-2412-1, IWC-2412-1, IWD-2412-1, IWE-2412-1, and IWF-2410-2.

Nine Mile Point Nuclear Station Unit 2 CNG-NMP2-OAR-003-14

..,elo,-. ,. THIRD INSERVICE INSPECTION INTERVAL Rev. 00 2014 OWNER'S ACTIVITY REPORT FOR Date:

INSERVICE EXAMINATIONS Page 6 of 9 FORM OAR-1 OWNER'S ACTIVITY REPORT As required by the provisions of the ASME Code Case N-532-4 Report Numberr-r: CNQ-NMP9-0AR-nnn-n1 4 Plant Nine Mile Point Nuclear Station, P. 0. Box 63. Lvcomina, New York 13093 (Name and Address of Plant)

Plant Unit 2 Commercial Service Date April 5. 1988 Refueling Outage Number RFO14 Current Inspection Interval 3rd Interval for ISI & PT, 2nd Interval for CISI April 5, 2008 to April 5, 2018 (1st, 2nd, 3rd, 4th, Other)

Current Inspection P priod Recnond In-*prvic~e Insoecetion Period Anril 5 2011 to Anril 5. 2015 eriod Second In-service Insnection Period April 5 2011 to April 5 2015 (1st, 2nd, 3rd)

Edition and Addenda of Section XI applicable to the Inspection Plans 2004 Edition, No Addenda Date and Revision of Inspection Plans CNG-NMP2-ISI-003, Revision 01, August 28, 2009 (ISI), CNG-NMP2-CISI-002, Revision 01, August 28, 2009 (Containment ISI), NMP2-PT-008 Revision 05, March 10, 2010 (Pressure Test)

Edition and Addenda of ASME Section Xl applicable to Repair/Replacement activities, if different than the Inspection Plan N/A (same Code Edition/Addenda)

(if applicable)

CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of RFO14 conform to the requirements of Section XI.

(refueling outage number)

Signed'AA**,k Z, 14C-GLC i/(.,

(General Supervisor - Engineering Programs)

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of NEW YORK and employed by HSB Global Standards of Hartford, CT have inspected the items described in this Owner's Activity Report and state that to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or con nected witthis inspection.

__________ _________Commissions Ae8/3-5-1Y 4,#47- Av'.--*'?'-

Inspector's Signature National Board, State, Province, and Endorsements Date (/z/i1q

Nine Mile Point Nuclear Station Unit 2 CNG-NMP2-OAR-003-14

-- xen.....THIRD INSERVICE INSPECTION INTERVAL Rev. 00 2014 OWNER'S ACTIVITY REPORT FOR Date:

INSERVICE EXAMINATIONS Page 7 of 9 TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE As required by the provisions of the ASME Code Case N-532-4 EVALUATION DESCRIPTION EXAMINATION ITEM ITEM CATEGORY NUMBER DESCRIPTION B-P B15.10 Pressure Retaining The ASME Class 1 end of refueling outage Components (Bolted vessel leakage test identified leakage Mechanical exceeding the level that requires a Design Connections) Engineering Evaluation in accordance with station procedures. Station procedures require Design Engineering Evaluation for any leakage originating from a bolted connection.

Condition Report CR-2014-003845 documents an undesirable condition associated with 80 drops per minute leakage from the ASME Class 1 valve 2RCS*HYV1 7B body-to-bonnet bolted flange connection. A Design Engineering Evaluation concludes that the identified leakage is acceptable as-is for continued service. Work Order C92657492 has been generated to address this condition.

Condition Report CR-2014-003847 documents an undesirable condition associated with 20 drops per minute leakage from the ASME Class 1 valve 2RCS*MOV1 0B body-to-bonnet bolted flange connection. A Design Engineering Evaluation concludes that the identified leakage is acceptable as-is for continued service. Work Order C92654714 has been generated to address this condition.

Condition Report CR-2014-003849 documents an undesirable condition associated with leakage from Control Rod Drive bolted flange connections. The as-found leakage ranged from 2 drops per minute to 80 drops per minute.

The as-left leakage was reduced significantly following scramming of control rod drives.

A Design Engineering Evaluation concludes that the identified leakage is acceptable as-is for continued service.

.1. 4 1

Nine Mile Point Nuclear Station Unit 2 CNG-NMP2-OAR-003-14

-..... ne......THIRD INSERVICE INSPECTION INTERVAL Rev. 00 2014 OWNER'S ACTIVITY REPORT FOR Date:

INSERVICE EXAMINATIONS Page 8 of 9 TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE As required by the provisions of the ASME Code Case N-532-4 REPAIR/REPLACE DESCRIPTION MENT CODE ITEM OF DATE PLAN NUMBER CLASS DESCRIPTION WORK COMPLETED None 4 .4. 4 4 4 4 4 4 4 4 4 4 4 4 4 4 I I I I

Nine Mile Point Nuclear Station Unit 2 CNG-NMP2-OAR-003-14

- THIRD INSERVICE INSPECTION INTERVAL Rev. 00 2014 OWNER'S ACTIVITY REPORT FOR Date:

INSERVICE EXAMINATIONS Page 9 of 9 END OF INSERVICE INSPECTION OWNER'S ACTIVITY REPORT FOR REFUELING OUTAGE FOURTEEN (RFO14)